Mech Equip Erection SUR

Transcript of Sur _Erection-BOQ- PI- Mech Equip Rev B

Summary mechanicalABCDERECTION TECHNICAL DOCUMENT2 x KA26-2 MS DC1500 MWPower Turbo SystemsSUROmanRevB12/15/10POWER ISLANDPARTICULAR TECHNICAL SPECIFICATIONS - DRAWINGS & BILLS OF QUANTITYMECHANICAL EQUIPMENT & PLANT INSTRUMENTATIONSUMMARYChapt.DESIGNATIONNumberTotal Weight TonnesPOWER ISLAND EQUIPMENT - BILL OF QUANTITIES1ERECTION BILL OF QUANTITIESBMechan. Open Cycle2SKIDS & FABRICATED EQUIPMENTW01 EB 03011.7483ROTATING MACHINESW01 EB 04010.2TOTAL WEIGHT POWER ISLAND MECH. EQUIPMENT / OPEN CYCLE (Tonnes) :21.9Mechan. Combined CyclePOWER ISLAND EQUIPMENT - DOCUMENT and DRAWINGS4SKIDS & FABRICATED EQUIPMENTW01 EB 030B213.25ROTATING MACHINESW01 EB 040B175.46CONDENSATION PLANTW01 EB 050B833.47MAIN COOLING WATER EQUIPMENTW01 EB 131B13.3TOTAL WEIGHT POWER ISLAND MECH. EQUIPMENT / Comb. Cycle (Tonnes) :B1235.3HANDLING EQUIPMENTW01 EB 031A158.17PLANT INSTRUMENTATION (PI & ROP)W01 EB 110A13.4Nr. of Instruments : 628TOTAL WEIGHT POWER ISLAND MECH. EQUIPMENT, Handl Equip and Instrum (Tonnes) :B1428.8Remarks:The Erection Standard Specification /EG.../EJ.../GS... will be provide later

&L&F&R&D

Mechanical Open Cycle12345678910111213141516171819202122232425262728293031323334353636 Bis37383940414243444546474849505152535455565758PP/WPGPS-DESIGNATIONRESP.SITEIDENTIFICATION AND LIMITACTIVITIESCOST-Allocation to PZ-POS.RevSorterScopeItem No.Item DescriptionNb of blockQty per Bl.Degree ofPre-assemblyEquipment DimensionsMax. WeightUnit Net Weight for all plantTotal weight for all plantSite AssemblyTransportRemarksRevEBESNumber of Blocks :1LengthWidthHeightDiam.Other / Remarks(filled)(empty)Packing CodeStorage CodeGeneral Installation SpecificationParticular Installation SpecificationEquipment DrawingCodeI&T Plan for Site WorksCodeErection Execution DocumentCodeIncotermsPlace of Dispatch(Country, State)ID.FASFPPWPSys.SPSAC-SSAC-CKKSMTSCEBEDETIPOTEMSESEECSEngineer.MaterialErec-Sup.ErectionCommis.SubsystemKKSNo. INo. II[y / n][m][m][m][m][t][Kg][Kg][T / P][T / P][T / P]EB30ySKIDS AND FABRICATED EQUIPMENT11,748EB030EB30B26yDEAERATOR AND TANK5,74811611D104035962M955194499481MAGKATDCATHODIC PROTECTION EQUIPMENT for mechanical equipmentCCCCCCCCCCCC/CSCSCS5710057111944909550094810MAGEB30B26y FWT / Deaerator11Pre-assembled5.12.04.21.85,7485,748FWST 18-12-1 DCD/P 10.0EXWIndonesiaEB30B55ySTEAM AND WATER SAMPLING PLANT6,000EB30B55y Sampling System For Water Steam Cycle11Container5.02.42.860006,000EXWEnglandEB40yROTATING MACHINES10,200EB040EB40B30yHP FEEDWATER PUMPS10,200EB40B30y Feed water pump13Skid3.11.40.83,400.010,200SC FWP HGM 3_10 KSBEXWIndiayTOTAL WEIGHT MECH. EQUIPMENT (Kg) :21,948

&L&12BOQ for Erection &C&12Valid for KA26-1 SS CTSUR / Open cycle&R&12Mech. Equipment WSC&L&F &C&P / &N&R&ASubdivision into relevant subsystems of a System (System see column 6)KKS designationSystem sorting index (System see column 6)System sorting index (System see column 6)Selection of scope according project specific Divison of Work (DOW)Serial number for the entire project scope (all systems)

(not mandatory)Specific item descriptionTotal quantity for the entire project scopeValid entries:

Cabinet - electrical equipment - control equipment

Container - shipped in or as container/module

Loose parts - shipped as bulk material in containers - shipped as bulk material fixed on pallets - shipped as bulk material directly on truck

Pre-assembled - shipped as one part - shape acc. drawing, see column 50

Pre-fabricated - shipped as separate parts - shapes acc. drawing, see column 50

Rack - gas bottles - sampling equipment

Set - furniture - tools

Skid - shipped as a complete skid on a baseframe - shape acc. drawing, see column 50

Turn-key - several shipments - erection and commissioning with subsupplierOther parameters, e.g.:

Volume (m3) Area (m2) Nom. diameter (DN) Volume flow (m3/h) Mass flow (kg/s)Maximum weight of equipment during any project stage (e.g. during hydro test)Net weight of unpacked equipment (e.g. during mechanical erection)Entire number of delivered parts for the total quantity of the line itemValid entries:

BD = Bundle C = Wooden case (for domestic only) EC = Wooden case (for export with rain cover) FSS = Barrel (plastic or steel drum) ISO20B = 20 ft. ISO container (owned by ALSTOM) ISO40B = 40 ft. ISO container (owned by ALSTOM) OPEN = without any packing PAL = Pallet SC = Plywood case STBOX = Non-ISO container (e.g. electr./control modules) TB = Shipping floor (expendable pallet) TR = Drum TRKONH = Wooden shipping structure TRKONS = Steel shipping structure (cover, skid, ...) VER = Wooden crateValid entries:

A - AC - air conditioned

B - Indoor - indoor at a place comparable to its final location

C - Protected - provisions against water/dust from top, side and bottom required - build-up of water and humidity to be avoided

D - Outdoor - only protection against physical damage required - equipment or material remains with the original packingDocument No. of applicable General Installation SpecificationDocument No. of applicable Particular Installation Specification (system specific)Drawing No. of applicable Equipment Drawing (e.g. outline drawing, transport drawing, layout, ...)

(only required in case no usable drawing is enclosed in the documents listed in columns 48, 49 or 54)Valid entries (refers to column 50):

T = Typical (not project specific) P = Project specificDocument No. of applicable I&T Plan for Site Works

(only required in case no I&T plan is enclosed in the documents listed in column 54)Valid entries (refers to column 52):

T = Typical (not project specific) P = Project specificDocument No. of applicable subsupplier Erection Execution DocumentValid entries (refers to column 54):

T = Typical (not project specific) P = Project specificValid entries (acc. INCOTERMS 2000):

EXW = Ex Works

FCA = Free Carrier FAS = Free Alongside Ship FOB = Free On Board

CFR = Cost And Freight CIF = Cost, Insurance and Freight CPT = Carriage Paid To CIP = Carriage and Insurance Paid To

DAF = Delivered At Frontier DES = Delivered Ex Ship DEQ = Delivered Ex Quay DDU = Delivered Duty Unpaid DDP = Delivered Duty PaidLocation where equipment has to be collected by ALSTOM transport contractor:

Large countries - Country name to be stated - State/county name to be stated

Small countries - Country name to be statedIn case of doubt ask Construction department (Luis delValle) if drawing is required.Typical drawing sufficient for tender phase.If you attach drawings in mail --> mention it in this column!!!Info only for Transport Department

Mechanical Comb Cycle12345678910111213141516171819202122232425262728293031323334353636 Bis37383940414243444546474849505152535455565758PP/WPGPS-DESIGNATIONRESP.SITEIDENTIFICATION AND LIMITACTIVITIESCOST-Allocation to PZ-POS.RevSorterScopeItem No.Item DescriptionNb of blockQty per Bl.Degree ofPre-assemblyEquipment DimensionsMax. WeightUnit Net Weight for all plantTotal weight for all plantSite AssemblyTransportRemarksRevEBESNumber of Blocks :2LengthWidthHeightDiam.Other / Remarks(filled)(empty)Packing CodeStorage CodeGeneral Installation SpecificationParticular Installation SpecificationEquipment DrawingCodeI&T Plan for Site WorksCodeErection Execution DocumentCodeIncotermsPlace of Dispatch(Country, State)ID.FASFPPWPSys.SPSAC-SSAC-CKKSMTSCEBEDETIPOTEMSESEECSEngineer.MaterialErec-Sup.ErectionCommis.SubsystemKKSNo. INo. II[y / n][m][m][m][m][t][Kg][Kg][T / P][T / P][T / P]AEB30ySKIDS AND FABRICATED EQUIPMENT213,200EB030AEB30B15yCONDENSER VACCUUM EQUIPMENT19,000204D105015736M944294499481LCMKBNBADVCCCCCCCCCCCC/CSCSCS5710057360944909441094810ALCMEB30B15yStart-up Ejector21Skid4.21.52.0n/a2,0004,000ECC - Protected118.5949.1_118.5979.1T1AHX701853TER-251-20-1236, Rev. -EXWGermany204D105015736M944294499481LCMKBNBADVCCCCCCCCCCCC/CSCSCS5710057360944909441094810ALCMEB30B15ysilencer21Pre-assembled1.03.51.0n/a2,5005,000ECC - Protected118.5949.1_118.5979.1T1AHX701853TER-251-20-1236, Rev. -EXWGermanyD5285725M956495699585MBHLP OTCCCCCCCCCCCCC/CSCSCS571005725094490AMBHEB30B15yService Ejector21Skid4.31.52.01350.05,00010,000ECC - ProtectedEvac. GA-2stage- 118.5948.1T1AHX701853TER-251-20-1236, Rev. -EXWGermanyAEB30B26yDEAERATOR AND TANK87,600FWST Sines Outline11611D104035962M955194499481MAGKATDCATHODIC PROTECTION EQUIPMENT for mechanical equipmentCCCCCCCCCCCC/CSCSCS5710057111944909550094810AMAGEB30B26yFWT / Deaerator compl.21Pre-assembled16.04.07.83.6150000.043,80087,600OPEND - OutdoorFWST 38-215-2 DCD/ H18.0-0.5T1AHA 022 746TEXWHungaryAEB30B45yDRAIN/FLASH TANK10,000AEB30B45yADV(Atmospheric drain vessel)21Pre-assembled3.53.57.02.310000.05,00010,000OPEND - OutdoorADV 230-3 GA dwg _1AHA062525T1AHX701853TEXWHungaryAEB30K06nHeater Exchanger for GT-Airpreheater0AEB30K06nHeater for GT-Airpreheater steam / water11Skid5.01.51,0001,000AEB 30K 05nDISTRICT HEATING EXCHANGERS0AEB 30K 05nHeater f. DH with subcooler11Pre-assembled8.01.311,200outline dwg DH calorifer 8-12-2010AEB30K50yNOISE ATTENUATION EQUIPMENT15,600AEB30K50yADV Silencer21Pre-assembled3.81.07001,400AEB30K50yHP Blow out Silencer21Pre-assembled1.52.61,3002,600AEB30K50yLP Blow out Silencer21Pre-assembled1.51.51,0002,000AEB30K50yAcoustic Enclosure HP-FW-Pump23Loose parts5.82.52.98,6001,6009,600AEB30G65yEMISSION CONTROL EQUIPMENT5,000AEB30G65yHRSG exhaust gas analysis system21Container3.02.52.85,9002,5005,0001AHA029933fr. ROPAEB30C20yCLOSED CIRCUIT COOLING WATER EXCHANGER38,000AEB30C20yClosed cooling water coolers (water / water)22Pre-assembled4.01.43.233009,50038,0001AHA034286fr. ROPAEB30K10yMISCELLANEOUS TANKS0.04,000AEB30K10y Head tank for CCW21Pre-assembled2.01.81,1002,0004,0001AHA029935fr. ROPAEB30K10n Hydrogen separator21Pre-assembled3.01.71,0001,0001AHA032459fr. ROPBEB30B20SYSTEM ENG. & PROCESS EQUIPMENT TO CONDENSATE FILTERING SYSTEM0fr. ROPBEB30B20Tanks, pumps, pipes & instrum. compl. preassem11Skid8.03.04.012,00012,000AEB30B50yFEEDWATER AND CLOSED CIRCUIT DOSING PLANT0.06,0001AHA029938AEB30B50y HRSG dosing unit incl. storage tank21Container2.81.22.13,0001,5003,000fr. ROPAEB30B50y W/S cycle dosing unit incl. storage tank21Container2.31.72.58,6001,5003,000fr. ROPAEB30B55ySTEAM AND WATER SAMPLING PLANT28,000AEB30B55ySampling System for WSC21Container13.52.42.8n/a14,00028,000STBOXD - OutdoorMDG/19M/QUL---B55/GA001T1AHX701853TEXWGreat BritainBEB30B55nCondenser water side evacuation12Skid1.61.01.5500fr. ROPAEB30B55EB30B80nHRSG BLOW DOWN COLLECTING EQUIPMENT INCL. E&C SYSTEM, DET. ARRANGEMENT01AHA 031812fr. ROPAEB30B55EB30B80n Collecting tank11Pre-assembled14.04.020,000Tank is undergroundfr. ROPAEB30B80n Cooler11Pre-assembled4.02.02.03,000fr. ROPAEB30B80n Pump12Pre-assembled2.31.11.51,500fr. ROPAEB30B80nHRSG BLOW DOWN COLLECTING EQUIPMENT INCL. E&C SYSTEM, DET. ARRANGEMENT01AHA 031812AEB30B80n Pump22Pre-assembled0.50.50.81,5001,000AEB40yROTATING MACHINES175,400EB040AEB40B20yCONDENSATE EXTRACTION PUMPS24,000D5285725M956495699585MBHHP OTCCCCCCCCCCCCC/CSCSCS571005725094490AMBHEB40B20yCondensate Pumps, Compl. with motor23Skid1.87.01.86050.04,00024,000ECC - ProtectedCEP GA drw PembrokeT1AHX701853TEXWGermanyAEB40B20nCondensate pump for DH12Skid1.20.60.6300ZA 80-2250AEB40B30yHP FEEDWATER PUMPS139,200AEB40B30yHP / IP FW-Pumps w. Voith coupling23Skid8.52.23.17505.021,000126,000ECC - ProtectedFWP GA dwg_MD 159-360_1d+10 SulzerT1AHX701853TEXWGermanyAEB40B31nLP/IP FEEDWATER PUMPS0AEB40B30nIP FW-Pumps22Skid2.70.81.42800.0387181194Recirculating Pumps32Skid2.21.01.01800.010,800M1700.50 / 2AEB40B30yFW PreheaterPumps23Skid3.41.41.42200.013,200FWP recirc pump GA dwg_ZF 150-630 SulzerAEB40B30EB40B30nCLOSED HEAT WATER PUMP F. GT AIR HEATING0AEB40EB40B43nCirc. Heat water pump f. GT air heating12Skid1.80.81.01000.0UG1084781AEB40J15yMISCELLANEOUS CENTRIFUGAL PUMPS5,000AEB40J15yADV Drain Pump22Skid1.40.71.0200.02501,000ECC - ProtectedADV pump GA-ApolloT1AHX701853TA-2201GB, sheets B11-12EXWGermanyAEB40J15yBlowdown Pump22Skid0.50.50.8200.01,0004,000ECC - ProtectedT1AHX701853TA-2201GB, sheets B11-12EXWGermanyfr. ROPAEB40J01yCLOSED CIRCUIT COOLING WATER PUMPS7,200AEB40J01yClosed cooling water pumps incl. E.Motors22Pre-assembled2.00.81.41,8007,2001AHA 029936fr. ROP186D104015711M955194499481MAGKATDCondenser (direct cooling variant)CCCCCCCCCCCC/CSCSCS5710057110944909550094810AMAGEB50yCONDENSING PLANT833,400TRKONHD - OutdoorEB050T1AHA016049TEXWHungaryEB50B01yWATER COOLED CONDENSING PLANT833,400CM/S 60+85-2-97.0-4x5874 / 24.1 / 0.4189D104015755M944194499481MAJKBEBStart-up EjectorCCCC/CCCCCC/CSCSCS5410057550944909441094810AMAJEB50B01yUpper tubed module21Pre-assembled18.016.212.0as delivred139,000278,000nd. v. mal. angeord.189D104015755M944194499481MAJKBEBStart-up EjectorCCCC/CCCCCC/CSCSCS5410057550944909441094810AMAJEB50B01yLower tubed module21Pre-assembled18.016.212.0as delivred139,000278,000189D104015755M944194499481MAJKBEBService EjectorCCCC/CCCCCC/CSCSCS5410057550944909441094810AMAJEB50B01yhotwell21Pre-fabricated12.54.81.8as delivred24,00048,000189D104015755M944194499481MAJKBEBSilencerCCCC/CCCCCC/CSCSCS5410057550944909441094810AMAJEB50B01yneck (half)22Pre-fabricated7.09.010.1as delivred56,650226,600In two parts189D104015755M944194499481MAJKBEBService EjectorCCCC/CCCCCC/CSCSCS5410057550944909441094810AMAJEB50B01yFlash box21Pre-fabricated4.01.0as delivred1,3002,600206D105015753M944194499481LCBKBBBCondensate PumpsCCCC/CCCCCC/CSCSCS5410057530944909441094810ALCBEB50B01yLevel Pipe21Loose parts1.50.50.5as delivred100200AEB131yMAIN COOLING WATER PIPING EQUIPMENT13,300EB131AEB131C40yDEBRIS FILTER IN COOL. WAT. SUPPLY LINES (For CCW-Cooler)1,600GGG / 00 / M / MCPL61 / EB / 131AEB131C40y Strainer (for CCW-Cooler)22Loose parts2.81.01.03003001,2001AHA 032475fr. ROPAEB131C40y Control cubicle21Cabinet0.30.20.4200200400fr. ROPAEB131C40yDEBRIS FILTER IN COOL. WAT. SUPPLY LINES (For Condensor)1,5001AHA 034287yDebris Filter21Pre-assembled1.01.01.05001,000fr. ROPyControl Panel11Cabinet1.01.01.0500500fr. ROPBEB131B10yCONTINUOUS TUBE CLEANING EQUIPMENT10,200GGG / 00 / M / MCPL61 / EB / 1311AHA 029941BEB131B10y Strainer section22Loose parts2.51.72.32,0008,000fr. ROPBEB131B10y Recirculating unit incl. control panel21Skid2.51.52.21,1002,200fr. ROPAyTOTAL WEIGHT PI MECH. EQUIPMENT (Kg) :1,235,300

&LBOQ for Erection, &CValid for 1xKA26-1 SS DCSUR / Comb Cycle&RMech Equipm Power Island&L&F &C&P / &N&RPrint Date &DSubdivision into relevant subsystems of a System (System see column 6)KKS designationSystem sorting index (System see column 6)System sorting index (System see column 6)Selection of scope according project specific Divison of Work (DOW)Serial number for the entire project scope (all systems)

(not mandatory)Specific item descriptionTotal quantity for the entire project scopeValid entries:

Cabinet - electrical equipment - control equipment

Container - shipped in or as container/module

Loose parts - shipped as bulk material in containers - shipped as bulk material fixed on pallets - shipped as bulk material directly on truck

Pre-assembled - shipped as one part - shape acc. drawing, see column 50

Pre-fabricated - shipped as separate parts - shapes acc. drawing, see column 50

Rack - gas bottles - sampling equipment

Set - furniture - tools

Skid - shipped as a complete skid on a baseframe - shape acc. drawing, see column 50

Turn-key - several shipments - erection and commissioning with subsupplierOther parameters, e.g.:

Volume (m3) Area (m2) Nom. diameter (DN) Volume flow (m3/h) Mass flow (kg/s)Maximum weight of equipment during any project stage (e.g. during hydro test)Net weight of unpacked equipment (e.g. during mechanical erection)Entire number of delivered parts for the total quantity of the line itemValid entries:

BD = Bundle C = Wooden case (for domestic only) EC = Wooden case (for export with rain cover) FSS = Barrel (plastic or steel drum) ISO20B = 20 ft. ISO container (owned by ALSTOM) ISO40B = 40 ft. ISO container (owned by ALSTOM) OPEN = without any packing PAL = Pallet SC = Plywood case STBOX = Non-ISO container (e.g. electr./control modules) TB = Shipping floor (expendable pallet) TR = Drum TRKONH = Wooden shipping structure TRKONS = Steel shipping structure (cover, skid, ...) VER = Wooden crateValid entries:

A - AC - air conditioned

B - Indoor - indoor at a place comparable to its final location

C - Protected - provisions against water/dust from top, side and bottom required - build-up of water and humidity to be avoided

D - Outdoor - only protection against physical damage required - equipment or material remains with the original packingDocument No. of applicable General Installation SpecificationDocument No. of applicable Particular Installation Specification (system specific)Drawing No. of applicable Equipment Drawing (e.g. outline drawing, transport drawing, layout, ...)

(only required in case no usable drawing is enclosed in the documents listed in columns 48, 49 or 54)Valid entries (refers to column 50):

T = Typical (not project specific) P = Project specificDocument No. of applicable I&T Plan for Site Works

(only required in case no I&T plan is enclosed in the documents listed in column 54)Valid entries (refers to column 52):

T = Typical (not project specific) P = Project specificDocument No. of applicable subsupplier Erection Execution DocumentValid entries (refers to column 54):

T = Typical (not project specific) P = Project specificValid entries (acc. INCOTERMS 2000):

EXW = Ex Works

FCA = Free Carrier FAS = Free Alongside Ship FOB = Free On Board

CFR = Cost And Freight CIF = Cost, Insurance and Freight CPT = Carriage Paid To CIP = Carriage and Insurance Paid To

DAF = Delivered At Frontier DES = Delivered Ex Ship DEQ = Delivered Ex Quay DDU = Delivered Duty Unpaid DDP = Delivered Duty PaidLocation where equipment has to be collected by ALSTOM transport contractor:

Large countries - Country name to be stated - State/county name to be stated

Small countries - Country name to be stated

Handl EquipmSur2 x KA26-2 MS12345678910111213141516171819202122232425262728293031323334353636 Bis3738394041424344454647484950515253545556575859PP/WPGPS-DESIGNATIONRESP.SITEIDENTIFICATION AND LIMITACTIVITIESCOST-Allocation to PZ-POS.RevSorterScopeItem No.Item DescriptionNb of blockQty per blockDegree ofPre-assemblyEquipment DimensionsUnit Net VolumeTotalVolumeMax. WeightUnit Net WeightTotal weight for all plantSite AssemblyTransportRemarksPower Island /Non Power IslandRevEBESLengthWidthHeightDiam.VolumeVolumeOther / Remarks(filled)(empty)Packing CodeStorage CodeGeneral Installation SpecificationParticular Installation SpecificationEquipment DrawingCodeI&T Plan for Site WorksCodeErection Execution DocumentCodeIncotermsPlace of Dispatch(Country, State)ID.FASFPPWPSys.SPSAC-SSAC-CKKSMTSCEBEDETIPOTEMSESEECSEngineer.MaterialErec-Sup.ErectionCommis.SubsystemKKSNo. INo. IIy[m][m][m][m][m3][m3][t][Kg][Kg][T / P][T / P][T / P]11051D302015451B955294499481LD.JBDBSYSTEM ENG. & PROCESS EQUIPMENT TO CONDENSATE FILTERING SYSTEMCCCC/CCCCCC/CSCSCS5451154511944909550094810CC_05EB030nSYSTEM ENG. & PROCESS EQUIPMENT TO CONDENSATE FILTERING SYSTEMTurn-key0.00516D511015731B9441-9481LCPKBBHCOLD CONDENSATE TANKCCCC/CCCCCC/CCCCCS5448057311573115731194810CC_05EB030nCOLD CONDENSATE TANKTurn-key0.0B-900 23-10545D512015443B9456--PG.KBWBSYSTEM ENGINEERING CLOSED COOLING WATERCCCC////////54430----CC_09EB030nSYSTEM ENGINEERING CLOSED COOLING WATER-0.0DRB-8138 370EB31yHANDLING EQUIPMENT1,217158,090EB031EB31G01ydouble girder crane span=17.0 m / capacity 125/20 t21Pre-assembled24.06.53.04689364800096,000okmain machine cranePower IslandEB31G02ySingle Girder crane span = 5.90 m / capacity 3.2 t21Pre-assembled8.02.21.8326345009,000okabove ST oil roomPower IslandEB31G02ySingle Girder crane span = 12.00 m / capacity 5t11Pre-assembled8.02.21.8323245004,500okWorkshop & WarehouseBoP AreaEB31G03ymonorail hoist capacity 10 t23Pre-assembled1.41.21.22125503,300okFW pump areaPower IslandEB31G04ymonorail hoist capacity 5 t23Pre-assembled1.41.21.22124502,700okRecirculation pump areaPower IslandEB31G05ymonorail hoist capacity 1.5 t00Pre-assembled0.70.81.010.02500.0above feedwater preheating pumpsPower IslandEB31G06ymonorail hoist capacity 3.20 t22Pre-assembled1.80.90.9163201,280okMonorail above HRSG PlatformPower IslandEB31G07yWall mounted jib crane capacity 0.5 t22Pre-assembled2.51.21.2414220880okGT Air intakePower IslandEB31G08ymonorail hoist capacity 3 t21Pre-assembled0.70.81.011300600okabove feedwater tankPower IslandEB31G09ymonorail hoist capacity 0.5 t21Pre-assembled0.70.81.01180160okabove LBS valvePower IslandEB31G10ymonorail hoist capacity 5t21Pre-assembled0.70.81.011400800okabove condensate pump areaPower IslandEB31G11ymonorail hoist capacity 5t00Pre-assembled0.70.81.010.04000.0above condensate pumpPower IslandEB31G12ymonorail hoist capacity 1 t21Pre-assembled0.70.81.011180360okabove atmospheric drain pumpPower IslandEB31G13ymonorail hoist capacity 1 t00Pre-assembled0.70.81.010.01800.0above CCW pumpsPower IslandEB31G14ymanual chain hoist 1 t00Pre-assembled0.70.81.010.01100.0above CCW pumpsPower IslandEB31G15ymonorail hoist capacity 5 t00Pre-assembled0.70.81.010.03200.0above ball strainerPower IslandEB31G16ymonorail hoist capacity 1 t00Pre-assembled0.70.81.010.02200.0above OTC valvesPower IslandEB31G17ymonorail hoist capacity 1 t00Pre-assembled0.70.81.010.02200.0APW Dummy valvePower IslandEB31G18ymonorail hoist capacity 1 t22Pre-assembled0.70.81.012180720okBypass Control valvePower IslandEB31G19ymonorail hoist capacity 1.5 t00Pre-assembled0.70.81.010.02200.0IP Bypass valvePower IslandEB31G20ymonorail hoist capacity 1.5 t00Pre-assembled0.70.81.010.02200.0LP Bypass valvePower IslandEB31G40ymonorail hoist capacity 2.5 t22Pre-assembled0.70.81.0123001,200okGenerator bearing (GT-side)Power IslandEB31G40ymonorail hoist capacity 2.5 t22Pre-assembled0.70.81.0123001,200okGenerator bearing (Exit-side)Power IslandEB31G21ymonorail hoist capacity 1 t22Pre-assembled0.70.81.012220880okabove OTC valvesPower IslandEB31G22ypush travel trolley 1 t00Pre-assembled0.70.81.010.01800.0above HP CS valvesPower IslandEB31G23ymonorail hoist capacity 1.5 t22Pre-assembled0.70.81.012220880okabove HP Main Stream Line valvesPower IslandEB31G24ymanual chain hoist 1.5 t22Pre-assembled0.70.81.012110440okabove HP Main Stream Line valvesPower IslandEB31G25ypush travel trolley 1.5 t00Pre-assembled0.70.81.010.01900.0above LP Main Stream Line valvesPower IslandEB31G26ymonorail hoist capacity 1.5 t22Pre-assembled0.70.81.012220880okabove HP Drum safety valvesPower IslandEB31G27ymonorail hoist capacity 1.5 t22Pre-assembled0.70.81.012220880okabove IP Drum safety valvesPower IslandEB31G28ymonorail hoist capacity 1.5 t00Pre-assembled0.70.81.010.02200.0above HP Drum safety valvesPower IslandEB31G29ymonorail hoist capacity 1.5 t00Pre-assembled0.70.81.010.02200.0above IP Drum safety valvesPower IslandEB31G30ymonorail hoist capacity 1.5 t22Pre-assembled0.70.81.012220880above IP Drum safety valvesPower IslandEB31G31ymonorail hoist capacity 1.5 t22Pre-assembled0.70.81.012220880okabove LP Drum safety valvesPower IslandEB31G32ymonorail hoist capacity 1.5 t00Pre-assembled0.70.81.010.02200.0above LP Drum safety valvesPower IslandEB31G33ymonorail hoist capacity 1.5 t22Pre-assembled0.70.81.012220880okabove HP Feed Control Station ValvePower IslandEB31G34ymonorail hoist capacity 1.5 t22Pre-assembled0.70.81.012220880okabove IP Feed Control Station ValvePower IslandEB31G35ymonorail hoist capacity 1.5 t22Pre-assembled0.70.81.012220880okabove LP Feed Control Station ValvePower IslandEB31G36ymonorail hoist capacity 0.75 t23Pre-assembled0.60.70.9022101,260okabove Geno circuit brakerPower IslandEB31G37ymanual chain hoist 1 t21Pre-assembled0.70.81.01180160okabove HRSG blow down pumpsPower IslandEB31G38ypush travel trolley 1 t21Pre-assembled0.70.81.011160320okabove HRSG blow down pumpsPower IslandEB31G39yMonorail hoist 0.5 t21Pre-assembled0.70.81.01150100okabove cold reheat NRVPower IslandEB31G40ymonorail hoist capacity 3 t11Pre-assembled0.70.81.011300300okWater Treatment buildingBoP AreaEB31G40ymonorail hoist capacity 3 t11Pre-assembled0.70.81.011300300okElectrochlorination PlantBoP AreaEB31G41ymonorail hoist capacity 5 t15Pre-assembled0.70.81.0133001,500okFuel Oil pumpstationBoP AreaEB31G42ygeared travel trolley 3 t00Pre-assembled0.70.81.010.01800.0FF Pump HouseBoP AreaEB31G43yGoliath crane 35t11Pre-assembled31.03.01.093932000020,000okobove Cooling water pumpsBoP AreaEB31G44ymonorail hoist capacity 3 t12Pre-assembled0.70.81.011300600okdifferent locationBoP AreaEB31G45ymonorail hoist capacity 1 t12Pre-assembled0.70.81.011180360okdifferent locationBoP AreaEB31G45ymonorail hoist capacity 0.5 t12Pre-assembled0.70.81.01150100okdifferent locationBoP AreaEB31G46yChain hoist block capacity 3 t12Pre-assembled0.50.50.800300600okdifferent locationBoP AreaEB31G46yChain hoist block capacity 1 t12Pre-assembled0.50.50.800140280okdifferent locationBoP AreaEB31G47yChain hoist block capacity 0.5 t12Pre-assembled0.50.50.700135270okdifferent locationBoP AreaEB31G48yHoist suspension eye capacity 3 t12Pre-assembled0.50.50.600220440okdifferent locationBoP AreaEB31G48yHoist suspension eye capacity 1 t12Pre-assembled0.50.50.600120240okdifferent locationBoP AreaEB31G49yHoist suspension eye capacity 0.5 t12Pre-assembled0.50.50.600100200okdifferent locationBoP Area1239I-10015470B9452--GD.PBKDSYSTEM ENG. AND PROCESS EQUIPMENT FOR SEA WATER DESALINATION PLANT AND CHEMICAL STORE/HANDLING COMPLETE INCL. DET. ARRANGEMENTPLPL/PLPLPL/PLPLPL5448054705547055470554705P_05EB134G49nSYSTEM ENG. AND PROCESS EQUIPMENT FOR SEA WATER DESALINATION PLANT AND CHEMICAL STORE/HANDLING COMPLETE INCL. DET. ARRANGEMENT1Turn-key0.001250I-11015470B9452--GK.PBLDBLENDING PLANT COMPLETE WITH AUXILIARIES INCL. DET. ARRANGEM.PLPL/PLPLPL/PLPLPL5448054705547055470554705P_05EB134G50nBLENDING PLANT COMPLETE WITH AUXILIARIES INCL. DET. ARRANGEM.1Turn-key0.001300K104015456B944594399482PUKOENBCHLORINE DOSING INCL. GENERATION TO COOLING/SEA WATER INCL. DET. ARRANGEMENTPLPL/PLPLPL/PSPSPS5456054560945909442094820P_07EB134G51yCHLORINE DOSING INCL. GENERATION TO COOLING/SEA WATER INCL. DET. ARRANGEMENT1-0.00.01300K104015456B944594399482PUKOENB Electrochlorination plant (e.g. ELCAT)PLPL/PLPLPL/PSPSPS5456054560945909442094820P_07EB134G52y Electrochlorination plant (e.g. ELCAT)1Turn-key0.00.01300K104015456B944594399482PUKOENB Degasser tankPLPL/PLPLPL/PSPSPS5456054560945909442094820P_07EB134G53n Degasser tank1Turn-key0.0017061K209035457B944594399482P..XXXXPRETREATMENT PLANT COMPLETEPLPL/PLPLPL/PLPLPL5441054574545745457454574P_07EB134G54nPRETREATMENT PLANT COMPLETE1-0.0017061K209035457B944594399482P..XXXX ClarifierPLPL/PLPLPL/PLPLPL5441054574545745457454574P_07EB134G55n Clarifier1Turn-key0.0017061K209035457B944594399482P..XXXX Clarified water basin/tankPLPL/PLPLPL/PLPLPL5441054574545745457454574P_07EB134G56n Clarified water basin/tank1Turn-key0.0017061K209035457B944594399482P..XXXX Sludge thickenerPLPL/PLPLPL/PLPLPL5441054574545745457454574P_07EB134G57n Sludge thickener1Turn-key0.0017061K209035457B944594399482P..XXXX Waste water recovery sump/basinPLPL/PLPLPL/PLPLPL5441054574545745457454574P_07EB134G58n Waste water recovery sump/basin1Turn-key0.0015015L304015470B9452--GD.XXXXSYSTEM ENG. AND PROCESS EQUIPMENT FOR SEA WATER DESALINATION PLANT AND CHEMICAL STORE/HANDLING COMPLETE INCL. DET. ARRANGEMENTPLPL/PLPLPL/PLPLPL5470154702547025470254702P_10EB134G59nSYSTEM ENG. AND PROCESS EQUIPMENT FOR SEA WATER DESALINATION PLANT AND CHEMICAL STORE/HANDLING COMPLETE INCL. DET. ARRANGEMENT1Turn-key0.001545N-01015461B9455--G..QAKBSYSTEM ENG. WASTE WATER SYSTEMPLPL////////54610----P_06EB134G60nSYSTEM ENG. WASTE WATER SYSTEM1-0.001607N-09016614B945594399482QUPQATPSAMPLING STATION TO WASTE WATERPLPL/PLPLPL/PSPSPS6614566145945909452094820HP_06EB134G61nSAMPLING STATION TO WASTE WATER1Rack0.01AHA031811015022L305015470B944594399482PUKXXXXREMINERALIZATION EQUIPMENT TO SEA WATER DESALINATION PLANTPLPL/PLPLPL/PLPLPL5470154703547035470354703IP_10EB134G62nREMINERALIZATION EQUIPMENT TO SEA WATER DESALINATION PLANT1Turn-key0.00EB135G63yCOMPLETE PACKAGE0.01480L201015511B9451--QH.IFBDAUXILIARY BOILER COMPLETE INCL. FIRING WITH EL/CONTROL, W/S-CYCLE, DOSING, STACK, ANCHOR BOLTS, DET. ARRANGEMENT -DOW-Rem.: ONLY FOR BOILER