DESCRIPTION QTY UNIT RATE
D: GROUNDWORK
D20: Excavation and filling
Clear Site of Vegetation 198 m2
Excavate topsoil; 150mm average depth. 133.08 m2
Deposit
Deposit excavated material 200m away from site 5 m3
Excavation
Excavate pits for column base; commencing from
ground level exceeding 0.3m wide and maximum
depth not exceeding 2.00m. 22.17 m3
Excavate trench to receive strip; commencingfrom ground level exceeding 0.3m wide and
maximum depth not exceeding 1.00m. 43 m3
Working space
Excavate working space to column base; with
subsequence backfilling. 80 m2
Disposal
Surplus excavated material away from site 42 m
Ground and surface water Item
Filling to excavation
Materials arising from excavation 24 m3
Filling to make up levels
150mm bed of approved hardcore fil ling 106 m2
600mm sharp sand earth filling to specified level to
receive hardcore and rammed at intervals of
150mm. 64 m3
Carried to Collection
Groundwork Cont'd

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 2/93
DESCRIPTION QTY UNIT RATE
Surface treatment
Level and compact bottom of excavation to
receive concrete. 60 m2
Apply anti-termite to side and bottom ofexcavation. 234 m
2
E10: In-situ Concrete
Plain insitu concrete Grade 7N/mm2 in:
50mm blinding under column base and
foundation. 60 m2
Ditto under concrete slab 106 m2
Plain insitu concrete Grade 15N/mm2 in:
Concrete foundation footing.8 m
3
Reinforced insitu concrete Grade 20N/mm2 in:
350- 500 mm column base. 16 m3
450mm column starters. 3 m3
150mm concrete bed16 m
3
E20: Formwork for in-situ concrete
Sawn formwork to:
Sides of column base 230-350mm high. 51 m
Sides of column starters 230mm width. 24 m2
Earth Work Surpport 174 m2
Carried to Collection

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 3/93
DESCRIPTION QTY UNIT RATE
(Groundwork contd)
Edges of bed not exceeding 250mm high 46 m
E30: Reinforcement for in-situ concrete
16mm diameter bars in column base. 619 kg
16mm diameter bars in column starters 291 kg
10mm ditto stirrups for starter in column. 135 kg
BRC mesh reinforcement to BS 4483; reference
A142 weighing 2.22kg/m2 in:
Concrete bed 106 m2
F10: Brick/Block walling
Sandcrete Hollow block work filled solid with weak
concrete in cement and sand (1:4)
230mm thick wall 47 m2
J20: Mastic asphalt tanking/Damp proof
Damp proof membrane flooring and underlay to
receive oversite; width exceeding 300mm. 106 m2
Allow a provisional sum for additional groundwork.
Sum
Carried to Collection
COLLECTION
Page 2/1
Page 2/2
Page 2/3
GROUNDWORK
Carried to Summary

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 4/93
DESCRIPTION QTY UNIT RATE
FRAMES
E: IN SITU CONCRETE/LARGE PRECAST CONCRETE
E05:In-situ concrete construction generally
Vibrated Concrete Grade 20 in:
Concrete columns. m3
Beams. m3
E20: Formwork for in-situ concrete
Sawn formwork to:
Vertical sides of columns. m2
Sides and soffit of beams. m2
E30: Reinforcement for in-situ concrete
High yield deformed bars to BS 4449 in beam.
10mm diameter bar in columns. kg
16mm ditto. kg
10mm diameters in beams. kg
16mm ditto. kg
20mm ditto. kg
FRAMES
Carried to Summary

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 5/93
DESCRIPTION QTY UNIT RATE
UPPER FLOORS
E: IN SITU CONCRETE/LARGE PRECAST CONCRETE
E05:In-situ concrete construction generally
Vibrated Concrete Grade 20 in:
Slab m3
E20: Formwork for in-situ concrete
Sawn formwork to:
horizontal soffit of slab m2
Edges of slab 250mm high m
E30: Reinforcement for in-situ concrete
High yield deformed bars to BS 4449 in
12mm ditto. kg
UPPER FLOOR
Carried to Summary

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 6/93
DESCRIPTION QTY UNIT RATE
STAIRCASES
E: IN SITU CONCRETE/LARGE PRECAST CONCRETE
E05:In-situ concrete construction generally
Vibrated Concrete Grade 20 in:
Staircases and landing m3
E20: Formwork for in-situ concrete
Sawn formwork to:
Soffit of landing m2
Sloping waist m2
Faces of staircase string not exceeding 300mm
extreme width cut to rofile. m
Ditto face of undercut riser 150mm hi h. m
Ed es of landin m
E30: Reinforcement for in-situ concrete
High yield deformed bars to BS 4449 in
12mm diameter bar in staircases and landin . kg
10mm ditto. kg
Allow a provisional sum of N.00 for the supply and
installation of staircases balustrade and railing
sum
Carried to Collection

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 7/93
DESCRIPTION QTY UNIT RATE
STAIRCASES CONT'D
M: SURFACE FINISHES
M:20 Plastered/Rendered/Roughcast Coating
15mm thick cement and sand (1:3 )renderingfinished fair and smooth on:
Soffit of waist and landing m2
Edges of waist m2
Cement and sand (1:3)
12mm floated backings in faces of risers m2
12mm rendering to sides of steps m2
Cement and sand (1:3)
42mm screeded beds in tread and landing m2
M40: Stone/Concrete/Quarry/Ceramic
Ceramic/Vitrified floor tiles
Supply and fix
300 x 200 x 6mm coloured ceramic/vitrified floor
tiles (PC=N4750/M2) laid with 2mm square joints on
floated backings (measured separately) bedded
in plain cement mortar and pointed in a neatcoloured cement in landing and waist m
2
Tread; 300mm wide m2

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 8/93
DESCRIPTION QTY UNIT RATE
STAIRCASES CONT'D
M60: Painting/Clear finishig
Prepare and apply three coats of "Portland"
Emulsion paint on rendered:
Internal wall
Soffit of waist and landing m2
Edges of waist m2
Carried to Collection
COLLECTIONS
Page 2/6
Page 2/7
Page 2/8
STAIRCASES
Carried to Summary

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 9/93
DESCRIPTION QTY UNIT RATE
ROOF CONSTRUCTION
E: CLADDING/COVERING
H72:Aluminium strip/Sheet coverings/Flashings0.55mm Navy blue long span aluminium roofing
sheets fixed to hard wood purlins at 900mm centres m
with drive screws rubber washers and covers with
one and half corrugation 150mm sides lap and
300mm end laps (measured net) .
Ridge capping 600mm girth m
Valley 600mm girth m
Wall flashing m
Ditto Hips m
Eaves average 150mm girth m
Aluminium cladding, 350mm wide fixed to hard wood m
Ditto, top edge trimmer, 200mm girth. m
Ditto bottom edge trimmer, 150mm girth. m
Carcassing items
Treated sawn hard wood
50 x 100mm king post and struts. m
50 x75mm purlins m
50 x 100mm rafters. m
50 x 100mm tie beam m
75 x 100mm wall plate rag bolted to wall at 1200mm
centres m
50 x 50mm noggins m
50 x 100mm Hips m
ROOF CONSTRUCTION
Carried to summary

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 10/93
DESCRIPTION QTY UNIT RATE
EXTERNAL AND INTERNAL WALLS
F: MASONRY
E05: In-situ concrete construction generally
Vibrated Concrete Grade 20 in:
Lintel m
E20: Formwork for in-situ concrete
Sawn formwork to:
Sides and soffit of Lintel m
E30: Reinforcement for in-situ concrete
High yield deformed bars to BS 4449 in beam.
10-12mm diameter bars in lintel and concrete top
at Laundry area (provisional) kg
F10: Block wall
Sandcrete Hollow block work in cement and sand
(1:4)
230mm walls m2
150mm walls m2
EXTERNAL AND INTERNAL WALLSCarried to Summary

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 11/93
DESCRIPTION QTY UNIT RATE
DOORS AND IRONMONGERIES
DOORS
Purpose made garage door 4000 x 2400mm on
steel frames. Num
Purpose made glazed double leaf steel doubleswing doors on steel frames. Num
Treated and well seasoned mansonia hardwood
pannelled doors with 250 x 250mm fixed peep holes. Num
Size 900 x 2100mm.
Treated and well seasoned hardwood pannelled
flush doors. Size 900 x 2100mm. Nu.m
Treated and well seasoned hardwood flush doors.
Size 750 x 2100mm. Nu.m
Door frames
50 x 230mm rebated door frames fixed to block work
with architraves. Lin.m
IRONMONGERY
Supply and fixed the following irongery to hard
wood
Pairs: 100mm Pressed Brass bolt hinges Num
Ditto 125mm barrel bolt and socket Num
Well design mortile lock and lever furniture handle Num
PAINTING
Prepare and apply two undercoat and one finishing
coat of clear synthetic finish on :
General surface of doors Sq.m
Frames 200 - 300mm girth Lin.m
ELEMENT NR.5
DOORS : to genral collection

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 12/93
DESCRIPTION QTY UNIT RATE
ELEMENT NR.6
WINDOW
Supply, fabricate, and install panels and bays
aluminium Projecting windows with bronze anodized
finish
Ditto, size 4000 x 2100mm high. Num
Ditto, size 3000 x 1200mm high. Num
Ditto, size 2000 x 1200mm high. Num
Ditto, size 750 x 600mm high. Num
SUNDRIES
Allow a provisional sum of N 1,300,000.00 for the
Fabrication and installation of standard high yield 16mm
diameter bar as burglary proof placed vertically at
100mm centres as vertical bars and horizontal bars
at 450mm centres alternate bars all welded toge- sum
ther and painted with approved gross paint, inclu-
ding plugging to concrete or blockwork to Engineer
satisfaction in the following:
Collection
Doors
Windows
Doors and Windows
Carried to Summary

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 13/93
DESCRIPTION QTY UNIT RATE
ELEMENT NR.7
FINISHES
Wall finishings
In-situ furnishings
12mm cements and sand (1:4) smooth rendering
External and Internal walls Sq.m
Ditto, in attached column Sq.m
Reveal not exceeding 100 - 150mm girth Lin.m
Sides of beams Sq.m
Soffit of beam Lin.m
Floor finishing
Floor tiles
300 x 300 x 6mm Non - slip vitrified ceramic floor tiles
laid on screeded backing in cement mortar (1: 3 ) andpointed in white cement in toilet . Sq.m
Wall Finishes Tiles200 x 300mm x 6mm ceramic wall tiles fixed to
screeded backing in cement mortar (1:3) and pointed Sq.m
in white cement in toilets, kitchen and bathroom: m g .

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 14/93
DESCRIPTION QTY UNIT RATE
CEMENT AND SAND BACKING
35mm thick ditto, to receive floor tiles Sq.m
35mm thick ditto to receive wall tiles. Sq.m
CEILING FINISHINGSAmoula plastic ceiling board fixed horizonally
to hard wood noggins (Measure seperately). Sq.m
FLOOR, WALL AND CEILING FINISHINGSCarried to summary

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 15/93
DESCRIPTION QTY UNIT RATE
ELECTRICAL INSTALLATION
Allow a P. C Sum of N5 350 000.00 for Electrical Sum
Add for profit and attendance 7.5%
Allow a fixed Sum of N500,000.00 for Builders work Sum
Carried to summary

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 16/93
DESCRIPTION QTY UNIT RATE
MECHANICAL INSTALLATION
Allow a P. C Sum of N4,500,000.00 for Mechanical
Sum
Add for profit and attendance. 7.5%
Allow a fixed Sum of N500,000.00 for Builders work
Sum
ELECTRICAL INSTALLATION
Carried to summar

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 17/93
DESCRIPTION QTY UNIT RATE
FITTINGS AND FIXTURES
Allow a provional sum of N1,500,450.00 for the
supply and installation of balcony railings and
balustrade
sum
FITTINGS AND FIXTUREScarried to summary

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 18/93
DESCRIPTION QTY UNIT RATE
SEPTIC TANK (Size 4.80 x 2.00 x 2.50m deep) 2NRS
D20: Excavating and Filling
Excavation
Excavate pit starting from ground level not
exceeding 2.00m depth m3
Earthwork support
Earthwork support to opposing faces of
excavation
starting from ground level maximum depth not
exceeding 2.0m m2
Disposal
Remove surplus excavated material from site m3
Surface treatment
Leveling and compacting bottom of excavations m2
E10: In-situ concrete
Plain in-situ concrete Grade 7 in:
50mm Blinding m3
Reinforced concrete 1:2:4-19mm aggregate
developing works strength 25N/mm2 at 28 days
filled into formwork and vibrated in:-
150mm bed m3
100mm cover slab m3
Precast concrete
50mm baffle wall size 1200 x 800mm reinforced
suitably for handling including bedding in chaseformed on block wall Nr
Carried to collection

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 19/93
DESCRIPTION QTY UNIT RATE
(Septic tank contd)
: e n orcemen
High yield deformed bar reinforcement to BS 4449
10 - 25mm Diameter bar in bed kg
Ditto in cover slab kg
E20: Formwork
Sawn formwork to:
Horizontal soffit of slab m2
Edges of bed not exceeding 250mm high m
Edges of slab ditto. m
F10: Brick/Block walling
Hollow sandcrete block walls in cement and
sand mortar (1:4) and filled solid with concrete
150mm thick m2
Form opening in 230mm blockwall for 100mm PVC
pipe Nr
FINISHES
15mm thick cement and sand (1:3) smooth
rendering on wall m2
30mm thick ditto screeded bed. m2
Carried to collection
COLLECTION
Page 2/21
Page 2/22
1Nr
SEPTIC TANK (2Nrs)
Carried to External summary

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 20/93
DESCRIPTION QTY UNIT RATE
S0AKAWAY PIT (Size 2.80 x 2.80 x 2.50m deep )2Nrs
D20: Excavating and Filling
Excavation
Excavate pit starting from ground level not
exceeding 2.00m depth m3
Earthwork support
Earthwork support to opposing faces of
excavation
starting from ground level maximum depth not
exceeding 2.0m m2
Disposal
Remove surplus excavated material from site m3
Surface treatment
Leveling and compacting bottom of excavations m2
Filling to make up levels
50mm graded stones filling m3
E10: In-situ concrete
Reinforced concrete 1:2:4-19mm aggregate
developing works strength 25N/mm2 at 28 daysfilled into formwork and vibrated in:-
Cover slab m3
E30: Reinforcement
High yield deformed bar reinforcement to BS 4449
including all hooks in:
Ditto in cover slab kg
E20: Formwork
Sawn formwork to:
Horizontal soffit of slab m2
Edges of slab ditto m
Carried to collection

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 21/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 22/93
DESCRIPTION QTY UNIT RATE
Carried to collection
(Manholes contd)
Precast concrete
150mm thick precast concrete base size 750 x
750mm Nr
75mm thick precast concrete slab size 750 x
750mm with mild steel handle anchored in slab Nr
F10: Brick/Block walling
Hollow sandcrete block walls in cement and
sand mortar (1:4) and filled solid with concrete
grade 7
150mm thick m2
Form opening in 150mm blockwall for 100mm PVC pipe Nr
FINISHES
12mm thick cement and sand (1:3) render on wall m2
Sundries
150mm (average) haunching including forming channel m2
Carried to collection
COLLECTION
Page 2/24
Page 2/25
1Nr
MANHOLE
Carried to External work summary 30

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 23/93
DESCRIPTION QTY UNIT RATE
MANHOLE: 600 x 450mm (1Nr)
D20: Excavating and Filling
Excavation
Excavate pit for manhole starting from ground
level and not exceeding 2.00m depth. m3
Disposal
Remove surplus excavated material from site m3
Surface treatment
Leveling and compacting bottom of excavations m2
E10: In-situ concrete
Plain in-situ concrete Grade 7 in:
50mm Blinding m3
Precast concrete
150mm thick precast concrete base size 750 x750mm Nr
75mm thick precast concrete slab size 750 x
750mm with mild steel handle anchored in slab Nr
F10: Brick/Block wallingHollow sandcrete block walls in cement and
sand mortar (1:4) and filled solid with concrete
grade 7
150mm thick m2
Form opening in 150mm blockwall for 100mm PVC pipe Nr
FINISHES
12mm thick cement and sand (1:3) render on wall m2
Sundries
150mm (average) haunching including forming channel m2

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 24/93
DESCRIPTION QTY UNIT RATE
MANHOLE
Carried to External work summary
MANHOLE: 600 x 600mm (1Nr)
D20: Excavating and Filling
Excavation
Excavate pit for manhole starting from ground
level and not exceeding 2.00m depth. m3
Disposal
Remove surplus excavated material from site m3
Surface treatment
Leveling and compacting bottom of excavations m2
E10: In-situ concrete
Plain in-situ concrete Grade 7 in:
50mm Blinding m3
Precast concrete
150mm thick precast concrete base size 750 x750mm Nr
75mm thick precast concrete slab size 750 x
750mm with mild steel handle anchored in slab Nr
F10: Brick/Block walling
Hollow sandcrete block walls in cement and
sand mortar (1:4) and filled solid with concrete
grade 7
150mm thick m2
Form opening in 150mm blockwall for 100mm PVC
pipe Nr
FINISHES
12mm thick cement and sand (1:3) render on wall m2

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 25/93
DESCRIPTION QTY UNIT RATE
Sundries
150mm (average) haunching including forming
channel m2
1Nr
MANHOLE
Carried to External work summary 4
COURTYARD FINISHES
WALKWAYS
D20: Filling
Imported laterite earthfilling in making up levelswell compacted and consolidated in 150mm
layers m3
Imported stonebase filling in making up levels well
compacted to receive concrete paving m3
E10: In-situ concrete
Plain in-situ concrete Grade 20N/mm2 in:
75mm in concrete paving m3
COURTYARD FINISHESCarried to External work summary
COLLECTION
Septic tank (2Nrs)
Soak away pit (2Nrs)
Manholes (600 x 450mm)
Manholes (450 x 450mm)
Manholes (600 x 600mm)
Courtyard Finishes
External Works
Carried to Summary

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 26/93
DESCRIPTION QTY UNIT RATE
SUMMARY
GROUNDWORK
FRAMES
UPPER FLOORS
STAIRCASES
ROOF CONSTRUCTION
EXTERNAL AND INTERNAL WALLS
WINDOWS AND DOORS
FLOOR, WALL AND CEILING FINISHINGS
ELECTRICAL INSTALLATIONS
MECHANICAL INSTALLATIONS
FITTINGS AND FIXTURES
EXTERNAL WORKS
SUB-TOTAL
ADD
CONTIGENCIES
TOTAL COST ESTIMATE

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 27/93
DESCRIPTION QTY UNIT RATE

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 28/93
DESCRIPTION QTY UNIT RATE

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 29/93
DESCRIPTION QTY UNIT RATE

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 30/93
DESCRIPTION QTY UNIT RATE

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 31/93
DESCRIPTION QTY UNIT RATE

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 32/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 33/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 34/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 35/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 36/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 37/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 38/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 39/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 40/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 41/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 42/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 43/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 44/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 45/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 46/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 47/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 48/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 49/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 50/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 51/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 52/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 53/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 54/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 55/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 56/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 57/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 58/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 59/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 60/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 61/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 62/93
AMOUNT

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 63/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 64/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 65/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 66/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 67/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 68/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 69/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 70/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 71/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 72/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 73/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 74/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 75/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 76/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 77/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 78/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 79/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 80/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 81/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 82/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 83/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 84/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 85/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 86/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 87/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 88/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 89/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 90/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 91/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 92/93

7/31/2019 VwedeSample BOQ
http://slidepdf.com/reader/full/vwedesample-boq 93/93