    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

    ITEM DESCRIPTION UNIT QTY RATE

    EXCAVATION & EARTHWORK

    1

    Clearing site including grubbing up roots,

    2 Setting Out Item

    3

    4

    5

    6

    m2

    Excavation in trenches for columnfootings in depth not exceeding 1.5m,backfilled into excavation and removesurplus material from site

    m3

    Filling in making up levels with importedmaterial well watered and compacted inlayers

    m3

    Filling in making up levels with importedmaterials well watered and cpmpacted inlayers for the internal roadwayconstruction

    m3

    Hardcore filling in under floors, well ram& compacted in layers, thickness not

    exceeding 150mm

    m3

    TOTAL FOR EXCAVATION &EARTHWORK CARRIED TO SUMMARY

  • 8/8/2019 BOQ Puliyankulam

    2/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

    ITEM DESCRIPTION UNIT QTY RATE

    CONCRETE WORK

    Concrete

    Work upto DPC

    8

    9

    10 G25 reinforced cement concrete in tie be

    11 G25 reinforced cement concrete in Plinth

    Work upto Roof Level

    12 G25 reinforced cement concrete column

    Reinforcement

    Tor steel (bars) and Mild steel

    reinforcement (stirrups) in the following

    13 Column footing Kg

    14 Column shaft Kg

    15

    16 Tie beam Kg

    17 Plinth beam Kg

    G25 reinforced cement concrete incolumn footing and column shaft uptoDPC level

    m3

    75mm thick G25 reinforced cementconcrete in ground floor slab

    m3

    m3

    m3

    m3

    One layer of A142 welded mesh under

    ground floor slab area includingnecessary laps

    m2

  • 8/8/2019 BOQ Puliyankulam

    3/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

    Formwork

    ply wood formwork to the following

    18 Column footing

    19 Column shaft

    20 Ground floor slab

    21Tie beam

    22 Plinth beam

    Miscellanneous Concrete Work

    23m

    24Nos

    m2

    m2

    m2

    m2

    m2

    150150mm high reinforced concrete

    lintels including 2nos 3/8" dia rods atbottom and necessary form work

    250250250mm size column Footingsincluding GI pipes for verandah coumns

    TOTAL FOR CONCRETE WORKCARRIED TO SUMMARY

  • 8/8/2019 BOQ Puliyankulam

    4/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

    MASONRY WORK

    Work upto DPC

    Random rubble masonryin wall

    25

    Work upto Rooflevel

    26

    foundation in cement and sand 1:5 using150mm to 225mm size broken stone m3

    150mm thick hollow block wall in cementand sand 1:5 m2

    TOTAL FOR MASONRY WORKCARRIED TO INSTALLATION

  • 8/8/2019 BOQ Puliyankulam

    5/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

    ASPHALT WORK

    1000 gauge polythene damp proof

    27

    28

    memberane laying under concrete floorwith minimum 150mm end & side laps m2

    Waterproofing in bathroom floors & wallsupto 1.5m height with approved typewaterproofing compound m2

    TOTAL FOR ASPHALT WORKCARRIED TO SUMMARY

  • 8/8/2019 BOQ Puliyankulam

    6/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

    DOORS & WINDOWS

    29 Nos

    30 Nos

    31 Nos

    32 Fanlight size 600mm600mm,including f Nos

    Single sash, side hung, Plywood doorincluding door frame, type D1, size750mm2100mm

    Single sash side hung, PVC doorincluding door frame, type D2, size700mm2100mm

    Double sash, side hung, timber louvered

    window including timber frame size1200mm1200mm

  • 8/8/2019 BOQ Puliyankulam

    7/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

    ROOF & ROOF PLUMBING

    33

    34

    35 m

    36 m

    Roof covering with corrugated asbestossheets & ceilling m2

    Timber framework including ridging, wallplates, ridge plate, rafters, battens,valence and barge boards m2

    PVC eaves gutter 41/2" square type fixedto valence board with PVC brackets

    PVC downpipes 31/2" dia. Fixed to wallwith PVC clips

    TOTAL FOR ROOF & ROOF

    PLUMBING CARRIED TO SUMMARY

  • 8/8/2019 BOQ Puliyankulam

    8/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

    FINISHES

    37

    38 m

    39 5/8" thick plastering to block walls

    TOTAL FOR FINISHES CARRIED TO SUMMARY

    1/2" thick rendering in cement and sand1:3 in floors m2

    Skirting 4"1/2" thick in cement and san

    m2

  • 8/8/2019 BOQ Puliyankulam

    9/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

    PAINTING

    40

    external weather shield paint of twocoats and a primer undercoat includingpreparation of surfaces to receive paintto external plastered walls m2

  • 8/8/2019 BOQ Puliyankulam

    10/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

    41

    Water supply system

    internal paint emulsion finish with twocoats paint and suitable under coatincluding preparation of surfaces ofinternal plastered walls m2

    TOTAL FOR PAINTING WORKCARRIED TO SUMMARY

    SYSTEM

  • 8/8/2019 BOQ Puliyankulam

    11/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

    42 Nos

    Supply and installation of

    43 12mm pipe m

    44 20mm pipe m

    45 32mm pipe m

    46 Gate valves 20mm Nos

    47 Gate valves 12mm Nos

    Sanitary fittings and toilet accessories

    supply and fixing(including all connections) of

    48 Wash basin Nos

    49 water closet with hand shower Nos

    50 head shower Nos

    51 piller tap Nos

    52 Towel rack Nos

    53 soap holder Nos

    Water disposal system

    54 Nos

    55 90mm Pipe m

    56 110mm pipe m

    57 Gullies Nos

    58 Manholes Nos

    Water storage tank 1000litres includingall necessary fixing accessaries andplaced in position and complete withfloat switch and all connections

    Floor traps with stainless steel grating ontop including water seal fix completewith all connections

  • 8/8/2019 BOQ Puliyankulam

    12/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

    59 NosConstruction of Brick septic tankincluding all connections

    TOTAL FOR PLUMBING, DRAINAGEAND DISPOSAL SYSTEM CARRIED TO

    SUMMARY

  • 8/8/2019 BOQ Puliyankulam

    13/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

    ELECTRICAL WORK

    60 Nos

    61 Wall bracket lamp points Nos

    62 Fan points Nos

    63 5A socket outlet points Nos

    Supply and Installation of

    64 Fans Nos

    65 Lamps Nos

    Supply and installation of DB consistingall connection and all cables complete toworking order

    Point wiring including for an cables,wiring, conducting, clips, earth cables,draw wires, brackers,ceiling roses, wiring

    wooden blocks, junction boxes, switchboxes, 3 core flexible cord, bulb holders,accessories, switches, socket outletbases, hardware fixing and insulatingmaterials, cuyying holes and chases andmaking good to walls for the following

    TOTAL FOR ELECTRICAL WORKCARRIED TO SUMMARY

  • 8/8/2019 BOQ Puliyankulam

    14/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

    AMOUNT

  • 8/8/2019 BOQ Puliyankulam

    15/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

    AMOUNT

  • 8/8/2019 BOQ Puliyankulam

    16/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

  • 8/8/2019 BOQ Puliyankulam

    17/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

  • 8/8/2019 BOQ Puliyankulam

    18/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

  • 8/8/2019 BOQ Puliyankulam

    19/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

  • 8/8/2019 BOQ Puliyankulam

    20/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

  • 8/8/2019 BOQ Puliyankulam

    21/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

  • 8/8/2019 BOQ Puliyankulam

    22/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

  • 8/8/2019 BOQ Puliyankulam

    23/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

  • 8/8/2019 BOQ Puliyankulam

    24/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

  • 8/8/2019 BOQ Puliyankulam

    25/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES

  • 8/8/2019 BOQ Puliyankulam

    26/26

    PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES