51 Aa¨vq-5 Bill of Quantity (BoQ) Summary Bill of Quantity (B Sl Description of Items A B C D E F Grand Total In Words: ……………………………………………….. Summary price of Part-A, NSN BTS (From Table - A ) Summary price of Part-B, Huawei BTS (From Table - B ) Summary price of Part-C, NSN Services (From Table - C ) Summary price of Part-D, Huawei Services (From Table - D ) Summary price of Part-E, RNP and NSN BTS Integration (From Table - E ) Summary price of Part-E, RNP and Huawei BTS Integration (From Table - F )

Transcript of BoQ Relocation

Page 1: BoQ Relocation

51

Aa¨vq-5Bill of Quantity (BoQ)

Summary Bill of Quantity (BoQ)

Sl Description of Items Total Price (BDT)

A -

B -

C -

D -

E -

F -

Grand Total -

In Words: ………………………………………………..

Summary price of Part-A, NSN BTS(From Table - A )

Summary price of Part-B, Huawei BTS(From Table - B )

Summary price of Part-C, NSN Services(From Table - C )

Summary price of Part-D, Huawei Services(From Table - D )

Summary price of Part-E, RNP and NSN BTS Integration(From Table - E )

Summary price of Part-E, RNP and Huawei BTS Integration(From Table - F )

Page 2: BoQ Relocation

52

Installation & Commissioning works for NSN/Siemens BTS

Table: A.1 (BTS Installation)

Sl No Description of works Unit

1 Site 170 - -

2 Site 164 - -

3 Site 11 - -

4 Site 21 - -

5 Site 10 - -

6 Site 84 - -

7 NSN BTS Commissioning Site 460 - -

Summary price of Table: A.1 -

Dismantle works with Packaging, Transport & Warehousing

Table: A.2 (Dismantle, Packaging & Transportation from Site to warehouse or similar distance)

Sl No Description of works Unit

1 Site 180 - -

2 DUAL Band Indoor BTS with all accessories Site 248 - -

3 Site 11 - -

4 Site 21 - -

3 DC Power System (Battery , Rectifier etc) Site 100 - -

4 Air Conditioning System Site 100 - -

5 Micro wave System (up to 1.2 meter) Site 100 - -

Summary price of Table: A.2 -

Qunatity(a)

Unit Price(b)

Total Price(axb)

Installation of Single Band Indoor BTS at new site.

Installation of DUAL Band Indoor BTS at new site.

Installation of Single Band Outdoor BTS at new site.

Installation of Dual Band Outdoor BTS at new site.

Installation of Single Band Indoor BTS at Existing site.

Installation of Dual Band Indoor BTS at Existing site.

Qunatity(a)

Unit Price(b)

Total Price(axb)

Single Band Indoor BTS with all accessories

Single Band Outdoor BTS with all accessories

Dual Band Outdoor BTS with all accessories

Page 3: BoQ Relocation

53

Sl No Description of works Unit

1 Trip 100 - -

2 Trip 100 - -

3 Trip 100 - -

4 Trip 160 - -

Summary price of Table: A.3 -

Table: A.4 (Equipments Warehousing)

Sl No Description of works Unit

1 Month 18 - -

2 Month 18 - -

3 Month 18 - -

4 Month 18 - -

Summary price of Table: A.4 -

Table: A.5 (Different Telecom Passive equipments Installation)

1 DC Power System (Battery , Rectifier etc) Site 100 - -

Table: A.3 (Transportation of Equipments from Stored site to working site with Loading and unloading)

Qunatity(a)

Unit Price(b)

Total Price(axb)

Road Distance upto 50 km by covered Vehicle

Road Distance upto 100 km by covered Vehicle

Road Distance upto 200 km by covered Vehicle

Road Distance for more then 200 km by covered Vehicle

Qunatity(a)

Unit Price(b)

Total Price(axb)

Monthly Warehouse charge of Equipments for 1200 sft at Sylhet District

Monthly Warehouse charge of Feeder cable & equipments for 1500 sft at Sylhet District

Monthly Warehouse charge of Equipments for 1200 sft at Faridpur/Jessore District

Monthly Warehouse charge of Feeder cable & other equipments for 1500 sft at Faridpur/Jessore District

Page 4: BoQ Relocation

54

2 Air Conditioning System Site 100 - -

3 Micro wave System (up to 1.2 meter) Site 100 - -

Summary price of Table: A.5 -

Page 5: BoQ Relocation

54

Supply Additional Accessories for BTS Installation

Table: A.6 (Supply Additional Accessories for BTS Installation, if required)

SL Item description Unit Qty Amount Total Price

1 25rm DC Cable (Black) Meter 3000 - -

2 25rm DC Cable (Blue) Meter 3000 - -

3 6rm DC Cable (Black) Meter 3000 - -

4 6rm DC Cable (Blue-black) Meter 3000 - -

5 25rm Grounding Cable Y/G Meter 3000 - -

6 16rm Grounding Cable Meter 3000 - -

7 Lugs(25rm-22/8) Pcs 3000 - -

8 Lugs(16rm) Pcs 1500 - -

9 Lugs(6rm) Pcs 1500 - -

10 Outdoor Short Jumper Pcs 60 - -

11 Indoor Short Jumper Pcs 60 - -

12 7/8" Feeder Cable Meter 50000 - -

13 4/5" connector (Male) Pcs 60 - -

14 7/8" connector (Male) Pcs 120 - -

15 4/5" connector Female Pcs 120 - -

16 7/8" connector Female Pcs 120 - -

17 7/8"Feeder clamp Pcs 10000 - -

18 7/8"Grounding kit Pcs 5000 - -

19 PCM cable 120ohm(8 pairs) Meter 3000 - -

20 Alarm cable 120ohm(16 pairs) Meter 3000 - -

Summary price of Table: A.6 -

Page 6: BoQ Relocation

55

Installation & Commissioning works for Huawei BTS

Table: B.1 (BTS Installation)

Sl No Description of works Unit

1 Site 342 - -

2 Site 17 - -

3 Huawei BTS Commissioning Site 359 - -

Summary price of Table: B.1 -

Dismantle works with Packaging, Transport & Warehousing

Table: B.2 (Dismantle, Packaging & Transportation from Site to warehouse or similar distance)

Sl No Description of works Unit

1 Site 342 - -

2 DUAL Band Indoor BTS with all accessories Site 17 - -

3 DC Power System (Battery , Rectifier etc) Site 100 - -

4 Air Conditioning System Site 100 - -

5 Micro wave System (up to 1.2 meter) Site 100 - -

Summary price of Table: B.2 -

Sl No Description of works Unit

1 Road Distance upto 50 km by covered Van Trip 59 - -

2 Trip 100 - -

3 Trip 100 - -

Qunatity(a)

Unit Price(b)

Total Price(axb)

Installation of Single Band Indoor BTS at new site.

Installation of Dual Band Indoor BTS at new site.

Qunatity(a)

Unit Price(b)

Total Price(axb)

Single Band Indoor BTS with all accessories

Table: B.3 (Transportation of Equipments from Stored site to working site with Loading and unloading)

Qunatity(a)

Unit Price(b)

Total Price(axb)

Road Distance upto 100 km by covered Van

Road Distance upto 200 km by covered Van

Page 7: BoQ Relocation

56

4 Trip 100 - -

Summary price of Table: B.3 -

Table: B.4 (Equipments Warehousing)

Sl No Description of works Unit

1 Month 18 - -

2 Month 18 - -

3 Month 18 - -

4 Month 18 - -

Summary price of Table: B.4 -

Table: B.5 (Different Telecom Passive equipments Installation)

1 DC Power System (Battery , Rectifier etc) Site 100 - -

2 Air Conditioning System Site 100 - -

3 Micro wave System (up to 1.2 meter) Site 100 - -

Summary price of Table: B.5 -

Road Distance for more then 200 km by covered Van

Qunatity(a)

Unit Price(b)

Total Price(axb)

Monthly Warehouse charge of Equipments for 1200 sft at Chittagong District

Monthly Warehouse charge of Feeder cable & other equipments for 1500 sft at Chittagong District

Monthly Warehouse charge of Equipments for 1200 sft at Rangpur District

Monthly Warehouse charge of Feeder cable & other equipments for 1500 sft at Rangpur District

Page 8: BoQ Relocation

57

Supply Additional Accessories for BTS Installation

Table: B.6 (Supply Additional Accessories for BTS Installation, if required)

SL Item description Unit Qty/Site Amount Total Price

1 25rm DC Cable (Black) Meter 2000 - -

2 25rm DC Cable (Blue) Meter 2000 - -

3 6rm DC Cable (Black) Meter 2000 - -

4 6rm DC Cable (Blue-black) Meter 2000 - - 5 25rm Grounding Cable Y/G Meter 2000 - - 6 16rm Grounding Cable Meter 2000 - -

7 Lugs(25rm-22/8) Pcs 2000 - -

8 Lugs(16rm) Pcs 1000 - -

9 Lugs(6rm) Pcs 1000 - -

10 Outdoor Short Jumper Pcs 40 - -

11 Indoor Short Jumper Pcs 40 - -

12 7/8" Feeder Cable Meter 50000 - -

13 4/5" connector (Male) Pcs 40 - -

14 7/8" connector (Male) Pcs 80 - -

15 4/5" connector Female Pcs 80 - - 16 7/8" connector Female Pcs 80 - -

17 7/8"Feeder clamp Pcs 7000 - -

18 7/8"Grounding kit Pcs 3000 - -

19 PCM cable 120ohm(8 pairs) Meter 2000 - - 20 Alarm cable 120ohm(16 pairs) Meter 2000 - -

Summary price of Table: B.6 -

Page 9: BoQ Relocation

58

Network Planning & BSS Equipments I&C

Table: C.1 (BSS related Services)

Sl No Description of works Unit

1 Site 5 - -

Summary price of Table: C.1 -

Qunatity(a)

Unit Price(b)

Total Price(axb)

BSC Relocation with Commissioning & Integration as turn key basis

Page 10: BoQ Relocation

59

Network Planning & BSS Equipments I&C

Table: D.1 (BSS related Services)

Sl No Description of works Unit

1 Site 3 - -

Summary price of Table: D.1 -

Qunatity(a)

Unit Price(b)

Total Price(axb)

BSC Relocation with Commissioning & Integration as turn key basis

Page 11: BoQ Relocation

60

NSN/ Siemens Radio Network Planning & BTS Integration

Table: E.1 (Radio Network Planning & Integration)

Sl No Description of works Unit

1 Radio Network Planning Site 460 - -

2 BTS Integration Site 300 - -

Summary price of Table: E.1 -

Qunatity(a)

Unit Price(b)

Total Price(axb)

Page 12: BoQ Relocation

61

Huawei Radio Network Planning & BTS Integration

Table: F.1 (Radio Network Planning & Integration)

Sl No Description of works Unit

1 Radio Network Planning Site 359 - -

2 BTS Integration Site 200 - -

Summary price of Table: F.1 -

Qunatity(a)

Unit Price(b)

Total Price(axb)