Transcript of BOQ Appartment
-
7/29/2019 BOQ Appartment
1/78
VDB Willow Farm
A CIVIL AND ALLIED WORKS
1 MASONRY WORKS
2 PLASTERING WORKS
3 FLOORING AND CLADDING WORKS
4 DOORS & WINDOWS
5 PAINTING WORKS
6 MISCELLANEOUS WORKS
7 STRUCTURAL
8 PODIUM
9 INFRASTRUCTURE
SUB TOTAL -
ABSTARCT COST
Remarks
Sl
No
.
ITEM DESCRIPTION Amount
-
7/29/2019 BOQ Appartment
2/78
Professional Consultants
1.00 MASONRY
1.01
Providing and constructing 200mm thick Solid concrete
block work in walls, piers and architectural features at all
levels using approved Solid blocks of minimum strength 50
kgs/sqcm in cement mortar 1:6 including curing, steel scaffolding, steel staging, leads and lifts. Cost to include
drilling the column and fixing 200mm long, 50 x 4mm thk.
MS Flat, bent to shape with anchor bolts, at every fifth
course. GI Expanded Metal mesh shall be placed and tied in
position between masonry and MS Flat, bent to shape, with
anchor bolts at every fifth course. The rate is inclusive of
cost of fabrication of reinforcement steel with all leads and
lifts and as directed by Architect/Engineer in charge.
1.02
Providing and constructing 150mm thick Solid concrete
block work in walls, piers and architectural features at all
levels using approved Solid blocks of minimum strength 50
kgs/sqcm in cement mortar 1:6 including curing, steel
scaffolding, steel staging, leads and lifts. Cost to include
drilling the column and fixing 200mm long, 50 x 4mm thk.MS Flat, bent to shape with anchor bolts, at every fifth
course. GI Expanded Metal mesh shall be placed and tied in
position between masonry and MS Flat, bent to shape, with
anchor bolts at every fifth course. The rate is inclusive of
cost of fabrication of reinforcement steel with all leads and
lifts and as directed by Architect/Engineer in charge.
# DESCRIPTION
Page 2 of 78
-
7/29/2019 BOQ Appartment
3/78
Professional Consultants
1.03
Providing and constructing 100mm thick Solid block work at
all levels in walls, piers and architectural features using
approved solid blocks of minimum strength 50 kgs/sqcm in
cement mortar 1:4 including curing, steel scaffolding, steel
staging, leads and lifts and a concrete band 75mm thick.
with 2nos. Tor 8 longitudinal bars and Tor 8 at 200c/c
transverse reinforcement. at every fifth course with M15
grade concrete mix including steel shuttering, steel staging,
curing etc., complete, including drilling the column & fixing
200mm long 50 x 4mm thick MS flat bent to shape, with
anchor bolts at every fifth course, with all leads and lifts
and as directed by Architect/Engineer in charge. The rate is
inclusive of reinforcement steel and cost of steel fabrication
of reinforcement steel with all leads and lifts and as
directed by Architect/Engineer in charge.
MASONRY WORKS Sub-total -1 : -
2.00 PLASTERING WORKS
2.01
Prepare the surface and plaster the ceiling, soffit of
staircase etc., in cement mortar 1:4, 12 mm thick with
smooth finish to line and level with lime rendering at all
levels including lead and lift of materials, hydrating the lime
24 hours before starting of work with necessary scaffolding
, curing , etc., complete.
Page 3 of 78
-
7/29/2019 BOQ Appartment
4/78
Professional Consultants
2.02
Prepare the surface and plaster all internal RCC / Masonry
surface, walls, etc., in cement mortar 1:5 , 15 mm thick ,
smooth finished to line and plumb with lime rendering at all
levels rounding of corners wherever required complete with
necessary scaffolding, curing etc, complete.including lead
and lifts hydrating the lime for 24 hours before starting of
work.at all levels rounding of corners wherever required
complete with necessary scaffolding, curing etc,
complete..Cost to include supplying and Fixing Plaster
Mesh/Corner Bead made out of galvanized iron of nominal
thickness 0.35mm with a zinc coating of 120 gms / Sqm of
Arpitha make at the concrete and masonryjunctions,Column corners, wall corners, with Galvanised
nails etc., wherever called for required size.
2.03
Prepare the surface and plaster all internal RCC / Masonry
surface, walls to receive dadoo backing, in cement mortar1:5 , 15 mm thick , rough finished to line and plumb at all
levels rounding of corners wherever required complete with
necessary scaffolding, curing etc, complete.including lead
and lifts hydrating the lime for 24 hours before starting of
work.at all levels rounding of corners wherever required
complete with necessary scaffolding, curing etc,
complete.Cost to include supplying and Fixing Plaster
Mesh/Corner Bead made out of galvanized iron of nominal
thickness 0.35mm with a zinc coating of 120 gms / Sqm of
Arpitha make at the concrete and masonry
junctions,Column corners, wall corners, with Galvanised
nails etc., wherever called for required size.
Page 4 of 78
-
7/29/2019 BOQ Appartment
5/78
Professional Consultants
2.04
Providing rough plastering 15mm thick in CM 1:6 on wallsat all levels & lifts, including rough finishing to line and
plumb, cost of scaffolding, curing, etc., complete, with all
leads and lifts and as directed by Architect/Engineer in
charge. ( In ducts , shafts) with water proofing compound
(using approved waterproofing compound added as per
manufacturers instructions. Cost to include supplying and
Fixing Plaster Mesh/Corner Bead made out of galvanized
iron of nominal thickness 0.35mm with a zinc coating of
120 gms / Sqm of Arpitha make at the concrete and
masonry junctions,Column corners, wall corners, with
Galvanised nails etc., wherever called for required size.
Page 5 of 78
-
7/29/2019 BOQ Appartment
6/78
Professional Consultants
2.05
Providing waterproof plaster to external walls, columns,
etc. in waterproof cement mortar 1:4 (using approved
waterproofing compound added as per manufacturers
instructions) for over all thickness 20mm but applied in twocoats, first coat of 14mm thick, second coat of 6mm with
water proof compound to be applied after application of
first coat, finished to line and level to approved texture,
including all leads, lifts, scaffolding and curing complete.
The rate is inclusive of forming of drip moulds &
architectural grooves of size 25x10mm as per the detailed
drawing and directions of the Architect/Engineer-in-
charge.Cost to include supplying and Fixing Plaster
Mesh/Corner Bead made out of galvanized iron of nominal
thickness 0.35mm with a zinc coating of 120 gms / Sqm of
Arpitha make at the concrete and masonry
junctions,Column corners, wall corners, with Galvanised
nails etc., wherever called for required size.
3.00 FLOORING AND CLADDING WORKS
3.00 IPS FLOORING-TERRACEProviding and laying 50mm thick Indian patent stone
monolithic flooring (at all levels) 50mm thick of 1 portion of
cement, 2 parts of coarse sand and 4 parts of stone
aggregate by volume grading of aggregate The floor shall
be completed with 1:1 cement sand mortar 12mm thick and
cement slurry 2.2kg/sqm including Glass divider strips45/50x4mm thick set in the flooring including necessary
levelling, setting, etc.,. Rate to include curing & protection
etc complete., with all lead and lift and as directed
Architect En ineer in char e includin necessar Floora) For average thickness of 50~55 mm.
b) For average thickness of 70~75 mm.
FLOORING AND CLADDING WORKS Sub-total -3 :
PLASTERING WORKS Sub-total -2 :
Page 6 of 78
-
7/29/2019 BOQ Appartment
7/78
Professional Consultants
Page 7 of 78
-
7/29/2019 BOQ Appartment
8/78
Professional Consultants
Page 8 of 78
-
7/29/2019 BOQ Appartment
9/78
Professional Consultants
Page 9 of 78
-
7/29/2019 BOQ Appartment
10/78
Professional Consultants
Page 10 of 78
-
7/29/2019 BOQ Appartment
11/78
Professional Consultants
Page 11 of 78
-
7/29/2019 BOQ Appartment
12/78
Professional Consultants
Page 12 of 78
-
7/29/2019 BOQ Appartment
13/78
Professional Consultants
Rate /Unit
QTY.
1,874.00 930.00 1,742,820.00 1,874.00
25.00 765 19,125.00 25.00
Type C 1
Amount
TOTAL QTY
TYPE C2
TOTAL QTY
TYPE C1
United Engineering
Page 13 of 78
-
7/29/2019 BOQ Appartment
14/78
Professional Consultants
384.00 690 264,960.00 384.00
- - -2,026,905.00
-
1,251.00 260.00 325,260.00 1,251.00
Page 14 of 78
-
7/29/2019 BOQ Appartment
15/78
Professional Consultants
2,930.00 270.00 791,100.00 2,930.00
- - -
472.00 260.00 122,720.00 472.00
Page 15 of 78
-
7/29/2019 BOQ Appartment
16/78
Professional Consultants
408.00 260.00 106,080.00 408.00
Page 16 of 78
-
7/29/2019 BOQ Appartment
17/78
Professional Consultants
- - -
2,126.00 335.00 712,210.00 2,126.00
- - - -
2,057,370.00
-
-
-
- - - -
375.00 350.00 131,250.00 375.00
RATE ONLY - RATE ONLY
131,250.00Page 17 of 78
-
7/29/2019 BOQ Appartment
18/78
Professional Consultants
4,215,525.00
Page 18 of 78
-
7/29/2019 BOQ Appartment
19/78
Professional Consultants
Page 19 of 78
-
7/29/2019 BOQ Appartment
20/78
Professional Consultants
Page 20 of 78
-
7/29/2019 BOQ Appartment
21/78
Professional Consultants
Page 21 of 78
-
7/29/2019 BOQ Appartment
22/78
Professional Consultants
Page 22 of 78
-
7/29/2019 BOQ Appartment
23/78
Professional Consultants
Page 23 of 78
-
7/29/2019 BOQ Appartment
24/78
Professional Consultants
Rate /Unit Rate /Unit
QTY. QTY.
930.00 1,742,820.00 11,244.00 930.00
- -
765 19,125.00 150.00 765
Amount
TOTAL QTY
TYPE C3 TO C8
UnitedUnited Engineering
Type C 2 Type
Page 24 of 78
-
7/29/2019 BOQ Appartment
25/78
Professional Consultants
690 264,960.00 2,304.00 690
- -2,026,905.00
-
260.00 325,260.00 7,506.00 260.00
Page 25 of 78
-
7/29/2019 BOQ Appartment
26/78
Professional Consultants
270.00 791,100.00 17,580.00 270.00
- -
260.00 122,720.00 2,832.00 260.00
Page 26 of 78
-
7/29/2019 BOQ Appartment
27/78
Professional Consultants
260.00 106,080.00 2,448.00 260.00
Page 27 of 78
-
7/29/2019 BOQ Appartment
28/78
Professional Consultants
- -
335.00 712,210.00 12,756.00 335.00
- - - -
2,057,370.00
-
-
-
- - - -
350.00 131,250.00 2,250.00 350.00
- RATE ONLY
131,250.00Page 28 of 78
-
7/29/2019 BOQ Appartment
29/78
Professional Consultants
4,215,525.00
Page 29 of 78
-
7/29/2019 BOQ Appartment
30/78
Professional Consultants
Page 30 of 78
-
7/29/2019 BOQ Appartment
31/78
Professional Consultants
Page 31 of 78
-
7/29/2019 BOQ Appartment
32/78
Professional Consultants
Page 32 of 78
-
7/29/2019 BOQ Appartment
33/78
Professional Consultants
Page 33 of 78
-
7/29/2019 BOQ Appartment
34/78
Professional Consultants
Page 34 of 78
-
7/29/2019 BOQ Appartment
35/78
Professional Consultants
Rate /Unit
QTY.
10,456,920.00 2,675.00 930.00 2,487,750.00
- - -
114,750.00 125.00 765 95,625.00
Engineering
C 3 TO C 8
Amount
TOTAL QTY
TYPE D1 & D2
United Engineering
Type D1 & D2
Amount
Page 35 of 78
-
7/29/2019 BOQ Appartment
36/78
Professional Consultants
1,589,760.00 550.00 690 379,500.00
- - -12,161,430.00 2,962,875.00
- -
1,951,560.00 2,800.00 260.00 728,000.00
Page 36 of 78
-
7/29/2019 BOQ Appartment
37/78
Professional Consultants
4,746,600.00 6,025.00 270.00 1,626,750.00
- - -
736,320.00 595.00 260.00 154,700.00
Page 37 of 78
-
7/29/2019 BOQ Appartment
38/78
Professional Consultants
636,480.00 545.00 260.00 141,700.00
Page 38 of 78
-
7/29/2019 BOQ Appartment
39/78
Professional Consultants
- - -
4,273,260.00 2,560.00 335.00 857,600.00
- - - -
12,344,220.00 3,508,750.00
- -
- -
- -
- - - -
787,500.00 661.00 350.00 231,350.00
- RATE ONLY -
787,500.00 231,350.00Page 39 of 78
-
7/29/2019 BOQ Appartment
40/78
Professional Consultants
25,293,150.00 6,702,975.00
60,253,587.03
Page 40 of 78
-
7/29/2019 BOQ Appartment
41/78
Professional Consultants
Page 41 of 78
-
7/29/2019 BOQ Appartment
42/78
Professional Consultants
Page 42 of 78
-
7/29/2019 BOQ Appartment
43/78
Professional Consultants
Page 43 of 78
-
7/29/2019 BOQ Appartment
44/78
Professional Consultants
Page 44 of 78
-
7/29/2019 BOQ Appartment
45/78
Professional Consultants
Page 45 of 78
-
7/29/2019 BOQ Appartment
46/78
Professional Consultants
Rate /Unit
QTY.
3,748.00 930.00 3,485,640.00 21,415.00
- -
50.00 765 38,250.00 375.00
TOTAL QTYTOTAL QTY
Club house
United Engineering
Club House
Amount
Page 46 of 78
-
7/29/2019 BOQ Appartment
47/78
Professional Consultants
768.00 690 529,920.00 4,390.00
- -4,053,810.00
-
2,502.00 260.00 650,520.00 15,310.00
Page 47 of 78
-
7/29/2019 BOQ Appartment
48/78
Professional Consultants
5,860.00 270.00 1,582,200.00 35,325.00
- -
944.00 260.00 245,440.00 5,315.00
Page 48 of 78
-
7/29/2019 BOQ Appartment
49/78
Professional Consultants
816.00 260.00 212,160.00 4,625.00
Page 49 of 78
-
7/29/2019 BOQ Appartment
50/78
Professional Consultants
- -
38,268.00 335.00 12,819,780.00 57,836.00
- -
15,510,100.00
- -
- -
- -
- -
750.00 350.00 262,500.00 4,411.00
-
-262,500.00
Page 50 of 78
-
7/29/2019 BOQ Appartment
51/78
Professional Consultants
19,826,410.00 -
Page 51 of 78
-
7/29/2019 BOQ Appartment
52/78
Professional Consultants
Page 52 of 78
-
7/29/2019 BOQ Appartment
53/78
Professional Consultants
Page 53 of 78
-
7/29/2019 BOQ Appartment
54/78
Professional Consultants
Page 54 of 78
-
7/29/2019 BOQ Appartment
55/78
Professional Consultants
Page 55 of 78
-
7/29/2019 BOQ Appartment
56/78
Professional Consultants
Page 56 of 78
-
7/29/2019 BOQ Appartment
57/78
Professional Consultants
930.00 19,915,950.00
-
765.00 286,875.00
Amount
Rate
United Engineering
Rate Amount QTY.
Page 57 of 78
-
7/29/2019 BOQ Appartment
58/78
Professional Consultants
690.00 3,029,100.00
-23,231,925.00 -
-
-
260.00 3,980,600.00
Page 58 of 78
-
7/29/2019 BOQ Appartment
59/78
Professional Consultants
270.00 9,537,750.00
-
260.00 1,381,900.00
Page 59 of 78
-
7/29/2019 BOQ Appartment
60/78
Professional Consultants
260.00 1,202,500.00
Page 60 of 78
-
7/29/2019 BOQ Appartment
61/78
Professional Consultants
-
335.00 19,375,060.00
-
35,477,810.00 -
-
-
-
-
350.00 1,543,850.00
-
-1,543,850.00 -
Page 61 of 78
-
7/29/2019 BOQ Appartment
62/78
Professional Consultants
60,253,585.00 -
Page 62 of 78
-
7/29/2019 BOQ Appartment
63/78
Professional Consultants
Page 63 of 78
-
7/29/2019 BOQ Appartment
64/78
Professional Consultants
Page 64 of 78
-
7/29/2019 BOQ Appartment
65/78
Professional Consultants
Page 65 of 78
-
7/29/2019 BOQ Appartment
66/78
Professional Consultants
Page 66 of 78
-
7/29/2019 BOQ Appartment
67/78
Professional Consultants
Page 67 of 78
-
7/29/2019 BOQ Appartment
68/78
Professional Consultants
Remarks
Page 68 of 78
-
7/29/2019 BOQ Appartment
69/78
Professional Consultants
Page 69 of 78
-
7/29/2019 BOQ Appartment
70/78
Professional Consultants
Page 70 of 78
-
7/29/2019 BOQ Appartment
71/78
Professional Consultants
Page 71 of 78
-
7/29/2019 BOQ Appartment
72/78
Professional Consultants
Page 72 of 78
-
7/29/2019 BOQ Appartment
73/78
Professional Consultants
Page 73 of 78
-
7/29/2019 BOQ Appartment
74/78
professional consultants
consulting structural engineers
I 1 EARTH WORK EXCAVATIONGeneral earthwork excavation in all types of soil for levelling & lowering
the ground for lowest basement formation level, footings, raft, rc wall
foundations, lift pits, trenches, sump tanks etc. from natural ground
level up to the pcc bottom, stacking the excavated earth & disposable
material where ever indicated in site, Excluding back filling, but
including filling depressions wherever necessary, watering,
consolidating, transporting surplus excavated earth / debris away from
the site, shoring, bailing out water, etc. complete. Contractor shall get
acquainted with site conditions, nature of soil and adopt suitable
adequate dewatering system as deemed fit for the nature of soil,
prevailing water table and water collected by runoff or rain to get the
surface reasonably dry for laying pcc at the time of execution so that
execution will not be ham ered or dela ed. The rate shall include0.0m upto 1.5m depth cum
Cutting of soil up to plinth level:
from 0 to 1.5mtr depth cum
0.0 m upto 1.5 m depth
a) Isolated footing cum
b) Combined footing cum
1.5m upto 3.0m depth
a) Isolated footing cum
b) Combined footing cum
ii 1.5m upto 3.0m depth
a) Combined footing (At Lift) cum
a) All soils:
from 0 to 1.5mtr depth cum
from 1.5 to 3.0mtr depth cum
b) Cutting of soil up to plinth level:
from 0 to 1.5mtr depth cum
from 1.5 to 3.0mtr depth cum
3.0 m to 4.5 m depth cum
c) in Hard rocks with controlled blasting:
from 0 to 1.5mtr depth cum
from 1.5 to 3.0mtr depth cum
3.0 m to 4.5 m depth cum
d) in Hard rocks with Chistelling:
from 0 to 1.5mtr depth cum
from 1.5 to 3.0mtr depth cum
3.0 m to 4.5 m depth cum
A EARTH WORK FOR ROADS
1
Earth work excavation by manual means in ordinary soil involving an
average horizontal throw upto 0.5m excavated surface levelled and
sides neatly dressed, the disposed earth to be levelled neatly after
breaking of clods complete as per specifications.
2
Excavation in soft rock without blasting for formation of roads including
stacking neatly, to uniform line and level with all lead cost of all labour,
equipment, complete as per specifications.
3
Compaction of original ground with maximum of 6 passes of 8 to 10tonnes power roller including filling in depression occuring during rolling
including cost of all labour, HOM of machinery complete as per
specification.
4
Providing and laying of 250mm thick WBM with 65 to 40mm size
aggregates with interstices filled with murram jelly with all necessary
lead lift and placing in position. Complete
5
Extra for watering the earth to bring the earth upto required optimum
misture content manually including cost of all labour complete as per
specifications.
SL.
NO
.
Description of items UNIT
Page 74 of 78
-
7/29/2019 BOQ Appartment
75/78
professional consultants
consulting structural engineers
6
Extra for watering the earth to bring the earth upto required optimum
moisture content with mechinery including cost of all labour, HOM of
machineries complete as per specificatons.
7
Extra for rolling to specification with the use of vibratory roller when
earth is at suitable moisture content with desired field density not less
than 95% of maximum dry density (Modified heavy proctor test)
including HOM of machineries complete as per specifications.
8
Extra for rolling to specification with power roller 8-10 tonne when
earth is at suitable moisture content with desired field density not less
than 95% of maximum dry density (Ordinary proctor test) including
HOM of machineries complete as per sepcifications.
B SUB BASES - BASES (NON BITUMINOUS) AND SHOULDERS
1
rov ng, ay ng, sprea ng an compact on stone aggregates o
specific sizes to water bound macadam specification including spreading
in uniform thickness, hand packing rolling with 3 wheeled steel/
vibratory roller 8-10 tonners in stages to proper grade and camber,
applying and brooming requisite type of screening/binding materials to
fill up the interestices of coarse aggregate, watering and compacting to
-
2
Providing, laying, spreading and compacting graded stone aggregate to
wet mix macadam specification including premixing the Material with
water at OMC in mechanical mix plant carriage of mixed Material by
tipper to site, laying in uniform layers with paver in sub-base /base
course on well prepared surface and compacting with vibratory roller to
achieve the desired density.
2 SOIL NAILING
In addit ion to the general specification in item 1.0, providing and
stabili zing the slope of earth cut during the excavation process to
prevent the sliding by driving the rebar's to the required depth in slope
to the soil surface as per soil consultant /experts recommendations. The
rate shall include the fee payable to the experts for their design and
mesh with gunniting.
Smtr
3 SHORING
In addition to the general specification in item 1.0, stabilizing the slope
of earth during the excavation process to prevent the sliding by
providing suitable shoring. The design of shoring system based on the
system and material used. Contractor shall study the soil conditions ,
depth at which shoring may be required using adequate benching and
anchoring at base and various levels. The rate shall include making good
shoring and recovering the materials used while back filling.
Smtr
4 BACK FILLING
4
Earth back filling for sides of foundations, retaining wall, trenches, lift
pits, sump tank, above raft slab ( filling upto basement floor finish )and
else where as directed by engineer in charge including watering and
consolidating in 150mm thick layers, etc., complete as per detai led
specification with available earth only and shall be stacked with in the
site in OSR.
cum
III MASONRY
1 SIZE STONE MASONRY IN CM (1:6)
Providing and constructing of granite/trap/basalt size stone hammered
dressed in courses not less than 20cms high,bond stons of 2 m apart in
each coused including cost of materials , labour, curing complete as per
specifications.
cum
III CONCRETE
1 PLAIN CEMENT CONCRETE:
Providing & laying M10 concrete using 20mm downsize aggregates 75
thick below Footings, Raft, Retaining walls, Sump Tanks, Drains,
Trenches, D.G.Foundations, HSD Storage Tanks, STP etc.
cum
a) Isolated footing cum
b) Combined footing cumc) Retaining wall cum
D.P C - Above SSM woks:
Providing & laying M10 concrete using 20mm downsize aggregates 75
thick above SSM using water proofing compound.cum
2 D.P C - Above SSM woks:
Providing & laying M10 concrete using 20mm downsize aggregates
75 thick above SSM using water proofing compound.cum
Page 75 of 78
-
7/29/2019 BOQ Appartment
76/78
professional consultants
consulting structural engineers
3 REINFORCED CEMENT CONCRETE
Important notes in regard to reinforced cement concrete.
1. All concrete used for reinforced concrete work (structural concrete)
shall be "Controlled concrete"
While quoting for structural concrete work contractors are particularly
advised to study the relevant drawings carefully before quoting.
Contractors shall submit drawings showing the scheme of form work
(shuttering) for beams and slabs, areas which project out at various
levels as indicated in drawings and this shall be obligatory.
The successful tenderer shall maintain at site, cube testing machine in
good working order, sieves, slump cone, graduated cylinder and
weights, scales for material testing.
NOTE: A qualified mechanic shall always be available during working
hours for maintenance of weight batching machines.
Providing & laying controlled reinforced cement concrete confirming to
grades as specified in (IS 456 - 2000) as per specifications using 20mm
down size aggregates at any depth or heights excluding the cost of steel
rein orcement centrin shutterin sca oldin but inclusive o costFor all structural concrete elements post construction dimension and
levels shall be documented and submitted
Note: Construction joints shall be at pre approved locations only shall
be vertical or stepped. Concrete shall be chipped immediately after final
setting using mechanical chippers and thoroughly cleaned. Surface shall
be given
a. A thick coat of slurry if the joint is less than 3 days old
b. A thick coat of slurry with latex based admixture if the joint is lessthan 7 days old
c. A coat of epoxy if it is more than 7 daysonstructon onts n coumns, wa s s a e or zonta an a t e
latent concrete shall be removed after final setting and shall be given a
The rates shall also include account for any admixtures (approved by the
consultants) the contractor may use in order to enhance the workability,
to achieve accelerated strength, etc. The rate shall include use of
plasticizers and retarders to limit the water/cement ratio to 0.45 and
the temperature to 25 degree C at the time of setting. Complete care
shall be taken to achieve dense and fully watertight concrete.
A Using RMC from outside
1
a) M25 for footings -RMC incl Cement cum
b) M20 for Isolated footings- RMC incl Cement cum
c) M20 for Combined footings- RMC incl Cement cum
RCC COLUMNS :
4 Columns of different sizes and shapes at various levels/heights.
a)Below Basement(m-35) cum
b)Basement ot Ground (m-35) cum
c) Ground to First floor (m-35) cum
d) First to Second floor (M-30) cum
e)Second to third floor (M-30) cum
f) Second floor to Terrace (M-25) cum
g) Third floor to Terrace (M-25) cum
h) Terrace to Staircase head room (M-25) cumi)Terrace to Staircase head room (M-30) cum
M20 conrete for swimming pool:
RCC wall cum
Base slab cum
# M-20 for R.C. Slabs of different thickness including Sunken slabs, etc.,
a)Ramp- RMC incl Cement cum
b)Grade Slab- RMC incl Cement cum
c) ground floor- RMC incl Cement cum
d) First floor-RMC incl Cement cum
e)Second floor- RMC incl Cement cum
f)Third FloorRMC incl Cement cum
g)Terrace floor- RMC incl Cement cum
h) Staircase head room- RMC incl Cement cum
# M-20 for R.C.Beams (upstand and down stand )
a)Ramp beam RMC incl Cement cum
b) ground floor-RMC incl Cement cum
c) First floor-RMC incl Cement cum
d)Second floor-RMC incl Cement cum
e)Third floor- RMC incl Cement cum
f) Terrace floor- RMC incl Cement cum
Page 76 of 78
-
7/29/2019 BOQ Appartment
77/78
professional consultants
consulting structural engineers
g) Staircase head room -RMC incl Cement cum
1
5a
M-20 for R.C.Beams (At plinth level )- RMC incl Cement cum
iii M25 conrete for RCC retaining wall: cum
RCC wall-RMC incl Cement cum
Base slab-RMC incl Cement cum
M20 conrete for RCC retaining wall:
RCC wall-RMC incl Cement cum
Base slab-RMC incl Cement cum
viM-20 for R.C.STAIRCASES at all levels including concrete in steps and
midlanding.a) Basement to Ground cum
b) Ground to First floor cum
c) First to Second floor cum
d) Second floor to Third floor cum
e) third floor to Terrace cum
8 Shearwall
a) Basement to Ground (M-35) cum
a) Ground to First floor (M-35) cum
b) First to Second floor (M-30) cum
c) Second floor to Third floor(M-30) cum
c) third floor to Terrace(M-25) cum
# M-20 for Lintel cum
IV FORMWORK FOR CONCRETE WORKS:
Scheme of Formwork including casting slabs to gentle slope, special
staging for casting floors of different heights, roof projections at various
levels and profiled formwork.
Contractors shall submit drawings showing the scheme of formwork
including back propping and proper sequence of removal of formwork
and back propping so that the structural slab will not be overloaded due
to construction loads.
Formwork shall be designed for close jointed rigid, durable and shall
have adequate strength, water tightness and ensure easy removal etc.,
Props, shoring and bracings shall be all in steel or Aluminium.
Formwork designed with proposed materials (to be approved prior to
making) shall be able to retain its shape, line, dimension, level within the
allowable limits of variations.
Formwork shall facilitate for making holes / recess for leaving dowels
embedments etc. at no additional cost and shall be submitted for
approval.
Necessary arrangement shall be envisaged to provide camber in beams
or slabs as per design.
Formwork shall have adequate openings for cleaning.
Formwork in following items of work at all level
1For beam bottoms & sides, Arch beams s lab, ramp beams, racker
beams etc.
a)Ramp beam Smt
b) Plinth Smt c)Ground Floor Smt
d)First floor Smt
e) Second floor Smt
f)Third Floor Smt
g) Terrace floor Smt
h) Stair case headroom/Above terrace Smt
2 M-20 for R.C. Slabs of different thickness including Sunken slabs, etc.,
a)Ramp Smt
a)Ground floor Smt
b)First floor Smt
c) Second floor Smt
d) Third fllor Smt
e)Terrace floor Smt
f)above terrace floor Smt
3 For Columns of different sizes and shapes at various levels/heights.
a)Below basement floor Smt
b) Basement ot Ground Smt
c) Ground to First floor Smt
d) First to Second floor Smt
e) Second floor to Third floor Smt
Page 77 of 78
-
7/29/2019 BOQ Appartment
78/78
professional consultants
consulting structural engineers
f) Third floor to terrace Smt
g) Above terrace floor Smt
4 For R.C.STAIRCASES at all levels including steps & midlanding.
a)Basement to Ground floor Smtr
b) Ground to First floor Smtr
c) First to Second floor Smtr
d) Second floor Smtr
e)third floor Smtr
5 For Shear wall of different sizes and shapes at various levels/heights.
a) Basement ot Ground Smt
b) Ground to First floor Smt
c) First to Second floor Smt
d) Second floor to Third floor Smt
e) Third floor to terrace Smt
6For Retaining wall of different sizes and shapes at various
levels/heights.
a)base slab Smt
b) Wall Smt
7 For Plinth beam Smtr
8 For LINTEL AND CHEJJA Smtr
VI A) REINFORCING STEEL :
Providing & Fixing steel reinforcement for RCC including material,
fabricating as per IS-2502, transporting, storing, de-coiling,
straightening, cutting, bending, spirally hooping and placing in position
at all levels, including all labour, equipments, supplies, incidentals,
sampling and testing as prescribed in IS codes including all charges
thereon for requisite tests, supervision and binding with approved
quality binding wire. The measurement shall be as per IS 1200 Part- and
unit weight shall be derived as mentioned in IS 1786. The rolling margin
shall be on Contractors own cost. The rate shall include cost of cover
blocks, binding wire, chairs, spacers and pins to be provided as per
specifications and the same will not be measured separately for
payment. Quantity of steel as per drawing and with authorized overlaps
only shall be measured and paid for.
The quoted rate will include welding of reinforcement with low
hydrogen low heat welding electrodes for the welding length mentioned
in the drawings in place of conventional laps of larger diameter bars
only wherever consultants recommend, for which no extra shall be
claimed. Replacing conventional laps with welding splices will be
entirely at consultants discretion. Such unclaimed welding will also
include welding of reinforcement to already fixed insert plates,
structural steel members etc. Shear connectors prepared from the
reinforcing steel welded to structural steel members shall be measured
in the reinforcement item.
The rate also includes protecting the reinforcing bars in their virgin
form or in the fabricated form, or when placed and tied up position or
as dowels left for future continuation of work or at construction joint
against corrosion due to exposure to weather if left exposed and un-
encased for more than three weeks from the date of delivery to the site.
Cement wash shall be given to such bars if they are likely to be exposed
for more that three weeks and less than twelve weeks. Process of
application of cement slurry shall be repeated after every twelve weeks
if the exposure period is stretched.
High yield strength deformed bars conforming to IS:1786 with
Fy=500N/sq.mm
SUB TOTAL - STEEL WORKS