RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL OF QUANTITIES
ON PLOT NO JVC11BBMRA005(681-1358)
AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
U
BILL OF QUANTITIES
http://void%280%29/http://void%280%29/http://void%280%29/ -
8/10/2019 The Last Boq(Full)
2/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 1ON PLOT NO JVC11BBMRA005(681-1358) (PRELIMINARIES)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
21B
ITEM14B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
A
UNoteU: UAny item to be provided underPreliminaries section, if not executed or
provided by the Contractor, shall be deducted
from the Lumpsum Tender price, on actual
expenses as per market rateU
.
ULimitation of the SiteThe Contractor will be required to confine his
activities within the boundaries of the site
including the storage of materials, the positioning
of plant and offices and all other equipment
needed for the execution of the Contract. A
temporary fence shall be erected around the
boundary of the site construction of new 24 g
galvanized sheet steel 2 meters high & as per
Dawing and Specafication .
L.S.
BUWater for the Works
29B
The Contractor shall supply clean water for the
works including the works of sub-contractors and
shall supply all temporary plumbing pipework andstorage tanks that may be required pending the
laying of the permanent water main or the
availability thereof and shall pay all fees for
connection and all charges for water consumed.
In the event of a piped water supply not being
readily available at the site the Contractor will be
required at his own expense to transport water to
the site by tanker. L.S.
C0BSoil Investigation
The Contractor shall carry out a careful study of
soil conditions (investigation) by means of at least
three bore holes to a depth 20 Mts. and 3 copies of
soil test report is to be submitted to the Consultant
for approval before commencing any foundations
works. 3 Nos..
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
3/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 1ON PLOT NO JVC11BBMRA005(681-1358) (PRELIMINARIES)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
22B
ITEM15B
DESCRIPTION QTY UNIT RATE TOTAL DHS.A Site Working Conditions
Throughout the period of construction of the
works, the Contractor shall maintain the whole
area of his operations in a clean, tidy and safecondition by arranging his materials in an orderly
manner. All rubbish, waste material, debris and
the like shall be cleared off the working area as it
accumulates and if not removed directly off the
site shall be deposited at general collecting points
allocated by the Engineer pending removal from
site. L.S.
B1BSign Boards2 Nos. of signboards as per drawings and
specifications. Contractor should submit shop
drawing.
Nos.
C2BSite Clearance
Allow for re-routing any existing services which
comes within the limit of Contract. Include for alllabour/material required and approval from
concerned department and as directed by
Engineer. L.S.
D3BSite Levelling
The Contractor shall be responsible for and make
allowances for all necessary earthworks including
those measured separately under the various
section of the Bill of Quantities. L.S.
E4BSite Visiting
The Contractor should visiting the site and any
Demolishing works is on his responsibilities as per
in the site
L.S.
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
4/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 1ON PLOT NO JVC11BBMRA005(681-1358) (PRELIMINARIES)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
23B
ITEM16B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
A Existing Plants, Trees, Vegetation
Due care is to be exercised to protect all plants, trees,
vegetation and the like that may be existing in andaround the site. L.S.
B Temporary Lighting and Power for theWorks
The Contractor shall supply all light and power
required for the works including the works for sub-
contractors including supplying, operating and
maintaining temporary switches, cables and leads
that may be required pending the laying of the
permanent cable or the availability thereof and shall
pay all fees for the connections and all charges for
the current consumed. In the event of the electricity
supply not being readily available, the Contractor
will be required at his own expense to supply,
operate and maintain temporary generators. L.S.
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
5/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 1ON PLOT NO JVC11BBMRA005(681-1358) (PRELIMINARIES)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
24B
ITEM17B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
A Office Equipments at Site :
Provide, maintain and finally remove the site offices
with new furniture as per specifications. LS
B Material Requirements :
Provide material, tools and equipments stores
according to the standards and also room for concrete
cubes L.S.
C Necessary Equipments for WorksImplementation28BGarbage collection point and all other equipments to
ensure carrying out the works on the best standards.
L.S.
D Safety and General Site equipments for allthe staff and visitors at the Site :
Safety shoes, protection helmets, safety belts when
working on elevations, guiding signs, spotlights,safety precautions for open areas staircase, open
yards and general site cleaning. L.S.
E Shop DrawingsPrepare shop drawings for Kitchen Cabinet,
Aluminume workes, Wooden Workes, Finishing,
Toilets, Bathrooms, Steel reinforcement, Piless,
Woter Proof, Electrical, Sanitary Water supply
drainage, Telephone and Fire protections prior to
commencement of actual work, pay all legal fee and
other expenses to the concerned departments forobtaining the final connections from the authorities
up to the distribution points on site with the co-
ordination Engineer.
L.S.
F As Buil t DrawingsPrepare and provide as built drdawings for all the
service viz. Electrical, Water supply and drainage
works duly approved by the concerned authorities. L.S.
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
6/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 1ON PLOT NO JVC11BBMRA005(681-1358) (PRELIMINARIES)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
25B
ITEM18B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
G Samples approval L.S
Provide in duplicate samples of all the materials and
shop drawings for the Engineer approval.H Interim Payment Certif icates L.S
I
J
Submit on each interim payment certificate 24 Nos.
photographs in duplicate along with negative to
Engineer.
Security Insurances
Insurance for the Works
Third party insurance
Workmen compensation insurance
Works by other Contractors
Allow for co-coordinating with other
contractors for the execution of their works.
Important note :
- All quantities should be calculated by
contractors and any enquires to be before one
week from submitted tender date.
- Contractors should be add profit and over
head for any P.S item or P.C rate ( Supply Fix )
- Contractors should be add profit and over
head also builders works for item of P.C rate (
Supply )
L.S
.
L.S
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
7/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 1ON PLOT NO JVC11BBMRA005(681-1358) (PRELIMINARIES)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
26B
ITEM19B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
A The tenderer is to details below any additional items
with quantities and rates not previously included to
complete the build-up of L.S. tender price for this
section of the works. Should the tenderer fail to
insert any items here, it will be deemed that his L.S.price for the tender includes all items and no
subsequent claim for any additional item will be
entertained.
11B
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
8/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 1ON PLOT NO JVC11BBMRA005(681-1358) (PRELIMINARIES)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
27B
ITEM20B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
5BTO COLLECTION
From Page B1/01
Page B1/02
Page B1/03
Page B1/04
Page B1/05
Page B1/06
12B
BILL NO.1 PRELIMINARIES GENERAL DHS
13B
TOTAL CARRIED TO SUMMARY
-
8/10/2019 The Last Boq(Full)
9/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4 FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED
ON PLOT NO JVC11BBMRA005(681-1358)
AT AL BARSHA SOUTH FOUR , JUMERA VILLAGE ,DUBAI
Bill No. 09
Garbage System
Item Description Quantity Unit Rate Amount
Garbage System
1 Supply and install garbage chute system as specified complete
with all accessories and including exchat system and fire
system and MEP work and approved by Engineer( 200,000
AED/ONE) Item
2 Allow for any items not indicated herein but required for a
complete and operational system Item
3 Allow for builder's work
4 Operational maintenance Item
5 Trolly No
To Collection DH
B13/01
-
8/10/2019 The Last Boq(Full)
10/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4 FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED
ON PLOT NO JVC11BBMRA005(681-1358)
AT AL BARSHA SOUTH FOUR , JUMERA VILLAGE ,DUBAI
Bill No. 09
Garbage System
Item Quantity Unit Rate DH
COLLECTION
Page B13/01
To Collection DH
-
8/10/2019 The Last Boq(Full)
11/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4 FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED
ON PLOT NO JVC11BBMRA005(681-1358)
AT AL BARSHA SOUTH FOUR , JUMERA VILLAGE ,DUBAI
Bill No. 09
Garbage System
B13/02
-
8/10/2019 The Last Boq(Full)
12/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 10
ON PLOT NO JVC11BBMRA005(681-1358) (ELEVATORS WORKS)
AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
B10/01
ItemNo
Description Qty. UnitUnitRate
Amount(Dhs.)
A.
B.
0B
C
D.
E.
1B
ELEVATORS
Supply, install, test and commission thefollowing elevators including allequipment etc. in accordance topreparing shop drawings, allowing fortesting for 16 hours inspection, trainingstaff and providing 12 months freemaintenance from the date ofpreliminary handing over date.
Complete Passenger elevators 800 Kg.(10 persons) capacity, 1.6 meter persecond speed, gearless type, 06 stops,06 openings all in the same line at front(B,G,1-4 Typical) with all requiredaccessories and control panel andstainless steel gamp for opening doorsin all floors(150,000 AED/ONE)
Allow for builders work as needed forthe installation of the elevators.
Allow for testing, commissioning,training of building staff etc.
Allow for working shop drawing,operation and maintenance manualsetc.
Allow for 12 month free maintenance
after the initial handing over andcommissioning
2
Item
Item
Item
Item
Nos.
L.S
L.S
L.S
L.S
TOTAL BILL NO10: ELEVATORSCarried to Main Summary
Dhs.
Item Description Qty. Unit Unit Amount
-
8/10/2019 The Last Boq(Full)
13/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 10
ON PLOT NO JVC11BBMRA005(681-1358) (ELEVATORS WORKS)
AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
B10/02
No Rate (Dhs.)
The tenderer is to details below any
additional items with quantities and ratesnot previously included to complete the
build-up of L.S. tender price for this
section of the work. Should the tenderer
fail to insert any items here, it will be
deemed that his L.S. price for the tender
includes all items and no subsequent
claim for any additional item will be
entertained
TOTAL BILL NO10: ELEVATORSCarried to Main Summary
Dhs
-
8/10/2019 The Last Boq(Full)
14/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 10
ON PLOT NO JVC11BBMRA005(681-1358) (ELEVATORS WORKS)
AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
B10/03
ItemNo
Description Qty. UnitUnitRate
Amount(Dhs.)
TO COLLECTION FOR BILL NO 10
From page NO B10/01
From page NO B10/02
TOTAL BILL NO10: ELEVATORSCarried to Main Summary
Dhs
-
8/10/2019 The Last Boq(Full)
15/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 10
ON PLOT NO JVC11BBMRA005(681-1358) (ELEVATORS WORKS)
AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
B10/04
-
8/10/2019 The Last Boq(Full)
16/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 2
ON PLOT NO JVC11BBMRA005(681-1358) (SUB STRUCTURE)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
13B
ITEM9B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
A
UEXCAVATE (AS APPROVED BYCONSULTANT) NOT LESS THAN 400 CMBELOW EXISTING GROUNDLEVEL(ASPHALT ) INCLUDING HARDSOIL, SOFTROCK, ROCK ETC. UP TOREQUIRED FOUNDATION DEPTH.
Shoring work as per drawing and
specification(shop drawing &calculation should
be submitted for approvel)
Item
B
C
17B
Excavation up to to pcc level
Allow for dewatering to keep excavation free from
water.
M3
Item N.A
D
18BFILLING MATERIAL
Filling (selected approved soil) under floor slab
and entrance steps including levelling and
compacting in layers as specified (each layer not
exceeding 250 mm) compacted to at least 95% of
maximum dry density for each layer) from anapproved source as directed by engineer
M3
1BCONCRETE SUNDRIES
E2B
One layer of 250 micron polythene sheeting
lapped at joints for all underground concrete.
M2
F
G
H
water proofing as per specifications and drawing
details of horizontal & vertical surfaces of
concrete applied for all underground concrete
works, plinth wall ground beams, neck columns,upper tie beams, entrance .etc) (2 layer 5 mm
water proofing membrane) and (1 layer 6mm thick
protection board )
- Horizontal
- Vertical
2 coats of bitumen
Water Stopper
M2
M2
M2
L.M
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
17/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 2
ON PLOT NO JVC11BBMRA005(681-1358) (SUB STRUCTURE)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
14B
ITEM10B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
MASS CONCRETE CLASS C 20 N/MM2USING SULPHATE RESISTING CEMENTINCLUDING ALL NECESSARYFORMWORK
A 100 mm thick M2
REINFORCED CONCRETE CLASS A (40N/MM2) USING SULPHATE RESISTINGCEMENT INCLUDING ALL NECESSARYFORMWORK STEEL REINFORCEMENT ASPER SPECIFIED AND SHOWN ON DRGS.
B
C
D
E
F
Raft (thk as per approved drawing)
Lift bit
Under ground water tank
Tie & ground beams
Solid slab 300mm thk
M3
M3
M3
M3
M2
H Anti-termite treatment :
- Under foundation
- On perimeter
M2
Lm
5B
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
18/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 2
ON PLOT NO JVC11BBMRA005(681-1358) (SUB STRUCTURE)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
15B
ITEM11B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
A The tenderer is to details below any additional items
with quantities and rates not previously included to
complete the build-up of L.S. tender price for this
section of the work. Should the tenderer fail to insert
any items here, it will be deemed that his L.S. price
for the tender includes all items and no subsequent
claim for any additional item will be entertained.
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
19/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 2
ON PLOT NO JVC11BBMRA005(681-1358) (SUB STRUCTURE)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
16B
ITEM12B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
0BTO COLLECTION FOR BILL NO. 2 :
From Page B2/01
Page B2/02
Page B2/03
7B
BILL NO.2 SUB STRUCTURE DHS
8B
TOTAL CARRIED TO SUMMARY
-
8/10/2019 The Last Boq(Full)
20/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 3ON PLOT NO JVC11BBMRA005(681-1358) (SUPERSTRUCTURE)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
7B
ITEM4B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
USUPERSTRUCTUREUREINFORCED CONCRETE CLASS (A) 40N/MM2 USING ORDINARY PORTLANDCEMENT INCLUDING ALL NECESSARYFORMWORK AS SPECIFIED ONDRAWINGS.
A
B
Columns
Concrete protection around column in wet areaM3
C Core wall M3D
E
Beams
Flat slab for ground floorM3
F Post tension slabs 250 mm thk M2
G
H
Post tension slabs 280 mm thk.
Post tension slabs 320 mm thkM2
I Solid slab M3
J Swimming pool M2
K
L
M
Parapet
Transformer trench
150mm Bases for kitchen cabinets
M3
M3
M2N
O
P
Q
R
S
Arch, decorative element & Lentils
In Stair Case
Equipment foundations (A/C &Water tank &.....etc)
Wall for underground water tank and pump room
Ext staircase & Ramps& Box flowers
Main ramp
M3
M3
M3
M3
M3
M3
0BTO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
21/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 3ON PLOT NO JVC11BBMRA005(681-1358) (SUPERSTRUCTURE)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
8B
ITEM5B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
A The tenderer is to details below any additional items
with quantities and rates not previously included to
complete the build-up of L.S. tender price for this
section of the work. Should the tenderer fail toinsert any items here, it will be deemed that his L.S.
price for the tender includes all items and no
subsequent claim for any additional item will be
entertained.
1B
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
22/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 3ON PLOT NO JVC11BBMRA005(681-1358) (SUPERSTRUCTURE)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
9B
ITEM6B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
UTO COLLECTION FOR BILL NO. 3:
From Page B3/01
Page B3/02
2BBIILL NO.3 SUPERSTRUCTURE -
3B
TOTAL CARRIED TO SUMMARY DHS
-
8/10/2019 The Last Boq(Full)
23/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 4
ON PLOT NO JVC11BBMRA005(681-1358) (BLOCK WORK )AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
6B
ITEM3B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
A
B
C
U
Block Works
200mm Solid block work with smooth sand
plaster including all support columen and copying
beam as per in drawing and specifacation forshoring
200 mm thick Hollow Blocks as per in Drawing
and specification .
100 mm thick Hollow Blocks as per in Drawing
and specification .
M2
M2
M2
D Thermal blocks,250mm M2
0B
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
24/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 4
ON PLOT NO JVC11BBMRA005(681-1358) (BLOCK WORK )AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
7B
ITEM4B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
A The tenderer is to details below any additional
items with quantities and rates not previously
included to complete the build-up of L.S. tender
price for this section of the work. Should thetenderer fail to insert any items here, it will be
deemed that his L.S. price for the tender includes
all items and no subsequent claim for any
additional item will be entertained.
1B
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
25/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 4
ON PLOT NO JVC11BBMRA005(681-1358) (BLOCK WORK )AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
8B
ITEM5B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
U
TO COLLECTIONU
U
FOR BILL NO. 4 :
From Page B4/01
Page B4/02
2B
BILL NO.4 - BLOCK WORKS TOTAL CARRIED TO SUMMARY DHS
-
8/10/2019 The Last Boq(Full)
26/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 5ON PLOT NO JVC11BBMRA005(681-1358) (ROOFING AND WATERPROOFING)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
6B
ITEM3B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
URoof Water ProofingWorks(COMPOSYSTEM FROM ROOFCARE)(25 YEARS GARANTEE)
A Roof water proof works composystem from roofcare as drawindg and specifacation including all
works and skirting
M2
UWaterproofing of Kitchen / bathroom / toilet /
Balcony/flower box and All Wet Areas(10
YEARS GRANTEE)
All these items under floor finishing
I Sand/cement screed M2
J Concrete primer M2
K One layer of 5mm thk. Dermabit applied
waterproofing membrane with polyester as
specified.
M2
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
27/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 5ON PLOT NO JVC11BBMRA005(681-1358) (ROOFING AND WATERPROOFING)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
7B
ITEM4B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
A The tenderer is to details below any additional
items with quantities and rates not previously
included to complete the build-up of L.S. tender
price for this section of the work. Should thetenderer fail to insert any items here, it will be
deemed that his L.S. price for the tender includes
all items and no subsequent claim for any
additional item will be entertained.
1B
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
28/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 5ON PLOT NO JVC11BBMRA005(681-1358) (ROOFING AND WATERPROOFING)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
8B
ITEM5B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
UTOTAL COLLETION FOR BILLA NO. 5 :
From Page No. B5/01
From Page No. B5/02
2B
BILL NO.5 WATER PROOFING - TOTAL CARRIED TO SUMMARY DHS
-
8/10/2019 The Last Boq(Full)
29/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 6ON PLOT NO JVC11BBMRA005(681-1358) (FINISHING WORK)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
13B
ITEM7B
DESCRIPTION QTY UNI
T
RATE TOTAL DHS.
UNOTEU:- ALL ITEMS TO BE CHECKED WITH
DRAWING & SPECIFICATIONS- CONTRACTORS SHOULD CALCULATE ALL
QUANTITIES AS PER DRAWING- CONTRACTOR SHOULD PROVIDE ANY
SHOP DRAWING FOR METHOD OFFIXATION AS PER SPECS & ENGINEERREQUIREMENTS
1
A
B
C
D
2
A
B
C
D
U
Floor Finishes
UCeramic:-
Supply and fix ceramic tiles for (all bed rooms & tol
& bath rooms & pantry & m.bed rooms & terrace &
store & laundry ) in flats (35 AED/M2)
Supply and fix ceramic tiles for (living hall &
entrance & lobby ) in flats (45 AED/M2)
Supply and fix ceramic tiles for service area&corridors & shops(garbage rooms & telephone
rooms & electrical rooms & water meter rooms &
L.V rooms & shops & security room & corridors ) in
flats (45 AED/M2)
skirting ( 25 AED/L.M)
UGranite & MARBLE:-Granite for slopes in entrance as per drawing and
specification (250 AED/M2).
Granite for main &back entrance as per drawing andspecification (250 AED/M2)
Granite for main entrance steps as per drawing and
specification (250 AED/L.M)
Granite for internal steps as per drawing and
specification ( stare 1 & stare 2) (70 AED/L.M).
M2
M2
M2
M2
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
30/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 6ON PLOT NO JVC11BBMRA005(681-1358) (FINISHING WORK)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
ITEM8B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
E
F
G
H
I
2
3
A
B
C
D
Granite for landing of internal steps as per
drawing and specification (star1&star2) (70
AED/M2).
Marble for lift lobby as per drawing and
specification (250AED/M2)
Granite skirting (40 AED/L.M)
Marble skirting ( 40 AED/L.M)
Marble tresholds
UEpoxy traffic deck coating systemUfrom JOUTIN
or equal approved for vehicular traffic in barking
area and ramp as per drawing and specification
UCeiling finishes:-
12.5 mm thick gypsium board with cornish&baulk
head painted with acrylic emulsion paint for
corridors and service roomsas per drawing and
specifacation
12.5 mm thick gypsium board with cornish&baulk
head painted with acrylic emulsion paint for
halls and all rooms in flats as per drawing and
specifacation
125 mm thick moisture resistance gypsium boardwith cornish &bulk head for main entrance and
wet area painted with acrylic emulsion paint
600X600 MM thk suspended baked enamel
aluminum tiles with exposed splin for all bath
rooms and paintry and wet areas
M2
M2
L.M
L.M
L.M
M2
M2
M2
M2
M2
2B
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
31/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 6ON PLOT NO JVC11BBMRA005(681-1358) (FINISHING WORK)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
15B
ITEM9B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
1
A
B
C
D
E
2
A
B
C
3
A
B
4
0BWalls Finishes
Plaster work:-Spry Plaster work for parking area as per drawing
and specification .
Internal plaster including all accessoires as per
drawing and specification .
External plaster including all accessoires as per
drawing and specifacation.
External plaster for parapet including all
accessoires as per drawing and specifacation
Aluminum angle for grooves
Paint works:-Pure acrylic anti-carbonation silk smooth finish on
Jotashiled from Jotun or approved equal as per
drawing and specifacation for parking area
External paint finish weather proof as per
drawings & specification and to the consuiltants
approval from jotun or approved equal (full
epoxy)
Internal fenomastic paint (wash able) as per
drawing & specifacation and to the consultants
approval from jotun or approval equal
Stone Cladding
Stone cladding in elevation as per drawing andspecication
Stone handerail as per drawing and specafication
Granite CladdingGranite cladding for main enterance &box flowers
as per drawing and specifacation
M2
M2
M2
M2
L.M
M2
M2
M2
M2
M2
M2
3B
BILL NO.6 FINISHING TOTAL CARRIED TO SUMMARY DHS
-
8/10/2019 The Last Boq(Full)
32/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 6ON PLOT NO JVC11BBMRA005(681-1358) (FINISHING WORK)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
16B
ITEM10B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
5
A
B
C
1
2
3
4
5
6
7
8
9
10
11
12
13
Wall Ceramic
Cerimic tiles for bath rooms &kitchens&paintrys
& lundary including border ( 35 AED/M2)
Cerimic tiles for garbage rooms (20 AED/M2)
Cerimic tiles for corradors and passing area
including border (45 AED/M2)
External worksInterlock tile (8 cm) as per drawing and
specifacation
Kerpstone as per drawing and specifacations
Compound wall as per drawing and
specifacations
GRC decorative
Roof clay tiles(70 AED/M2)
Door sign
Wheel stopper
GI grating
Corner gaurds
Traffic signs and marking as per drawing andspecification
Reflective mirror as per drawing and specification
Gate barrier
Roof deck & roof garden and landscape as per
drawing and specification(120AED/M2)
M2
M2
M2
M2
L.M
L.M
L.M
M2
ITEM
ITEM
ITEM
ITEM
ITEM
ITEM
ITEM
M2
4B
BILL NO.6 FINISHING TOTAL CARRIED TO SUMMARY DHS
-
8/10/2019 The Last Boq(Full)
33/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 6ON PLOT NO JVC11BBMRA005(681-1358) (FINISHING WORK)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
17B
ITEM11B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
A The tenderer is to details below any additional
items with quantities and rates not previously
included to complete the build-up of L.S. tender
price for this section of the work. Should thetenderer fail to insert any items here, it will be
deemed that his L.S. price for the tender includes
all items and no subsequent claim for any
additional item will be entertained.
5B
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
34/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 6ON PLOT NO JVC11BBMRA005(681-1358) (FINISHING WORK)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
18B
ITEM12B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
TOTAL COLLETION FOR BILLA NO. 6 :
From Page No. B6/01
From Page No. B6/02
From Page No. B6/03
From Page No. B6/04
From Page No. B6/05
BILL NO 6 FINISHING - TOTAL CARRIED TO SUMMARY DHS
-
8/10/2019 The Last Boq(Full)
35/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 6ON PLOT NO JVC11BBMRA005(681-1358) (FINISHING WORK)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
-
8/10/2019 The Last Boq(Full)
36/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 7ON PLOT NO JVC11BBMRA005(681-1358) (ALUMINUM& METAL WORKS)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
9BITEM 5BDESCRIPTION QTY UNIT RATE TOTAL DHS.
U1
A
B
U
Coloured powder coated aluminiumwindows and complete panels, flyscreen,ironmongery, mastic sealant and like as perspecification and drawing.
UUPVC windows as per drawing
(W01) (200 X 200) CM
(W02) (305 X 200) CM
M2
M2
C (W03) (200 X 120) CM M2
D (W04) (90X120) CM M2
E (W05) (60X100) CM M2
F (W06) (60X120) CM M2
G (W07) (140X120) CM M2
H (W08) (55X100) CM M2
I
J
(W09) (180X120) CM
(W10) (165X120) CM
M2
M2
K (W11) (200X195) CM M2
1B
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
37/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 7ON PLOT NO JVC11BBMRA005(681-1358) (ALUMINUM& METAL WORKS)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
10B
ITEM6B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
2
Aluminium & Metal Works to be continued
U
Aluminium Doors
A (AD01) (200x220)CM NO
B (AD02)(400X300/400) CM NO
C (AD03) (440X220) CM
Aluminum door with stainless steel cladding for
main entrance as per drawing and specification
NO
D (AD04) (180X220) CM NO
E (AD05) (100X220) CM NO
F (AD06) (310X220) CM NO
G (AD07) (200X220) CM NO
H (SD01) (305X300) CM NO
I (SD02) (100X300) CM NO
J
K
L
M
U
3
U4
U5
U6
U7
U8
(SD03) (100X220) CM
(SD04) (75X220) CM
(SD05) (100X220) CM
(SD06) (180X220) CM
UCast aluminum railingU color as per architects
approval (for terrace and balcony) (500/L.M)
U
Miled steel railingU
as per drawing and
specification for staircase& ramps (500/L.M)
USpiral staircaseU with wooden tread for duplex
flat as per drawing(shop drawing &method of
statement should be submitted for eng approval)
UBird screen
UInspection ladderU(as per drawing)
U
Care shedU
as per drawing & specification for 9
cars
NO
NO
NO
NO
L.M
L.M
Item
Item
Item
Item
2B
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
38/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 7ON PLOT NO JVC11BBMRA005(681-1358) (ALUMINUM& METAL WORKS)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
11B
ITEM7B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
A The tenderer is to details below any additional
items with quantities and rates not previouslyincluded to complete the build-up of L.S. tender
price for this section of the work. Should the
tenderer fail to insert any items here, it will be
deemed that his L.S. price for the tender includes
all items and no subsequent claim for any
additional item will be entertained.
3B
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
39/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 7ON PLOT NO JVC11BBMRA005(681-1358) (ALUMINUM& METAL WORKS)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
12B
ITEM8B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
0BTo COLLECTION FOR BILL NO. 7
From Page No.B7/01
Page No.B7/02
4B
BILL NO.7ALU & METAL WORK TOTAL CARRIED TO SUMMARY DHS
-
8/10/2019 The Last Boq(Full)
40/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 7ON PLOT NO JVC11BBMRA005(681-1358) (ALUMINUM& METAL WORKS)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
-
8/10/2019 The Last Boq(Full)
41/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 8
ON PLOT NO JVC11BBMRA005(681-1358) (JOINERY&IRONMONGERY)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
9B
ITEM5B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
1-
A
UWOODEN WORKS:-
UDoors:-
Supply & Fix wooden sub frames single leaf18mm thk. As per specifications
No
B
C
D
E
F
G
2-
H
I
Supply & fix wooden doors fire rated for staircase
as per drawing and civil defense requirements
D01(110X220) CM(2,000/ONE)
Supply & fix wooden doors fire rated for
Apartment as per drawing and civil defense
requirements D02(100X220) CM(2,000/ONE)
Supply & fix wooden doors for bed rooms as per
drawing and specification D03(90X220)
CM(1,500/ONE)
Supply & fix wooden doors for bath rooms and
toilet as per drawing and specificationD04(80X220) CM(1,500 /ONE)
Supply & fix wooden doors with hand cape for
basement as per drawing and specification
D05(110X220) CM(2,000/ONE)
Supply & fix wooden doors fire rated for roof as
per drawing and civil defense requirements
D06(100X220) CM(2,000/ONE)
U
WOODEN PERGOLA:-
Supply & fix wooden pergola(400 X 400) CM as
per drawing and specification at roof
(15,000/ONE)
Supply & fix wooden pergola(200 X 200) CM as
per drawing and specification at roof (6,000/ONE)
No
No
No
No
No
No
No
No
0B
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
42/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 8
ON PLOT NO JVC11BBMRA005(681-1358) (JOINERY&IRONMONGERY)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
10B
`ITEM6B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
3-
4-
UKITCHEN CABANET :-
Supply & insulation works of kitchen cabinet topand bottom including base unit and cupboards and
sink and cookers and all requirements as per
drawing and specification (400,000 AED)
UWOODEN WARDROBESSupply & insulation works of wardrobes including
all required works as per drawing and
specification (250,000 AED)
ITEM
ITEM
1B
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
43/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 8
ON PLOT NO JVC11BBMRA005(681-1358) (JOINERY&IRONMONGERY)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
11B
ITEM7B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
A The tenderer is to details below any additional
items with quantities and rates not previously
included to complete the build-up of L.S. tender
price for this section of the work. Should thetenderer fail to insert any items here, it will be
deemed that his L.S. price for the tender includes
all items and no subsequent claim for any
additional item will be entertained.
2B
TO COLLECTION DHS
-
8/10/2019 The Last Boq(Full)
44/73
RESIDENTIAL/COMMERCIAL BUILDING
(B+G+4FLOOR+ROOF)
FOR MRS/ACES PROPERTY LIMITED BILL NO. 8
ON PLOT NO JVC11BBMRA005(681-1358) (JOINERY&IRONMONGERY)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI
12B
ITEM8B
DESCRIPTION QTY UNIT RATE TOTAL DHS.
UTO COLLECTION FOR BILL 8 :From Page No.B8/01
Page No .B8/02
Page No .B8/03
3B
BILL NO. 8 JOINERY & IRONMONGERY - DHS
4B
TOTAL CARRIED TO SUMMARY
-
8/10/2019 The Last Boq(Full)
45/73
NO ITEM FLOOR WALL CELLING DOOR KITCHEN CABANET DRESS
1 BASMENT
GRAGE AREA EPOXY PAINT PAINT PAINT
LIFT LOBBY MARBLE/250 AED MARBLE/250 AED GUBSUM BOARD
SECURITY CERIMIC/45 AED PAINT GUBSUM BOARD NORMAL/1500 AED
RAMP EPOXY PAINT 0 0
2 GROUND FLOOR
LIVING HALL WITH ENTRANC CERIMIC/45 AED PAINT GUBSUM BOARD FIRE RATED/3000AED
BED ROOMS CERIMIC/35 AED PAINT GUBSUM BOARD NORMAL/1500 AED
TOL CERIMIC/35 AED CERIMIC/35 AED FALSECELLING NORMAL/1500 AED
BATH CERIMIC/35 AED CERIMIC/35 AED FALSECELLING NORMAL/1500 AED
PAINTRY CERIMIC/35 AED CERIMIC35AED FALSECELLING
M.BED ROOM CERIMIC/35 AED PAINT GUBSUM BOARD NORMAL/1500 AED
TERRACE CERIMIC/35 AED PAINT W. P GUBSUM
STORE CERIMIC/35 AED PAINT FALSECELLING NORMAL/1500 AED
COORIDOR CERIMIC/45 AED CERIMIC/45 AED GUBSUM BOARD
STARCASE 1 GRANITE /70 AED PAINT GUBSUM BOARD FIRE RATED/2000AED
STARCASE 2 GRANITE /70 AED PAINT GUBSUM BOARD FIRE RATED/2000AED
GARBAGE ROOM CERIMIC/45 AED CERIMIC/45 AED FALSECELLING
EL ROOM CERIMIC/45 AED PAINT FALSECELLING FIRE RATED/2000AED
L.V ROOM CERIMIC/45 AED PAINT FALSECELLING FIRE RATED/2000AED
RECEPTION GRANITE/250 AED GRANITE/250 AED GUBSUM BOARD
MAIN ENTRANCE GRANITE/250 AED GRANITE/250 AED GUBSUM BOARD STANLESS STEEL
RAMP FOR ENTRANCE GRANITE/250 AED 0 0
SHOPS CERIMIC/45 AED PAINT FALSECELLING GLASS
PARKING AREA EPOXY PAINT PAINT PAINT
3 TYPICAL FLOORLIVING HALL WITH ENTRANC CERIMIC/45 AED PAINT GUBSUM BOARD FIRERATED/3000 AED
BED ROOMS CERIMIC/35 AED PAINT GUBSUM BOARD NORMAL/1500 AED
BATH CERIMIC/35 AED CERIMIC/35 AED FALSECELLING NORMAL/1500 AED
TOL CERIMIC/35 AED CERIMIC/35 AED FALSECELLING NORMAL/1500 AED
PAINTRY CERIMIC/35 AED CERIMIC/35 AED FALSECELLING
LOBBY CERIMIC/45 AED PAINT GUBSUM BOARD
M.BED ROOM CERIMIC/35 AED PAINT GUBSUM BOARD NORMAL/1500 AED
LUNDRY CERIMIC/35 AED PAINT FALSECELLING NORMAL/1500 AED
STORE CERIMIC/35 AED PAINT FALSECELLING NORMAL/1500 AED
TELEPHONE ROOM CERIMIC/45 AED PAINT FALSECELLING FIRE RATED/2000AED
EL ROOM CERIMIC/45 AED PAINT FALSECELLING FIRE RATED/2000AED
STARCASE1 CERIMIC/45 AED PAINT GUBSUM BOARD FIRE RATED/2000AED
STARCASE2 CERIMIC/45 AED PAINT GUBSUM BOARD FIRE RATED/2000AED
WATER MEATER ROOM CERIMIC/45 AED PAINT FALSECELLING FIRE RATED/2000AED
COORIDOR CERAMIC/45 AED CERAMIC/45 AED GUBSUM BOARD
CHUIT ROOM CERIMIC/45 AED CERIMIC/20 AED FALSECELLING FIRE RATED/2000AED
BALACONY CERIMIC/45 AED PAINT GUBSUM BOARD
4 FOURTH FLOOR
LIVING HALL WITH ENTRANC CERIMIC/45 AED PAINT GUBSUM BOARD
BED ROOMS CERIMIC/35 AED PAINT GUBSUM BOARD
TOL CERIMIC/35 AED CERIMIC/35 AED FALSECELLING
BATH CERIMIC/35 AED CERIMIC/35 AED FALSECELLING
M.BED ROOM CERIMIC/35 AED PAINT GUBSUM BOARD
LOBBY CERIMIC/45 AED PAINT GUBSUM BOARD
LUNDRY CERIMIC/35 AED PAINT FALSECELLING
EL ROOM CERIMIC/45 AED PAINT FALSECELLING
WATER MEATER ROOM CERIMIC/45 AED PAINT FALSECELLING
CHUIT ROOM CERIMIC/45 AED CERIMIC/20 AED FALSECELLING
GAS ROOM CERIMIC/45 AED PAINT FALSECELLING
COORIDOR CERIMIC/45 AED CERIMIC/45 AED GUBSUM BOARD
STORE CERIMIC/35 AED PAINT FALSECELLING
PAINTRY CERIMIC/35 AED CERIMIC/35 AED FALSECELLING
KITCHEN CERIMIC/35 AED CERIMIC/35 AED FALSECELLING
STARCASE1 CERIMIC/45 AED PAINT GUBSUM BOARD
STARCASE2 CERIMIC/45 AED PAINT GUBSUM BOARD
ROOF GARDEN LAND SCPE/GRASS
5 ROOF FLOOR
LIFT ROOM CERIMIC/35 AED PAINT PAINT
EL ROOM CERIMIC/45 AED PAINT FALSECELLING
STARCASE1 CERIMIC/45 AED PAINT FALSECELLING
GARDEN LAND SCPE/GRASS 0 0
ROOF OMPO ROOF SYSTE 0 0
CHUIT ROOM CERIMIC CERIMIC FALSECELLING
6 TOP ROOF
ROOF OMPO ROOF SYSTEM
1000AED/R.M
-
8/10/2019 The Last Boq(Full)
46/73
ACES Property Limited Crown Home Consult
PROPOSED BUILDING
(B+G+4+R)
On Plot No. JVC 11BBMRA005 (681-1358)
Aces Limited Property
Item
NoITEM DESCRIPTION Quantity Unit Rate Amount
Dhs Dhs
A
B
C
16 ELECTRICAL
Notes
The Contractor has to refer to the specifications and drawings for
all details related to the works of this division and he is to include
L.S
L.S
L.S
for complying with all the requirements contained therein, whether
Item
Item
Item
or not they are specifically mentioned within the items description.
Contractor shall obtain authorities approvals during construction
stage and pay all fees and charges need by authorities, prepairing
offical submission and obtain approvals for building permit.
16060 EARTHING SYSTEM
Low voltage earthing:
Supply and install earthing system including copper rods, plates
according to drawings ,specs and international standers to verify
earthing resistance of 1 ohm.
Low voltage earthing
Low current earthing:
Supply and install clean earthing system including copper rods,
plates according to specs and international standers to verify
earthing resistance of 0.5 ohm
Low current earthing
Swimming Pool and fountains earthing:
Supply and install clean earthing system including copper rods,
plates according to specs and international standers to verify
earthing resistance of 0.5 ohm
Swimming Pools earthing
Carried to Collection Dhs
Crown Home Consultants Page 1 of 15 July
-
8/10/2019 The Last Boq(Full)
47/73
ACES Property Limited Crown Home Consult
E
A
B
C
D
E
F
G
H
IJ
K
L
M
N
O
P
Q
R
S
T
U
VW
X
Y
Z
AA
AB
16425 LOW VOLTAGE SWITCH GEAR & SWITCH BOARDS:
1
1
1
1
1
1
1
1
1
11
1
1
1
1
1
1
1
1
1
1
1
11
1
1
1
1
1
Supply , install and test metal enclosed FORM-4 Type 6, IP54main
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
NrNr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
NrNr
Nr
Nr
Nr
Nr
Nr
distribution board complete with metal enclosure, instrumentation,
indicating lamps, earthing, fixing and supporting materials and all
cable glands for incoming and outgoing cables, termination, etc...
(to be installed inside air-conditioned room (30 C ambient temp)):
LVP-1 with 420KVAR capacitor bank
16470 DISTRIBUTION AND SUB DISTRIBUTION PANEL
BOARD
Supply , install , test and operate distribution and sub distribution
panel boards as shown in drawings and specs. complete with ,
busbars , hooking up of all incoming & outgoing feeders and all
necessary accessories and ancillary works required for complete
installation for the following panels
Flat distribution boards shall include all required accessories and
builders works for installation of KWHM's
Sub Main & Branch distribution panel boards
SMDB-BF
SMDB-LL
SMDB-G
SMDB-1ST
SMDB-2ND
SMDB-3RD
SMDB-4TH
SMDB- R
SMDB- ACDB-SS
DB-BF
DB-G
DB-LL1
DB-LL2
DB-LL3
DB-LL4
DB-TEL
DB-LAY
DB- SH01
DB- SH02
DB- G001
DB- G002DB- G003
DB- G004
DB- G005
DB- G006
DB- 101
DB-102Carried to Collection Dhs
Crown Home Consultants Page 2 of 15 July
-
8/10/2019 The Last Boq(Full)
48/73
-
8/10/2019 The Last Boq(Full)
49/73
ACES Property Limited Crown Home Consult
A
B
C
D
E
A
B
C
D
E
F
G
H
I
J
K
L
L
M
N
DB- 405
DB- 406
DB- 407
DB- 408
DB-R
16120 LOW VOLTAGE CABLES
Indoor Copper Cables
Supply , install , connecting and testing as shown in drawings and
specs 0.6/1.0 kv power copper cable with stranded copper
conductors the item shall include all required accessories for
perfect connection and installation.
(4x300)+150E sqmm multi-core cable CU/XLPE/PVC
(4x240)+120E sqmm multi-core cable CU/XLPE/PVC
(4x185)+95E sqmm multi-core cable CU/XLPE/PVC
(4x150)+70E sqmm multi-core cable CU/XLPE/PVC
(4x120)+70E sqmm multi-core cable CU/XLPE/PVC
(4x70)+35E sqmm multi-core cable CU/XLPE/PVC
(4x50)+25E sqmm multi-core cable CU/XLPE/PVC
(4x16)+16E sqmm multi-core cable CU/XLPE/PVC
(4x10)+10E sqmm multi-core cable CU/XLPE/PVC
(4x6)+6E sqmm multi-core cable CU/XLPE/PVC
2x(1x10)+10E sqmm single-core cable CU/PVC
2x(1x6)+6E sqmm single-core cable CU/PVC
16111 CABLE TRAYS:
Supply , install as shown in drawings & specs. cable tray complete
1
1
1
1
1
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
with all required accessories for complete installation and
100mm width x 50mm height
200mm width x 100mm height
300mm width x 100mm height
Nr
Nr
Nr
Nr
Nr
mt
mt
mt
mt
mt
mt
mt
mt
mt
mt
mt
mt
mt
mt
mt
Carried to Collection Dhs
Crown Home Consultants Page 4 of 15 July
-
8/10/2019 The Last Boq(Full)
50/73
ACES Property Limited Crown Home Consult
A
B
C
D
E
F
G
H
I
JK
L
M
N
O
P
Q
R
S
16500 LIGHTING INSTALLATION
Lighting Outlets
Supply and install with all required accessories (switches, push
b u tto n s, co p p er wir es, PV C b o xes etc) acco r d in gto d r awin gs
and specs
Ceiling lighting outlet.
wall light outlet.
Ground light outlet
Swimming pool lighting outlet
Lighting Fixtures
Supply, install and test lighting fixtures complete with all required
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.SL.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
accessories for complete installation as per drawings and specs
F1
F2
F3
F4
F5
F6
F7
F8
F9
F10
F11
F12
F13
F14
F15
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
NrNr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Carried to Collection Dhs
Crown Home Consultants Page 5 of 15 July
-
8/10/2019 The Last Boq(Full)
51/73
ACES Property Limited Crown Home Consult
A
B
C
DE
F
G
H
Lighting Switches
Supply, install , test and operate lighting switches as shown per
drawings and specs for complete installation
One way, One Gang
One way, Two Gang
One way, Three Gang
Two way, One GangTwo way, Two Gang
Occupancy Sensor
Adderssable Central Battery
Emergency Lighting Outlets
Su p p ly with all r eq u ir ed accesso r ies ( co p p er wir es,PV C b o xes
etc) according to drawings and specs
L.S
L.S
L.S
L.SL.S
L.S
L.S
L.SCeiling Emergency lighting outlet.
Nr
Nr
Nr
NrNr
Nr
Nr
Nr
Carried to Collection Dhs
A
B
C
D
E
F
H
I
Emergancy Lighting Fixtures
Supply and test lighting fixtures complete with all required
accessories for complete installation as per drawings and specs
Recessed Ceiling mounted safety lights using 1x8w compact
fluorescent lamp.
Surface Ceiling mounted safety lights using 1x8w compact
fluorescent lamp.
Wall mounted safety lights using 1x8w compact fluorescent lamp.
16143 POWER OUTLETS AND ACCESSORIES
Power and socket outlets
Supply, install, test and put into operation socket outlet with all
r eq u ir ed accesso r ies ( co p p er wir es, PV C p ip es, b oxes etc)
according to drawings and specs.
Single phase single socket outlet with 3x4 sqmm 450/750V CU
wires
Single phase duplex socket outlet with 3x4 sqmm 450/750V CU
wires
Flexible outlet to feed wall camera with 3x4 sqmm 450/750V CU
wires.
Flexible outlet to feed ceiling camera with 3x4 sqmm 450/750V
CU wires.
Flexible outlet to feed washing machine with 3x4 sqmm
450/750V CU wires.
Disconnect Switches Outlets
Supply and install disconnect switch outlet with all required
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
accesso r ies ( co p p er cab les , PV C co n d u its , b o xes etc
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Carried to Collection Dhs
Crown Home Consultants Page 6 of 15 July
-
8/10/2019 The Last Boq(Full)
52/73
ACES Property Limited Crown Home Consult
N
O
P
Q
A
B
C
D
E
F
G
H
P
Q
R
S
T
U
V
X
A
B
C
D
E
F
Single phase disconnect switch outlet complete with (3x6) sqmm
240V CU/PVC.
Three phase disconnect switch outlet complete with (3x4) sqmm
415V CU/PVC.
Three phase disconnect switch outlet complete with (4x6+6) sqmm
415V CU/XLPE/PVC.
Three phase disconnect switch outlet complete with (4x16+10)
sqmm 415V CU/XLPE/PVC.
Three phase disconnect switch outlet complete with (4x70+50)
sqmm 415V CU/XLPE/PVC.
Three phase disconnect switch outlet complete with (4x150+70)
sqmm 415V CU/XLPE/PVC.
Power accessories
Single phase single socket 13A
Single phase duplex socket 13A
Single phase single socket 13A Weather proof.
Single phase single socket 13A, 120 CM height
Single phase single CCTV socket 13A
Ceiling Single phase single CCTV socket 13A
Disconnect Switches
20A, 1P+W, 240V
20A,3P+W,415V
32A,3P+W,415V
63A,3P+W,415V
200A,3P+W,415V
250A,3P+W,415V
400A,3P+W,415V
630A,3P+W,415V
16725 Fire Alarm & Voice Evacuation system
Main Fire Alarm Control Panels
Supplying, installing, connecting and testing fire alarm
addressable control panels (FACPs), complete with Battery,
Battery Charger , Power supply , Auto Dialer , Printer , Repeater
Panel FARPs , and all necessary accessories and ancillary works ,
interfaces and materials required for complete installation back to
fire alarm control panels as specified and as indicated on the
drawings, complete with the following:
5 loops Addressable Fire Alarm Control Panel " FACP.1 ".
Fire Alarm Control Panels complete with the followings:
Power supply and battery charger unit.
Battery sufficient for 24 hours and 30 minutes for full operation of
bells.
Interface Modules with the following systems:
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S.
L.S.
L.S.Interface Modules with Fire Fighting System.
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Item
ItemCarried to Collection Dhs
Crown Home Consultants Page 7 of 15 July
-
8/10/2019 The Last Boq(Full)
53/73
ACES Property Limited Crown Home Consult
G
H
I
J
K
L
MN
A
B
C
D
E
F
G
H
I
JK
L
M
N
O
P
Q
R
S
Interface Modules with Main Distribution Panels (MDBs).
Interface Modules with HVAC.
Interface Modules with Elevators.
Interface modules with Telephone MDF.
Automatic Telephone Dialer.
Dot Matrix Printer.
Graphic Command Center.24*7 Monitoring System for DCD
Fire Alarm Repeater Panels
Supplying, installing, connecting and testing fire alarm repeater
panel (FARP) ,complete with all necessary accessories and
ancillary works and materials required for complete installation to
be connected to the next fire alarm control panel as specified and
as indicated on the drawings
Fire Alarm Repeater Panel FARP
Fire Alarm Outlet and DevicesSupplying, installing, connecting and testing fire alarm station
L.S.
L.S.
L.S.
L.S.
L.S.
L.S.
L.S.L.S.
L.S.
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.SL.S
L.S
L.S
L.S
L.S
L.S
L.S.
L.S.
L.S.
Outlet complete with all required accessories, (2x1.5mm2) fire
retardant 105o c copper conductor as shown per drawings and Ditto as above but for Fire alarm manual call point
Ditto as above but (2x2.5mm2) for Fire alarm Sounder or Horn
Addressable optical smoke detector, Ceiling type.
Addressable optical smoke detector, Wall mounted type.
Addressable optical smoke detector, with Sounder Base.
Addressable rate of rise heat detector, Ceiling type.Addressable fixed heat detector at 90 degree, Ceiling type for
Generator installation.Addressable Combined Multisensor (smoke + heat) detector.Addressable Combined (optical smoke + heat) detector multi-
sounder type (sounder base).Fire alarm manual call point, Double action.
Fire alarm manual call point, Double action, weather proof type.
Fire alarm Sounder/Horn complete with strop light.Fire alarm Sounder/Horn complete with strop light , weather proof
tFyipree.man station outlet complete with cabling , device and all
aFcirceesmsoanrieTsenleepehdoendetostfaitnioisnhPwaonrekl.complete with all accessories
needed to finish work.Control Module.
Circuit Isolator.
Monitor Module
Item
Item
Item
Item
Nr
Nr
NrNr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
NrNr
Nr
Nr
Nr
Nr
Nr
Item
Item
Item
Carried to Collection Dhs
Crown Home Consultants Page 8 of 15 July
-
8/10/2019 The Last Boq(Full)
54/73
ACES Property Limited Crown Home Consult
A
B
C
D
E
F
G
H
I
Voice Evacuation system
Supplying, installing, connecting and testing fire alarm Evacuation
system including PVC fire retardant conduits for imbedded
L.S
L.S
L.S
L.S.
L.S.
L.S.
L.S.
L.S.
L.S.
installation, EMT for exposed installation, complete with conduit
fittin s, back boxes, unction boxes, fire retardant cables, com lete
Nr
Nr
Nr
Item
Nr
Nr
Nr
Nr
Nr
with devices and all necessary ancillary works and material for
com lete installation startin from the outlet and back to the VoiceEvacuation Amplifiers as specified and as indicated on the
drawings for the following items:
Voice Evacuation Loud speaker outlet complete with cable and all
necessary accessories needed to finish work.
Ceiling mounted Fire voice evacuation loudspeaker
(2/1.5/1/0.5)watts as per drawing.
Voice Evacuation 100 watts Amplifiers (3 Channels) to cover
voice evacuation loudspeakers as per drawings.
Voice Evacuation Recordable message module complete with all
accessories needed to finish work properly.
16775 Closed Circuit Television system CCTV
Main CCTV Equipements
Supplying, installing, connecting and testing CCTV system
console with DVRs (Hard Disc storage with min 1 month) and all
necessary accessories and ancillary materials and works required
for complete installation as specified and as indicated on the
drawings.
Video Matrix Switcher 26 inputs
Digital Video Recorder DVR 16 Channels for one month storage
LCD screens, 21 inch
CCTV Console
CCTV Outlets
Supplying, installing, connecting and testing CCTV outlets by 75
Ohm Co-axial cable , cabling , PVC conduits for imbedded
installation, EMT for exposed installation, conduit fittings back to
DVR and all necessary accessories and ancillary materials and
works required for complete installation as specified and as
indicated on drawings.
Camera outlet by 75 Ohm RG6 Co-axial cable as per drawing and
specifications
Carried to Collection Dhs
Crown Home Consultants Page 9 of 15 July
-
8/10/2019 The Last Boq(Full)
55/73
ACES Property Limited Crown Home Consult
A
B
C
1
2
A
A
B
CCTV Cameras
Supplying, installing, connecting and testing CCTV cameras with
wall mounting brackets, lenses, all necessary accessories and
ancillary materials and works required for complete installation as
specified and as indicated on the drawings.
Fixed Day/Night Dome mounted color camera, indoor type , 540
TVL.
Fixed Day/Night Color camera , outdoor type , with wall-mounting
bracket , Weather Proof type IP66, 540 TVL.
Fixed Day/Night Color camera , indoor type , with wall-mounting
bracket, 540 TVL.
16740 Structured Cabling system
L.S.
L.S.
L.S.
1
L.S
L.S
Note:
Active Com onents such as Switches , Core La er , Call Mana er
Nr
Nr
Nr
Nr
Nr
Nr
Design should be in compliance with "Du" requirements and
Main Distribution Structured Cabling Rack "MDR"
Supplying, installing, connecting and testing the following Racks
(MDR ) with UPS including power distribution panel, RJ45 patch
panels (Cat 6), fiber optic patch panels, cables organizers, RJ45
patch cords (Cat 6), fiber optic patch cords, space in the rack
cabinet for active com onents, number of 1X8-Core Multi-ModeOM3,10GB Fiber O tic cable u to IDF as er sin le line dia ram,labeling as per TIA standard and all necessary accessories and
ancillary works and materials required for complete installation as
specified according to DU specification and as indicated on the
drawings.
Main distrbution frame (MDR) as per drawing and according to
Data Outlets
Supplying, installing, connecting and testing the following outlets
including Cat6 cables, PVC conduits, conduit fittings, cable ducts,
boxes and all necessary accessories and ancillary works and
materials re uired for com lete installations startin from outlet u to its IDF rack as specified and as indicated on the drawings and
according to DU specifications..
Wall mounted Data outlet (using UTP CAT6 cables).
Dual Data & Telephone outlet (using 2 x UTP CAT6 cables).
Carried to Collection Dhs
Crown Home Consultants Page 10 of 15 July
-
8/10/2019 The Last Boq(Full)
56/73
ACES Property Limited Crown Home Consult
D
E
H
A
B
C
D
E
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
Data Fixtures
Su l in , installin , connectin and testin the followin fixtures
Nr
Nr
Nr
Item
Nr
Nr
Nr
Nr
RJ45 and all necessary accessories required for complete
installations as specified and as indicated on the drawings and
according to DU specifications.
Wall mounted Data Socket RJ45.
Wall mounted Dual (Data &Tel) Socket RJ45.
Telephone Terminal Cabinet Wired To MDR Using Cat-6 UTP
16740 Telephone system
Supplying, installing, connecting and testing Telephone system as
mentioned below com lete with all re uired accessories and cables
for proper operation and complete installation as per drawings andspecs including the following items:- (Note : Hyper PABX to be
designed and supplied by others) and according to DU
specifications.
Main distribution rack (MDR) 500 pairs.
Telephone Boxes
Supplying, installing, connecting and testing telephone box
Telephone Box (from UTP to Multi Pair) complete with
Telephone Box (from UTP to Multi Pair for Guest rooms)
Telephone Outlets
Supplying, installing, connecting and testing the following outlets
includin Cat6 cables, 20mm PVC conduits, conduit fittin s, cableducts, boxes and all necessary accessories and ancillary works and
materials re uired for com lete installations startin from outlet u to its Telephone Box as specified and as indicated on the drawings
and according to DU specifications.
Wall mounted analogue TEL outlet (using UTP CAT6 cables) at
height 30cm.
Wall mounted analogue TEL outlet (using UTP CAT6 cables) at
height 120cm.
Carried to Collection Dhs
Crown Home Consultants Page 11 of 15 July
-
8/10/2019 The Last Boq(Full)
57/73
ACES Property Limited Crown Home Consult
A
B
C
D
E
F
G
A
B
A
B
CD
E
F
L.S. Nr
L.S. Nr
L.S. Item
L.S. Item
L.S. Item
L.S. Item
L.S. Item
L.S Nr
L.S Nr
L.S Nr
L.S Nr
L.S Nr
L.S Nr
L.S. Meter
1 Nr
Telephone Fixtures
Su l in , installin , connectin and testin the followin fixturesRJ45 Analogue Tel. Fixture complete with all necessary
accessories required for complete installations as specified and as
indicated on the drawings and according to DU specifications.
Wall mounted analogue TEL Socket RJ45.
Wall mounted analogue TEL Socket RJ45, water proof type for
bathrooms.
Entry cable complete with all required (Conduits, Manhole, etc.)
as per drawing and according to DU specifications
Telephone cables as per drawing and according to DU
specifications
300x50mm HDGI-HDRF Cable Trunk with cover at H/L. as per
DU specification.
200x50mm HDGI Cable Trunk as per DU specification.
50x50mm HDGI Cable Trunk as per DU specification.
16781 Cable Antenna Television System "SMTV" RF Distribution
Supplying, installing, connecting and testing CATV system to
achieve 75 dB at least at outlets , 20 dB/ 100m at 862 MHZ
attenuation level including running inside Light current cable
trunk as indicated in drawings, conduit fittings, cable trunking,
coaxial cables,Terminations and all necessary accessories and
ancillary works for complete installation as specified and as
indicated on the drawin s Note : H.E.U number of Channels to beselected by owner, and Contrator should to determine Amplifiers
so as to receive signal at end user not less than 70 : 75 dB)
Wall mounted analogue TV Outlets.
Wall mounted analogue TV Fixture.
SMATV Network Cables
Supplying, installing, connecting and testing MATV network
including Splitters, Tap off , Main amplifiers, Distribution
Amplifiers,coaxial cables, conduits, conduit fittings, cable trunk,
back boxes, junction boxs and all necessary ancillary works and
materials required for complete installation according to drawings
& specifications.
1.8 meter parabolic satellite dish with LNB Quattro
VHF Antenna
UHF Antenna
Power Boaster
RG-11 cables as per drawing and single line diagram
Head End Unit "H.E.U" (Noting that number of Channels should
be selected according to Owner requirements).
To Collection
Crown Home Consultants Page 12 of 15 July
-
8/10/2019 The Last Boq(Full)
58/73
ACES Property Limited Crown Home Consult
Total collection
Page 1
Page 2
Page 3
Page 4Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Carried to Summary
Crown Home Consultants Page 13 of 15 July
-
8/10/2019 The Last Boq(Full)
59/73
Aces Property Limited
Bill of Quantities
Mechanical WorksMechanical
July. 2014Mech/1
PROPOSED BUILDING
(B+G+4+R)
On Plot No. JVC 11BBMRA005 (681-1358)
ITEM DESCRIPTION QTY. UNIT RATEAMOUNT
(AED)
A
1
1.1
1.2
1.2.1
1.2.2
7
7.1
7.1.1
11
11.2
11.3
MECHANICAL ENGINEERING INSTALLATIONS
Include for the complete installation as detailed in the
Specifications and on the Drawings . (cont'd.)
Provide necessary spare parts for normal wear and tear for two years
as recommended by the manufacturer for all mechanical equipment
and systems (HVAC&PLUMBING).contractor to provide list of
proposed spare parts with bid documents.
Air-conditioning installations
Fresh Air Handling Unit with Heat Recovery
Fresh Air Handling units with heat recovery supply air fan, return air
fan recovery wheels, panel/ bag filters, manometers, duct connections,
motorized dampers/ actuators,mixing boxes, valves, accessories, control
panel condensate connection to tundish and flexible pipe connection,
floor mounted all in accordance with the drawings and specification.
FAHU- 00
VRV Systems
Indoor System-00
Outdoor System-00
SPLIT AIR UNIT :
Supply and install ducted split air conditioning system
complete as specified including out
door condensing unit and indoor evaporator unit.
SPU-00
Extract fan.
Include for the complete installation as detailed in the
Specifications and on the Drawings .
EF - 00
ELECTRICAL REQUIRMENTS OF MECHANICAL WORKS
Electrical reqirements for mechanical works.
L.S
L.S
L.S
L.S
L.S
L.S
L.S
BUILDER'S WORK.
All builder's work in connection with HVAC.
Item
Nr
Nr
Nr
Nr
Nr
Nr
Carried to Collection
-
8/10/2019 The Last Boq(Full)
60/73
Aces Property Limited
Bill of Quantities
Mechanical WorksMechanical
July. 2014Mech/2
PROPOSED BUILDING
(B+G+4+R)
On Plot No. JVC 11BBMRA005 (681-1358)
ITEM DESCRIPTION QTY. UNIT RATEAMOUNT
(AED)
12
12.2
12.3
13
13.1
13.2
14.2
14.3
16
DUCT INSULATION
Duct insulation for air conditioned supply and return ducts inside buildin
Duct insulation for air conditioned supply and return ducts exposed
to outdoor,including Aluminum cladding and weater proofing.
METAL DUCTWORK (GALVANIZED STEEL DUCTWORK).Galvanized metal ductwork complete in accordance
with the specification and as shown on drawing
Low pressure duct supply and returne.
Low pressure duct exhaust/fresh air
DUCTWORK ACCESSORIES.
Flexible ductwork;low pressure.
L.S
L.S
L.S
L.S
DAMPERS
Nr
Nr
Nr
Nr
Nr
NrNr
Nr
Nr
Nr
Nr
Nr
Nr
Nr
Volume control dampers (V.D) L.S
Fire damper (FA / AD).Motorized damper
Sound attenuator
AIR OUTLETS AND INLETS:
Exhaust ceiling diffuser(ECD):
Supply Ceiling diffuser(SCD):
Supply Air Grill
L.SL.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
Return Air Grill
Supply Linear Slot Diffuser
Return Linear Slot Diffuser
Carried to Collection
-
8/10/2019 The Last Boq(Full)
61/73
Aces Property Limited
Bill of Quantities
Mechanical WorksMechanical
July. 2014Mech/3
PROPOSED BUILDING
(B+G+4+R)
On Plot No. JVC 11BBMRA005 (681-1358)
ITEM DESCRIPTION QTY. UNIT RATEAMOUNT
(AED)
TESTING,ADJUSTING AND BALANCING :
Testing , Adjusting and balancing as per specification for all systems.
The following including joints, supports, accessories, adhesives,
sealant, self adhesive aluminium tape, sleeves, fittings, sound
L.S
L.S
L.S
attenuators, dampers, complete a
Ducting including supports, access panels, complete
Insulation to ductwork ( low pressure )
Thermostats
Item
Item
Item
Carried to Collection
-
8/10/2019 The Last Boq(Full)
62/73
Aces Property Limited
Bill of Quantities
Mechanical WorksMechanical
July. 2014Mech/4
PROPOSED BUILDING
(B+G+4+R)
On Plot No. JVC 11BBMRA005 (681-1358)
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT(AED)
MECHANICAL INSTALLATION
COLLECTION
Total of Page No. Div 11/1
Total of Page No. Div 11/2
Total of Page No. Div 11/3
Total of Page No. Div 11/4
Carried to Collection
-
8/10/2019 The Last Boq(Full)
63/73
Aces Proper ty Limi ted
Jul
Bill Of Quantities_MechCrown Home Consultants Page 1 of 9
PROPOSED BUILDING
(B+G+4+R)
On Plot No. JVC 11BBMRA005 (681-1358)
Aces Limited Property
Item
NoITEM DESCRIPTION
Quantity Unit
Rate
Amount
Dhs
Dhs
A
B
C
D
E
GenerallyInclude for all electrical work in connection with plumbing
works
BUILD ERS WO
RK
Include all builders work in connection with plumbing
works
FIRE FIGHTING SYSTEMS
Fire Fighting Pump Set
Supply and install, connecting and testing automatic
packaged electric fire pumps centrifugal horizontal spilt
case, UL listed, FM compliant , NFPA 20, complete
including all accessories and controllers as specified and as
shown on drawings.
EFP- 1 -
Supply and install, connecting and testing automatic
packaged fire pumps diesel driven centrifugal horizontal
spilt case, UL listed, FM compliant, NFPA 20, complete
including all accessories and controllers as specified and as
shown drawing .
DFP- 1 -
Supplying, installing, connecting and testing automatic
packaged vertical jockey pump complete including fuel
tank, controllers and all accessories as specified and as
shown on drawings.
JP- 1 -
Black seamless steel pipes to BS 3601, schedule 40 with
Item
Item
L.S
L.S
L.S
Mechanical Coupling
Supply, install, connect and test Blacksteel pipes
including fittings, hangers , supports , all other accessories
and as specified and as indicated on the drawings.
Item
Item
No.
No.
No.
Carried to Collection Dhs
-
8/10/2019 The Last Boq(Full)
64/73
Aces Proper ty Limi ted
Jul
Bill Of Quantities_MechCrown Home Consultants Page 2 of 9
PROPOSED BUILDING
(B+G+4+R)
On Plot No. JVC 11BBMRA005 (681-1358)
Aces Limited Property
Item
NoITEM DESCRIPTION
Quantity Unit
Rate
Amount
Dhs
Dhs
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
25 dn
32 dn
40 dn
50 dn
65 dn
80 dn
100 dn
150 dn
Valves and accessories as specified and as shown on
drawing complete with supports
Valves complete for automatic sprinkler system
Fire Alarm Check Valve
Fire alarm check valve 150 including alarm motor gang,
test and drain valve, all as specified and shown on
drawings
Zone Control Valve
Zone control valve complete including isolation valve,
flow switch, test and drain valve as shown on drawing and
as specified
Zone control valve type ZCV
Pressure reducing station
Pressure reducing station complete
Deluge valve
Pre action valve
Test & Drain valves
TDV 25 dn
Automatic Relieve Vent ARV
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
ARV
M
M
M
M
M
M
M
M
Item
Item
No
No
No
No
No.
No.
Carried to Collection Dhs
-
8/10/2019 The Last Boq(Full)
65/73
Aces Proper ty Limi ted
Jul
Bill Of Quantities_MechCrown Home Consultants Page 3 of 9
PROPOSED BUILDING
(B+G+4+R)
On Plot No. JVC 11BBMRA005 (681-1358)
Aces Limited Property
Item
NoITEM DESCRIPTION
Quantity Unit
Rate
Amount
Dhs
Dhs
A
B
C
D
E
F
G
H
I
J
Fire Hose Cabinet
Supplying, installing, connecting and testing of fire hose
stations consisting of 25mm brass hose valve, firehose reel,
fire hose 25mm dia 30m long, fire hose 65mm dia 30m long
nozzel steel cabinet with 65mm fire Landing valve, and all
adapters and fittings required for the complete assembly.
(FHC)
FHC
Portable fire extinguishers
FE-1 5KG (CO2 Fire Extinguishers)
FE-2 6KG (Dry Bowder Fire Extinguishers)
Fire Blanket As Specified
Breeching Inlet Connections
Type BIC-1 complet with non return valve and all
accessories complet
Automatic Sprinkler
Pendent sprinkler
Supplying, installing, connecting and testing of 1/2 in fast
resopnse pendent concealed chrome plated sprinkler heads
to be installed in all areas with fals ceiling all as specified
and as shown on drawings.
Upright sprinkler
Supplying, installing, connecting and testing of 1/2 in
upright fast response sprinkler head to be installed all as
specified and as shown on drawings.
Side wall sprinkler
Supplying, installing, connecting and testing of 1/2 in side
wall fast response sprinkler head to be installed all as
specified and as shown on drawings.
FIRE SUPRESSION SYSTEM
L.S
LS
LS
LS
L.S
L.S
LS
L.S
L.S
FM200 SYSTEM
Complete System including Galvanized Steel SeemlessPipes to BS3601, Extinguishing Agent including
Cylindres,valves,Nozzels, Detection Systems, Control
Panels and Alarms.etc and all accessories
No.
No.
No.
No.
No.
No.
No.
No.
Item
Carried to Collection Dhs
-
8/10/2019 The Last Boq(Full)
66/73
Aces Proper ty Limi ted
Jul
Bill Of Quantities_MechCrown Home Consultants Page 4 of 9
PROPOSED BUILDING
(B+G+4+R)
On Plot No. JVC 11BBMRA005 (681-1358)
Aces Limited Property
Item
NoITEM DESCRIPTION
Quantity Unit
Rate
Amount
Dhs
Dhs
B
C
D
E
F
G
H
I
J
PLUMBING
MECHANICAL - PLUMBING WORKS
GENERAL:
Supply, installation, testing & commissioning of the
following items as per specifictions, drawings and other
contract documents. Any other items necessary for the
optimum performance of the mechanical systems shall be
provided whether mentioned or not mentioned herein at
no extra cost including but not limited to arrows,
identification, sleeves caulking, wooden frames, labels,
tags, As-Built drawings submittals warranty and including
all electrical and mechanical connections.
Note : Testing and commissioning price through experts of
MEP contractor/suppliers is included
WATER DISTRIBUTION SYSTEMS
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
Domestic Cold Water pipes
Domestic water system pipes complete with fittings,
supports, insulation as per specifications and as shown in
the drawings
15 dn
20 dn
25 dn
32 dn
40 dn
50 dn
65 dn
80 dn
110 dn
M
M
M
M
M
M
M
M
M
Carried to Collection Dhs
-
8/10/2019 The Last Boq(Full)
67/73
Aces Proper ty Limi ted
Jul
Bill Of Quantities_MechCrown Home Consultants Page 5 of 9
PROPOSED BUILDING
(B+G+4+R)
On Plot No. JVC 11BBMRA005 (681-1358)
Aces Limited Property
Item
NoITEM DESCRIPTION
Quantity Unit
Rate
Amount
Dhs
Dhs
A
B
C
D
E
F
G
H
K
L
M
N
O
Water Treatment System
Cold water treatment system for drinking water forkitchen area complete with fittings, supports, and all
accessories as per specifications and as shown in the
drawings
Hot water system and pipes
Hot water system pipes complete with valves, fittings,
supports,flexible connections,accessories and
insulation..etc. as per specifications and as shown in the
drawings
15 dn
20 dn
25 dn
32 dn
40 dn
50 dn
65 dn
80 dn
Hot Water circulation Pump Set
As shown on the drawings, GPM Capacity at Bar Head,
Skid mounted pumps complete with valves, suction and
discharge header etc. 2 Pumps, (1 Duty+1 Stand-by) (Hot
water circulation pumps) with control panel and all
accessories ready for operation with valves, fittingsetc
complete.
Automatic Air Vent AAV
150 mm
Water Flow Meter
Water flow meter type WFM-1
GATE VALVE
TYPE G.V
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
LS
LS
LS
LS
Hose Bib Tap
Hose bib; type HB with hose bib union
TYPE H.B
No.
M
M
M
M
M
M
M
M
No.
No.
No.
No.
No.
Carried to Collection Dhs
-
8/10/2019 The Last Boq(Full)
68/73
Aces Proper ty Limi ted
Jul
Bill Of Quantities_MechCrown Home Consultants Page 6 of 9
PROPOSED BUILDING
(B+G+4+R)
On Plot No. JVC 11BBMRA005 (681-1358)
Aces Limited Property
Item
NoITEM DESCRIPTION
Quantity Unit
Rate
Amount
Dhs
Dhs
A
B
C
D
E
F
G
H
I
J
K
L
M
N
Domestic Water Transfer Pump Set
GPM Capacity at Bar Head, Skid mounted pumpscomplete with valves, suction and discharge header etc.(2
Pumps, 1Duty+1 STAND-BY) From plant room to System,
with pressure tank, control panel float switches and all
accessories ready for operation.
Domestic Water Booster Pump Set
GPM Capacity at Bar Head, Skid mounted pumps
complete with valves, suction and discharge header etc.(2
Pumps, 1Duty+1 STAND-BY) From plant room to System. ,
with pressure tank, control panel float switches and all
accessories ready for operation.
Solar Water Heater System as per specification and
drawing
Under Ground water tank (RCC)
GRP Roof Water Tank
SANITARY DRAINAGE
Supply materials and labor for a complete installation of
sanitary sewer and storm water drainage system for roof,
ready for operation as shown on plan. All installation shall
be in accordance with the manufacturers recommendation.
The system shall be installed completely and be ready for
operation.
Drainage pipes
25 dn
50 dn
75 dn
100 dn
150 dn
200 dn
L.S
L.S
1
1
1
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
Floor DrainsType FD
BD
PD
Item
Item
Item
Item
Item
M
M
M
M
M
M
M
M
M
Carried to Collection Dhs
-
8/10/2019 The Last Boq(Full)
69/73
Aces Proper ty Limi ted
Jul
Bill Of Quantities_MechCrown Home Consultants Page 7 of 9
PROPOSED BUILDING
(B+G+4+R)
On Plot No. JVC 11BBMRA005 (681-1358)
Aces Limited Property
Item
NoITEM DESCRIPTION
Quantity Unit
Rate
Amount
Dhs
Dhs
A
B
C
D
E
F
G
H
I
J
K
L
Ceiling Clean OutType CO
Floor Clean Out
Type FCO
Funnel Floor Drain
Type FFD
Cowls
Type RVC
STORM WATER SYSTEMS
Roof drains
Type RWO
PLUMBING FIXTURES
Water closets include all accessories&Valves
Type EWC-1
Lavatories include all accessories&Valves
Type WHB-1
Bathtub & showers include all accessories Valves
Type BT-1
Type SHO-1
Urinal include all accessories Valves
Type UR-1
Miscellaneous fixtures and fittings
Gutter Drain With Heavy Duty Cover
Kitchen Sink include all accessories and valves :
Type KS-1
LS
LS
LS
LS
L.S
L.S
L.S
L.S
L.S
L.S
LS
L.S
15459 INTERCEPTORS
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
M
No.
Carried to Collection Dhs
-
8/10/2019 The Last Boq(Full)
70/73
Aces Proper ty Limi ted
Jul
Bill Of Quantities_MechCrown Home Consultants Page 8 of 9
PROPOSED BUILDING
(B+G+4+R)
On Plot No. JVC 11BBMRA005 (681-1358)
Aces Limited Property
Item
NoITEM DESCRIPTION
Quantity Unit
Rate
Amount
Dhs
Dhs
A
B
C
D
E
Grease Trap Interceptor
Type GRT
Grease Interceptor
Acid Resistent Coated interior and exterior fabricated steel
grease interceptor, with internal air relief by-pass, Bronze
cleanout plug,Removable pressure equalizing/flow
diffusing
inlet baffle,and visible double wall trap seal, etc
Inspection chambers
Type MH
Gully Traps
Type GT
Break Pressure Chamber
TYPE BPMH-1
LS
L.S
L.S
L.S
L.S
Submersible Pump Sets
Supply ma