    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL OF QUANTITIES

    ON PLOT NO JVC11BBMRA005(681-1358)

    AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    U

    BILL OF QUANTITIES

    http://void%280%29/http://void%280%29/http://void%280%29/
  • 8/10/2019 The Last Boq(Full)

    2/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 1ON PLOT NO JVC11BBMRA005(681-1358) (PRELIMINARIES)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    21B

    ITEM14B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    A

    UNoteU: UAny item to be provided underPreliminaries section, if not executed or

    provided by the Contractor, shall be deducted

    from the Lumpsum Tender price, on actual

    expenses as per market rateU

    .

    ULimitation of the SiteThe Contractor will be required to confine his

    activities within the boundaries of the site

    including the storage of materials, the positioning

    of plant and offices and all other equipment

    needed for the execution of the Contract. A

    temporary fence shall be erected around the

    boundary of the site construction of new 24 g

    galvanized sheet steel 2 meters high & as per

    Dawing and Specafication .

    L.S.

    BUWater for the Works

    29B

    The Contractor shall supply clean water for the

    works including the works of sub-contractors and

    shall supply all temporary plumbing pipework andstorage tanks that may be required pending the

    laying of the permanent water main or the

    availability thereof and shall pay all fees for

    connection and all charges for water consumed.

    In the event of a piped water supply not being

    readily available at the site the Contractor will be

    required at his own expense to transport water to

    the site by tanker. L.S.

    C0BSoil Investigation

    The Contractor shall carry out a careful study of

    soil conditions (investigation) by means of at least

    three bore holes to a depth 20 Mts. and 3 copies of

    soil test report is to be submitted to the Consultant

    for approval before commencing any foundations

    works. 3 Nos..

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    3/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 1ON PLOT NO JVC11BBMRA005(681-1358) (PRELIMINARIES)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    22B

    ITEM15B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.A Site Working Conditions

    Throughout the period of construction of the

    works, the Contractor shall maintain the whole

    area of his operations in a clean, tidy and safecondition by arranging his materials in an orderly

    manner. All rubbish, waste material, debris and

    the like shall be cleared off the working area as it

    accumulates and if not removed directly off the

    site shall be deposited at general collecting points

    allocated by the Engineer pending removal from

    site. L.S.

    B1BSign Boards2 Nos. of signboards as per drawings and

    specifications. Contractor should submit shop

    drawing.

    Nos.

    C2BSite Clearance

    Allow for re-routing any existing services which

    comes within the limit of Contract. Include for alllabour/material required and approval from

    concerned department and as directed by

    Engineer. L.S.

    D3BSite Levelling

    The Contractor shall be responsible for and make

    allowances for all necessary earthworks including

    those measured separately under the various

    section of the Bill of Quantities. L.S.

    E4BSite Visiting

    The Contractor should visiting the site and any

    Demolishing works is on his responsibilities as per

    in the site

    L.S.

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    4/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 1ON PLOT NO JVC11BBMRA005(681-1358) (PRELIMINARIES)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    23B

    ITEM16B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    A Existing Plants, Trees, Vegetation

    Due care is to be exercised to protect all plants, trees,

    vegetation and the like that may be existing in andaround the site. L.S.

    B Temporary Lighting and Power for theWorks

    The Contractor shall supply all light and power

    required for the works including the works for sub-

    contractors including supplying, operating and

    maintaining temporary switches, cables and leads

    that may be required pending the laying of the

    permanent cable or the availability thereof and shall

    pay all fees for the connections and all charges for

    the current consumed. In the event of the electricity

    supply not being readily available, the Contractor

    will be required at his own expense to supply,

    operate and maintain temporary generators. L.S.

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    5/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 1ON PLOT NO JVC11BBMRA005(681-1358) (PRELIMINARIES)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    24B

    ITEM17B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    A Office Equipments at Site :

    Provide, maintain and finally remove the site offices

    with new furniture as per specifications. LS

    B Material Requirements :

    Provide material, tools and equipments stores

    according to the standards and also room for concrete

    cubes L.S.

    C Necessary Equipments for WorksImplementation28BGarbage collection point and all other equipments to

    ensure carrying out the works on the best standards.

    L.S.

    D Safety and General Site equipments for allthe staff and visitors at the Site :

    Safety shoes, protection helmets, safety belts when

    working on elevations, guiding signs, spotlights,safety precautions for open areas staircase, open

    yards and general site cleaning. L.S.

    E Shop DrawingsPrepare shop drawings for Kitchen Cabinet,

    Aluminume workes, Wooden Workes, Finishing,

    Toilets, Bathrooms, Steel reinforcement, Piless,

    Woter Proof, Electrical, Sanitary Water supply

    drainage, Telephone and Fire protections prior to

    commencement of actual work, pay all legal fee and

    other expenses to the concerned departments forobtaining the final connections from the authorities

    up to the distribution points on site with the co-

    ordination Engineer.

    L.S.

    F As Buil t DrawingsPrepare and provide as built drdawings for all the

    service viz. Electrical, Water supply and drainage

    works duly approved by the concerned authorities. L.S.

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    6/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 1ON PLOT NO JVC11BBMRA005(681-1358) (PRELIMINARIES)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    25B

    ITEM18B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    G Samples approval L.S

    Provide in duplicate samples of all the materials and

    shop drawings for the Engineer approval.H Interim Payment Certif icates L.S

    I

    J

    Submit on each interim payment certificate 24 Nos.

    photographs in duplicate along with negative to

    Engineer.

    Security Insurances

    Insurance for the Works

    Third party insurance

    Workmen compensation insurance

    Works by other Contractors

    Allow for co-coordinating with other

    contractors for the execution of their works.

    Important note :

    - All quantities should be calculated by

    contractors and any enquires to be before one

    week from submitted tender date.

    - Contractors should be add profit and over

    head for any P.S item or P.C rate ( Supply Fix )

    - Contractors should be add profit and over

    head also builders works for item of P.C rate (

    Supply )

    L.S

    .

    L.S

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    7/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 1ON PLOT NO JVC11BBMRA005(681-1358) (PRELIMINARIES)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    26B

    ITEM19B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    A The tenderer is to details below any additional items

    with quantities and rates not previously included to

    complete the build-up of L.S. tender price for this

    section of the works. Should the tenderer fail to

    insert any items here, it will be deemed that his L.S.price for the tender includes all items and no

    subsequent claim for any additional item will be

    entertained.

    11B

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    8/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 1ON PLOT NO JVC11BBMRA005(681-1358) (PRELIMINARIES)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    27B

    ITEM20B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    5BTO COLLECTION

    From Page B1/01

    Page B1/02

    Page B1/03

    Page B1/04

    Page B1/05

    Page B1/06

    12B

    BILL NO.1 PRELIMINARIES GENERAL DHS

    13B

    TOTAL CARRIED TO SUMMARY

  • 8/10/2019 The Last Boq(Full)

    9/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4 FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED

    ON PLOT NO JVC11BBMRA005(681-1358)

    AT AL BARSHA SOUTH FOUR , JUMERA VILLAGE ,DUBAI

    Bill No. 09

    Garbage System

    Item Description Quantity Unit Rate Amount

    Garbage System

    1 Supply and install garbage chute system as specified complete

    with all accessories and including exchat system and fire

    system and MEP work and approved by Engineer( 200,000

    AED/ONE) Item

    2 Allow for any items not indicated herein but required for a

    complete and operational system Item

    3 Allow for builder's work

    4 Operational maintenance Item

    5 Trolly No

    To Collection DH

    B13/01

  • 8/10/2019 The Last Boq(Full)

    10/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4 FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED

    ON PLOT NO JVC11BBMRA005(681-1358)

    AT AL BARSHA SOUTH FOUR , JUMERA VILLAGE ,DUBAI

    Bill No. 09

    Garbage System

    Item Quantity Unit Rate DH

    COLLECTION

    Page B13/01

    To Collection DH

  • 8/10/2019 The Last Boq(Full)

    11/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4 FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED

    ON PLOT NO JVC11BBMRA005(681-1358)

    AT AL BARSHA SOUTH FOUR , JUMERA VILLAGE ,DUBAI

    Bill No. 09

    Garbage System

    B13/02

  • 8/10/2019 The Last Boq(Full)

    12/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 10

    ON PLOT NO JVC11BBMRA005(681-1358) (ELEVATORS WORKS)

    AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    B10/01

    ItemNo

    Description Qty. UnitUnitRate

    Amount(Dhs.)

    A.

    B.

    0B

    C

    D.

    E.

    1B

    ELEVATORS

    Supply, install, test and commission thefollowing elevators including allequipment etc. in accordance topreparing shop drawings, allowing fortesting for 16 hours inspection, trainingstaff and providing 12 months freemaintenance from the date ofpreliminary handing over date.

    Complete Passenger elevators 800 Kg.(10 persons) capacity, 1.6 meter persecond speed, gearless type, 06 stops,06 openings all in the same line at front(B,G,1-4 Typical) with all requiredaccessories and control panel andstainless steel gamp for opening doorsin all floors(150,000 AED/ONE)

    Allow for builders work as needed forthe installation of the elevators.

    Allow for testing, commissioning,training of building staff etc.

    Allow for working shop drawing,operation and maintenance manualsetc.

    Allow for 12 month free maintenance

    after the initial handing over andcommissioning

    2

    Item

    Item

    Item

    Item

    Nos.

    L.S

    L.S

    L.S

    L.S

    TOTAL BILL NO10: ELEVATORSCarried to Main Summary

    Dhs.

    Item Description Qty. Unit Unit Amount

  • 8/10/2019 The Last Boq(Full)

    13/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 10

    ON PLOT NO JVC11BBMRA005(681-1358) (ELEVATORS WORKS)

    AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    B10/02

    No Rate (Dhs.)

    The tenderer is to details below any

    additional items with quantities and ratesnot previously included to complete the

    build-up of L.S. tender price for this

    section of the work. Should the tenderer

    fail to insert any items here, it will be

    deemed that his L.S. price for the tender

    includes all items and no subsequent

    claim for any additional item will be

    entertained

    TOTAL BILL NO10: ELEVATORSCarried to Main Summary

    Dhs

  • 8/10/2019 The Last Boq(Full)

    14/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 10

    ON PLOT NO JVC11BBMRA005(681-1358) (ELEVATORS WORKS)

    AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    B10/03

    ItemNo

    Description Qty. UnitUnitRate

    Amount(Dhs.)

    TO COLLECTION FOR BILL NO 10

    From page NO B10/01

    From page NO B10/02

    TOTAL BILL NO10: ELEVATORSCarried to Main Summary

    Dhs

  • 8/10/2019 The Last Boq(Full)

    15/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 10

    ON PLOT NO JVC11BBMRA005(681-1358) (ELEVATORS WORKS)

    AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    B10/04

  • 8/10/2019 The Last Boq(Full)

    16/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 2

    ON PLOT NO JVC11BBMRA005(681-1358) (SUB STRUCTURE)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    13B

    ITEM9B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    A

    UEXCAVATE (AS APPROVED BYCONSULTANT) NOT LESS THAN 400 CMBELOW EXISTING GROUNDLEVEL(ASPHALT ) INCLUDING HARDSOIL, SOFTROCK, ROCK ETC. UP TOREQUIRED FOUNDATION DEPTH.

    Shoring work as per drawing and

    specification(shop drawing &calculation should

    be submitted for approvel)

    Item

    B

    C

    17B

    Excavation up to to pcc level

    Allow for dewatering to keep excavation free from

    water.

    M3

    Item N.A

    D

    18BFILLING MATERIAL

    Filling (selected approved soil) under floor slab

    and entrance steps including levelling and

    compacting in layers as specified (each layer not

    exceeding 250 mm) compacted to at least 95% of

    maximum dry density for each layer) from anapproved source as directed by engineer

    M3

    1BCONCRETE SUNDRIES

    E2B

    One layer of 250 micron polythene sheeting

    lapped at joints for all underground concrete.

    M2

    F

    G

    H

    water proofing as per specifications and drawing

    details of horizontal & vertical surfaces of

    concrete applied for all underground concrete

    works, plinth wall ground beams, neck columns,upper tie beams, entrance .etc) (2 layer 5 mm

    water proofing membrane) and (1 layer 6mm thick

    protection board )

    - Horizontal

    - Vertical

    2 coats of bitumen

    Water Stopper

    M2

    M2

    M2

    L.M

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    17/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 2

    ON PLOT NO JVC11BBMRA005(681-1358) (SUB STRUCTURE)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    14B

    ITEM10B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    MASS CONCRETE CLASS C 20 N/MM2USING SULPHATE RESISTING CEMENTINCLUDING ALL NECESSARYFORMWORK

    A 100 mm thick M2

    REINFORCED CONCRETE CLASS A (40N/MM2) USING SULPHATE RESISTINGCEMENT INCLUDING ALL NECESSARYFORMWORK STEEL REINFORCEMENT ASPER SPECIFIED AND SHOWN ON DRGS.

    B

    C

    D

    E

    F

    Raft (thk as per approved drawing)

    Lift bit

    Under ground water tank

    Tie & ground beams

    Solid slab 300mm thk

    M3

    M3

    M3

    M3

    M2

    H Anti-termite treatment :

    - Under foundation

    - On perimeter

    M2

    Lm

    5B

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    18/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 2

    ON PLOT NO JVC11BBMRA005(681-1358) (SUB STRUCTURE)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    15B

    ITEM11B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    A The tenderer is to details below any additional items

    with quantities and rates not previously included to

    complete the build-up of L.S. tender price for this

    section of the work. Should the tenderer fail to insert

    any items here, it will be deemed that his L.S. price

    for the tender includes all items and no subsequent

    claim for any additional item will be entertained.

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    19/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 2

    ON PLOT NO JVC11BBMRA005(681-1358) (SUB STRUCTURE)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    16B

    ITEM12B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    0BTO COLLECTION FOR BILL NO. 2 :

    From Page B2/01

    Page B2/02

    Page B2/03

    7B

    BILL NO.2 SUB STRUCTURE DHS

    8B

    TOTAL CARRIED TO SUMMARY

  • 8/10/2019 The Last Boq(Full)

    20/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 3ON PLOT NO JVC11BBMRA005(681-1358) (SUPERSTRUCTURE)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    7B

    ITEM4B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    USUPERSTRUCTUREUREINFORCED CONCRETE CLASS (A) 40N/MM2 USING ORDINARY PORTLANDCEMENT INCLUDING ALL NECESSARYFORMWORK AS SPECIFIED ONDRAWINGS.

    A

    B

    Columns

    Concrete protection around column in wet areaM3

    C Core wall M3D

    E

    Beams

    Flat slab for ground floorM3

    F Post tension slabs 250 mm thk M2

    G

    H

    Post tension slabs 280 mm thk.

    Post tension slabs 320 mm thkM2

    I Solid slab M3

    J Swimming pool M2

    K

    L

    M

    Parapet

    Transformer trench

    150mm Bases for kitchen cabinets

    M3

    M3

    M2N

    O

    P

    Q

    R

    S

    Arch, decorative element & Lentils

    In Stair Case

    Equipment foundations (A/C &Water tank &.....etc)

    Wall for underground water tank and pump room

    Ext staircase & Ramps& Box flowers

    Main ramp

    M3

    M3

    M3

    M3

    M3

    M3

    0BTO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    21/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 3ON PLOT NO JVC11BBMRA005(681-1358) (SUPERSTRUCTURE)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    8B

    ITEM5B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    A The tenderer is to details below any additional items

    with quantities and rates not previously included to

    complete the build-up of L.S. tender price for this

    section of the work. Should the tenderer fail toinsert any items here, it will be deemed that his L.S.

    price for the tender includes all items and no

    subsequent claim for any additional item will be

    entertained.

    1B

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    22/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 3ON PLOT NO JVC11BBMRA005(681-1358) (SUPERSTRUCTURE)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    9B

    ITEM6B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    UTO COLLECTION FOR BILL NO. 3:

    From Page B3/01

    Page B3/02

    2BBIILL NO.3 SUPERSTRUCTURE -

    3B

    TOTAL CARRIED TO SUMMARY DHS

  • 8/10/2019 The Last Boq(Full)

    23/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 4

    ON PLOT NO JVC11BBMRA005(681-1358) (BLOCK WORK )AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    6B

    ITEM3B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    A

    B

    C

    U

    Block Works

    200mm Solid block work with smooth sand

    plaster including all support columen and copying

    beam as per in drawing and specifacation forshoring

    200 mm thick Hollow Blocks as per in Drawing

    and specification .

    100 mm thick Hollow Blocks as per in Drawing

    and specification .

    M2

    M2

    M2

    D Thermal blocks,250mm M2

    0B

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    24/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 4

    ON PLOT NO JVC11BBMRA005(681-1358) (BLOCK WORK )AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    7B

    ITEM4B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    A The tenderer is to details below any additional

    items with quantities and rates not previously

    included to complete the build-up of L.S. tender

    price for this section of the work. Should thetenderer fail to insert any items here, it will be

    deemed that his L.S. price for the tender includes

    all items and no subsequent claim for any

    additional item will be entertained.

    1B

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    25/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 4

    ON PLOT NO JVC11BBMRA005(681-1358) (BLOCK WORK )AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    8B

    ITEM5B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    U

    TO COLLECTIONU

    U

    FOR BILL NO. 4 :

    From Page B4/01

    Page B4/02

    2B

    BILL NO.4 - BLOCK WORKS TOTAL CARRIED TO SUMMARY DHS

  • 8/10/2019 The Last Boq(Full)

    26/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 5ON PLOT NO JVC11BBMRA005(681-1358) (ROOFING AND WATERPROOFING)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    6B

    ITEM3B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    URoof Water ProofingWorks(COMPOSYSTEM FROM ROOFCARE)(25 YEARS GARANTEE)

    A Roof water proof works composystem from roofcare as drawindg and specifacation including all

    works and skirting

    M2

    UWaterproofing of Kitchen / bathroom / toilet /

    Balcony/flower box and All Wet Areas(10

    YEARS GRANTEE)

    All these items under floor finishing

    I Sand/cement screed M2

    J Concrete primer M2

    K One layer of 5mm thk. Dermabit applied

    waterproofing membrane with polyester as

    specified.

    M2

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    27/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 5ON PLOT NO JVC11BBMRA005(681-1358) (ROOFING AND WATERPROOFING)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    7B

    ITEM4B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    A The tenderer is to details below any additional

    items with quantities and rates not previously

    included to complete the build-up of L.S. tender

    price for this section of the work. Should thetenderer fail to insert any items here, it will be

    deemed that his L.S. price for the tender includes

    all items and no subsequent claim for any

    additional item will be entertained.

    1B

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    28/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 5ON PLOT NO JVC11BBMRA005(681-1358) (ROOFING AND WATERPROOFING)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    8B

    ITEM5B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    UTOTAL COLLETION FOR BILLA NO. 5 :

    From Page No. B5/01

    From Page No. B5/02

    2B

    BILL NO.5 WATER PROOFING - TOTAL CARRIED TO SUMMARY DHS

  • 8/10/2019 The Last Boq(Full)

    29/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 6ON PLOT NO JVC11BBMRA005(681-1358) (FINISHING WORK)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    13B

    ITEM7B

    DESCRIPTION QTY UNI

    T

    RATE TOTAL DHS.

    UNOTEU:- ALL ITEMS TO BE CHECKED WITH

    DRAWING & SPECIFICATIONS- CONTRACTORS SHOULD CALCULATE ALL

    QUANTITIES AS PER DRAWING- CONTRACTOR SHOULD PROVIDE ANY

    SHOP DRAWING FOR METHOD OFFIXATION AS PER SPECS & ENGINEERREQUIREMENTS

    1

    A

    B

    C

    D

    2

    A

    B

    C

    D

    U

    Floor Finishes

    UCeramic:-

    Supply and fix ceramic tiles for (all bed rooms & tol

    & bath rooms & pantry & m.bed rooms & terrace &

    store & laundry ) in flats (35 AED/M2)

    Supply and fix ceramic tiles for (living hall &

    entrance & lobby ) in flats (45 AED/M2)

    Supply and fix ceramic tiles for service area&corridors & shops(garbage rooms & telephone

    rooms & electrical rooms & water meter rooms &

    L.V rooms & shops & security room & corridors ) in

    flats (45 AED/M2)

    skirting ( 25 AED/L.M)

    UGranite & MARBLE:-Granite for slopes in entrance as per drawing and

    specification (250 AED/M2).

    Granite for main &back entrance as per drawing andspecification (250 AED/M2)

    Granite for main entrance steps as per drawing and

    specification (250 AED/L.M)

    Granite for internal steps as per drawing and

    specification ( stare 1 & stare 2) (70 AED/L.M).

    M2

    M2

    M2

    M2

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    30/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 6ON PLOT NO JVC11BBMRA005(681-1358) (FINISHING WORK)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    ITEM8B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    E

    F

    G

    H

    I

    2

    3

    A

    B

    C

    D

    Granite for landing of internal steps as per

    drawing and specification (star1&star2) (70

    AED/M2).

    Marble for lift lobby as per drawing and

    specification (250AED/M2)

    Granite skirting (40 AED/L.M)

    Marble skirting ( 40 AED/L.M)

    Marble tresholds

    UEpoxy traffic deck coating systemUfrom JOUTIN

    or equal approved for vehicular traffic in barking

    area and ramp as per drawing and specification

    UCeiling finishes:-

    12.5 mm thick gypsium board with cornish&baulk

    head painted with acrylic emulsion paint for

    corridors and service roomsas per drawing and

    specifacation

    12.5 mm thick gypsium board with cornish&baulk

    head painted with acrylic emulsion paint for

    halls and all rooms in flats as per drawing and

    specifacation

    125 mm thick moisture resistance gypsium boardwith cornish &bulk head for main entrance and

    wet area painted with acrylic emulsion paint

    600X600 MM thk suspended baked enamel

    aluminum tiles with exposed splin for all bath

    rooms and paintry and wet areas

    M2

    M2

    L.M

    L.M

    L.M

    M2

    M2

    M2

    M2

    M2

    2B

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    31/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 6ON PLOT NO JVC11BBMRA005(681-1358) (FINISHING WORK)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    15B

    ITEM9B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    1

    A

    B

    C

    D

    E

    2

    A

    B

    C

    3

    A

    B

    4

    0BWalls Finishes

    Plaster work:-Spry Plaster work for parking area as per drawing

    and specification .

    Internal plaster including all accessoires as per

    drawing and specification .

    External plaster including all accessoires as per

    drawing and specifacation.

    External plaster for parapet including all

    accessoires as per drawing and specifacation

    Aluminum angle for grooves

    Paint works:-Pure acrylic anti-carbonation silk smooth finish on

    Jotashiled from Jotun or approved equal as per

    drawing and specifacation for parking area

    External paint finish weather proof as per

    drawings & specification and to the consuiltants

    approval from jotun or approved equal (full

    epoxy)

    Internal fenomastic paint (wash able) as per

    drawing & specifacation and to the consultants

    approval from jotun or approval equal

    Stone Cladding

    Stone cladding in elevation as per drawing andspecication

    Stone handerail as per drawing and specafication

    Granite CladdingGranite cladding for main enterance &box flowers

    as per drawing and specifacation

    M2

    M2

    M2

    M2

    L.M

    M2

    M2

    M2

    M2

    M2

    M2

    3B

    BILL NO.6 FINISHING TOTAL CARRIED TO SUMMARY DHS

  • 8/10/2019 The Last Boq(Full)

    32/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 6ON PLOT NO JVC11BBMRA005(681-1358) (FINISHING WORK)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    16B

    ITEM10B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    5

    A

    B

    C

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    Wall Ceramic

    Cerimic tiles for bath rooms &kitchens&paintrys

    & lundary including border ( 35 AED/M2)

    Cerimic tiles for garbage rooms (20 AED/M2)

    Cerimic tiles for corradors and passing area

    including border (45 AED/M2)

    External worksInterlock tile (8 cm) as per drawing and

    specifacation

    Kerpstone as per drawing and specifacations

    Compound wall as per drawing and

    specifacations

    GRC decorative

    Roof clay tiles(70 AED/M2)

    Door sign

    Wheel stopper

    GI grating

    Corner gaurds

    Traffic signs and marking as per drawing andspecification

    Reflective mirror as per drawing and specification

    Gate barrier

    Roof deck & roof garden and landscape as per

    drawing and specification(120AED/M2)

    M2

    M2

    M2

    M2

    L.M

    L.M

    L.M

    M2

    ITEM

    ITEM

    ITEM

    ITEM

    ITEM

    ITEM

    ITEM

    M2

    4B

    BILL NO.6 FINISHING TOTAL CARRIED TO SUMMARY DHS

  • 8/10/2019 The Last Boq(Full)

    33/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 6ON PLOT NO JVC11BBMRA005(681-1358) (FINISHING WORK)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    17B

    ITEM11B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    A The tenderer is to details below any additional

    items with quantities and rates not previously

    included to complete the build-up of L.S. tender

    price for this section of the work. Should thetenderer fail to insert any items here, it will be

    deemed that his L.S. price for the tender includes

    all items and no subsequent claim for any

    additional item will be entertained.

    5B

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    34/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 6ON PLOT NO JVC11BBMRA005(681-1358) (FINISHING WORK)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    18B

    ITEM12B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    TOTAL COLLETION FOR BILLA NO. 6 :

    From Page No. B6/01

    From Page No. B6/02

    From Page No. B6/03

    From Page No. B6/04

    From Page No. B6/05

    BILL NO 6 FINISHING - TOTAL CARRIED TO SUMMARY DHS

  • 8/10/2019 The Last Boq(Full)

    35/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 6ON PLOT NO JVC11BBMRA005(681-1358) (FINISHING WORK)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

  • 8/10/2019 The Last Boq(Full)

    36/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 7ON PLOT NO JVC11BBMRA005(681-1358) (ALUMINUM& METAL WORKS)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    9BITEM 5BDESCRIPTION QTY UNIT RATE TOTAL DHS.

    U1

    A

    B

    U

    Coloured powder coated aluminiumwindows and complete panels, flyscreen,ironmongery, mastic sealant and like as perspecification and drawing.

    UUPVC windows as per drawing

    (W01) (200 X 200) CM

    (W02) (305 X 200) CM

    M2

    M2

    C (W03) (200 X 120) CM M2

    D (W04) (90X120) CM M2

    E (W05) (60X100) CM M2

    F (W06) (60X120) CM M2

    G (W07) (140X120) CM M2

    H (W08) (55X100) CM M2

    I

    J

    (W09) (180X120) CM

    (W10) (165X120) CM

    M2

    M2

    K (W11) (200X195) CM M2

    1B

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    37/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 7ON PLOT NO JVC11BBMRA005(681-1358) (ALUMINUM& METAL WORKS)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    10B

    ITEM6B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    2

    Aluminium & Metal Works to be continued

    U

    Aluminium Doors

    A (AD01) (200x220)CM NO

    B (AD02)(400X300/400) CM NO

    C (AD03) (440X220) CM

    Aluminum door with stainless steel cladding for

    main entrance as per drawing and specification

    NO

    D (AD04) (180X220) CM NO

    E (AD05) (100X220) CM NO

    F (AD06) (310X220) CM NO

    G (AD07) (200X220) CM NO

    H (SD01) (305X300) CM NO

    I (SD02) (100X300) CM NO

    J

    K

    L

    M

    U

    3

    U4

    U5

    U6

    U7

    U8

    (SD03) (100X220) CM

    (SD04) (75X220) CM

    (SD05) (100X220) CM

    (SD06) (180X220) CM

    UCast aluminum railingU color as per architects

    approval (for terrace and balcony) (500/L.M)

    U

    Miled steel railingU

    as per drawing and

    specification for staircase& ramps (500/L.M)

    USpiral staircaseU with wooden tread for duplex

    flat as per drawing(shop drawing &method of

    statement should be submitted for eng approval)

    UBird screen

    UInspection ladderU(as per drawing)

    U

    Care shedU

    as per drawing & specification for 9

    cars

    NO

    NO

    NO

    NO

    L.M

    L.M

    Item

    Item

    Item

    Item

    2B

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    38/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 7ON PLOT NO JVC11BBMRA005(681-1358) (ALUMINUM& METAL WORKS)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    11B

    ITEM7B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    A The tenderer is to details below any additional

    items with quantities and rates not previouslyincluded to complete the build-up of L.S. tender

    price for this section of the work. Should the

    tenderer fail to insert any items here, it will be

    deemed that his L.S. price for the tender includes

    all items and no subsequent claim for any

    additional item will be entertained.

    3B

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    39/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 7ON PLOT NO JVC11BBMRA005(681-1358) (ALUMINUM& METAL WORKS)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    12B

    ITEM8B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    0BTo COLLECTION FOR BILL NO. 7

    From Page No.B7/01

    Page No.B7/02

    4B

    BILL NO.7ALU & METAL WORK TOTAL CARRIED TO SUMMARY DHS

  • 8/10/2019 The Last Boq(Full)

    40/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 7ON PLOT NO JVC11BBMRA005(681-1358) (ALUMINUM& METAL WORKS)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

  • 8/10/2019 The Last Boq(Full)

    41/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 8

    ON PLOT NO JVC11BBMRA005(681-1358) (JOINERY&IRONMONGERY)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    9B

    ITEM5B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    1-

    A

    UWOODEN WORKS:-

    UDoors:-

    Supply & Fix wooden sub frames single leaf18mm thk. As per specifications

    No

    B

    C

    D

    E

    F

    G

    2-

    H

    I

    Supply & fix wooden doors fire rated for staircase

    as per drawing and civil defense requirements

    D01(110X220) CM(2,000/ONE)

    Supply & fix wooden doors fire rated for

    Apartment as per drawing and civil defense

    requirements D02(100X220) CM(2,000/ONE)

    Supply & fix wooden doors for bed rooms as per

    drawing and specification D03(90X220)

    CM(1,500/ONE)

    Supply & fix wooden doors for bath rooms and

    toilet as per drawing and specificationD04(80X220) CM(1,500 /ONE)

    Supply & fix wooden doors with hand cape for

    basement as per drawing and specification

    D05(110X220) CM(2,000/ONE)

    Supply & fix wooden doors fire rated for roof as

    per drawing and civil defense requirements

    D06(100X220) CM(2,000/ONE)

    U

    WOODEN PERGOLA:-

    Supply & fix wooden pergola(400 X 400) CM as

    per drawing and specification at roof

    (15,000/ONE)

    Supply & fix wooden pergola(200 X 200) CM as

    per drawing and specification at roof (6,000/ONE)

    No

    No

    No

    No

    No

    No

    No

    No

    0B

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    42/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 8

    ON PLOT NO JVC11BBMRA005(681-1358) (JOINERY&IRONMONGERY)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    10B

    `ITEM6B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    3-

    4-

    UKITCHEN CABANET :-

    Supply & insulation works of kitchen cabinet topand bottom including base unit and cupboards and

    sink and cookers and all requirements as per

    drawing and specification (400,000 AED)

    UWOODEN WARDROBESSupply & insulation works of wardrobes including

    all required works as per drawing and

    specification (250,000 AED)

    ITEM

    ITEM

    1B

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    43/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 8

    ON PLOT NO JVC11BBMRA005(681-1358) (JOINERY&IRONMONGERY)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    11B

    ITEM7B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    A The tenderer is to details below any additional

    items with quantities and rates not previously

    included to complete the build-up of L.S. tender

    price for this section of the work. Should thetenderer fail to insert any items here, it will be

    deemed that his L.S. price for the tender includes

    all items and no subsequent claim for any

    additional item will be entertained.

    2B

    TO COLLECTION DHS

  • 8/10/2019 The Last Boq(Full)

    44/73

    RESIDENTIAL/COMMERCIAL BUILDING

    (B+G+4FLOOR+ROOF)

    FOR MRS/ACES PROPERTY LIMITED BILL NO. 8

    ON PLOT NO JVC11BBMRA005(681-1358) (JOINERY&IRONMONGERY)AT AL BARSHA SOUTH FOUR, JUMERA VILLAGE ,DUBAI

    12B

    ITEM8B

    DESCRIPTION QTY UNIT RATE TOTAL DHS.

    UTO COLLECTION FOR BILL 8 :From Page No.B8/01

    Page No .B8/02

    Page No .B8/03

    3B

    BILL NO. 8 JOINERY & IRONMONGERY - DHS

    4B

    TOTAL CARRIED TO SUMMARY

  • 8/10/2019 The Last Boq(Full)

    45/73

    NO ITEM FLOOR WALL CELLING DOOR KITCHEN CABANET DRESS

    1 BASMENT

    GRAGE AREA EPOXY PAINT PAINT PAINT

    LIFT LOBBY MARBLE/250 AED MARBLE/250 AED GUBSUM BOARD

    SECURITY CERIMIC/45 AED PAINT GUBSUM BOARD NORMAL/1500 AED

    RAMP EPOXY PAINT 0 0

    2 GROUND FLOOR

    LIVING HALL WITH ENTRANC CERIMIC/45 AED PAINT GUBSUM BOARD FIRE RATED/3000AED

    BED ROOMS CERIMIC/35 AED PAINT GUBSUM BOARD NORMAL/1500 AED

    TOL CERIMIC/35 AED CERIMIC/35 AED FALSECELLING NORMAL/1500 AED

    BATH CERIMIC/35 AED CERIMIC/35 AED FALSECELLING NORMAL/1500 AED

    PAINTRY CERIMIC/35 AED CERIMIC35AED FALSECELLING

    M.BED ROOM CERIMIC/35 AED PAINT GUBSUM BOARD NORMAL/1500 AED

    TERRACE CERIMIC/35 AED PAINT W. P GUBSUM

    STORE CERIMIC/35 AED PAINT FALSECELLING NORMAL/1500 AED

    COORIDOR CERIMIC/45 AED CERIMIC/45 AED GUBSUM BOARD

    STARCASE 1 GRANITE /70 AED PAINT GUBSUM BOARD FIRE RATED/2000AED

    STARCASE 2 GRANITE /70 AED PAINT GUBSUM BOARD FIRE RATED/2000AED

    GARBAGE ROOM CERIMIC/45 AED CERIMIC/45 AED FALSECELLING

    EL ROOM CERIMIC/45 AED PAINT FALSECELLING FIRE RATED/2000AED

    L.V ROOM CERIMIC/45 AED PAINT FALSECELLING FIRE RATED/2000AED

    RECEPTION GRANITE/250 AED GRANITE/250 AED GUBSUM BOARD

    MAIN ENTRANCE GRANITE/250 AED GRANITE/250 AED GUBSUM BOARD STANLESS STEEL

    RAMP FOR ENTRANCE GRANITE/250 AED 0 0

    SHOPS CERIMIC/45 AED PAINT FALSECELLING GLASS

    PARKING AREA EPOXY PAINT PAINT PAINT

    3 TYPICAL FLOORLIVING HALL WITH ENTRANC CERIMIC/45 AED PAINT GUBSUM BOARD FIRERATED/3000 AED

    BED ROOMS CERIMIC/35 AED PAINT GUBSUM BOARD NORMAL/1500 AED

    BATH CERIMIC/35 AED CERIMIC/35 AED FALSECELLING NORMAL/1500 AED

    TOL CERIMIC/35 AED CERIMIC/35 AED FALSECELLING NORMAL/1500 AED

    PAINTRY CERIMIC/35 AED CERIMIC/35 AED FALSECELLING

    LOBBY CERIMIC/45 AED PAINT GUBSUM BOARD

    M.BED ROOM CERIMIC/35 AED PAINT GUBSUM BOARD NORMAL/1500 AED

    LUNDRY CERIMIC/35 AED PAINT FALSECELLING NORMAL/1500 AED

    STORE CERIMIC/35 AED PAINT FALSECELLING NORMAL/1500 AED

    TELEPHONE ROOM CERIMIC/45 AED PAINT FALSECELLING FIRE RATED/2000AED

    EL ROOM CERIMIC/45 AED PAINT FALSECELLING FIRE RATED/2000AED

    STARCASE1 CERIMIC/45 AED PAINT GUBSUM BOARD FIRE RATED/2000AED

    STARCASE2 CERIMIC/45 AED PAINT GUBSUM BOARD FIRE RATED/2000AED

    WATER MEATER ROOM CERIMIC/45 AED PAINT FALSECELLING FIRE RATED/2000AED

    COORIDOR CERAMIC/45 AED CERAMIC/45 AED GUBSUM BOARD

    CHUIT ROOM CERIMIC/45 AED CERIMIC/20 AED FALSECELLING FIRE RATED/2000AED

    BALACONY CERIMIC/45 AED PAINT GUBSUM BOARD

    4 FOURTH FLOOR

    LIVING HALL WITH ENTRANC CERIMIC/45 AED PAINT GUBSUM BOARD

    BED ROOMS CERIMIC/35 AED PAINT GUBSUM BOARD

    TOL CERIMIC/35 AED CERIMIC/35 AED FALSECELLING

    BATH CERIMIC/35 AED CERIMIC/35 AED FALSECELLING

    M.BED ROOM CERIMIC/35 AED PAINT GUBSUM BOARD

    LOBBY CERIMIC/45 AED PAINT GUBSUM BOARD

    LUNDRY CERIMIC/35 AED PAINT FALSECELLING

    EL ROOM CERIMIC/45 AED PAINT FALSECELLING

    WATER MEATER ROOM CERIMIC/45 AED PAINT FALSECELLING

    CHUIT ROOM CERIMIC/45 AED CERIMIC/20 AED FALSECELLING

    GAS ROOM CERIMIC/45 AED PAINT FALSECELLING

    COORIDOR CERIMIC/45 AED CERIMIC/45 AED GUBSUM BOARD

    STORE CERIMIC/35 AED PAINT FALSECELLING

    PAINTRY CERIMIC/35 AED CERIMIC/35 AED FALSECELLING

    KITCHEN CERIMIC/35 AED CERIMIC/35 AED FALSECELLING

    STARCASE1 CERIMIC/45 AED PAINT GUBSUM BOARD

    STARCASE2 CERIMIC/45 AED PAINT GUBSUM BOARD

    ROOF GARDEN LAND SCPE/GRASS

    5 ROOF FLOOR

    LIFT ROOM CERIMIC/35 AED PAINT PAINT

    EL ROOM CERIMIC/45 AED PAINT FALSECELLING

    STARCASE1 CERIMIC/45 AED PAINT FALSECELLING

    GARDEN LAND SCPE/GRASS 0 0

    ROOF OMPO ROOF SYSTE 0 0

    CHUIT ROOM CERIMIC CERIMIC FALSECELLING

    6 TOP ROOF

    ROOF OMPO ROOF SYSTEM

    1000AED/R.M

  • 8/10/2019 The Last Boq(Full)

    46/73

    ACES Property Limited Crown Home Consult

    PROPOSED BUILDING

    (B+G+4+R)

    On Plot No. JVC 11BBMRA005 (681-1358)

    Aces Limited Property

    Item

    NoITEM DESCRIPTION Quantity Unit Rate Amount

    Dhs Dhs

    A

    B

    C

    16 ELECTRICAL

    Notes

    The Contractor has to refer to the specifications and drawings for

    all details related to the works of this division and he is to include

    L.S

    L.S

    L.S

    for complying with all the requirements contained therein, whether

    Item

    Item

    Item

    or not they are specifically mentioned within the items description.

    Contractor shall obtain authorities approvals during construction

    stage and pay all fees and charges need by authorities, prepairing

    offical submission and obtain approvals for building permit.

    16060 EARTHING SYSTEM

    Low voltage earthing:

    Supply and install earthing system including copper rods, plates

    according to drawings ,specs and international standers to verify

    earthing resistance of 1 ohm.

    Low voltage earthing

    Low current earthing:

    Supply and install clean earthing system including copper rods,

    plates according to specs and international standers to verify

    earthing resistance of 0.5 ohm

    Low current earthing

    Swimming Pool and fountains earthing:

    Supply and install clean earthing system including copper rods,

    plates according to specs and international standers to verify

    earthing resistance of 0.5 ohm

    Swimming Pools earthing

    Carried to Collection Dhs

    Crown Home Consultants Page 1 of 15 July

  • 8/10/2019 The Last Boq(Full)

    47/73

    ACES Property Limited Crown Home Consult

    E

    A

    B

    C

    D

    E

    F

    G

    H

    IJ

    K

    L

    M

    N

    O

    P

    Q

    R

    S

    T

    U

    VW

    X

    Y

    Z

    AA

    AB

    16425 LOW VOLTAGE SWITCH GEAR & SWITCH BOARDS:

    1

    1

    1

    1

    1

    1

    1

    1

    1

    11

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    11

    1

    1

    1

    1

    1

    Supply , install and test metal enclosed FORM-4 Type 6, IP54main

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    NrNr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    NrNr

    Nr

    Nr

    Nr

    Nr

    Nr

    distribution board complete with metal enclosure, instrumentation,

    indicating lamps, earthing, fixing and supporting materials and all

    cable glands for incoming and outgoing cables, termination, etc...

    (to be installed inside air-conditioned room (30 C ambient temp)):

    LVP-1 with 420KVAR capacitor bank

    16470 DISTRIBUTION AND SUB DISTRIBUTION PANEL

    BOARD

    Supply , install , test and operate distribution and sub distribution

    panel boards as shown in drawings and specs. complete with ,

    busbars , hooking up of all incoming & outgoing feeders and all

    necessary accessories and ancillary works required for complete

    installation for the following panels

    Flat distribution boards shall include all required accessories and

    builders works for installation of KWHM's

    Sub Main & Branch distribution panel boards

    SMDB-BF

    SMDB-LL

    SMDB-G

    SMDB-1ST

    SMDB-2ND

    SMDB-3RD

    SMDB-4TH

    SMDB- R

    SMDB- ACDB-SS

    DB-BF

    DB-G

    DB-LL1

    DB-LL2

    DB-LL3

    DB-LL4

    DB-TEL

    DB-LAY

    DB- SH01

    DB- SH02

    DB- G001

    DB- G002DB- G003

    DB- G004

    DB- G005

    DB- G006

    DB- 101

    DB-102Carried to Collection Dhs

    Crown Home Consultants Page 2 of 15 July

  • 8/10/2019 The Last Boq(Full)

    48/73

  • 8/10/2019 The Last Boq(Full)

    49/73

    ACES Property Limited Crown Home Consult

    A

    B

    C

    D

    E

    A

    B

    C

    D

    E

    F

    G

    H

    I

    J

    K

    L

    L

    M

    N

    DB- 405

    DB- 406

    DB- 407

    DB- 408

    DB-R

    16120 LOW VOLTAGE CABLES

    Indoor Copper Cables

    Supply , install , connecting and testing as shown in drawings and

    specs 0.6/1.0 kv power copper cable with stranded copper

    conductors the item shall include all required accessories for

    perfect connection and installation.

    (4x300)+150E sqmm multi-core cable CU/XLPE/PVC

    (4x240)+120E sqmm multi-core cable CU/XLPE/PVC

    (4x185)+95E sqmm multi-core cable CU/XLPE/PVC

    (4x150)+70E sqmm multi-core cable CU/XLPE/PVC

    (4x120)+70E sqmm multi-core cable CU/XLPE/PVC

    (4x70)+35E sqmm multi-core cable CU/XLPE/PVC

    (4x50)+25E sqmm multi-core cable CU/XLPE/PVC

    (4x16)+16E sqmm multi-core cable CU/XLPE/PVC

    (4x10)+10E sqmm multi-core cable CU/XLPE/PVC

    (4x6)+6E sqmm multi-core cable CU/XLPE/PVC

    2x(1x10)+10E sqmm single-core cable CU/PVC

    2x(1x6)+6E sqmm single-core cable CU/PVC

    16111 CABLE TRAYS:

    Supply , install as shown in drawings & specs. cable tray complete

    1

    1

    1

    1

    1

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    with all required accessories for complete installation and

    100mm width x 50mm height

    200mm width x 100mm height

    300mm width x 100mm height

    Nr

    Nr

    Nr

    Nr

    Nr

    mt

    mt

    mt

    mt

    mt

    mt

    mt

    mt

    mt

    mt

    mt

    mt

    mt

    mt

    mt

    Carried to Collection Dhs

    Crown Home Consultants Page 4 of 15 July

  • 8/10/2019 The Last Boq(Full)

    50/73

    ACES Property Limited Crown Home Consult

    A

    B

    C

    D

    E

    F

    G

    H

    I

    JK

    L

    M

    N

    O

    P

    Q

    R

    S

    16500 LIGHTING INSTALLATION

    Lighting Outlets

    Supply and install with all required accessories (switches, push

    b u tto n s, co p p er wir es, PV C b o xes etc) acco r d in gto d r awin gs

    and specs

    Ceiling lighting outlet.

    wall light outlet.

    Ground light outlet

    Swimming pool lighting outlet

    Lighting Fixtures

    Supply, install and test lighting fixtures complete with all required

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.SL.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    accessories for complete installation as per drawings and specs

    F1

    F2

    F3

    F4

    F5

    F6

    F7

    F8

    F9

    F10

    F11

    F12

    F13

    F14

    F15

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    NrNr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Carried to Collection Dhs

    Crown Home Consultants Page 5 of 15 July

  • 8/10/2019 The Last Boq(Full)

    51/73

    ACES Property Limited Crown Home Consult

    A

    B

    C

    DE

    F

    G

    H

    Lighting Switches

    Supply, install , test and operate lighting switches as shown per

    drawings and specs for complete installation

    One way, One Gang

    One way, Two Gang

    One way, Three Gang

    Two way, One GangTwo way, Two Gang

    Occupancy Sensor

    Adderssable Central Battery

    Emergency Lighting Outlets

    Su p p ly with all r eq u ir ed accesso r ies ( co p p er wir es,PV C b o xes

    etc) according to drawings and specs

    L.S

    L.S

    L.S

    L.SL.S

    L.S

    L.S

    L.SCeiling Emergency lighting outlet.

    Nr

    Nr

    Nr

    NrNr

    Nr

    Nr

    Nr

    Carried to Collection Dhs

    A

    B

    C

    D

    E

    F

    H

    I

    Emergancy Lighting Fixtures

    Supply and test lighting fixtures complete with all required

    accessories for complete installation as per drawings and specs

    Recessed Ceiling mounted safety lights using 1x8w compact

    fluorescent lamp.

    Surface Ceiling mounted safety lights using 1x8w compact

    fluorescent lamp.

    Wall mounted safety lights using 1x8w compact fluorescent lamp.

    16143 POWER OUTLETS AND ACCESSORIES

    Power and socket outlets

    Supply, install, test and put into operation socket outlet with all

    r eq u ir ed accesso r ies ( co p p er wir es, PV C p ip es, b oxes etc)

    according to drawings and specs.

    Single phase single socket outlet with 3x4 sqmm 450/750V CU

    wires

    Single phase duplex socket outlet with 3x4 sqmm 450/750V CU

    wires

    Flexible outlet to feed wall camera with 3x4 sqmm 450/750V CU

    wires.

    Flexible outlet to feed ceiling camera with 3x4 sqmm 450/750V

    CU wires.

    Flexible outlet to feed washing machine with 3x4 sqmm

    450/750V CU wires.

    Disconnect Switches Outlets

    Supply and install disconnect switch outlet with all required

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    accesso r ies ( co p p er cab les , PV C co n d u its , b o xes etc

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Carried to Collection Dhs

    Crown Home Consultants Page 6 of 15 July

  • 8/10/2019 The Last Boq(Full)

    52/73

    ACES Property Limited Crown Home Consult

    N

    O

    P

    Q

    A

    B

    C

    D

    E

    F

    G

    H

    P

    Q

    R

    S

    T

    U

    V

    X

    A

    B

    C

    D

    E

    F

    Single phase disconnect switch outlet complete with (3x6) sqmm

    240V CU/PVC.

    Three phase disconnect switch outlet complete with (3x4) sqmm

    415V CU/PVC.

    Three phase disconnect switch outlet complete with (4x6+6) sqmm

    415V CU/XLPE/PVC.

    Three phase disconnect switch outlet complete with (4x16+10)

    sqmm 415V CU/XLPE/PVC.

    Three phase disconnect switch outlet complete with (4x70+50)

    sqmm 415V CU/XLPE/PVC.

    Three phase disconnect switch outlet complete with (4x150+70)

    sqmm 415V CU/XLPE/PVC.

    Power accessories

    Single phase single socket 13A

    Single phase duplex socket 13A

    Single phase single socket 13A Weather proof.

    Single phase single socket 13A, 120 CM height

    Single phase single CCTV socket 13A

    Ceiling Single phase single CCTV socket 13A

    Disconnect Switches

    20A, 1P+W, 240V

    20A,3P+W,415V

    32A,3P+W,415V

    63A,3P+W,415V

    200A,3P+W,415V

    250A,3P+W,415V

    400A,3P+W,415V

    630A,3P+W,415V

    16725 Fire Alarm & Voice Evacuation system

    Main Fire Alarm Control Panels

    Supplying, installing, connecting and testing fire alarm

    addressable control panels (FACPs), complete with Battery,

    Battery Charger , Power supply , Auto Dialer , Printer , Repeater

    Panel FARPs , and all necessary accessories and ancillary works ,

    interfaces and materials required for complete installation back to

    fire alarm control panels as specified and as indicated on the

    drawings, complete with the following:

    5 loops Addressable Fire Alarm Control Panel " FACP.1 ".

    Fire Alarm Control Panels complete with the followings:

    Power supply and battery charger unit.

    Battery sufficient for 24 hours and 30 minutes for full operation of

    bells.

    Interface Modules with the following systems:

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S.

    L.S.

    L.S.Interface Modules with Fire Fighting System.

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Item

    ItemCarried to Collection Dhs

    Crown Home Consultants Page 7 of 15 July

  • 8/10/2019 The Last Boq(Full)

    53/73

    ACES Property Limited Crown Home Consult

    G

    H

    I

    J

    K

    L

    MN

    A

    B

    C

    D

    E

    F

    G

    H

    I

    JK

    L

    M

    N

    O

    P

    Q

    R

    S

    Interface Modules with Main Distribution Panels (MDBs).

    Interface Modules with HVAC.

    Interface Modules with Elevators.

    Interface modules with Telephone MDF.

    Automatic Telephone Dialer.

    Dot Matrix Printer.

    Graphic Command Center.24*7 Monitoring System for DCD

    Fire Alarm Repeater Panels

    Supplying, installing, connecting and testing fire alarm repeater

    panel (FARP) ,complete with all necessary accessories and

    ancillary works and materials required for complete installation to

    be connected to the next fire alarm control panel as specified and

    as indicated on the drawings

    Fire Alarm Repeater Panel FARP

    Fire Alarm Outlet and DevicesSupplying, installing, connecting and testing fire alarm station

    L.S.

    L.S.

    L.S.

    L.S.

    L.S.

    L.S.

    L.S.L.S.

    L.S.

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.SL.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S.

    L.S.

    L.S.

    Outlet complete with all required accessories, (2x1.5mm2) fire

    retardant 105o c copper conductor as shown per drawings and Ditto as above but for Fire alarm manual call point

    Ditto as above but (2x2.5mm2) for Fire alarm Sounder or Horn

    Addressable optical smoke detector, Ceiling type.

    Addressable optical smoke detector, Wall mounted type.

    Addressable optical smoke detector, with Sounder Base.

    Addressable rate of rise heat detector, Ceiling type.Addressable fixed heat detector at 90 degree, Ceiling type for

    Generator installation.Addressable Combined Multisensor (smoke + heat) detector.Addressable Combined (optical smoke + heat) detector multi-

    sounder type (sounder base).Fire alarm manual call point, Double action.

    Fire alarm manual call point, Double action, weather proof type.

    Fire alarm Sounder/Horn complete with strop light.Fire alarm Sounder/Horn complete with strop light , weather proof

    tFyipree.man station outlet complete with cabling , device and all

    aFcirceesmsoanrieTsenleepehdoendetostfaitnioisnhPwaonrekl.complete with all accessories

    needed to finish work.Control Module.

    Circuit Isolator.

    Monitor Module

    Item

    Item

    Item

    Item

    Nr

    Nr

    NrNr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    NrNr

    Nr

    Nr

    Nr

    Nr

    Nr

    Item

    Item

    Item

    Carried to Collection Dhs

    Crown Home Consultants Page 8 of 15 July

  • 8/10/2019 The Last Boq(Full)

    54/73

    ACES Property Limited Crown Home Consult

    A

    B

    C

    D

    E

    F

    G

    H

    I

    Voice Evacuation system

    Supplying, installing, connecting and testing fire alarm Evacuation

    system including PVC fire retardant conduits for imbedded

    L.S

    L.S

    L.S

    L.S.

    L.S.

    L.S.

    L.S.

    L.S.

    L.S.

    installation, EMT for exposed installation, complete with conduit

    fittin s, back boxes, unction boxes, fire retardant cables, com lete

    Nr

    Nr

    Nr

    Item

    Nr

    Nr

    Nr

    Nr

    Nr

    with devices and all necessary ancillary works and material for

    com lete installation startin from the outlet and back to the VoiceEvacuation Amplifiers as specified and as indicated on the

    drawings for the following items:

    Voice Evacuation Loud speaker outlet complete with cable and all

    necessary accessories needed to finish work.

    Ceiling mounted Fire voice evacuation loudspeaker

    (2/1.5/1/0.5)watts as per drawing.

    Voice Evacuation 100 watts Amplifiers (3 Channels) to cover

    voice evacuation loudspeakers as per drawings.

    Voice Evacuation Recordable message module complete with all

    accessories needed to finish work properly.

    16775 Closed Circuit Television system CCTV

    Main CCTV Equipements

    Supplying, installing, connecting and testing CCTV system

    console with DVRs (Hard Disc storage with min 1 month) and all

    necessary accessories and ancillary materials and works required

    for complete installation as specified and as indicated on the

    drawings.

    Video Matrix Switcher 26 inputs

    Digital Video Recorder DVR 16 Channels for one month storage

    LCD screens, 21 inch

    CCTV Console

    CCTV Outlets

    Supplying, installing, connecting and testing CCTV outlets by 75

    Ohm Co-axial cable , cabling , PVC conduits for imbedded

    installation, EMT for exposed installation, conduit fittings back to

    DVR and all necessary accessories and ancillary materials and

    works required for complete installation as specified and as

    indicated on drawings.

    Camera outlet by 75 Ohm RG6 Co-axial cable as per drawing and

    specifications

    Carried to Collection Dhs

    Crown Home Consultants Page 9 of 15 July

  • 8/10/2019 The Last Boq(Full)

    55/73

    ACES Property Limited Crown Home Consult

    A

    B

    C

    1

    2

    A

    A

    B

    CCTV Cameras

    Supplying, installing, connecting and testing CCTV cameras with

    wall mounting brackets, lenses, all necessary accessories and

    ancillary materials and works required for complete installation as

    specified and as indicated on the drawings.

    Fixed Day/Night Dome mounted color camera, indoor type , 540

    TVL.

    Fixed Day/Night Color camera , outdoor type , with wall-mounting

    bracket , Weather Proof type IP66, 540 TVL.

    Fixed Day/Night Color camera , indoor type , with wall-mounting

    bracket, 540 TVL.

    16740 Structured Cabling system

    L.S.

    L.S.

    L.S.

    1

    L.S

    L.S

    Note:

    Active Com onents such as Switches , Core La er , Call Mana er

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Design should be in compliance with "Du" requirements and

    Main Distribution Structured Cabling Rack "MDR"

    Supplying, installing, connecting and testing the following Racks

    (MDR ) with UPS including power distribution panel, RJ45 patch

    panels (Cat 6), fiber optic patch panels, cables organizers, RJ45

    patch cords (Cat 6), fiber optic patch cords, space in the rack

    cabinet for active com onents, number of 1X8-Core Multi-ModeOM3,10GB Fiber O tic cable u to IDF as er sin le line dia ram,labeling as per TIA standard and all necessary accessories and

    ancillary works and materials required for complete installation as

    specified according to DU specification and as indicated on the

    drawings.

    Main distrbution frame (MDR) as per drawing and according to

    Data Outlets

    Supplying, installing, connecting and testing the following outlets

    including Cat6 cables, PVC conduits, conduit fittings, cable ducts,

    boxes and all necessary accessories and ancillary works and

    materials re uired for com lete installations startin from outlet u to its IDF rack as specified and as indicated on the drawings and

    according to DU specifications..

    Wall mounted Data outlet (using UTP CAT6 cables).

    Dual Data & Telephone outlet (using 2 x UTP CAT6 cables).

    Carried to Collection Dhs

    Crown Home Consultants Page 10 of 15 July

  • 8/10/2019 The Last Boq(Full)

    56/73

    ACES Property Limited Crown Home Consult

    D

    E

    H

    A

    B

    C

    D

    E

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    Data Fixtures

    Su l in , installin , connectin and testin the followin fixtures

    Nr

    Nr

    Nr

    Item

    Nr

    Nr

    Nr

    Nr

    RJ45 and all necessary accessories required for complete

    installations as specified and as indicated on the drawings and

    according to DU specifications.

    Wall mounted Data Socket RJ45.

    Wall mounted Dual (Data &Tel) Socket RJ45.

    Telephone Terminal Cabinet Wired To MDR Using Cat-6 UTP

    16740 Telephone system

    Supplying, installing, connecting and testing Telephone system as

    mentioned below com lete with all re uired accessories and cables

    for proper operation and complete installation as per drawings andspecs including the following items:- (Note : Hyper PABX to be

    designed and supplied by others) and according to DU

    specifications.

    Main distribution rack (MDR) 500 pairs.

    Telephone Boxes

    Supplying, installing, connecting and testing telephone box

    Telephone Box (from UTP to Multi Pair) complete with

    Telephone Box (from UTP to Multi Pair for Guest rooms)

    Telephone Outlets

    Supplying, installing, connecting and testing the following outlets

    includin Cat6 cables, 20mm PVC conduits, conduit fittin s, cableducts, boxes and all necessary accessories and ancillary works and

    materials re uired for com lete installations startin from outlet u to its Telephone Box as specified and as indicated on the drawings

    and according to DU specifications.

    Wall mounted analogue TEL outlet (using UTP CAT6 cables) at

    height 30cm.

    Wall mounted analogue TEL outlet (using UTP CAT6 cables) at

    height 120cm.

    Carried to Collection Dhs

    Crown Home Consultants Page 11 of 15 July

  • 8/10/2019 The Last Boq(Full)

    57/73

    ACES Property Limited Crown Home Consult

    A

    B

    C

    D

    E

    F

    G

    A

    B

    A

    B

    CD

    E

    F

    L.S. Nr

    L.S. Nr

    L.S. Item

    L.S. Item

    L.S. Item

    L.S. Item

    L.S. Item

    L.S Nr

    L.S Nr

    L.S Nr

    L.S Nr

    L.S Nr

    L.S Nr

    L.S. Meter

    1 Nr

    Telephone Fixtures

    Su l in , installin , connectin and testin the followin fixturesRJ45 Analogue Tel. Fixture complete with all necessary

    accessories required for complete installations as specified and as

    indicated on the drawings and according to DU specifications.

    Wall mounted analogue TEL Socket RJ45.

    Wall mounted analogue TEL Socket RJ45, water proof type for

    bathrooms.

    Entry cable complete with all required (Conduits, Manhole, etc.)

    as per drawing and according to DU specifications

    Telephone cables as per drawing and according to DU

    specifications

    300x50mm HDGI-HDRF Cable Trunk with cover at H/L. as per

    DU specification.

    200x50mm HDGI Cable Trunk as per DU specification.

    50x50mm HDGI Cable Trunk as per DU specification.

    16781 Cable Antenna Television System "SMTV" RF Distribution

    Supplying, installing, connecting and testing CATV system to

    achieve 75 dB at least at outlets , 20 dB/ 100m at 862 MHZ

    attenuation level including running inside Light current cable

    trunk as indicated in drawings, conduit fittings, cable trunking,

    coaxial cables,Terminations and all necessary accessories and

    ancillary works for complete installation as specified and as

    indicated on the drawin s Note : H.E.U number of Channels to beselected by owner, and Contrator should to determine Amplifiers

    so as to receive signal at end user not less than 70 : 75 dB)

    Wall mounted analogue TV Outlets.

    Wall mounted analogue TV Fixture.

    SMATV Network Cables

    Supplying, installing, connecting and testing MATV network

    including Splitters, Tap off , Main amplifiers, Distribution

    Amplifiers,coaxial cables, conduits, conduit fittings, cable trunk,

    back boxes, junction boxs and all necessary ancillary works and

    materials required for complete installation according to drawings

    & specifications.

    1.8 meter parabolic satellite dish with LNB Quattro

    VHF Antenna

    UHF Antenna

    Power Boaster

    RG-11 cables as per drawing and single line diagram

    Head End Unit "H.E.U" (Noting that number of Channels should

    be selected according to Owner requirements).

    To Collection

    Crown Home Consultants Page 12 of 15 July

  • 8/10/2019 The Last Boq(Full)

    58/73

    ACES Property Limited Crown Home Consult

    Total collection

    Page 1

    Page 2

    Page 3

    Page 4Page 5

    Page 6

    Page 7

    Page 8

    Page 9

    Page 10

    Page 11

    Page 12

    Carried to Summary

    Crown Home Consultants Page 13 of 15 July

  • 8/10/2019 The Last Boq(Full)

    59/73

    Aces Property Limited

    Bill of Quantities

    Mechanical WorksMechanical

    July. 2014Mech/1

    PROPOSED BUILDING

    (B+G+4+R)

    On Plot No. JVC 11BBMRA005 (681-1358)

    ITEM DESCRIPTION QTY. UNIT RATEAMOUNT

    (AED)

    A

    1

    1.1

    1.2

    1.2.1

    1.2.2

    7

    7.1

    7.1.1

    11

    11.2

    11.3

    MECHANICAL ENGINEERING INSTALLATIONS

    Include for the complete installation as detailed in the

    Specifications and on the Drawings . (cont'd.)

    Provide necessary spare parts for normal wear and tear for two years

    as recommended by the manufacturer for all mechanical equipment

    and systems (HVAC&PLUMBING).contractor to provide list of

    proposed spare parts with bid documents.

    Air-conditioning installations

    Fresh Air Handling Unit with Heat Recovery

    Fresh Air Handling units with heat recovery supply air fan, return air

    fan recovery wheels, panel/ bag filters, manometers, duct connections,

    motorized dampers/ actuators,mixing boxes, valves, accessories, control

    panel condensate connection to tundish and flexible pipe connection,

    floor mounted all in accordance with the drawings and specification.

    FAHU- 00

    VRV Systems

    Indoor System-00

    Outdoor System-00

    SPLIT AIR UNIT :

    Supply and install ducted split air conditioning system

    complete as specified including out

    door condensing unit and indoor evaporator unit.

    SPU-00

    Extract fan.

    Include for the complete installation as detailed in the

    Specifications and on the Drawings .

    EF - 00

    ELECTRICAL REQUIRMENTS OF MECHANICAL WORKS

    Electrical reqirements for mechanical works.

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    BUILDER'S WORK.

    All builder's work in connection with HVAC.

    Item

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Carried to Collection

  • 8/10/2019 The Last Boq(Full)

    60/73

    Aces Property Limited

    Bill of Quantities

    Mechanical WorksMechanical

    July. 2014Mech/2

    PROPOSED BUILDING

    (B+G+4+R)

    On Plot No. JVC 11BBMRA005 (681-1358)

    ITEM DESCRIPTION QTY. UNIT RATEAMOUNT

    (AED)

    12

    12.2

    12.3

    13

    13.1

    13.2

    14.2

    14.3

    16

    DUCT INSULATION

    Duct insulation for air conditioned supply and return ducts inside buildin

    Duct insulation for air conditioned supply and return ducts exposed

    to outdoor,including Aluminum cladding and weater proofing.

    METAL DUCTWORK (GALVANIZED STEEL DUCTWORK).Galvanized metal ductwork complete in accordance

    with the specification and as shown on drawing

    Low pressure duct supply and returne.

    Low pressure duct exhaust/fresh air

    DUCTWORK ACCESSORIES.

    Flexible ductwork;low pressure.

    L.S

    L.S

    L.S

    L.S

    DAMPERS

    Nr

    Nr

    Nr

    Nr

    Nr

    NrNr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Nr

    Volume control dampers (V.D) L.S

    Fire damper (FA / AD).Motorized damper

    Sound attenuator

    AIR OUTLETS AND INLETS:

    Exhaust ceiling diffuser(ECD):

    Supply Ceiling diffuser(SCD):

    Supply Air Grill

    L.SL.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    Return Air Grill

    Supply Linear Slot Diffuser

    Return Linear Slot Diffuser

    Carried to Collection

  • 8/10/2019 The Last Boq(Full)

    61/73

    Aces Property Limited

    Bill of Quantities

    Mechanical WorksMechanical

    July. 2014Mech/3

    PROPOSED BUILDING

    (B+G+4+R)

    On Plot No. JVC 11BBMRA005 (681-1358)

    ITEM DESCRIPTION QTY. UNIT RATEAMOUNT

    (AED)

    TESTING,ADJUSTING AND BALANCING :

    Testing , Adjusting and balancing as per specification for all systems.

    The following including joints, supports, accessories, adhesives,

    sealant, self adhesive aluminium tape, sleeves, fittings, sound

    L.S

    L.S

    L.S

    attenuators, dampers, complete a

    Ducting including supports, access panels, complete

    Insulation to ductwork ( low pressure )

    Thermostats

    Item

    Item

    Item

    Carried to Collection

  • 8/10/2019 The Last Boq(Full)

    62/73

    Aces Property Limited

    Bill of Quantities

    Mechanical WorksMechanical

    July. 2014Mech/4

    PROPOSED BUILDING

    (B+G+4+R)

    On Plot No. JVC 11BBMRA005 (681-1358)

    ITEM DESCRIPTION QTY. UNIT RATE AMOUNT(AED)

    MECHANICAL INSTALLATION

    COLLECTION

    Total of Page No. Div 11/1

    Total of Page No. Div 11/2

    Total of Page No. Div 11/3

    Total of Page No. Div 11/4

    Carried to Collection

  • 8/10/2019 The Last Boq(Full)

    63/73

    Aces Proper ty Limi ted

    Jul

    Bill Of Quantities_MechCrown Home Consultants Page 1 of 9

    PROPOSED BUILDING

    (B+G+4+R)

    On Plot No. JVC 11BBMRA005 (681-1358)

    Aces Limited Property

    Item

    NoITEM DESCRIPTION

    Quantity Unit

    Rate

    Amount

    Dhs

    Dhs

    A

    B

    C

    D

    E

    GenerallyInclude for all electrical work in connection with plumbing

    works

    BUILD ERS WO

    RK

    Include all builders work in connection with plumbing

    works

    FIRE FIGHTING SYSTEMS

    Fire Fighting Pump Set

    Supply and install, connecting and testing automatic

    packaged electric fire pumps centrifugal horizontal spilt

    case, UL listed, FM compliant , NFPA 20, complete

    including all accessories and controllers as specified and as

    shown on drawings.

    EFP- 1 -

    Supply and install, connecting and testing automatic

    packaged fire pumps diesel driven centrifugal horizontal

    spilt case, UL listed, FM compliant, NFPA 20, complete

    including all accessories and controllers as specified and as

    shown drawing .

    DFP- 1 -

    Supplying, installing, connecting and testing automatic

    packaged vertical jockey pump complete including fuel

    tank, controllers and all accessories as specified and as

    shown on drawings.

    JP- 1 -

    Black seamless steel pipes to BS 3601, schedule 40 with

    Item

    Item

    L.S

    L.S

    L.S

    Mechanical Coupling

    Supply, install, connect and test Blacksteel pipes

    including fittings, hangers , supports , all other accessories

    and as specified and as indicated on the drawings.

    Item

    Item

    No.

    No.

    No.

    Carried to Collection Dhs

  • 8/10/2019 The Last Boq(Full)

    64/73

    Aces Proper ty Limi ted

    Jul

    Bill Of Quantities_MechCrown Home Consultants Page 2 of 9

    PROPOSED BUILDING

    (B+G+4+R)

    On Plot No. JVC 11BBMRA005 (681-1358)

    Aces Limited Property

    Item

    NoITEM DESCRIPTION

    Quantity Unit

    Rate

    Amount

    Dhs

    Dhs

    A

    B

    C

    D

    E

    F

    G

    H

    I

    J

    K

    L

    M

    N

    O

    P

    25 dn

    32 dn

    40 dn

    50 dn

    65 dn

    80 dn

    100 dn

    150 dn

    Valves and accessories as specified and as shown on

    drawing complete with supports

    Valves complete for automatic sprinkler system

    Fire Alarm Check Valve

    Fire alarm check valve 150 including alarm motor gang,

    test and drain valve, all as specified and shown on

    drawings

    Zone Control Valve

    Zone control valve complete including isolation valve,

    flow switch, test and drain valve as shown on drawing and

    as specified

    Zone control valve type ZCV

    Pressure reducing station

    Pressure reducing station complete

    Deluge valve

    Pre action valve

    Test & Drain valves

    TDV 25 dn

    Automatic Relieve Vent ARV

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    ARV

    M

    M

    M

    M

    M

    M

    M

    M

    Item

    Item

    No

    No

    No

    No

    No.

    No.

    Carried to Collection Dhs

  • 8/10/2019 The Last Boq(Full)

    65/73

    Aces Proper ty Limi ted

    Jul

    Bill Of Quantities_MechCrown Home Consultants Page 3 of 9

    PROPOSED BUILDING

    (B+G+4+R)

    On Plot No. JVC 11BBMRA005 (681-1358)

    Aces Limited Property

    Item

    NoITEM DESCRIPTION

    Quantity Unit

    Rate

    Amount

    Dhs

    Dhs

    A

    B

    C

    D

    E

    F

    G

    H

    I

    J

    Fire Hose Cabinet

    Supplying, installing, connecting and testing of fire hose

    stations consisting of 25mm brass hose valve, firehose reel,

    fire hose 25mm dia 30m long, fire hose 65mm dia 30m long

    nozzel steel cabinet with 65mm fire Landing valve, and all

    adapters and fittings required for the complete assembly.

    (FHC)

    FHC

    Portable fire extinguishers

    FE-1 5KG (CO2 Fire Extinguishers)

    FE-2 6KG (Dry Bowder Fire Extinguishers)

    Fire Blanket As Specified

    Breeching Inlet Connections

    Type BIC-1 complet with non return valve and all

    accessories complet

    Automatic Sprinkler

    Pendent sprinkler

    Supplying, installing, connecting and testing of 1/2 in fast

    resopnse pendent concealed chrome plated sprinkler heads

    to be installed in all areas with fals ceiling all as specified

    and as shown on drawings.

    Upright sprinkler

    Supplying, installing, connecting and testing of 1/2 in

    upright fast response sprinkler head to be installed all as

    specified and as shown on drawings.

    Side wall sprinkler

    Supplying, installing, connecting and testing of 1/2 in side

    wall fast response sprinkler head to be installed all as

    specified and as shown on drawings.

    FIRE SUPRESSION SYSTEM

    L.S

    LS

    LS

    LS

    L.S

    L.S

    LS

    L.S

    L.S

    FM200 SYSTEM

    Complete System including Galvanized Steel SeemlessPipes to BS3601, Extinguishing Agent including

    Cylindres,valves,Nozzels, Detection Systems, Control

    Panels and Alarms.etc and all accessories

    No.

    No.

    No.

    No.

    No.

    No.

    No.

    No.

    Item

    Carried to Collection Dhs

  • 8/10/2019 The Last Boq(Full)

    66/73

    Aces Proper ty Limi ted

    Jul

    Bill Of Quantities_MechCrown Home Consultants Page 4 of 9

    PROPOSED BUILDING

    (B+G+4+R)

    On Plot No. JVC 11BBMRA005 (681-1358)

    Aces Limited Property

    Item

    NoITEM DESCRIPTION

    Quantity Unit

    Rate

    Amount

    Dhs

    Dhs

    B

    C

    D

    E

    F

    G

    H

    I

    J

    PLUMBING

    MECHANICAL - PLUMBING WORKS

    GENERAL:

    Supply, installation, testing & commissioning of the

    following items as per specifictions, drawings and other

    contract documents. Any other items necessary for the

    optimum performance of the mechanical systems shall be

    provided whether mentioned or not mentioned herein at

    no extra cost including but not limited to arrows,

    identification, sleeves caulking, wooden frames, labels,

    tags, As-Built drawings submittals warranty and including

    all electrical and mechanical connections.

    Note : Testing and commissioning price through experts of

    MEP contractor/suppliers is included

    WATER DISTRIBUTION SYSTEMS

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    Domestic Cold Water pipes

    Domestic water system pipes complete with fittings,

    supports, insulation as per specifications and as shown in

    the drawings

    15 dn

    20 dn

    25 dn

    32 dn

    40 dn

    50 dn

    65 dn

    80 dn

    110 dn

    M

    M

    M

    M

    M

    M

    M

    M

    M

    Carried to Collection Dhs

  • 8/10/2019 The Last Boq(Full)

    67/73

    Aces Proper ty Limi ted

    Jul

    Bill Of Quantities_MechCrown Home Consultants Page 5 of 9

    PROPOSED BUILDING

    (B+G+4+R)

    On Plot No. JVC 11BBMRA005 (681-1358)

    Aces Limited Property

    Item

    NoITEM DESCRIPTION

    Quantity Unit

    Rate

    Amount

    Dhs

    Dhs

    A

    B

    C

    D

    E

    F

    G

    H

    K

    L

    M

    N

    O

    Water Treatment System

    Cold water treatment system for drinking water forkitchen area complete with fittings, supports, and all

    accessories as per specifications and as shown in the

    drawings

    Hot water system and pipes

    Hot water system pipes complete with valves, fittings,

    supports,flexible connections,accessories and

    insulation..etc. as per specifications and as shown in the

    drawings

    15 dn

    20 dn

    25 dn

    32 dn

    40 dn

    50 dn

    65 dn

    80 dn

    Hot Water circulation Pump Set

    As shown on the drawings, GPM Capacity at Bar Head,

    Skid mounted pumps complete with valves, suction and

    discharge header etc. 2 Pumps, (1 Duty+1 Stand-by) (Hot

    water circulation pumps) with control panel and all

    accessories ready for operation with valves, fittingsetc

    complete.

    Automatic Air Vent AAV

    150 mm

    Water Flow Meter

    Water flow meter type WFM-1

    GATE VALVE

    TYPE G.V

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    LS

    LS

    LS

    LS

    Hose Bib Tap

    Hose bib; type HB with hose bib union

    TYPE H.B

    No.

    M

    M

    M

    M

    M

    M

    M

    M

    No.

    No.

    No.

    No.

    No.

    Carried to Collection Dhs

  • 8/10/2019 The Last Boq(Full)

    68/73

    Aces Proper ty Limi ted

    Jul

    Bill Of Quantities_MechCrown Home Consultants Page 6 of 9

    PROPOSED BUILDING

    (B+G+4+R)

    On Plot No. JVC 11BBMRA005 (681-1358)

    Aces Limited Property

    Item

    NoITEM DESCRIPTION

    Quantity Unit

    Rate

    Amount

    Dhs

    Dhs

    A

    B

    C

    D

    E

    F

    G

    H

    I

    J

    K

    L

    M

    N

    Domestic Water Transfer Pump Set

    GPM Capacity at Bar Head, Skid mounted pumpscomplete with valves, suction and discharge header etc.(2

    Pumps, 1Duty+1 STAND-BY) From plant room to System,

    with pressure tank, control panel float switches and all

    accessories ready for operation.

    Domestic Water Booster Pump Set

    GPM Capacity at Bar Head, Skid mounted pumps

    complete with valves, suction and discharge header etc.(2

    Pumps, 1Duty+1 STAND-BY) From plant room to System. ,

    with pressure tank, control panel float switches and all

    accessories ready for operation.

    Solar Water Heater System as per specification and

    drawing

    Under Ground water tank (RCC)

    GRP Roof Water Tank

    SANITARY DRAINAGE

    Supply materials and labor for a complete installation of

    sanitary sewer and storm water drainage system for roof,

    ready for operation as shown on plan. All installation shall

    be in accordance with the manufacturers recommendation.

    The system shall be installed completely and be ready for

    operation.

    Drainage pipes

    25 dn

    50 dn

    75 dn

    100 dn

    150 dn

    200 dn

    L.S

    L.S

    1

    1

    1

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    Floor DrainsType FD

    BD

    PD

    Item

    Item

    Item

    Item

    Item

    M

    M

    M

    M

    M

    M

    M

    M

    M

    Carried to Collection Dhs

  • 8/10/2019 The Last Boq(Full)

    69/73

    Aces Proper ty Limi ted

    Jul

    Bill Of Quantities_MechCrown Home Consultants Page 7 of 9

    PROPOSED BUILDING

    (B+G+4+R)

    On Plot No. JVC 11BBMRA005 (681-1358)

    Aces Limited Property

    Item

    NoITEM DESCRIPTION

    Quantity Unit

    Rate

    Amount

    Dhs

    Dhs

    A

    B

    C

    D

    E

    F

    G

    H

    I

    J

    K

    L

    Ceiling Clean OutType CO

    Floor Clean Out

    Type FCO

    Funnel Floor Drain

    Type FFD

    Cowls

    Type RVC

    STORM WATER SYSTEMS

    Roof drains

    Type RWO

    PLUMBING FIXTURES

    Water closets include all accessories&Valves

    Type EWC-1

    Lavatories include all accessories&Valves

    Type WHB-1

    Bathtub & showers include all accessories Valves

    Type BT-1

    Type SHO-1

    Urinal include all accessories Valves

    Type UR-1

    Miscellaneous fixtures and fittings

    Gutter Drain With Heavy Duty Cover

    Kitchen Sink include all accessories and valves :

    Type KS-1

    LS

    LS

    LS

    LS

    L.S

    L.S

    L.S

    L.S

    L.S

    L.S

    LS

    L.S

    15459 INTERCEPTORS

    No.

    No.

    No.

    No.

    No.

    No.

    No.

    No.

    No.

    No.

    M

    No.

    Carried to Collection Dhs

  • 8/10/2019 The Last Boq(Full)

    70/73

    Aces Proper ty Limi ted

    Jul

    Bill Of Quantities_MechCrown Home Consultants Page 8 of 9

    PROPOSED BUILDING

    (B+G+4+R)

    On Plot No. JVC 11BBMRA005 (681-1358)

    Aces Limited Property

    Item

    NoITEM DESCRIPTION

    Quantity Unit

    Rate

    Amount

    Dhs

    Dhs

    A

    B

    C

    D

    E

    Grease Trap Interceptor

    Type GRT

    Grease Interceptor

    Acid Resistent Coated interior and exterior fabricated steel

    grease interceptor, with internal air relief by-pass, Bronze

    cleanout plug,Removable pressure equalizing/flow

    diffusing

    inlet baffle,and visible double wall trap seal, etc

    Inspection chambers

    Type MH

    Gully Traps

    Type GT

    Break Pressure Chamber

    TYPE BPMH-1

    LS

    L.S

    L.S

    L.S

    L.S

    Submersible Pump Sets

    Supply ma