BOQ NO 04

CONSTRUCTION OF PAVILION FOR CRICKET GROUND

SUMMARY

Bill No Description

4.1 FOUNDATION

4.2 GROUND FLOOR

4.3 FIRST FLOOR

4.4 ELECTRICAL INSTALLATION

Total Carried to Grand Summary

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE DISTRICT

Page 2: BOQ-sample

Amount

Rs. Cts. 3,116,930.00

8,664,125.00

7,308,480.00

1,101,950.00

20,191,485.00

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX -

Page 3: BOQ-sample

BOQ NO 04

CONSTRUCTION OF PAVILION FOR CRICKET GROUND

BILL NO : 4.1 FOUNDATION WORKS

ITEM DESCRIPTION

4.1.1 Excavation

4.1.2 Concrete

4.1.3 Rubble masonry

4.1.4 Plastering

Sub Total Bill No 4.1 carried to Summary

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE DISTRICT

Page 4: BOQ-sample

AMOUNT

Rs. Cts.

529,500.00

1,620,050.00

951,000.00

16,380.00

3,116,930.00

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX -

Page 5: BOQ-sample

BOQ NO 4.1CONSTRUCTION OF PAVILION FOR CRICKET GROUND

BILL NO : 01 FOUNDATION WORKS

Item Description Unit Qty. Rate

Rs.Cts.

4.1.1- EXCAVATION

4.1.1.1 200 590.00

4.1.1.2 250 1,350.00

4.1.1.3 370 200.00

Sub Total carried to Summary

4.1.2 - CONCRETE

C15 (25) Concrete

4.1.2.1 4 12,500.00

4.1.2.2 6 12,500.00

4.1.2.3 4 12,500.00

4.1.2.4 16 12,500.00

C20( 20 ) Concrete

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE DISTRICT

Excavation for column and staircase foundation to a depth not exceeding 1.5m in any material except rock requiring blasting part return fill in and ram and disposal of surplus soil.

m3

Earth filling under floors with borrowed Gravel.Rate to include spreading, watering and compacting in 150mm layers to achieved at least 95% proctor compaction. (Compacted Volume)

m3

Application of anti termite pre construction soil treatment using chemical of Biflex or approved equivalent material for the ground floor as instructed by engineer on manufacture's specification.

m2

50mm thick screed concrete for column, & staircase foundation on laying gauge 750 polythene.

m3

75mm thick screed concrete for wall foundation on laying gauge 750 polythene.

m3

150mm thick screed concrete for retaining wall of tiers on laying gauge 750 polythene.

m3

75mm thick floor concrete on laying gauge 750 polythene.

m3

Page 6: BOQ-sample

Item Description Unit Qty. Rate

Rs.Cts.

4.1.2.5 72 1,300.00

C30( 20 ) Concrete

Up to DPC

4.1.2.6 In column bases, stair case base & column shafts. 19 17,500.00

4.1.2.7 In Tie beam 15 17,500.00

Formwork

4.1.2.8 In column bases, stair case base & column shafts. 100 1,100.00

4.1.2.9 In Tie beam 53 1,100.00

4.1.2.10In Tiers sitting area 11 1,100.00

Reinforcement

High yield steel

4.1.2.11In column bases, stair case base & column shafts. kg 1000 200.00

4.1.2.12In Tie beam kg 500 200.00

Mild steel

4.1.2.13In column base & shafts. kg 140 195.00

4.1.2.14In Tiers sitting area kg 250 195.00

Sub Total carried to Summary

4.1.3 - RANDOM RUBBLE MASONRY

4.1.3.1 50 10,200.00

4.1.3.2 45 9,800.00

Sub Total carried to Summary

4.1.4 - PLASTERING

4.1.4.1 26 630.00

75mm thick floor concrete on laying gauge 750 polythene in Tiers sitting area.Rate to include for making of expansion joints.

m2

m3

m3

m2

m2

m2

Random rubble masonry in 1:5 cement sand mortar in wall foundation

m3

Random rubble masonry in 1:5 cement sand mortar in Tiers and RRM Wall.

m3

20mm thick plinth plastering 1:3 cement sand finished smooth with neat cement floating.

m2

Page 7: BOQ-sample

Item Description Unit Qty. Rate

Rs.Cts.

Sub Total carried to Summary

Page 8: BOQ-sample

Amount

Rs.Cts.

118,000.00

337,500.00

74,000.00

529,500.00

50,000.00

75,000.00

50,000.00

200,000.00

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE

Page 9: BOQ-sample

Amount

Rs.Cts.

93,600.00

332,500.00

262,500.00

110,000.00

58,300.00

12,100.00

200,000.00

100,000.00

27,300.00

48,750.00

1,620,050.00

510,000.00

441,000.00

951,000.00

16,380.00

Page 10: BOQ-sample

Amount

Rs.Cts.

16,380.00

Page 11: BOQ-sample

BOQ.NO 4CONSTRUCTION OF PAVILION FOR CRICKET GROUND

BILL NO : 4.2 - GROUND FLOOR

SUMMARY

ITEM DESCRIPTION

4.2.1 Concrete

4.2.2 Brick work

4.2.3 Plastering

4.2.4 Paving

4.2.5 Painting

4.2.6 Doors & Windows

4.2.7 Plumbing

4.2.8 Sewerage

4.2.9 Miscellaneous work

Sub Total Bill No 4.2 Carried to Summary

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE DISTRICT

Page 12: BOQ-sample

AMOUNT

Rs. Cts

3,351,725.00

1,073,000.00

677,250.00

836,980.00

397,160.00

773,500.00

702,175.00

643,575.00

208,760.00

8,664,125.00

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX -

Page 13: BOQ-sample

BOQ NO 04CONSTRUCTION OF PAVILION FOR CRICKET GROUND

BILL NO : 4.2 - GROUND FLOOR

Item Description Unit Qty Rate

Rs. Cts.

4.2.1- CONCRETE

C30( 20 ) Concrete

4.2.1.1 In column shafts 9 17,500.00

4.2.1.2 In floor slab 30 17,500.00

4.2.1.3 In floor beams 20 17,500.00

4.2.1.4 In staircase 10 17,500.00

4.2.1.5 m 12 1,000.00

4.2.1.6 m 8 1,100.00

4.2.1.7 m 3 1,300.00

4.2.1.8 m 3 1,450.00

4.2.1.9 m 11 1,000.00

Formwork

4.2.1.10 In column shafts 120 1,100.00

4.2.1.11 In floor slab 200 1,100.00

4.2.1.12 In floor beams 150 1,100.00

4.2.1.13 In staircases 70 1,100.00

Reinforcement

High yield steel

4.2.1.14 In column shafts kg 800 200.00

4.2.1.15 In floor slab kg 2200 200.00

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE DISTRICT

m3

m3

m3

m3

In 225x75mm lintels, LT1 Rate to include for formwork & reinforcement.

In 225x125mm lintels, LT2 Rate to include for formwork & reinforcement.

In 225x200mm lintels, LT4 Rate to include for formwork & reinforcement.

In 112.5x75mm lintels, LT6 Rate to include for formwork & reinforcement.

In 225x75mm beam at window sill level, LT1.Rate to include for formwork & reinforcement.

m2

m2

m2

m2

Page 14: BOQ-sample

Item Description Unit Qty Rate

Rs. Cts.

4.2.1.16 In floor beams kg 2500 200.00

4.2.1.17 In staircases kg 1500 200.00

Mild steel

4.2.1.18 In column shafts kg 165 195.00

4.2.1.19 In floor beams kg 400 195.00

Sub Total carried to Summary

4.2.2 -BRICK WORK

4.2.2.1 85 11,800.00

4.2.2.2 50 1,400.00

Sub Total carried to Summary

4.2.3 - PLASTERING

4.2.3.1 150 440.00

4.2.3.2 595 450.00

4.2.3.3 275 570.00

4.2.3.4 265 400.00

4.2.3.5 m 425 190.00

Sub Total carried to Summary

4.2.4 - PAVING

4.2.4.1 240 630.00

4.2.4.2 m 84 220.00

225mm thick Brick work in 1:5 cement sand mortar in walls.

m3

112mm thick Brick work in 1:5 cement sand mortar in walls.

m2

15mm thick external wall plaster in 1:1:5 cement lime & sand finished semi rough.

m2

15mm thick internal wall plaster in 1:1:5 cement lime and sand finished smooth with lime putty.

m2

15mm thick column plaster with 1:5 cement & sand finished smooth.

m2

Appication of one coat of skim coat to the soffit of the slab & beams.

m2

15mm thick 1:1:5 cement lime sand plaster to External and internal reveals

20mm thick, 1:3 cement rendering, including neat cement or colored cement floating.

m2

100mm high skirting in 1:3 projected on flush with wall including forming groove.

Page 15: BOQ-sample

Item Description Unit Qty Rate

Rs. Cts. 4.2.4.3 40 3,700.00

4.2.4.4 70 3,250.00

4.2.4.5 75 3,700.00

4.2.4.6 m 65 220.00

Sub Total carried to Summary

4.2.5 - PAINTING

4.2.5.1 155 400.00

4.2.5.2 620 360.00

4.2.5.3 46 360.00

4.2.5.4 265 360.00

Sub Total carried to Summary

4.2.6 - DOORS & WINDOWS

Supplying & fixing of 300x300mm antislip glazed ceremic floor tiles for toilets. Rate to include for 12mm thick 1:3 cement sand bedding.

m2

Supplying & fixing 200 x 300mm glazed Ceramic wall tiling up to 1.5m height in toilets including 12mm thick 1:3 raking plaster.

m2

Supplying & fixing of 300x300mm glazed ceremic floor tiles. Rate to include for 12mm thick 1:3 cement sand bedding.

m2

100mm high tile skirting projected on flush with wall.

External wall painting by preparation of surface with application of alkaline resisting primer & two coats of approved quality weather shield paint.

m2

Internal wall painting by preparation of surface with application of one primer coat & two coats of approved quality emulsion paint.

m2

Column painting by preparation of surface with application of one primer coat & two coats of approved quality emulsion paint.

m2

Soffit of slab and beam painting with application of one coat of primer & two coats approved quality emulsion paint.

m2

All Aluminium sections shall be POWDER COATED

Rate to include for heavy quality door lock,door closers, floor hinges & all other accessories

Page 16: BOQ-sample

Item Description Unit Qty Rate

Rs. Cts. 4.2.6.1 7.4 15,500.00

4.2.6.2 7.6 15,500.00

4.2.6.3 4.8 15,500.00

4.2.6.4 3.8 12,500.00

4.2.6.5 3.2 11,000.00

4.2.6.6 3.8 15,500.00

4.2.6.7 16.8 14,500.00

4.2.6.8 5.5 14,800.00

Sub Total carried to Summary

4.2.7- PLUMBING

Sanitary Fittings & Accessories

Supply and fixing of Door type DW1, size 2735 x 2700mm, Aluminium framed Aluminium & Glazed double sash door .(01 Nos)

m2

Supply and fixing of Door type D1, size 900 x 2100mm, Aluminium framed Aluminium & Glazed single sash door .(04 Nos)

m2

Supply and fixing of Door type D2, size 750 x 2100mm, PVC framed PVC sash door .(03 Nos)

m2

Supply and fixing of Door type D3, size 900 x 2100mm, Aluminium framed Aluminium composite panel single sash door .(02 Nos)

m2

Supply and fixing of Door type D4, size 1500 x 2100mm, Aluminium framed Aluminium & Glazed double sash door .(01 Nos)

m2

Supply and fixing of Door type D5, size 900 x 2100mm, Aluminium framed Aluminium composite panel single sash door .(02 Nos)

m2

Supplying and fixing window type W1, 1200x2800mm Aluminium framed glazed window . (05 Nos).

m2

Supplying and fixing fanlight type FL1, 600x1300mm Aluminium framed glazed fanlight (07 Nos).

m2

Page 17: BOQ-sample

Item Description Unit Qty Rate

Rs. Cts. 4.2.7.1 nr 7 25,275.00

4.2.7.2 nr 3 14,000.00

4.2.7.3 nr 6 17,500.00

4.2.7.4 nr 8 22,500.00

4.2.7.5 nr 5 1,750.00

4.2.7.6 nr 8 7,000.00

4.2.7.7 nr 9 1,500.00

4.2.7.8 nr 7 3,500.00

Water supply distribution SystemPipe Work

Water supply distribution SystemPipe Work

4.2.7.9 m 40 170.00

4.2.7.10 m 30 215.00

Supplying and fixing closed couple low level water closet (WC) complete with 9 litre capacity flushing cistern & fittings, seat & cover, "P" or "S " trap, WC connector, flexible hose etc, all accessories complete to working order (American Standard or approved equivalent).

Furnishing & installing ceramic squatting pan (standard size) complete with plastic cistern,foot rest and all other necessary connections (American Standard or approved equivalent)

Supplying & Fixing bowl type Urinal with flush pipe, spreder, waste outlet & bottel trap complete to working order.

Supplying & fixing pedestal type wash basin with pillar tap, waste plug, bottle trap, flexible hose & other accessories (American Standard or approved equivalent).

Supplying & fixing chromium plated bib tap (plumber)

Supplying and fixing of 900 x 600 bath room mirror ( American Standard)

Supplying and fixing of chromium plated soap holder

Supplying & fixing bidet shower (American standard)

Supplying, laying and fixing of 20mm dia.Type 1000, PVC pipe including all fittings.

Supplying, laying and fixing of 25mm dia.Type 1000, PVC pipe including all fittings.

Page 18: BOQ-sample

Item Description Unit Qty Rate

Rs. Cts. 4.2.7.11 m 60 320.00

4.2.7.12 m 20 540.00

Pipe fixtures and fittings

4.2.7.11 nr 25 1,250.00

4.2.7.12 nr 4 1,750.00

4.2.7.13 nr 4 3,500.00

Sub total carried to summary4.2.8 - SEWERAGE

4.2.8.1 nr 7 3,500.00

4.2.8.2 m 80 1,750.00

4.2.8.3 m 70 1,370.00

4.2.8.4 m 40 680.00

4.2.8.5 m 20 380.00

4.2.8.6 nr 3 11,000.00

4.2.8.7 nr 7 7,125.00

4.2.8.8 nr 5 6,200.00

Supplying, laying and fixing of 32mm dia. Type 1000, PVC pipe including all fittings.

Supplying, laying and fixing of 50mm dia. Type 1000, PVC pipe including all fittings.

Supplying & fixing of 12mm dia chromium plated angle valves.

Supplying & fixing of 32mm dia brass gate valve

Supplying & fixing of 50mm dia brass gate valve

Construction of gully pit 100x100mm internally to required depth not exceeding 100mm with cement concrete and 150 x150mm plastic grating including forming and fixing outlet pipe in toilets.

Supplying, laying 110mm dia. Type 600 PVC pipes to sewer line.

Supplying, laying 90mm dia. Type 600 PVC pipes to waste water line .

Supplying, laying 63mm dia. Type 600 PVC pipes to waste water line.

Supplying, laying and fixing of 40mm dia. Type 600, PVC pipe including all fittings.

Construction of 225 thick brick manholes, size 900 x 900 mm( Internally) height varies between 900-1200 mm. Rate to include for cover slab

Construction of 225 thick brick manholes, size 600 x 600 mm( Internally) height varies between 500-700 mm. Rate to include for cover slab

Construction of 225 thick brick catch pit,size 450 x 450 mm( Internally) height varies between 300-450 mm. Rate to include for cover slab.

Page 19: BOQ-sample

Item Description Unit Qty Rate

Rs. Cts. 4.2.8.9 nr 1 130,000.00

4.2.8.10 nr 2 52,250.00

Sub Total Carried to Summary

4.2.9 -MISCELLANEOUS WORK

4.2.9.1 70 2,000.00

4.2.9.2 6 3,000.00

4.2.9.3 m 12 4,230.00

Sub Total Carried to Summary

Construction of 225 thick brick septic tank, size 2.1 x 0.9 x 2.0m (Internally) .Rate to include for excavation,back filling, concreting, plastering etc.

Construction of sockage pits with 1200mm dia , 2400mm depth ( 04 Nos ) for waste water line & sewarage line.

Application of approved type water proofing agent ( "Deepseal 201" or equivalent ) to toilet floors & walls up to 1500 mm height.

m2

Construction of 4000mm long , 1500mm wide 300mm thick C20(20) concrete ramp including laying 200 x200mm (8mm dia.) BRC fabric on laying guage 750 polythene.

m2

Supplying & fixing of GI hand rail consists of outer Dia 33mm, ( 3.2mm thick) verticals, OD 21mm ( 2.65 thick) horizontal bars, top rail with OD 48mm(3.2mm thick)

Page 20: BOQ-sample

Amount

Rs. Cts.

157,500.00

525,000.00

350,000.00

175,000.00

12,000.00

8,800.00

3,900.00

4,350.00

11,000.00

132,000.00

220,000.00

165,000.00

77,000.00

160,000.00

440,000.00

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE

Page 21: BOQ-sample

Amount

Rs. Cts.

500,000.00

300,000.00

32,175.00

78,000.00

3,351,725.00

1,003,000.00

70,000.00

1,073,000.00

66,000.00

267,750.00

156,750.00

106,000.00

80,750.00

677,250.00

151,200.00

18,480.00

Page 22: BOQ-sample

Amount

Rs. Cts. 148,000.00

227,500.00

277,500.00

14,300.00

836,980.00

62,000.00

223,200.00

16,560.00

95,400.00

397,160.00

Page 23: BOQ-sample

Amount

Rs. Cts. 114,700.00

117,800.00

74,400.00

47,500.00

35,200.00

58,900.00

243,600.00

81,400.00

773,500.00

Page 24: BOQ-sample

Amount

Rs. Cts. 176,925.00

42,000.00

105,000.00

180,000.00

8,750.00

56,000.00

13,500.00

24,500.00

6,800.00

6,450.00

Page 25: BOQ-sample

Amount

Rs. Cts. 19,200.00

10,800.00

31,250.00

7,000.00

14,000.00

702,175.00

24,500.00

140,000.00

95,900.00

27,200.00

7,600.00

33,000.00

49,875.00

31,000.00

Page 26: BOQ-sample

Amount

Rs. Cts. 130,000.00

104,500.00

643,575.00

140,000.00

18,000.00

50,760.00

208,760.00

Page 27: BOQ-sample

BOQ NO 04CONSTRUCTION OF PAVILION FOR CRICKET GROUND

BILL NO : 4.3 - FIRST FLOOR

SUMMARY

ITEM DESCRIPTION

4.3.1 Concrete

4.3.2 Brick work

4.3.3 Roofing & Roof Plumbing

4.3.4 Plastering

4.3.5 Paving

4.3.6 Painting

4.3.7 Doors & Windows

4.3.8 Plumbing

4.3.9 Sewerage

4.3.10 Miscellaneous work

Sub Total Bill No 4.3 Carried to Summary

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE DISTRICT

Page 28: BOQ-sample

AMOUNT

Rs. Cts

1,234,800.00

913,400.00

2,571,250.00

379,890.00

511,150.00

274,330.00

520,550.00

385,910.00

178,000.00

339,200.00

7,308,480.00

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX -

Page 29: BOQ-sample

BOQ NO 04

CONSTRUCTION OF PAVILION FOR CRICKET GROUND

BILL NO : 4.3 - FIRST FLOOR

Item Description Unit Qty RateRs. Cts.

4.3.1 - CONCRETE

C30( 20 ) Concrete4.3.1.1 In column shafts 7 18,000.00

4.3.1.2 In roof beams 11 18,000.00

4.3.1.3 m 6 1,100.00

4.3.1.4 m 6 1,300.00

4.3.1.5 m 14 1,100.00

Formwork

4.3.1.6 In column shafts 83 1,130.00

4.3.1.7 In roof beams 87 1,130.00

Reinforcement

High yield steel

4.3.1.8 In column shafts kg 1000 205.00

4.3.1.9 In roof beams kg 1980 205.00

Mild steel

4.3.1.10 In column shafts kg 180 195.00

4.3.1.11 In roof beams kg 220 195.00

Sub Total carried to Summary

4.3.2 -BRICK WORK

4.3.2.1 71 12,150.00

4.3.2.2 35 1,450.00

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE DISTRICT

m3

m3

In 225x75mm lintels, LT1 Rate to include for formwork & reinforcement.

In 225x125mm lintels, LT2 Rate to include for formwork & reinforcement.

In 225x75mm beam at window sill level, LT1.Rate to include for formwork & reinforcement.

m2

m2

225mm thick Brick work in 1:5 cement sand mortar in walls.

m3

112.5mm thick Brick work in 1:5 cement sand mortar in walls.

m2

Page 30: BOQ-sample

Item Description Unit Qty RateRs. Cts.

Sub Total carried to Summary

4.3.3 - ROOFING & ROOF PLUMBING

4.3.3.1 430 2,400.00

4.3.3.2 250 525.00

4.3.3.3 432 1,100.00

4.3.3.4 nr 6 110,000.00

4.3.3.5 m 83 1,100.00

4.3.3.6 165 1,100.00

Sub Total carried to Summary

4.3.4 - PLASTERING

4.3.4.1 142 460.00

4.3.4.2 480 470.00

4.3.4.3 83 590.00

Supplying & fixing AZ 150, 0.47mm TCT Colour bonded Zn/Al roofing sheets on steel frame work . (Steel frame work measured separately)

m2

Supplying & laying 5mm thick double sided aluminium foil insulation sheet with 75x75mm GI wiremesh.(Mcfoil or equivalent)

m2

Supplying and fixing Galvernised Iron High Tensile Lipped channel 100 x 50 x 2.3mm for Purlins.Rate to include for rivets, nuts washers, one coat of anticorrosive paint & two coat of enamel paint.

m

Supplying & fixing of Steel truss type T1 with angle iron. Rate to include for base plate , cleats, rivets, nuts washers and applying of 250Mm (DFT) 3 coats of high performance epoxy to suit C4 enviornment exposure.(Interseal 670 Hs or equivelent)

Supplying & fixing 0.45mm TCT colour bonded Zn/Al Facia board. (Height 1000mm) Rate to include for steel frame.

Supplying and fixing Galvernised Iron High Tensile Lipped channel 100 x 50 x 2.3mm for railings.Rate to include for rivets, nuts washers, one coat of anticorrosive paint & two coat of enamel paint.

m

15mm thick external wall plaster in 1:1:5 cement lime & sand finished semi rough.

m2

15mm thick internal wall plaster in 1:1:5 cement lime and sand finished smooth with lime putty.

m2

15mm thick column plaster with 1:5 cement & sand finished smooth.

m2

Page 31: BOQ-sample

Item Description Unit Qty RateRs. Cts.

4.3.4.4 m 200 200.00

Sub Total carried to Summary

4.3.5 - PAVING

4.3.5.1 48 3,775.00

4.3.5.2 40 3,700.00

4.3.5.3 51 3,250.00

4.3.5.4 m 36 450.00

Sub Total carried to Summary

4.3.6 - PAINTING

4.3.6.1 152 410.00

4.3.6.2 490 370.00

4.3.6.3 83 370.00

Sub Total carried to Summary 4.3.7 - DOORS & WINDOWS

15mm thick 1:1:5 cement lime sand plaster to External and internal reveals

Supplying & fixing 300x300mm semi glazed ceramic floor tile . Rate to include for 12mm thick 1:3 cement sand bedding.

m2

Supplying & fixing of 300x300mm antislip glazed ceremic floor tiles for toilates. Rate to include for 12mm thick 1:3 cement sand bedding.

m2

Supplying & fixing 200 x 300mm glazed Ceramic wall tiling up to 1.5m height in toilets including 12mm thick 1:3 raking plaster.

m2

100mm high tile skirting in 1:3 projected on flush with wall including forming groove.

External wall painting by preparation of surface with application of alkaline resisting primer & two coats of approved quality weather shield paint.

m2

Internal wall painting by preparation of surface with application of one primer coat & two coats of approved quality emulsion paint.

m2

Column painting by preparation of surface with application of one primer coat & two coats of approved quality emulsion paint.

m2

All Aluminium sections shall be POWDER COATED

Rate to include for heavy quality door lock,door closers, floor hinges & all other accessories

Page 32: BOQ-sample

Item Description Unit Qty RateRs. Cts.

4.3.7.1 7.6 12,500.00

4.3.7.2 3.2 11,000.00

4.3.7.3 3.8 15,500.00

4.3.7.4 10.1 14,500.00

4.3.7.5 12.5 14,800.00

Sub Total carried to Summary

4.3.8 - PLUMBING

Sanitary Fittings & Accessories

4.3.8.1 nr 6 25,275.00

4.3.8.2 nr 4 22,500.00

4.3.8.3 nr 8 1,750.00

4.3.8.4 nr 4 7,000.00

4.3.8.5 nr 8 1,500.00

4.3.8.6 Supplying & fixing bidet shower (American standard) nr 6 3,500.00

Supply and fixing of Door type D3, size 900 x 2100mm, Aluminium framed Aluminium composite panel single sash door .(04 Nos)

m2

Supply and fixing of Door type D4, size 1500 x 2100mm, Aluminium framed Aluminium & Glazed double sash door .(01 Nos)

m2

Supply and fixing of Door type D6, size 900 x 2100mm, Aluminium framed Aluminium composite panel single sash door .(02 Nos)

m2

Supplying and fixing window type W1, 1200x2800mm Aluminium framed glazed window . (03 Nos).

m2

Supplying and fixing fanlight type FL2, 1200x1300mm Aluminium framed glazed fanlight (08 Nos).

m2

Supplying and fixing closed couple low level water closet (WC) complete with 9 litre capacity flushing cistern & fittings, seat & cover, "P" or "S " trap, WC connector, flexible hose etc, all accessories complete to working order (American Standard or approved equivalent).

Supplying & fixing pedestal type wash basin with pillar tap, waste plug, bottle trap, flexible hose & other accessories (American Standard or approved equivalent).

Supplying & fixing chromium plated bib tap ( plumber)

Supplying and fixing of 900 x 600 bath room mirror ( American Standard)

Supplying and fixing of chromium plated soap holder (Indian/ Chinese)

Page 33: BOQ-sample

Item Description Unit Qty RateRs. Cts.

4.3.8.7 Supplying & fixing bath shower with all accessaries. nr 4 3,500.00

Water supply distribution SystemPipe Work

Water supply distribution SystemPipe Work

4.3.8.8 m 30 180.00

4.3.8.9 m 40 225.00

4.3.8.10 m 20 33.00

4.3.8.11 m 20 560.00

Pipe fixtures and fittings

4.3.8.12 nr 12 1,250.00

4.3.8.13 Supplying & fixing of 32mm dia brass gate valve nr 4 1,750.00

4.3.8.14 Supplying & fixing of 50mm dia brass gate valve nr 2 3,500.00

Sub total carried to summary

4.3.9 - SEWERAGE

4.3.9.1 nr 12 3,500.00

4.3.9.2 m 30 1,850.00

4.3.9.3 m 30 1,450.00

4.3.9.4 m 30 700.00

4.3.9.5 m 40 400.00

Sub Total Carried to Summary

Supplying, laying and fixing of 20mm dia.Type 1000, PVC pipe including all fittings.

Supplying, laying and fixing of 25mm dia.Type 1000, PVC pipe including all fittings.

Supplying, laying and fixing of 32mm dia. Type 1000, PVC pipe including all fittings.

Supplying, laying and fixing of 50mm dia. Type 1000, PVC pipe including all fittings.

Supplying & fixing of 12mm dia chromium plated angle valves.

Construction of gully pit 100x100mm internally to required depth not exceeding 100mm with cement concrete and 150 x150mm plastic grating including forming and fixing outlet pipe in toilets.

Supplying, laying 110mm dia. Type 600 PVC pipes to sewer line.

Supplying, laying 90mm dia. Type 600 PVC pipes to waste water line .

Supplying, laying 63mm dia. Type 600 PVC pipes to waste water line.

Supplying, laying and fixing of 40mm dia. Type 600, PVC pipe including all fittings.

Page 34: BOQ-sample

Item Description Unit Qty RateRs. Cts.

4.3.10 -MISCELLANEOUS WORK

4.3.10.1 85 2,000.00

4.3.10.2 m 40 4,230.00

Sub Total Carried to Summary

Application of approved type water proofing agent ( "Deepseal 201" or equivalent ) to toilet floors & walls up to 1500 mm height.

m2

Supplying & fixing of GI hand rail consists of outer Dia 33mm, ( 3.2mm thick) verticals, OD 21mm ( 2.65 thick) horizontal bars, top rail with OD 48mm(3.2mm thick)

Page 35: BOQ-sample

AmountRs. Cts.

126,000.00

198,000.00

6,600.00

7,800.00

15,400.00

93,790.00

98,310.00

205,000.00

405,900.00

35,100.00

42,900.00

1,234,800.00

862,650.00

50,750.00

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE

Page 36: BOQ-sample

AmountRs. Cts.

913,400.00

1,032,000.00

131,250.00

475,200.00

660,000.00

91,300.00

181,500.00

2,571,250.00

65,320.00

225,600.00

48,970.00

Page 37: BOQ-sample

AmountRs. Cts.

40,000.00

379,890.00

181,200.00

148,000.00

165,750.00

16,200.00

511,150.00

62,320.00

181,300.00

30,710.00

274,330.00

Page 38: BOQ-sample

AmountRs. Cts.

95,000.00

35,200.00

58,900.00

146,450.00

185,000.00

520,550.00

151,650.00

90,000.00

14,000.00

28,000.00

12,000.00

21,000.00

Page 39: BOQ-sample

AmountRs. Cts.

14,000.00

5,400.00

9,000.00

660.00

11,200.00

15,000.00

7,000.00

7,000.00

385,910.00

42,000.00

55,500.00

43,500.00

21,000.00

16,000.00

178,000.00

Page 40: BOQ-sample

AmountRs. Cts.

170,000.00

169,200.00

339,200.00

Page 41: BOQ-sample

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE DISTRICT

BOQ NO 04

CONSTRUCTION OF PAVILION FOR CRICKET GROUND

BILL NO :4.4- ELECTRICAL INSTALLATION

Item Description Unit Qty RateRs. Cts.

Rates in Bill of Quantities shall include all necessary materials (Cables, conduits, PVC sunk boxes, bulbs, switches etc.) and labour required to complete the electrical installation to good working order.

Except where specifically stated, all costs associated with provision of all holes, openings, chases, ducts and other builders' work required for installation and make them good, shall be included in the rates.

Where reference is made to certain manufactures' products and items identified by registered trade marks, has been done for the sole purpose of defining and establishing standards of quality and performance and not with the intention of restricting the procurement of material or fitting to a particular manufacturer. However all equipment and material should meet the BS or an equivalent standard.

Testing and commissioning of the electrical installation is to be carried out by the contractor and inspection report to be submitted according to the requirements of the power supply Authority.

Electrical Items (MCB, RCCB etc.) should be European/Japanese origin or to the BS or equivalent and items without an accredited agent in Sri Lanka shall not be accepted.

All the quantities given here are approximated values and Quantities may change with the actual installation at the site.

Page 42: BOQ-sample

Item Description Unit Qty RateRs. Cts.

1.00 Item Allow 10,000.00

2.00 Main Distribution Board (MDB)

nr 1 150,000.00

02 Nos 40A, 4P MCB 16kA Breaking capacity

03 Nos 40A, 2P MCB 6kA Breaking capacity

01 Set of 100A Cu Bus bars for L1,L2,L3 & N01 No Earth BarAll required CTs and protection devices01 Set of indicators with protectionAll internal connections

All types of fittings, materials, painting and finishes shall be approved by the Engineer prior to installation.

All panel boards and consumer units should have wire numbering and a laminated circuit diagram should be pasted on the inside surface of the door.

Associated work for obtaining electrical connections from CEB (01 no. of 60A 3Phase connection-Client pay for the connection)

Supply and installation of switch gear cubicle made out of (1.5mm thickness) sheet steel (IP54) stove enameled or powder coated for the finish with one coat of primer to the approval of the engineer with following equipment.

01 No 63A, 4P MCCB Adjustable Thermal & Magnetic tripping time, 16kA Breaking capacity complete with bus bar extension accessories for incoming side.

01 No ELR ( with core balance) protection schemes adjustable from 0.1A to 10A with adjustable tripping time and all other accessories as per line diagram.

01 No Volt meter & Ammeter with selector switch and protection

Equipment to be to the BS and European/Japanese make

Page 43: BOQ-sample

Item Description Unit Qty RateRs. Cts.

3.0.0 Consumer Units

4.0.0 Three Phase Consumer Unit -TCU-F1.

01 No 40A, 4-pole ISO18 Nos 6-20A, 1-pole MCB 6kA03 No 40A 2-pole RCCB, 30mA sensitivity01 No Earth BarAll internal connectionsPolycarbonate enclosure

4.10 In First floor nr 1 52,500.00

5.0.0 Single Phase Consumer Unit - CU-G101 No 40A, 2-pole ISO10 Nos 6-20A, 1-pole MCB 6kA01 Nos 40A 2-pole RCCB, 30mA sensitivity

01 No Earth BarAll internal connectionsPolycarbonate enclosure

5.10 In Ground floor nr 1 16,500.00

6.0.0 Cables

Supply and installation of wall mounted switch gear cubicle made out of polycarbonate enclosure to the approval of the engineer with equipments as specified in each board. Additional space to be provided inside the distribution board enclosure to install two additional breakers (of capacity with existing max. outgoing breaker) if necessary.

Equipment to be to the BS and European/Japanese make

Equipment to be to the BS and European/Japanese make

Supply and installation (with all materials required including conduits and termination) of following cables.

Page 44: BOQ-sample

Item Description Unit Qty RateRs. Cts.

5.10 m 10.00 3,300.00

5.20 m 10.00 500.00

5.30 m 15.00 2,870.00

5.40 m 30.00 970.00

6.00 Cable Trunking

6.10

6.20 In Ground floor m 2 2,100.00

6.30 In First floor m 2 2,100.00

7.0.0 Wall Fans

7.10 In First Floor nr 6 12,500.00

7.20 Wall Fan Point Wiring

16mm2 Cu/PVC/PVC 4C cable from 60A 3Phase CEB meter to MDB.

10mm2 Cu/PVC Green & Yellow Earth cable from MDB to Earth electrode.

10mm2 Cu/PVC/PVC 4C cable + 10mm2 Green & Yellow Earth cables from MDB to TCU-F1 Panel.

10mm2 Cu/PVC/PVC 2C cable + 10mm2 Green & Yellow Earth cables from MDBs to Cus CU-G1 in ground floor.

PVC trunking Marshel Tuflex or equivalent make approved by Engineer. (Product shall be to relevant standards)

Supplying and installation 100mm x 50mm single compartment PVC Trunking with required accessories.

Supplying & Fixing of wall fans complete with regulator, fan hook and all other accessories. Guarantee cards shall be provided from accredited agent before installation. KDK or equivalent make approved by Engineer.

Wiring (including supply of all material) of the above wall fans using approved type 1mm2, Cu/PVC/PVC, 1C cables & 2.5mm2 earth wire drawn through securely fixed concealed PVC conduits including 5A socket outlet close to the fan and switch to an accessible location.

Page 45: BOQ-sample

Item Description Unit Qty RateRs. Cts.

7.30 In First Floor nr 6 3,000.00

7.40 Ceiling Fans

7.50 In Ground floor nr 5 7,500.00

7.60 Ceiling Fan Point Wiring

7.70 In Ground floor nr 5 3,000.00

8.0.1 Socket Outlets

8.10 13A Socket Outlets

8.20 In Ground floor nr 5 450.00

8.30 In First floor nr 6 450.00

8.40 Wiring of 13A Socket outlets

8.50 In Ground floor nr 5 3,500.00

Supplying & Fixing of ceiling fans complete with regulator, fan hook and all other accessories. Guarantee cards shall be provided from accredited agent before installation. KDK or equivalent make approved by Engineer.

Wiring (including supply of all material) of the above wall fans using approved type 1mm2, Cu/PVC/PVC, 1C cables & 2.5mm2 earth wire drawn through securely fixed concealed PVC conduits including 5A socket outlet close to the fan and switch to an accessible location.

Supply & installation of 13A shuttered switched single socket outlet to comply with BS 1363

Wiring (including supply of all material required ) of 13A socket outlets using approved type 2.5mm2 Cu/PVC/PVC, 2C cable & 2.5mm2 earth cable drawn through securely fixed concealed PVC conduit.

Page 46: BOQ-sample

Item Description Unit Qty RateRs. Cts.

8.60 In First floor nr 6 3,500.00

8.70 5A Socket Outlets

8.80 In Ground floor nr 5 250.00

8.90 In First floor nr 6 250.00

9.0.0 Wiring of 5A Socket outlets

9.10 In Ground floor nr 5 3,000.00

9.20 In First floor nr 6 3,000.00

10.0.0 Light Fittings

10.10 In Ground floor nr 10 3,000.00

10.20 In First Floor nr 22 3,000.00

10.30 In Ground floor nr 9 3,000.00

Supply & installation of 5A shuttered switched socket outlet to comply with BS 546.

Wiring (including supply of all material required ) of 5A socket outlets using approved type 1mm2 Cu/PVC/PVC, 2C cable & 2.5mm2 earth cable drawn through securely fixed concealed PVC conduit.

Supply and installation of wall mounted light fitting with a shade and 18 W CFL bulb. Bulb Osram, Phillips or Equivalent.

Supply and installation of surface type down light fitting with 18W CFL bulb. Bulb Osram, Phillips or Equivalent.

Page 47: BOQ-sample

Item Description Unit Qty RateRs. Cts.

10.40 In Ground floor nr 2 4,000.00

10.60 In Ground floor nr 10 3,200.00

10.70 In First floor nr 4 3,200.00

10.80 In First floor nr 6 18,000.00

11.0.0 Wiring of Light Points

11.10 In Ground floor nr 22 3,000.00

11.20 In First Floor nr 32 3,000.00

Supply and installation of 1200 mm long double fluorescent luminaries complete with powder coated white sheet steel housing with 02 Nos. 36W fluorescent tubes and industrial mirror type reflector diffuser, with accessories (electronic ballast, terminal block, etc) Fitting local and accessories Japanese or European make.

Supply and installation of 1200 mm long single fluorescent luminaries complete with powder coated white sheet steel housing with 01 No. 36W fluorescent tubes and industrial mirror type reflector diffuser, with accessories (electronic ballast, terminal block, etc) Fitting local and accessories Japanese or European make.

Supply and installation of highbay light fitting with a 150W Metal halide bulb. Bulb Osram, Phillips or Equivalent.

Wiring (including supply of 2.5 mm2 earth wire all materials) of the above light points using approved type PVC insulated PVC sheathed 1 mm2 copper cable drawn through securely fixed concealed PVC conduit.

Page 48: BOQ-sample

Item Description Unit Qty RateRs. Cts.

12.0.0 Main Earthing System

12.10 Item Allow 15,000.00

13.0.0 Telephone Installation

Telephone Junction Box (TJB)

13.10 In Ground floor nr 2 8,000.00

14.0.0 Telephone Socket Outlets

14.10 In Ground floor nr 2 750.00

14.20 In First Floor nr 2 750.00

Telephone Point Wiring

14.30 In Ground floor nr 2 3,100.00

Supply and Installation of all required materials and cables and connection to respective equipment to provide complete system.

Supply and Installation of an earth electrode of minimum 16mm dia. solid copper rod of length 1.2m or more with a clamp connection to earth conductor. Earth resistance shall be less than 10 Ohms tested on a dry day. An earth pit of size 300mm x 300mm x 200mm is to be prepared and covered by concrete plate to protect the earth electrode.

Supply and Installation of telephone junction box with 10 pair crone sets.

Supply and installation of RJ(11) single, shuttered, sunken wall mounted telephone socket outlet with modular insert and face plate comprising all other accessories required complying with relevant BS/IEC standards.

Wiring up to the telephone socket outlets from the respective floor junction box using approved type single pair UTP ( Unshielded Twisted Pair ) telephone cable drawn through securely fixed concealed PVC conduits comprising all other accessories required.

Page 49: BOQ-sample

Item Description Unit Qty RateRs. Cts.

14.40 In First Floor nr 2 3,100.00

15.0.0 Inspection and Testing

Item Allow 30,000.00

Drawings

16.0.0 Item Allow 7,500.00

Sub Total Bill No 4.4 Carried to Grand Summary

Testing the installation and rectify any defects and submit a certificate by a Chartered Electrical Engineer.

Provide two sets of 'As Built Drawings' (A3 size) to cover all the systems under electrical works binded as books.

Page 50: BOQ-sample

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE DISTRICT

AmountRs. Cts.

Page 51: BOQ-sample

AmountRs. Cts.

10,000.00

150,000.00

Page 52: BOQ-sample

AmountRs. Cts.

52,500.00

16,500.00

Page 53: BOQ-sample

AmountRs. Cts.

33,000.00

5,000.00

43,050.00

29,100.00

4,200.00

4,200.00

75,000.00

Page 54: BOQ-sample

AmountRs. Cts.

18,000.00

37,500.00

15,000.00

2,250.00

2,700.00

17,500.00

Page 55: BOQ-sample

AmountRs. Cts.

21,000.00

1,250.00

1,500.00

15,000.00

18,000.00

30,000.00

66,000.00

27,000.00

Page 56: BOQ-sample

AmountRs. Cts.

8,000.00

32,000.00

12,800.00

108,000.00

66,000.00

96,000.00

Page 57: BOQ-sample

AmountRs. Cts.

15,000.00

16,000.00

1,500.00

1,500.00

6,200.00

Page 58: BOQ-sample

AmountRs. Cts.

6,200.00

30,000.00

7,500.00

1,101,950.00

Page 59: BOQ-sample

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE DISTRICT

CONSTRUCTION OF PAVILION FOR CRICKET GROUNDBILL NO :4.1- FOUNDATION

Reference BILL NO : 4.1 Item No 4.1.1.1 Work Item Excavation for column ,wall foundation

2.83Norm Ref BSR (4)

Reference Labour Component Unit Quantity

Unskilled Labour Day 2.25

Total Cost for Labour - A

Reference Plant/Equipment Component Unit Quantity

Total Cost forPlant/Equipment - B

Reference Material Component Unit Quantity

Total Cost for Material - C

Reference Miscellaneous Cost Component Unit Quantity

Total Cost for Miscellaneous - D

Estimated Direct Cost - E (A+B+C+D)

Overhead and Profit - F 15% of E

Total for 2.83 (E+F) = G

Rate per Unit G/ 2.83

Rate per (m3)

Page 60: BOQ-sample

Say Rate

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE DISTRICTCONSTRUCTION OF PAVILION FOR CRICKET GROUNDBILL NO :4.1- FOUNDATION

Reference BILL NO : 4.1 Item No 4.1.2.1 , 4.1.2.2Work Item C 15 concrete

Norm Ref BSR (19 / 24)

Reference Labour Component Unit QuantityMixingSkilled Labour Day 0.33Unskilled Labour Day 2.00PlacingSkilled Labour Day 0.75Unskilled Labour Day 3.00

Total Cost for Labour - A

Reference Plant/Equipment Component Unit QuantityConcrete Mixer Day 0.33

Total Cost forPlant/Equipment - B

Reference Material Component Unit QuantityCement Bags 13.00

Sand 1.50

Metal (25mm) 2.60Water Lits 500.00Total Cost for Material - C

Reference Miscellaneous Cost Component Unit Quantity

Wastage 10% of Material

Total Cost for Miscellaneous - D

Estimated Direct Cost - E (A+B+C+D)

Overhead and Profit - F 15% of E

Total for 2.83 (E+F) = G

Rate per (m3) 2.83 (56.6m2)

m3

m3

Page 61: BOQ-sample

Rate per Unit G/ 2.83

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE DISTRICT

CONSTRUCTION OF PAVILION FOR CRICKET GROUNDBILL NO :4.1- FOUNDATION

Reference BILL NO : 4.1 Item No 4.1.2.6 , 4.1.2.7Work Item C 30 concrete

2.83Norm Ref BSR (22 / 30)

Reference Labour Component Unit QuantityMixingSkilled Labour Day 0.33Unskilled Labour Day 2.00PlacingSkilled Labour Day 0.75Unskilled Labour Day 3.00Total Cost for Labour - A

Reference Plant/Equipment Component Unit QuantityConcrete Mixer Day 0.33Vibrator Day 0.33

Total Cost forPlant/Equipment - B

Reference Material Component Unit QuantityCement Bags 23.00

Sand 1.19

Metal (20mm) 2.32Water Lits 681.00Total Cost for Material - C

Reference Miscellaneous Cost Component Unit QuantityWastage 10% of MaterialCurring 10% of Material

Total Cost for Miscellaneous - D

Estimated Direct Cost - E (A+B+C+D)

Overhead and Profit - F 15% of E

Say Rate per 1m3

Rate per (m3)

m3

m3

Page 62: BOQ-sample

Total for 2.83 (E+F) = G

Rate per Unit G/ 2.83

Say Rate

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE DISTRICTCONSTRUCTION OF PAVILION FOR CRICKET GROUNDBILL NO :4.1- FOUNDATION

Reference BILL NO : 4.1 Item No 4.1.2.8 , 4.1.2.9Work Item Formwork in column bases and shafts up to DPC

1.00Norm Ref CECB

Reference Labour Component Unit QuantitySkilled Labour Day 0.10Unskilled Labour Day 0.29

Total Cost for Labour - A

Reference Plant/Equipment Component Unit Quantity5% of Labour for tools

Total Cost forPlant/Equipment - B

Reference Material Component Unit Quantity

Plywood sheets 0.37

Class II, timber beams 0.003

Total Cost for Material - C

Reference Miscellaneous Cost Component Unit QuantityWire Nails kg 0.10Mould Oil Lits 0.30

Total Cost for Miscellaneous - D

Estimated Direct Cost - E (A+B+C+D)

Rate per (m2)

m2

m3

Page 63: BOQ-sample

Overhead and Profit - F 15% of E

Total for 1.00 (E+F) = G

Rate per Unit G/ 1.00

Say Rate

Page 64: BOQ-sample

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE DISTRICT

Mark-up : 15%

Rate Amount

650.00 1,462.500.000.00

1,462.50

Rate Amount0.000.000.000.000.00

Rate Amount0.000.000.000.000.00

Rate Amount0.000.000.000.000.00

Estimated Direct Cost - E (A+B+C+D) 1,462.50

219.38

1,681.88

594.30

Page 65: BOQ-sample

Say Rate 590.00

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE DISTRICT

Mark-up : 15%

Rate Amount

1,200.00 400.00800.00 1,600.00

1,200.00 900.00800.00 2,400.00

0.005,300.00

Rate Amount5,800.00 1,933.33

0.000.00

1,933.33

Rate Amount821.43 10,678.57

2,385.16 3,577.50

2,120.14 5,520.002.50 1,250.00

21,026.07

Rate Amount

2,102.61

2,102.61

Estimated Direct Cost - E (A+B+C+D) 30,362.01

4,554.30

34,916.31

Page 66: BOQ-sample

12,337.92

12,500.00

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE DISTRICT

Mark-up : 15%

Rate Amount

1,200.00 400.00800.00 1,600.00

1,200.00 900.00800.00 2,400.00

5,300.00

Rate Amount5,800.00 1,933.335,535.00 1,845.00

0.003,778.33

Rate Amount821.43 18,892.86

2,385.16 2,835.00

2,473.50 5,740.002.50 1,702.50

29,170.36

Rate Amount2,917.042,917.04

5,834.07

Estimated Direct Cost - E (A+B+C+D) 44,082.76

6,612.41

Page 67: BOQ-sample

50,695.18

17,913.49

Say Rate 17,500.00

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE DISTRICT

Mark-up : 15%

Rate Amount1,200.00 120.00

800.00 232.000.000.00

352.00

Rate Amount73.13

0.000.000.00

73.13

Rate Amount

763.89 282.64

80,000.00 240.000.000.00

522.64

Rate Amount190.00 19.00

80.00 24.000.000.00

43.00

Estimated Direct Cost - E (A+B+C+D) 990.76

Page 68: BOQ-sample

148.61

1,139.38

1,139.38

Say Rate 1,100.00

Page 69: BOQ-sample

TAKING OFF SHEET

PROJECT: PREPARED BY :

DATE :

DRG NO: SHEET NO :

T D S D T D S

4.1.1.1 Exc 2 4

footings 1.8

21 1.5 F1 0.075 1.08

1.5 8

2.5 118.125 24

1 3.3 SC Base 0.075 14.40

1 15.48

2.5 8.25 4

Exc for wall fdn 19.7

130 WF1 0.90 70.92

0.35 28 0.5

1.5 68.25 0.3

194.63 0.15 0.63

13 4.1.1.2 Earth filling under floors 71.55

24 21 1.5

0.45 140.4 1.5

0.5 24 tiers 0.25 11.8125

5 21 0.35

2.25 135 0.35

-1 4 stores 2.25 5.78813

1.8 3.3

4.05 -29.16 1

246.24 0.25 0.825

4.1.2.1 C15 Concrete 18.43

21 1.5 50mm thk 116

1.5 0.55

0.05 2.36 0.23 14.355

10 3.3 SC Base 14.36

1

0.05 1.65 4

4.01 19.7

116 4.1.2.2 C15 Concrete 0.075 5.91

0.6 75mm thk 4 4

0.075 5.22 0.9

5.22 0.075 1.08

24 4.1.2.3 C15 Concrete 28 0.9

0.95 150mm thk 0.15 3.78

0.15 3.42 10.77

CONSTRUCTION OF THE EASTERN PROVINCE NATIONAL SPORTS COMPLEX - TRINCOMALEE DISTRICT

CONSTRUCTION OF PAVILION FOR CRICKET GROUND

Page 70: BOQ-sample

3.42

Page 71: BOQ-sample

TAKING OFF SHEET

D

4.1.2.4 C15 Concrete75mm thk floor con

4.1.2.5 C20 ConcreteFloor Con

4.1.2.6 C30 ConcreteCol base and shaft

4.1.2.7 C30 Concretetie beam

4.1.2.10 Form WorkF.w for tiers sitting area con

Page 72: BOQ-sample