TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY RATE AMOUNT FIRE PROTECTION INSTALLATIONS-M1 (a) This part of the BoQ must be priced by a specialist fire protection sub-contractors to reduce failure due to financial risk. (b) The main contractor shall provide a CV or brochure for a specialist fire protection sub-contractor before work starts for approval by engineer. ( c) Allow for the specialist fire protection sub-contractor to visit the site and take measurements Sum 1 (d) Allow for production of factory shop drawings Sum 1 ( e) Allow for submission of brochures & datasheets for equipment to be supplied before equipment is purchased (f) Contractor must carefully study the Gauteng Province Department of Infrastructure Standard Quality Specifications ,project specification SANS standards and the site before submitting tenders.Contractors will be expected to submit SABS Mark samples and SABS certificates before purchasing all materials. CD available from DID offices (g) The fire protection installations should comply with fire requirements of SANS (NBR) with special reference to Part O, T and W in relation to mechanical installation. Notwithstanding the regulation and or the rational fire design the requirements are to be met (h) All work should comform to requirements of the Standard Quality Specification for Fire Protection- DID-E/M1 and Standard Quality Specification for Ventilation and Air Conditioning- DID-E/M6 Carried to Collection MECHANICAL SERVICES OCTOBER 2016 1

Transcript of TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF,...

Page 1: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

FIRE PROTECTION INSTALLATIONS-M1

(a) This part of the BoQ must be priced by a specialist

fire protection sub-contractors to reduce failure due

to financial risk.

(b) The main contractor shall provide a CV or brochure

for a specialist fire protection sub-contractor before

work starts for approval by engineer.

( c) Allow for the specialist fire protection sub-contractor

to visit the site and take measurements Sum 1

(d) Allow for production of factory shop drawings Sum 1

( e) Allow for submission of brochures & datasheets for

equipment to be supplied before equipment is

purchased

(f) Contractor must carefully study the Gauteng

Province Department of Infrastructure Standard

Quality Specifications ,project specification SANS

standards and the site before submitting

tenders.Contractors will be expected to submit

SABS Mark samples and SABS certificates before

purchasing all materials.

CD available from DID offices

(g) The fire protection installations should comply with

fire requirements of SANS (NBR) with special

reference to Part O, T and W in relation to

mechanical installation. Notwithstanding the

regulation and or the rational fire design

the requirements are to be met

(h) All work should comform to requirements of the

Standard Quality Specification for Fire Protection-

DID-E/M1 and Standard Quality Specification for

Ventilation and Air Conditioning- DID-E/M6

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 1

Page 2: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Fire Hydrants

All Fire Hydrants shall comply with the

requirements of SANS 1128-1.

1.0 Supply, install, test and commission Ø65mm Twin

Fire Booster connection complete with Plastic

material dust covers and connecting chain, 65mm

Pressure Gauge Adaptor with Ball Valve. Twin

booster shall be installaed at site entrance or in a

suitable position for access by the Fire Brigade. No. 1

1.1 Supply, install, test and commission Ø100mm

suction hydrant complete with Storz couplings and

plastic cover.

1.2 Supply No. 1

1.3 Install No. 1

1.4 Supply, install, test and commission 80mm x 65mm

Right Angled Tamperproof Hydrant with single lug

outlet and supplied complete with Tee key for

opening valve

1.5 Supply No. 12

1.6 Install No. 12

Fire Hose Reels

All Fire Hose Reels shall comply with the

requirements of SANS 543, and shall be in

installed accordance with SANS 10105-1 and

SANS 10400-W and the Department's Document

GP/M1 Rev 1.

2.0 Supply, install, test and commission SABS approved

fire hose reel fitted with 30m length of 20mm hose

mountedon wall bracket bolted to wall behind. The FHR to be

installed complete with 25mm chromium shut-off

valve, valve and a ø7mm aluminium nozzle and hose guide

FHR to be in red painted steel enclosures with

breakable glass and key.

2.1 Supply No. 342.2 Install No. 34

2.3 Supply ,install steel cabinets large enough to house 10kg hand held unit Fire extinguishers below the hose hose reels and should be with a break glass units

2.4 Supply No. 342.5 Install No. 34

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 2

Page 3: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Portable Fire extinguishers

All Portable Fire Extinguishers shall comply with the

requirements of SANS 1910, and the Department's requirements of SANS 1910, and the Department's

Document GP/M1 Rev 1

3.0 Supply and install 10kg Carbon Dioxide (CO2) type

fire extingusher

3.1 Supply No. 20

3.2 Supply and install a tamper proof translucent

polycarbonate enclosure for the 10 kg Carbon Dioxide

(CO2) Fire Extinguisher

3.3 Supply No. 203.4 Install No. 20

3.5 Supply 4.5kg Dry Chemical Powder (DCP) type fire

extingusher. One for each classroom and HOD

offices.3.6 Supply No. 130

Install No. 130

3.7 Supply and install a tamper proof translucent

polycarbonate enclosure for the 4,5 Dry Chemical

Powder (DCP) Fire Extinguisher. One for each

classroom and HOD offices.

3.8 Supply No. 1303.9 Install No. 130

Fire Signage

Photoluminescent fire signage and direction

location signage and warning notices in accordance

with SANS 1186-1: 2008, and incorporating the

pictographs in the standard size 190 x 190mm,

securely fixed to wall, door, ceiling or soffit as

required and as may be indicated on drawings and

architectural specifications.

4.0 Supply and install Photoliminescent fire fighting

equipmentdesignation, location and general escape symbolic

signsin accordance with SANS 1186-1: 2008.

4.1 Supply Sum 300

4.2 Install Sum 300

,

5 Fire Water Storage Tank

Supply and install 4.88m L x 2.44m W x 2.44m H (30kL)

sectional steel panel fire water storage tank to be

mounted on a purpose-made 1 x 5 metre elevated

steel structure stand. Or approved

5.01 Supply Sum 1

5.02 Install sum 1

5.03 Delivery to site Sum 1

5.03b Allow for builders works for tank and pump room as Sum lot

shown on fire protection site reticulation drawing

LXWXH=12000mmX8000mmX3500mm or to fit the

approved tank size and pumps

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 3

Page 4: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

5.04 Supply, install test and commision, a 1 x electric fire and 1 standby Diesel water booster pump complete

with electricmono block jockey pump equipped

with an EP8 pressure switch operated auto start

arrangement equipped with pressure gauges.The

system to be equipped with isolating ball valves,

strainers,non-return valves IP54 electrical control

panel c/w alarm, galvanised inletand outlet

manifolds all on a base pre-piped, pre-wiredand

tested.

5.05 Hydrant & Hosereel Diesel Driven Pumpset

- Pressure head: - 10.7 bars

- Flow rate: - 42 litres per second

Supply No. 1

Install No. 1

5.06 Hydrant & Hosereel Electric Driven Pumpset

- Pressure head: - 10.7 bars

- Flow rate: - 42 litres per second

Supply No. 1

Install No. 1

5.07 Hydrant & Hosereel Jockey Pump

Duty: 4.2 litres per second @ 11.7bar

Supply No. 1

Install No. 1

6.0 TANK AND BOOSTER PUMPS PIPEWORK

Supply and install galvanised pipework c/w fittings

and pipe supports within pump house

6.01 100mm diameter m 6

6.02 80mm diameter m 6

6.03 50mm diameter m

6.04 Supply and Install isolation Valves on pump pipeworks

6.05 100mm diameter No 2

6.06 80mm diameter No 4

6.07 Suppy and install non return valves as shown on the

drawings on pump pipeworks

6.08 100mm diameter No 2

6.09 80mm diameter No 1

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 4

Page 5: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

6.10 Suppy and install strainers as shown on the

drawings on pump pipeworks

6.11 100mm diameter No 2

6.12 80mm diameter No 2

6.13 Suppy and install bends as shown on the

drawings on pump pipeworks

6.14 100mm diameter No 4

6.15 80mm diameter No 4

6.16 Suppy and install Tees as shown on the

drawings on pump pipeworks

6.17 80mm-100mm-80mm diameter No 2

6.18 100mm -100mm-100mm diameter No 2

6.19 80mm -80mm-80mm diameter No 2

6.2 Suppy and install Reducers as shown on the

drawings on pump pipeworks

6.21 100mm-80mm diameter No 2

6.22 80mm-50mm diameter No 2

6.23 Suppy and install Drain Valves as shown on the

drawings on pump pipeworks

6.24 100mm diameter No 2

6..25 80mm diameter No 2

6.26 Suppy and install Flexibles as shown on the

drawings on pump pipeworks

6.27 100mm diameter No 2

6.28 80mm diameter No 2

6.29 Allow for pump mounting and tank mounting base lot 1

6.30 Suppy and install pressure gauge as shown on the No 2

drawings on pump pipeworks

6.31 Suppy and install flow switch No 1

6.32 Allow for all other valves and fittings not specified

but needed for successful installation of Tank and

pumps lot 1

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 5

Page 6: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

to protect pumps against fire engine boosters

Supply No 2

install No 2

6.34 CONTROL PANELS

Supply, install and connect weatherproof control

panels for the booster pump sets complete with

alarms and other accessories

Supply No. 1

Install No. 1

HDPE Pipework

All underground pipework shall be High Pressure

Class16 type IV HDPE used in conjunction with

compressionfittings.

7 150mm diameter High pressure class 16 HDPE pipes

laid in ground not more than 1000mm deep m 1700

7.01 110mm diameter High pressure class 16 HDPE pipes

laid in ground not more than 1000mm deep m 1300

7.1 50mm diameter High pressure class 16 HDPE pipes

laid in ground not more than 1000mm deep m 300

7.2 32mm diameter High pressure class 16 HDPE pipes

laid in ground not more than 1000mm deep

m 0

Extra over HDPE pipework for fittings, as shown on

the drawings:

Tees

7.3 150mm-110mm-150mm No. 12

7.4 110mm-50mm-110m No 6

7.5 110mm-110mm-110mm No. 3

Bends

7.7 150mm diameter No. 4

7.8 110mm diameter No. 16

7.9 25mm diameter No. 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 6

Page 7: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Adapters

7.10 150mm to 110mm HDPE to iron adaptors No. 15

7.11 110mm to 50mm HDPE to iron adaptors No. 13

7.12 75mm to 50mm HDPE to iron adaptors No. 0

7.13 32mm to 25mm HDPE to iron adaptors No. 15

7.14 50mm to 32mm HDPE to iron adaptors No. 0

Galvanised Mild Steel Pipework

Medium class galvanised mild steel (GMS)

screwed all necessary supports, fixing, brackets, saddles,

holderbats, etc, and pained red in accordance

with SANS 10140-3:2003: in the running length, and all

necessary supports, fixing, brackets, saddles, holderbats,

etc, and pained red in accordance with SANS 10140-

3:2003:

7.15 75mm diameter pipes m 0

7.16 50mm diameter pipes m 0

7.17 32mm diameter pipes m 0

7.18 25mm diameter pipes m 300

Extra over GMS pipework for fittings, as shown on the

drawings:

Tees

7.19 110mm diameter No. 0

7.20 25mm diameter No. 0

Bends

7.21 110mm diameter No. 0

7.22 25mm diameter No. 140

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 7

Page 8: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Operating and Maintenance Procedures

8.0 Compilation and submission of 4 No. Operation &

installation. No 4

Test and Commissioning

8.1 Allow for testing of entire fire protection installation

after completion Sum 1

8.2 Test again in the presence of and to entire

satisfation the consulting engineer

8.3 Testing and commission of the completed fire

protection installation Item 1

8.5 Attendance and profits on tests Item 1

8.6 Credit for redundant materials and equipment

8.7 Allow for inspections and measurements as

required for the shop drawings and detailed design

of installation 1

8.8 Allow for monthly site meetings and managing of

8.10 Allow for record drawings and operating instructions 1

8.11 Allow for transportation/travelling charges 1Allow for maintenance and specialist maintenance as

specified

8.12 Allow for 12 months guarantee in terms of the

Document 1

8.13 Allow for all transport and rigging, lifting gear, cranes

etc. that may be required for moving of plant

and equipment setting out works 1

8.14 Allow for attendance on main contractor and for

switching off, removing all redundant items and

earthing to make supply safe and re-energise after 1

installation

AS-BUILT INFORMATION AND OPERATING AND

MAINTENANCE MANUALS

8.15 Obtaining of all available information, compiling,

eproducing and finalising three sets of as-built and

Operating and Maintenance manuals 3

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 8

Page 9: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

SHOP AND "AS BUILT" DRAWINGS

drawings and 'as built" drawings to the entire works

and all its components include for 3 copies of all

drawings or approval carring out corrections as

required by engineer No. 3

TRAINING

8.17 Presenting a training course for operators 1

8.18 Presenting training course for maintenance staff 1

EQUIPMENT SELECTIONS

8.20 Provide detailed selections and samples as

required for approval before installing Sum 4

OPERATION AND MAINTENANCE MANUALS

8.21 Provide Operating and Maintenance Manuals:

including "as built" drawings and equpment

selection information No. 3

Other

8.24 Any other items required for the successful

completion of the work but not included in this

bill of quantities. Please specify :

Carried to Collection

CARRIED TO SUMMARY PAGE

SUB-TOTAL FOR FIRE PROTECTION

MECHANICAL SERVICES

OCTOBER 2016 9

Page 10: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

WET SERVICES INSTALLATIONS-M2

(a) This part of the BoQ must be priced by a specialist

plumber and solar sub-contractors to reduce failure

due financial risk.

(b) The main contractor shall provide a CV or brochure

for a specialist plumber and Solar sub-contractor

before work starts for approval by engineer.

( c) Allow for the specialist plumber and solar sub-

contractor to visit the site and take measurements Sum 1

(d) Allow for production of factory shop drawings Sum 1

( e) Allow for submission of brochures for equipment to

be purchased before equipment is purchased

(f) Contractor must study carefully the DID, GP SQS

specifications, project specification, SANS

standards and the site before submitting

tenders.Contractors will be expected to submit

SABS Mark samples and SABS certificates before

purchasing all materials.

(g) All work should conform to the requirements of the

Standard Quality Specification for Wet Services-

DID-E/M2

(h) All domesttic Water installations shall comply with

SANS 105252-1;2012

(i) COLD WATER SUPPLY RETICULATION

All rates supplied in this bill of quantities will be

deemed to include scaffolding to any height and

fixing of cold and hot water pipes up to and

including roof height.

All cold water supply pipes are to be chased into

walls except where pipes are to be surface-

mounted on wall face and fixed with standard type

pipe saddles and brackets.

(j) Copper Pipework

Half hard drawn copper pipes to SANS 460 Class

1 and SANS 1067 with capillary type soldered

joints done in accordance with the manufacturer's

specifications, and installed in accordance with

SANS 10400:2011 and SANS 10252-1:2004,

including couplers in the running length, and all

necessary supports, fixing, brackets,saddles,

holderbats, etc, and colour-coded in accordance

with SANS 10140-3:2003:

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 10

Page 11: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

All rates supplied in this bill of quantities will be

deemed to include scaffolding to any height and

fixing of cold and hotwater pipes up to and including

roof height.

All pipes suspended from concrete slabs, roof,

ceiling, etc, shall be deemed to include in the rates

all necessary hanger brackets, threaded rod

(irrespective of the suspension length), nuts,

washers, anchors and drilling of holes in the

concrete slab.

All hot water pipes are to be chased into walls

except where pipes are to be surface-mounted on

wall face or run in ceiling voids or inside ducts, and

fixed with standard type pipe saddles and brackets

at 1000mm maximum.

(l) Copper Pipework

Hard drawn copper pipes to SANS 460 and SANS

1067 with capillary type soldered joints done in

accordance with the manufacturer's specifications,

and installed in accordance with SANS 10400:2010

and SANS 10252-1:2004, including couplers in the

running length, and all necessary supports, fixing,

brackets, saddles, holderbats, etc, and colour-coded

in accordance with SANS 10140-3:2003. Installation

to comply with the Department's document GP/M2

Rev 1.

(m) Hot Water Supply

Straight copper piping not chased in walls but

surface-mounted fixed to walls, or in celing voids or

in service ducts are to be insulated with 25mm thick

pre-formed fibreglass sections (lagging) in

accordance with SANS 612:2007. The insulation

is to be clad in galvanised muffs secured with

10mm galvanised strapping and seal. Water proof

material and paint to be applied where the pipes run

below slab.Bends to be insulated with fibreglass

with 'Insulpro' hardsetting plaster protected with

gauze reinforced mastic.

Valves, strainers and flanges will not be insulated.

All materials and equipment, etc, are to be supplied

by the Contractor.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 11

Page 12: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

PRE SCHOOL HOSTEL

REMOVALS

1.0 Disconnect and make safe existing electric water

hot geyser No. 0

1.1 Remove from site existing hot water geyser and

cold water piping No. 0

1.2 Cutting of walls to remove pipes in the wall No. 0

1.3 Safe keeping all the accessories associated with

pipes, eg basins, shower heads, baths etc No. o

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 24

2.1 22mm diameter pipes. m 70

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

the Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 20

2.8 22mm diameter No 40

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 12

Page 13: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 10

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 13

Page 14: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 6

3.2 Install No. 6

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 24

3.7 22mm diameter insulated pipes m 20

3.8 28mm diameter insulated pipes m 36

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 15

3.10 22mm diameter No 25

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 15

3.14 22mm diameter No 25

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 14

Page 15: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

5mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 20

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

,

MECHANICAL SERVICES

OCTOBER 2016 15

Page 16: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

HALL

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 30

2.1 22mm diameter pipes. m 40

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, the as

shown on Hot and Cold Water Plumbing:

Bends

2.7 15mm diameter No 20

2.8 22mm diameter No 10

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 16

Page 17: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 0

2.16 22mm-22mm-22mm diameter No 10

2.17 22mm-15mm-22mm diameter No 20

2.18 54mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 2

2.21 32mm -22mm diameter No 0

2.22 32mm-15mm diameter No 0

2.23 22mm-15mm diameter No 2

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 0

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 17

Page 18: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 4

3.2 Install No. 4

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 15

3.7 22mm diameter insulated pipes m 30

3.8 28mm diameter insulated pipes m

Extra over copper pipework for fittings, as shown on

the Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 20

3.10 22mm diameter No 10

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 20

3.14 22mm diameter No 10

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 18

Page 19: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 2

3.18 22mm-15mm diameter No 2

3.19 35mm diameter No 0

Valves

5mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 14

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

,

MECHANICAL SERVICES

OCTOBER 2016 19

Page 20: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

LAUNDRY

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 18

2.1 22mm diameter pipes. m 50

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

the Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 15

2.8 22mm diameter No 18

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 20

Page 21: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 0

2.15 32mm-22mm-32mm diameter No 0

2.16 22mm-22mm-22mm diameter No 2

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 2

2.21 32mm -22mm diameter No 2

2.22 32mm-15mm diameter No 0

2.23 22mm-15mm diameter No 2

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 21

Page 22: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 1

3.2 Install No. 1

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 20

3.7 22mm diameter insulated pipes m 55

3.8 28mm diameter insulated pipes m 0

Extra over copper pipework for fittings, as shown on

the Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 18

3.10 22mm diameter No 10

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 10

3.14 22mm diameter No 8

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 22

Page 23: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

5mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 14

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

,

MECHANICAL SERVICES

OCTOBER 2016 23

Page 24: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

PRE SCHOOL TOILETS

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 15

2.1 22mm diameter pipes. m 40

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

the Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 15

2.8 22mm diameter No 10

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 24

Page 25: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 1

2.15 32mm-22mm-32mm diameter No 1

2.16 22mm-22mm-22mm diameter No 2

2.17 22mm-15mm-22mm diameter No 15

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 22mm Plastic to Male Iron adapter No 0

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 25

Page 26: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 4

3.2 Install No. 4

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 26

3.7 22mm diameter insulated pipes m 15

3.8 28mm diameter insulated pipes m 36

Extra over copper pipework for fittings, as shown on

the Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 18

3.10 22mm diameter No 28

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 15

3.14 22mm diameter No 25

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 26

Page 27: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

5mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 15

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

,

MECHANICAL SERVICES

OCTOBER 2016 27

Page 28: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

STAFF ROOM

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 20

2.1 22mm diameter pipes. m 60

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

the Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 15

2.8 22mm diameter No 30

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 28

Page 29: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 5

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 0

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 29

Page 30: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 1

3.2 Install No. 1

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 40

3.7 22mm diameter insulated pipes m 20

3.8 28mm diameter insulated pipes m 0

Extra over copper pipework for fittings, as shown

on Hot and Cold Water Plumbing layout drawings

Bends

3.9 15mm diameter No 14

3.10 22mm diameter No 30

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 5

3.14 22mm diameter No 4

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 30

Page 31: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 14

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

,

MECHANICAL SERVICES

OCTOBER 2016 31

Page 32: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

HOUSE 2

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 30

2.1 22mm diameter pipes. m 20

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

the Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 10

2.8 22mm diameter No 15

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 32

Page 33: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 5

2.17 22mm-15mm-22mm diameter No 6

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 33

Page 34: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 1

3.2 Install No. 1

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 30

3.7 22mm diameter insulated pipes m 25

3.8 28mm diameter insulated pipes m 0

Extra over copper pipework for fittings as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 14

3.10 22mm diameter No 20

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 6

3.14 22mm diameter No 10

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 34

Page 35: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 5

3.18 22mm-15mm diameter No 5

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 15

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

,

MECHANICAL SERVICES

OCTOBER 2016 35

Page 36: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

WORHSHOP 100

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 30

2.1 22mm diameter pipes. m 50

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

the Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 25

2.8 22mm diameter No 45

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 36

Page 37: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 5

2.17 22mm-15mm-22mm diameter No 18

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 37

Page 38: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 1

3.2 Install No. 1

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 30

3.7 22mm diameter insulated pipes m 25

3.8 28mm diameter insulated pipes m 0

Extra over copper pipework for fittings, as shown on

the Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 18

3.10 22mm diameter No 30

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 18

3.14 22mm diameter No 25

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 38

Page 39: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 14

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

,

MECHANICAL SERVICES

OCTOBER 2016 39

Page 40: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

WORKSHOP 200

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 20

2.1 22mm diameter pipes. m 40

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

the Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 15

2.8 22mm diameter No 10

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 40

Page 41: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 12

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 41

Page 42: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 1

3.2 Install No. 1

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 20

3.7 22mm diameter insulated pipes m 40

3.8 28mm diameter insulated pipes m 0

Extra over copper pipework for fittingsas shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 20

3.10 22mm diameter No 22

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 4

3.14 22mm diameter No 8

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 42

Page 43: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 15

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

,

MECHANICAL SERVICES

OCTOBER 2016 43

Page 44: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

WORKSHOP 300

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 20

2.1 22mm diameter pipes. m 40

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 24

2.8 22mm diameter No 10

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 44

Page 45: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 5

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 45

Page 46: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 1

3.2 Install No. 1

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 30

3.7 22mm diameter insulated pipes m 25

3.8 28mm diameter insulated pipes m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 12

3.10 22mm diameter No 10

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 12

3.14 22mm diameter No 10

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 46

Page 47: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 14

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

,

MECHANICAL SERVICES

OCTOBER 2016 47

Page 48: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

PRE SCHOOL CLASSES

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 30

2.1 22mm diameter pipes. m 55

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 25

2.8 22mm diameter No 35

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 48

Page 49: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 10

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 49

Page 50: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 1

3.2 Install No. 1

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 30

3.7 22mm diameter insulated pipes m 25

3.8 28mm diameter insulated pipes m 36

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 10

3.10 22mm diameter No 12

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 10

3.14 22mm diameter No 12

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 50

Page 51: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 12

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

,

SUB-TOTAL FOR BILL WET SERVICES

CARRIED TO SUMMARY PAGE

MECHANICAL SERVICES

OCTOBER 2016 51

Page 52: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

GIRLS HOSTEL E&G

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 30

2.1 22mm diameter pipes. m 66

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

the Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 15

2.8 22mm diameter No 20

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 52

Page 53: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 5

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 0

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 53

Page 54: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 6

3.2 Install No. 6

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 30

3.7 22mm diameter insulated pipes m 70

3.8 28mm diameter insulated pipes m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 20

3.10 22mm diameter No 10

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 15

3.14 22mm diameter No 25

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 54

Page 55: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 15

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 55

Page 56: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

GIRLS HOSTEL F

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 30

2.1 22mm diameter pipes. m 75

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 15

2.8 22mm diameter No 10

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 56

Page 57: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 12

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 0

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 57

Page 58: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 6

3.2 Install No. 6

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 40

3.7 22mm diameter insulated pipes m 80

3.8 28mm diameter insulated pipes m 36

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 30

3.10 22mm diameter No 25

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 10

3.14 22mm diameter No 8

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 58

Page 59: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 25

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 59

Page 60: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

KITCHEN

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 40

2.1 22mm diameter pipes. m 80

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 30

2.8 22mm diameter No 45

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 60

Page 61: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 5

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 61

Page 62: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 3

3.2 Install No. 3

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 20

3.7 22mm diameter insulated pipes m 40

3.8 28mm diameter insulated pipes m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 20

3.10 22mm diameter No 10

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 10

3.14 22mm diameter No 8

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 62

Page 63: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 25

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 63

Page 64: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

ADMIN

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 20

2.1 22mm diameter pipes. m 50

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 14

2.8 22mm diameter No 10

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 64

Page 65: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 5

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 0

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 65

Page 66: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 1

3.2 Install No. 1

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 20

3.7 22mm diameter insulated pipes m 25

3.8 28mm diameter insulated pipes m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 10

3.10 22mm diameter No 15

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 15

3.14 22mm diameter No 10

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 66

Page 67: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 15

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 67

Page 68: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

MEDIA CENTRE

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 0

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 30

2.1 22mm diameter pipes. m 50

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 20

2.8 22mm diameter No 40

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 68

Page 69: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 10

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 69

Page 70: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

CLASSROOM 200

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 0

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 30

2.1 22mm diameter pipes. m 100

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 25

2.8 22mm diameter No 20

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 70

Page 71: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 5

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 0

2.28 65mm Plastic to Male Iron adapter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 71

Page 72: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

CLASSROOM 400

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 0

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 35

2.1 22mm diameter pipes. m 105

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 20

2.8 22mm diameter No 10

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 72

Page 73: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 8

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 0

2.28 65mm Plastic to Male Iron adapter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 73

Page 74: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

OFFICES

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 30

2.1 22mm diameter pipes. m 80

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 25

2.8 22mm diameter No 18

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 74

Page 75: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 10

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 100

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 75

Page 76: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 100 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 1

3.2 Install No. 1

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 30

3.7 22mm diameter insulated pipes m 20

3.8 28mm diameter insulated pipes m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 15

3.10 22mm diameter No 25

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 15

3.14 22mm diameter No 25

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 76

Page 77: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 20

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 77

Page 78: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

FLATS

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 50

2.1 22mm diameter pipes. m 180

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 20

2.8 22mm diameter No 40

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 78

Page 79: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 10

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 79

Page 80: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 20

3.2 Install No. 20

3.4 Installation of Solar Controller No. 20

3.5 Installation of timer No. 20

Copper pipe work

3.6 15mm diameter insulated pipes m 80

3.7 22mm diameter insulated pipes m 120

3.8 28mm diameter insulated pipes m 36

Extra over copper pipework for fittings, as shown on

the Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 40

3.10 22mm diameter No 10

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 10

3.14 22mm diameter No 14

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 80

Page 81: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 30

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

SUB-TOTAL FOR BILL WET SERVICES

MECHANICAL SERVICES

OCTOBER 2016 81

Page 82: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

BOYS HOSTEL A

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 40

2.1 22mm diameter pipes. m 120

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 20

2.8 22mm diameter No 40

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 82

Page 83: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 10

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 83

Page 84: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 6

3.2 Install No. 6

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 35

3.7 22mm diameter insulated pipes m 120

3.8 28mm diameter insulated pipes m 36

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 18

3.10 22mm diameter No 26

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 40

3.14 22mm diameter No 10

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 84

Page 85: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 30

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 85

Page 86: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

BOYS HOSTEL B

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 35

2.1 22mm diameter pipes. m 120

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 30

2.8 22mm diameter No 15

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 86

Page 87: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 10

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 87

Page 88: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 6

3.2 Install No. 6

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 35

3.7 22mm diameter insulated pipes m 120

3.8 28mm diameter insulated pipes m 36

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 30

3.10 22mm diameter No 20

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 30

3.14 22mm diameter No 10

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 88

Page 89: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 30

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 89

Page 90: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

BOYS HOSTEL C

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 35

2.1 22mm diameter pipes. m 120

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 30

2.8 22mm diameter No 45

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 90

Page 91: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 8

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 91

Page 92: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 6

3.2 Install No. 6

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 35

3.7 22mm diameter insulated pipes m 120

3.8 28mm diameter insulated pipes m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 30

3.10 22mm diameter No 20

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 30

3.14 22mm diameter No 10

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 92

Page 93: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 30

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 93

Page 94: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

ABLUTIONS

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 0

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 30

2.1 22mm diameter pipes. m 80

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 20

2.8 22mm diameter No 40

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 94

Page 95: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 10

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 0

2.28 65mm Plastic to Male Iron adapter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 95

Page 96: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

BOYS HOSTEL D

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 35

2.1 22mm diameter pipes. m 110

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 30

2.8 22mm diameter No 10

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 96

Page 97: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 8

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 97

Page 98: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 6

3.2 Install No. 6

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 40

3.7 22mm diameter insulated pipes m 120

3.8 28mm diameter insulated pipes m 36

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 30

3.10 22mm diameter No 20

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 14

3.14 22mm diameter No 16

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 98

Page 99: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 30

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 99

Page 100: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

KITCHEN

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 40

2.1 22mm diameter pipes. m 90

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 30

2.8 22mm diameter No 10

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 100

Page 101: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 8

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 101

Page 102: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 2

3.2 Install No. 2

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 48

3.7 22mm diameter insulated pipes m 30

3.8 28mm diameter insulated pipes m 36

Extra over copper pipework for fittings, as shown on

the Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 30

3.10 22mm diameter No 10

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 10

3.14 22mm diameter No 4

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 102

Page 103: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 15

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 103

Page 104: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

CLASSROOM 100

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 0

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 40

2.1 22mm diameter pipes. m 120

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 20

2.8 22mm diameter No 40

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 104

Page 105: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 10

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 105

Page 106: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

CLASSROOM 300

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 0

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 44

2.1 22mm diameter pipes. m 100

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 30

2.8 22mm diameter No 10

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 106

Page 107: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 10

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 0

2.28 65mm Plastic to Male Iron adapter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 107

Page 108: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

CLASSROOM 500

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 50

2.1 22mm diameter pipes. m 100

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 24

2.8 22mm diameter No 20

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 108

Page 109: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 8

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 109

Page 110: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

PLAYROOMS

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 30

2.1 22mm diameter pipes. m 60

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 30

2.8 22mm diameter No 25

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 110

Page 111: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 8

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 111

Page 112: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

HOUSE 1

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 20

2.1 22mm diameter pipes. m 40

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 18

2.8 22mm diameter No 15

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 112

Page 113: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 8

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 113

Page 114: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 1

3.2 Install No. 1

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 24

3.7 22mm diameter insulated pipes m 20

3.8 28mm diameter insulated pipes m 36

Extra over copper pipework for fittings, as shown on

the Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 18

3.10 22mm diameter No 25

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 15

3.14 22mm diameter No 25

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 114

Page 115: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 4

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 115

Page 116: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

HOUSE 3

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 18

2.1 22mm diameter pipes. m 25

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 10

2.8 22mm diameter No 4

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 116

Page 117: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 4

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 117

Page 118: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 1

3.2 Install No. 1

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 20

3.7 22mm diameter insulated pipes m 25

3.8 28mm diameter insulated pipes m 0

Extra over copper pipework for fittings, as shown on

the Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 18

3.10 22mm diameter No 15

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 18

3.14 22mm diameter No 15

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 118

Page 119: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 4

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 119

Page 120: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

HOUSE 4

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 20

2.1 22mm diameter pipes. m 25

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 10

2.8 22mm diameter No 8

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 120

Page 121: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 4

2.17 22mm-15mm-22mm diameter No 12

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 0

2.28 65mm Plastic to Male Iron adapter No 0

SOLAR WATER HEATERS

3.0 Supply, install, test and commission a double

jacketed, direct thermosiphon circulation type 200

litre solar water heater, complete with 3kW

electrical heater back-up element and 2 x 2m flat

plate solar collectors, 10m of copper piping,

insulation, 2-off 20mm vacuum breakers, 15mm

expansion relief valve, lever ball valves, mixing

valve, temperature differential controller, hot water

pipe insulation and truss strengthening where

required. Installation to comply with the

Department's document GP/M 2 Rev 1. Units to be

SABS Mark with SABS certificate.

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 121

Page 122: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Cylinder (mounted on roof)

Cylinder Capacity: 200 litres

Cylinder Material: SS 441;

Cylinder Material Thickness: 1.5mm

SABS Pressure Rating: 600kPa

Design Working Pressure: 400kPa

Glazing Material: 3.2mm tampered low iron.

Absorber Material: Steel

Absorber Surface: Black Chrome selective surface

Solar Collector Mounting: North Facing

No. of Solar collectors: 2

Collector Aperture: 1.86m2

Full Weight of System incl. frame: 500kg

Solar Collector Mounting: North Facing

3.1 Supply No. 1

3.2 Install No. 1

3.4 Installation of Solar Controller No. 1

3.5 Installation of timer No. 1

Copper pipe work

3.6 15mm diameter insulated pipes m 18

3.7 22mm diameter insulated pipes m 25

3.8 28mm diameter insulated pipes m 0

Extra over copper pipework for fittings, as shown on

the Hot and Cold Water Plumbing Layout drawings:

Bends

3.9 15mm diameter No 10

3.10 22mm diameter No 25

3.11 28mm diameter No 0

3.12 35mm diameter No 0

Equal Tees

3.13 15mm diameter No 15

3.14 22mm diameter No 25

3.15 38mm diameter No 0

3.16 42mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 122

Page 123: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Reducers

3.17 28mm-22mm diameter No 4

3.18 22mm-15mm diameter No 4

3.19 35mm diameter No 0

Valves

15mm diameter stopcock/angle valve on cold and

3.20 hot water pipes to sanitary appliances. No 4

3.21 20mm diameter isolation ballvalve on cold water

pipes No 0

3.22 25mm diameter isolation ballvalve on cold water

pipe. No 0

3.23 65mm diameter isolation ballvalve on cold water

pipes. No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 123

Page 124: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

GUARD HOUSE

REMOVALS

1.0 Disconnect and make safe existing hot water

geyser No. 1

1.1 Remove from site existing hot water geyser and

cold water piping No. 1

1.2 Cutting of walls to remove pipes in the wall No. 1

1.3 Safe keeping all the associated with pipes, eg

basins, shower heads, baths etc No. 1

NEW INSTALLATIONS

Cold Water Supply

2.0 15mm diameter pipes. m 10

2.1 22mm diameter pipes. m 30

2.2 28mm diameter insulated pipes. m 0

2.3 35mm diameter insulated pipes. m 0

2.4 42mm diameter pipes. m 0

2.5 54mm diameter pipes. m 0

2.6 67mm diameter pipes. m 0

Extra over copper pipework for fittings, as shown on

Hot and Cold Water Plumbing Layout drawings:

Bends

2.7 15mm diameter No 8

2.8 22mm diameter No 6

2.9 28mm diameter No 0

2.10 35mm diameter No 0

2.11 42mm diameter No 0

2.12 54mm diameter No 0

2.13 67mm diameter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 124

Page 125: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Tees

2.14 50mm-32mm-50mm diameter No 2

2.15 32mm-22mm-32mm diameter No 2

2.16 22mm-22mm-22mm diameter No 5

2.17 22mm-15mm-22mm diameter No 6

2.18 54mm diameter No 0

2.19 67mm diameter No 0

Reducers

2.20 50mm-32mm diameter No 4

2.21 32mm -22mm diameter No 4

2.22 32mm-15mm diameter No 4

2.23 22mm-15mm diameter No 0

2.24 42mm diameter No 0

2.25 54mm diameter No 0

2.26 67mm diameter No 0

Adapters

2.27 25mm Plastic to Male Iron adapter No 4

2.28 65mm Plastic to Male Iron adapter No 0

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 125

Page 126: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

4.0 Testing and commission of the completed

installation Item 1

4.1 Attendance and profits on tests

4.2 Credit for redundant materials and equipment 1

4.3 Allow for inspections and measurements as

of installation required for the shop drawings

and detailed design 1

4.4 Allow for monthly site meetings and managing of

project and for senior supervision by a qualified

person

4.5 Allow for samples and technical information 1

4.6 Allow for record drawings and operating instructions 1

4.7 Allow for transportation/travelling charges 1

4.8 Allow for 12 months guarantee in terms of the 1

Document

4.9 Allow for all transport and rigging, lifting gear,

cranes, that may be required for moving of plant and

equipment setting out works 1

4.10 Allow for attendance on main contractor and for

switching off, removing all redundant items and

earthing to make supply safe and re-energise after

installation 1

AS-BUILT INFORMATION AND OPERATING AND

MAINTENANCE MANUALS

4.11 0btaining of all available information, compiling,

eproducing and finalising three sets of as-built and

Operating and Maintenance manuals as specified

Sb 05,01 and FF 03 and handing over to the

Engineer 3

Carried to Collection

MECHANICAL SERVICES

OCTOBER 2016 126

Page 127: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

SHOP AND "AS BUILT" DRAWINGS

4.12 Allow for preparation of detailed, dimensioned shop

drawings and 'as built" drawings to the entire works

and all its components include for 3 copies of all

drawings or approval carring out corrections as

required by engineer No. 3

TRAINING

18.23 Presenting a training course for operators 1

18.24 Presenting training course for maintenance staff 1

INSPECTION OF SITE AND SITE MEASUREMENT

18.25 Allow for detailed inspection of the site, site

measurement and setting out as necessary to carry

out the contract and to provide detailed dimensioned

shop drawings of all works Sum 1

EQUIPMENT SELECTIONS

18.26 Provide detailed selections and samples as

required for approval before installing Sum 1

OPERATION AND MAINTENANCE MANUALS

18.27 Provide Operating and Maintenance Manuals:

including "as built" drawings and equpment

selection information No. 3

SERVICE INSTALLATIONS AND CONNECTIONS

18.28 Electrical work: carry out complete connection from

local isolator, connect and gland off with water

proofed pvc sheathed copex and test electrical

installation to SANS 10142 and issue COC

certificates No. 3

Other

18.29 Any other items required for the successful

completion of the work but not included in this

bill of quantities. Please specify :

Carried to Collection

SUBTOTAL

SUB-TOTAL FOR BILL WET SERVICES

MECHANICAL SERVICES

OCTOBER 2016 127

Page 128: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

SPACE HEATING INSTALLATIONS-M2(2)

(a) This part of the BoQ must be priced by a specialist

HVAC sub-contractors to reduce failure

due financial risk.

(b) The main contractor shall provide a CV or brochure

for a specialist HVAC sub-contractor before

work starts for approval by engineer.

( c) Allow for the specialist HVAC sub-contractor

to visit the site and take measurements Sum 1

(d) Allow for production of factory shop drawings Sum 1

( e) Allow for submission of brochures and Data Sheet

for equipment to be supplied before equipment is

purchased Pricing of this BOQ must be done by

hvac specialist to reduce failure due to financial

risk

(f) Specialist to produce shop floor drawings to be

approved by the engineer

(g) Contractor must carefully study the DID, GP SQS

specifications, project specification, SANS

standards and the site before submitting

tenders.Contractors will be expected to submit

SABS Mark samples and SABS certificates before

purchasing all materials.

Carried to Collection

SPACE HEATING

JULY 2016 128

Page 129: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

1.0 3000l Hot Water Storage Tank with insulation c/w

cladding to DID SQS standards specification

and Heating Element 36kW as backup or approved

Working Pressure -400kPa

Supply No 1

Install No 1

2.0 Hot Water Pumps

Variable speed Circulating Pump

Liquid temperature Range -Upto 100 degrees

Working Pressure -TBC

Flow rate-64l/min or approved

2.1 Supply No 2

2.2 Install No 2

3.0 Solar Panels:Thermal Solar Collectors

Type ;Evacuated Tubes

Capacity: 3000litres/6hour to 100 deg C including

Mounting stands or approved

3.1 Supply Sum lot

3.2 Install Sum lot

3.3 Allow for a plinth and palisade fencing for storage Sum 1

tank and pumps ;Size-3000X2000x300mm

4.0 Space Heating ;Fan Coil Units

2.7 Kw

4.1 Supply No 4

4.2 Install No 4

3.9 Kw

4.3 Supply No 2

4.4 Install No 2

1.8Kw

4.5 Supply No 1

4.6 Install No 1

5.5 Kw

4.7 Supply No 1

4.8 Install No 1

4.8 Kw

4.9 Supply No 2

4.10 Install No 2

25mm Isolation Valves

5.1 Supply No 20

5.2 Install No 20

54mm Isolation Valves

5.3 Supply No 2

5.4 Install No 2

Carried to Collection

SPACE HEATING

JULY 2016 129

Page 130: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

6.0 On/off 220v Motorized Actuator

6.1 Supply No 10

6.2 Install No 10

Control Panels c/w sensors and timers

6.3 Supply Sum lot

6.4 Install Sum lot

7.0 Pipes

InsulationType -Superlon or approved by Engineer

Insulation Working Temperature- Upto 105 Degrees

7.1 Supply and install

7.2 25mm Copper Pipe superlon insulated m 140

7.3 54mm Copper Pipe superlon insulated m 200

8.0 Bends

8.1 Supply and install Superlon Insulated

8.2 25mm 90 deg bend no. 16

8.4 54mm 90 deg bend no. 6

9.0 Reducers

9.1 Supply and install Superlon Insulated

9.5 54 to 25mm no. 2

9 Pipe hangers

Supply Sum lot

Install Sum lot

9.1 54mm Strainers

Supply No 2

Install No 2

9.2 Thermostatic mixing valve maintain temperature

at 83-85 degree celcius

Supply No 10

Install No 10

9.3 Central programmer to provide overall on/off control

Supply No 1

Install No 1

9.4 Programmable Room thermostats

Supply No 10

Install No 10

Carried to Collection

SPACE HEATING

JULY 2016 130

Page 131: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

BLOCK B

1.0 3000l Hot Water Storage Tank with insulation c/w

cladding to DID SQS standards specification

and a Heating Element 36kW as backup or approved

Working Pressure -400kPa

Supply No 1

Install No 1

2.0 Hot Water Pumps

Variable speed Circulating Pump

Working Pressure -TBC

Flow rate-80l/min or approved

2.1 Supply No 2

2.2 Install No 2

3.0 Solar Panels:Thermal Solar Collectors

Type ;Evacuated Tubes

Capacity: 3000litres/6hour to 100 deg C including

Mounting stands or approved

3.1 Supply Sum lot

3.2 Install Sum lot

3.3 Allow for a plinth and palisade fencing for storage Sum 1

tank and pumps ;Size-3000X2000x300mm

4.0 Space Heating :Fan Coil Units

3.1 Kw

4.1 Supply No 7

4.2 Install No 7

1.9 Kw

4.3 Supply No 2

4.4 Install No 2

4.8Kw

4.5 Supply No 2

4.6 Install No 2

10Kw

4.7 Supply No 1

4.8 Install No 1

25mm Isolation Valves

4.9 Supply No 22

4.10 Install No 22

54mm isolation Valves

5.1 Supply No 2

5.2 Install No 2

On/off 220v Motorized Actuator

5.3 Supply No 11

5.4 Install No 11

6.0 Control Panels c/w sensors and timers

6.1 Supply Sum lot

6.2 Install Sum lot

Carried to Collection

SPACE HEATING

JULY 2016 131

Page 132: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

7.0 Pipes

InsulationType -Superlon or approved by Engineer

Insulation Working Temperature- Upto 105 Degrees

7.1 Supply and install

7.2 25mm Copper Pipe superlon insulated m 200

7.3 54mm Copper Pipe superlon insulated m 160

8.1 Supply and install Superlon Insulated

8.2 25mm 90 deg bend superlon insulated no. 24

8.4 54mm 90 deg bend superlon insulated no. 8

8.5 Reducers

8.6 Supply and install Superlon Insulated

8.7 54 to 25mm superlon insulated no. 2

9 Pipe hangers

Supply Sum lot

Install Sum lot

9.1 54mm Strainers

Supply No 2

Install No 2

9.2 Thermostatic mixing valve maintain temperature

at 83-85 degree celcius

Supply No 11

Install No 11

9.3Central programmer to provide overall on/off control

Supply No 1

Install No 1

9.4 Programmable Room thermostats

Supply No 11

Install No 11

Carried to Collection

SPACE HEATING

JULY 2016 132

Page 133: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

BLOCK C

1.0 2800l Hot Water Storage Tank with insulation c/w

cladding to DID SQS standards specification

and a Heating element 36kw as backup or approved

Working Pressure -400kPa

Supply No 1

Install No 1

2.0 Hot Water Pumps

Variable speed Circulating Pump

Liquid temperature Range -Upto 100 degrees

Working Pressure -TBC

Flow rate-22l/min or approved

2.1 Supply No 2

2.2 Install No 2

3.0 Solar Panels:Thermal Solar Collectors

Type ;Evacuated Tubes

Capacity: 2800litres/6hour to 100 deg C including

Mounting stands or approved

3.1 Supply Sum lot

3.2 Install Sum lot

3.3 Allow for a plinth and palisade fencing for storage Sum 1

tank and pumps ;Size-3000X2000x300mm

4.0

Space Heating ;Fan Coil Units

4.1 3 Kw

4.2 Supply No 4

Install No 4

4.7 25mm Isolation Valves

4.8 Supply No 8

Install No 8

4.9 54mm Isolation Valves

4.10 Supply No 2

Install No 2

5.1 On/off 220v Motorized Actuator

5.2 Supply No 4

Install No 4

Control Panels c/w sensors and timers

5.3 Supply Sum lot

5.4 Install Sum lot

Carried to Collection

SPACE HEATING

JULY 2016 133

Page 134: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

6.0 Pipes

InsulationType -Superlon or approved by Engineer

Insulation Working Temperature- Upto 105 Degrees6.1 Supply and install

6.3 25mm Copper Pipe insulated pipes m 60

6.4 54mm Copper Pipe insulated pipes m 60

7.0 Bends

7.1 Supply and install Superlon insulated

7.2 25mm 90 deg bend insulated no. 32

7.4 54mm 90 deg bend insulated no. 6

8.0 Reducers

8.1 Supply and install Superlon insulated

8.2 54 to 25mm insulated no. 2

9 Pipe hangers

Supply Sum lot

Install Sum lot

9.1 54mm Strainers

Supply No 2

Install No 2

9.2 Thermostatic mixing valve maintain temperature

at 83-85 degree celcius

Supply No 4

Install No 4

9.3 Central programmer to provide overall on/off control

Supply No 1

Install No 1

9.4 Programmable Room thermostats

Supply No 4

Install No 4

Carried to Collection

SPACE HEATING

JULY 2016 134

Page 135: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

BLOCK D

1.0 2800l Hot Water Storage Tank with insulation c/w

cladding to DID SQS standards specification

and a Heating element 36kW as backup or approved

Working Pressure -400kPa

Supply No 1

Install No 1

2.0 Hot Water Pumps

Variable speed Circulating Pump

Liquid temperature Range -Upto 100 degrees

Working Pressure -TBC

Flow rate-23l/min or approved

2.1 Supply No 2

2.2 Install No 2

3.0 Solar Panels:Thermal Solar Collectors

Type ;Evacuated Tubes

Capacity: 2800l/6hour to 100 deg C including

Mounting stands or approved

3.1 Supply Sum lot

3.2 Install Sum lot

3.3 Allow for a plinth and palisade fencing for storage Sum lot

tank and pumps ;Size-3000X2000x300mm

4.0 Space Heating ;Fan Coil Unit

5.2 Kw

4.1 Supply No 1

4.2 Install No 1

3.8 Kw

4.3 Supply No 2

4.4 Install No 2

15mm isolation Valves

4.5 Supply No 6

4.6 Install No 6

54mm isolation Valves

4.7 Supply No 2

4.8 Install No 2

On/off 220v Motorized Actuator

4.9 Supply No 3

4.10 Install No 3

Control Panels c/w sensors and timers

5.1 Supply Sum lot

5.2 Install Sum lot

Pipes

InsulationType -Superlon or approved by Engineer

Insulation Working Temperature- Upto 105 Degrees

6.0 Supply and install

6.1 25mm Copper Pipe Superlon insulated m 50

6.2 54mm Copper Pipe Superlon insulated m 50

Carried to Collection

SPACE HEATING

JULY 2016 135

Page 136: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

7.0 Bends

7.1 Supply and install Superlon insulated

7.2 25mm 90 deg bend insulated no. 80

7.3 54mm 90 deg bend insulated no. 10

8.0 Reducers

8.1 Supply and install Superlon insulated

8.2 54 to 25mm insulated no. 6

9 Pipe hangers

Supply Sum lot

Install Sum lot

9.1 54mm Strainers

Supply No 2

Install No 2

9.2 Thermostatic mixing valve maintain temperature

at 83-85 degree celcius

Supply No 3

9.3Central programmer to provide overall on/off control

Supply No 1

Install No 1

9.4 Programmable Room thermostats

Supply No 3

Install No 3

Carried to Collection

SPACE HEATING

JULY 2016 136

Page 137: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

BLOCK E-GIRLS HOSTEL

1.0 2800l Hot Water Storage Tank with insulation c/w

cladding to DID SQS standards specification

and Heating element 36kW as backup or approved

Working Presure -400kPa

Install No 1

Install No 1

2.0 Hot Water Pumps

Variable speed Circulating Pump

Liquid temperature Range -Upto 100 degrees

Working Pressure -TBC

Flow rate-70l/min or approved

2.1 Supply No 2

2.2 Install No 2

3.0 Solar Panels:Thermal Solar Collectors

Type ;Evacuated Tubes

Capacity: 2800litres /6hour to 100 deg C including

Mounting stands or approved

3.1 Supply No

3.2 Install No

3.3 Allow for a plinth and palisade fencing for storage Sum lot

tank and pumps ;Size-3000X2000x300mm

4.0 Space Heating Radiators

6.6Kw

4.1 Supply No 4

4.2 Install No 4

12.5 Kw

4.3 Supply No 4

4.4 Install No 4

25mm Valves

4.7 Supply No 16

4.8 Install No 16

54mm Valves

4.9 Supply No 2

4.10 Install No 2

On/off 220v Motorized Actuator

5.1 Supply No 8

5.2 Install No 8

Control Panels c/w sensors and timers

5.3 Supply Sum lot

5.4 Install Sum lot

Carried to Collection

SPACE HEATING

JULY 2016 137

Page 138: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

6.0 Pipes

InsulationType -Superlon or approved by Engineer

Insulation Working Temperature- Upto 105 Degrees6.1 Supply and install

6.2 25mm Copper Pipe superlon insulated m 160

6.3 54mm Copper Pipe superlon insulated m 160

7.0 Bends

7.1 Supply and install superlon insulated

7.2 25mm 90 deg bend no. 16

7.3 54mm 90 deg bend no. 6

8.0 Reducers

8.1 Supply and install superlon insulated

8.6 54 to 25mm no. 6

9 Pipe hangers

Supply Sum lot

Install Sum lot

9.2 54mm Strainers

Supply No 2

Install No 2

9.3 Thermostatic mixing valve maintain temperature

at 83-85 degree celcius

Supply No 8

Install No 8

9.4Central programmer to provide overall on/off control

Supply No 1

Install No 1

9.5 Programmable Room thermostats

Supply No 8

Install No 8

Carried to Collection

SPACE HEATING

JULY 2016 138

Page 139: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

BLOCK F

1.0 2800l Hot Water Storage Tank with insulation c/w

cladding to DID SQS standards specification

and a Heating element 36kW as backupor approved

working Pressure -400kPa

Supply No 1

Install No 1

2.0 Hot Water Pumps

Variable speed Circulating Pump

Liquid temperature Range -Upto 100 degrees

Working Pressure -TBC

Flow rate-23l/min or approved

2.1 Supply No 2

2.2 Install No 2

3.0 Solar Panels:Thermal Solar Collectors

Type ;Evacuated Tubes

Capacity: 2800litres/6hour to 100 deg C including

Mounting stands or approved

3.1 Supply Sum lot

3.2 Install Sum lot

3.3 Allow for a plinth and palisade fencing for storage No 1

tank and pumps ;Size-3000X2000x300mm

4.0 Space Heating Radiators:

3.1 Kw

4.1 Supply No 4

4.2 Install No 4

25mm Valves

4.3 Supply No 8

4.4 Install No 8

54mm Valves

4.5 Supply No 2

4.6 Install No 2

On/off 220v Motorized Actuator

4.7 Supply No 4

4.8 Install No 4

Control Panels c/w sensors and timers

4.9 Supply Sum lot

4.10 Install Sum lot

5.0 Pipes

InsulationType -Superlon or approved by Engineer

Insulation Working Temperature- Upto 105 Degrees

5.1 Supply and install

5.2 25mm Copper Pipe Superlon insulated m 60

5.3 54mm Copper Pipe Superlon insulated m 120

Carried to Collection

SPACE HEATING

JULY 2016 139

Page 140: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

6.0 Bends

6.1 Supply and install Superlon insulated

6.2 25mm 90 deg bend insulated no. 16

6.3 54mm 90 deg bend insulated no. 6

6.4

Reducers

7.0 Supply and install Superlon insulated

7.5 54 to 25mm insulated no. 2

9 Pipe hangers

Supply sum lot

Install sum lot

9.1 54mm Strainers

Supply No 2

Install No 2

9.2 Thermostatic mixing valve maintain temperature

at 83-85 degree celcius

Supply No 4

Install No 4

9.3Central programmer to provide overall on/off control

Supply No 1

Install No 1

9.4 Programmable Room thermostats

Supply No 4

Install No 4

Carried to Collection

SPACE HEATING

JULY 2016 140

Page 141: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

BLOCK G

1.0 2800l Hot Water Storage Tank with insulation c/w

cladding to DID SQS standards specification

and Heating element 36kW as backup or approved

Working Pressure -400kPa

Supply No 1

Install No 1

2.0 Hot Water Pumps

Variable speed Circulating Pump

Liquid temperature Range -Upto 100 degrees

Working Pressure -TBC

Flow rate-23l/min

2.1 Supply No 2

2.2 Install No 2

3.0 Solar Panels:Thermal Solar Collectors

Type ;Evacuated Tubes

Capacity: 2800litres/6hour to 100 deg C including

Mounting stands or approved

3.1 Supply sum lot

3.2 Install sum lot

3.3 Allow for a plinth and palisade fencing for storage No 1

tank and pumps ;Size-3000X2000x300mm

4.0 Space Heating :Fan Coil Units

3.1 Kw

4.1 Supply No 4

4.2 Install No 4

25mm Isolation Valves

4.3 Supply No 8

4.4 Install No 8

54mm isolation Valves

4.5 Supply No 2

4.6 Install No 2

On/off 220v Motorized Actuator

4.7 Supply No 8

4.8 Install No 8

Control Panels c/w sensors and timers

4.9 Supply Sum lot

4.10 Install Sum lot

5.0 Pipes

InsulationType -Superlon or approved by Engineer

Insulation Working Temperature- Upto 105 Degrees

5.1 Supply and install

5.2 25mm Copper Pipe Superlon insulated m 60

5.3 54mm Copper Pipe Superlon insulated m 120

Carried to Collection

SPACE HEATING

JULY 2016 141

Page 142: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

6.0 Bends

6.1 Supply and install Superlon insulated

6.2 22mm 90 deg bend no. 16

6.3 54mm 90 deg bend no. 6

7.0 Reducers

7.1 Supply and install Superlon insulated

7.2 54 to 32mm no. 4

9 Pipe hangers

Supply Sum lot

Install Sum lot

9.1 54mm Strainers

Supply No 2

Install No 2

9.2 Thermostatic mixing valve maintain temperature

at 83-85 degree celcius

Supply No 4

Install No 4

9.3Central programmer to provide overall on/off control

Supply No 1

Install No 1

9.4 Programmable Room thermostats

Supply No 4

Install No 4

Carried to Collection

SPACE HEATING

JULY 2016 142

Page 143: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

CR 200

1.0 2800l Hot Water Storage Tank with insulation c/w

cladding to DID SQS standards specification and

a Heating element 36kW as backup or approved

Working Pressure -400kPa

Supply No 1

Install No 1

2.0 Hot Water Pumps

Variable speed Circulating Pump

Liquid temperature Range -Upto 100 degrees

Working Pressure -TBC

Flow rate-45l/min

2.1 Supply No 2

2.2 Install No 2

3.0 Solar Panels:Thermal Solar Collectors

Type ;Evacuated Tubes

Capacity: 2800litres/6hour to 100 deg C including

Mounting stands or approved

3.1 Supply sum lot

3.2 Install sum lot

3.3 Allow for a plinth and palisade fencing for storage No 1

tank and pumps ;Size-3000X2000x300mm

4.0 Space Heating Radiator

1.17 Kw

4.1 Supply No 2

4.2 Install No 2

1.338 Kw

4.3 Supply No 2

4.4 Install No 2

2.64Kw

Supply No 2

Install No 2

3.036Kw

Supply No 2

Install No 2

3.6Kw

Supply No 2

Install No 2

4.068Kw

Supply No 2

Install No 2

4.5Kw

Supply No 2

Install No 2

Carried to Collection

SPACE HEATING

JULY 2016 143

Page 144: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

5.7Kw

Supply No 2

Install No 2

25mm Isolation Valves

4.5 Supply No 32

4.6 Install No 32

54mm isolation Valves

4.7 Supply No 2

4.8 Install No 2

On/off 220v Motorized Actuator

4.9 Supply No 16

4.10 Install No 16

Control Panels c/w sensors and timers

5.1 Supply Sum lot

5.2 Install Sum lot

6.0 Pipes

InsulationType -Superlon or approved by Engineer

Insulation Working Temperature- Upto 105 Degrees

6.1 Supply and install

6.3 25mm Copper Pipe Superlon insulated m 80

6.2 54mm Copper Pipe Superlon insulated m 180

6.0 Bends

6.1 Supply and install Superlon insulated

6.2 25mm 90 deg bend no. 16

6.3 54mm 90 deg bend no. 6

7.0 Reducers

7.1 Supply and install Superlon insulated

7.6 54 to 25mm no. 4

9 Pipe hangers

Supply sum lot

Install sum lot

9.1 25mm Strainers

Supply No 2

Install No 2

9.2 Thermostatic mixing valve maintain temperature

at 83-85 degree celcius

Supply No 16

Install No 16

Carried to Collection

SPACE HEATING

JULY 2016 144

Page 145: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

9.3 Central programmer to provide overall on/off control

Supply No 1

Install No 1

9.4 Programmable Room thermostats

Supply No 16

Install No 16

Carried to Collection

SPACE HEATING

JULY 2016 145

Page 146: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

CR 100

1.0 2800l Hot Water Storage Tank with insulation c/w

cladding to DID SQS standards specification

and Heating element 36Kw as backup or approved

Working Pressure -400kPa

Supply No 1

Install No 1

2.0 Hot Water Pumps

Variable speed Circulating Pump

Liquid temperature Range -Upto 100 degrees

Working Pressure -TBC

Flow rate-130l/min

2.1 Supply No 2

2.2 Install No 2

3.0 Solar Panels:Thermal Solar Collectors

Type ;Evacuated Tubes

Capacity: 2800litres/6hour to 100 deg C including

Mounting stands or approved

3.1 Supply Sum Lot

3.2 Install sum lot

3.3 Allow for a plinth and palisade fencing for storage No 1

tank and pumps ;Size-3000X2000x300mm

4.0 Space Heating ;Radiators

2.52 Kw

4.1 Supply No 24

4.2 Install No 24

4.3 25mm isolation Valves

Supply No 56

Install No 56

54mm isolation Valves

5.3 Supply No 2

5.4 Install No 2

6.0 On/off 220v Motorized Actuator

6.1 Supply No 18

6.2 Install No 18

Control Panels c/w sensors and timers

6.3 Supply Sum lot

6.4 Install Sum lot

Carried to Collection

SPACE HEATING

JULY 2016 146

Page 147: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

7.0 Pipes

InsulationType -Superlon or approved by Engineer

Insulation Working Temperature- Upto 105 Degrees

7.1 Supply and install

7.2 25mm Copper Pipe Superlon insulated m 200

7.3 54mm Copper Pipe Superlon insulated m 180

8.0 Bends

8.1 Supply and install Superlon insulated

8.2 25mm 90 deg bend no. 32

8.4 54mm 90 deg bend no. 10

9.0 Reducers

9.1 Supply and install Superlon insulated

9.2 54 to 25mm no. 2

9.3 Pipe hangers

Supply Sum lot

Install Sum lot

9.4 54mm Strainers

Supply No 2

Install No 2

9.5 Thermostatic mixing valve maintain temperature

at 83-85 degree celcius

Supply No 18

Install No 18

9.6 Central programmer to provide overall on/off control

Supply No 1

Install No 1

9.7 Programmable Room thermostats

Supply No 18

Install No 18

Carried to Collection

SPACE HEATING

JULY 2016 147

Page 148: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

CR300

1.0 2800l Hot Water Storage Tank with insulation c/w

cladding to DID SQS standards specification

with Heating element 36Kw as backup or approved

Working Pressure -400kPa

Supply No 1

Install No 1

2.0 Hot Water Pumps

Variable speed Circulating Pump

Liquid temperature Range -Upto 100 degrees

Working Pressure -TBC

Flow rate-90l/min

2.1 Supply No 2

2.2 Install No 2

3.0 Solar Panels:Thermal Solar Collectors

Type ;Evacuated Tubes

Capacity: 2800litres/6hour to 100 deg C including

Mounting stands or approved

3.1 Supply sum lot

3.2 Install sum lot

3.3 Allow for a plinth and palisade fencing for storage No 1

tank and pumps ;Size-3000X2000x300mm

4.0 Space Heating ;Fan Coil Units

2.25 Kw

4.1 Supply No 8

4.2 Install No 8

1.86 Kw

4.3 Supply No 6

4.4 Install No 6

25mm isolation Valves

4.5 Supply No 28

4.6 Install No 28

54mm isolation Valves

4.7 Supply No 2

4.8 Install No 2

On/off 220v Motorized Actuator

4.9 Supply No 14

4.10 Install No 14

Control Panels c/w sensors and timers

5.1 Supply Sum lot

5.2 Install Sum lot

6.0 Pipes

InsulationType -Superlon or approved by Engineer

Insulation Working Temperature- Upto 105 Degrees

6.1 Supply and install

6.2 25mm Copper Pipe Superlon insulated m 140

6.3 54mm Copper Pipe Superlon insulated m 140

Carried to Collection

SPACE HEATING

JULY 2016 148

Page 149: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

7.0 Bends

7.1 Supply and install Superlon insulated

7.2 25mm 90 deg bend no. 20

7.3 54mm 90 deg bend no. 2

8.0 Reducers

8.1 Supply and install Superlon insulated

8.6 54 to 25mm insulated no. 4

9 Pipe hangers

Supply Sum lot

Install Sum lot

9.1 54mm Strainers

Supply No 2

Install No 2

9.2 Thermostatic mixing valve maintain temperature

at 83-85 degree celcius

Supply No 28

Install No 28

9.3Central programmer to provide overall on/off control

Supply No 1

Install No 1

9.4 Programmable Room thermostats

Supply No 28

Install No 28

Carried to Collection

SPACE HEATING

JULY 2016 149

Page 150: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

CR400

1.0 2800l Hot Water Storage Tank with insulation c/w

cladding to DID SQS standards specification

and Heating element 36kW as backup or approved

Working Pressure-400kPa

Supply No 1

Install No 1

2.0 Hot Water Pumps

Variable speed Circulating Pump

Liquid temperature Range -Upto 100 degrees

Working Pressure -TBC

Flow rate-62l/min

2.1 Supply No 2

2.2 Install No 2

3.0 Solar Panels:Thermal Solar Collectors

Type ;Evacuated Tubes

Capacity: 2800litres/6hour to 100 deg C including

Mounting stands or approved

3.1 Supply sum lot

3.2 Install sum lot

3.3 Allow for a plinth and palisade fencing for storage No 1

tank and pumps ;Size-3000X2000x300mm

4.0 Space Heating:Fan Coil Units

4.3Kw

4.1 Supply No 2

4.2 Install No 2

3.3Kw

Supply No 4

Install No 4

25mm isolation Valves

4.3 Supply No 12

4.4 Install No 12

54mm isolation Valves

4.5 Supply No 2

4.6 Install No 2

On/off 220v Motorized Actuator

4.7 Supply No 6

4.8 Install No 6

Control Panels c/w sensors and timers

4.9 Supply Sum lot

4.10 Install Sum lot

Carried to Collection

SPACE HEATING

JULY 2016 150

Page 151: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

5 Pipes

InsulationType -Superlon or approved by Engineer

Insulation Working Temperature- Upto 105 Degrees

5.1 Supply and install

5.2 25mm Copper Pipe Superlon insulated m 140

5.3 54mm Copper Pipe Superlon insulated m 160

6.0 Bends

6.1 Supply and install Superlon insulated

6.2 22mm 90 deg bend no. 12

6.3 54mm 90 deg bend no. 6

7.0 Reducers

7.1 Supply and install Superlon insulated

7.6 54 to 25mm no. 2

9.51 Pipe hangers

Supply Sum lot

Install Sum lot

9.6 54mm Strainers

Supply No 2

Install No 2

9.7 Thermostatic mixing valve maintain temperature

at 83-85 degree celcius

Supply No 6

Install No 6

9.8Central programmer to provide overall on/off control

Supply No 1

Install No 1

9.9 Programmable Room thermostats

Supply No 6

Install No 6

Carried to Collection

SPACE HEATING

JULY 2016 151

Page 152: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

CR500

1.0 2800l Hot Water Storage Tank with insulation c/w

cladding to DID SQS standards specification

and Heating element 36kW as backup or approved

Working Pressure -400kPa

Supply No 1

Install No 1

2.0 Hot Water Pumps

Variable speed Circulating Pump

Liquid temperature Range -Upto 100 degrees

Working Pressure -TBC

Flow rate-203l/min

2.1 Supply No 2

2.2 Install No 2

3.0 Solar Panels:Thermal Solar Collectors

Type ;Evacuated Tubes

Capacity: 2800l/6hour to 100 deg C including

Mounting stands or approved

3.1 Supply Sum lot

3.2 Install Sum lot

3.3 Allow for a plinth and palisade fencing for storage No 1

tank and pumps ;Size-3000X2000x300mm

4.0 Space Heating Radiators

2.52Kw

4.1 Supply No 10

4.2 Install No 10

1.86Kw

Supply No 8

Install No 8

25mm isolation Valves

4.3 Supply No 36

4.4 Install No 36

54mm Isolation Valves

4.5 Supply No 2

4.6 Install No 2

On/off 220v Motorized Actuator

4.7 Supply No 18

4.8 Install No 18

Control Panels c/w sensors and timers

4.9 Supply Sum lot

4.10 Install Sum lot

Carried to Collection

SPACE HEATING

JULY 2016 152

Page 153: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

5.0 Pipes

InsulationType -Superlon or approved by Engineer

Insulation Working Temperature- Upto 105 Degrees

5.1 Supply and install

5.2 25mm Copper Pipe Superlon insulated m 180

5.3 54mm Copper Pipe Superlon insulated m 180

6.0 Bends

6.1 Supply and install Superlon insulated

6.2 25mm 90 deg bend no. 16

6.3 54mm 90 deg bend no. 6

7.0 Reducers

7.1 Supply and install Superlon insulated

7.2 54 to 25mm no. 4

8 Pipe hangers

Supply sum lot

Install sum lot

8.1 54mm Strainers

Supply No 2

Install No 2

8.2 Thermostatic mixing valve maintain temperature

at 83-85 degree celcius

Supply No 18

Install No 18

8.3 Central programmer to provide overall on/off control

Supply No 1

Install No 1

8.4 Programmable Room thermostats

Supply No 18

Install No 18

Carried to Collection

SPACE HEATING

JULY 2016 153

Page 154: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

DINNING HALL

1.0 2800l Hot Water Storage Tank with insulation c/w

cladding to DID SQS standards specification

and Heating element 36kW as a backup or approved

Working Pressure -400kPa

Supply No 1

Install No 1

2.0 Hot Water Pumps

Variable speed Circulating Pump

Liquid temperature Range -Upto 100 degrees

Working Pressure -TBC

Flow rate-86l/min

2.1 Supply No 2

2.2 Install No 2

3.0 Solar Panels:Thermal Solar Collectors

Type ;Evacuated Tubes

Capacity: 3000litres/6hour to 100 deg C including

Mounting stands or approved

3.1 Supply Sum lot

3.2 Install Sum lot

3.3 Allow for a plinth and palisade fencing for storage No 1

tank and pumps ;Size-3000X2000x300mm

4.0 Space Heating ;Radiators

4.1 3.0Kw

4.2 Supply No 10

Install No 10

4.3 25mm Isolation Valves

4.4 Supply No 24

Install No 24

4.5 54mm IsolationValves

4.6 Supply No 2

Install No 2

4.7 On/off 220v Motorized Actuator

4.8 Supply No 16

Install No 16

4.9 Control Panels c/w sensors and timers

4.10 Supply Sum lot

Install Sum lot

Carried to Collection

SPACE HEATING

JULY 2016 154

Page 155: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

5.0 Pipes

InsulationType -Superlon or approved by Engineer

Insulation Working Temperature- Upto 105 Degrees

5.1 Supply and Install

5.2 25mm Copper Pipe Superlon insulated m 100

5.3 54mm Copper Pipe Superlon insulated m 100

6.0 Bends

6.1 Supply and Install Superlon insulated

6.2 25mm 90 deg bend no. 24

6.3 54mm 90 deg bend no. 6

7.0 Reducers

7.1 Supply and Install Superlon insulated

7.6 54 to 25mm no. 2

8 Pipe hangers

Supply Sum lot

Install Sum lot

8.1 54mm Strainers

Supply No 2

Install No 2

8.2 Thermostatic mixing valve to maintain temperature

at 83-85 degree celcius

Supply No 1

Install No 1

8.3Central programmer to provide overall on/off control

Supply No 1

Install No 1

8.4 Programmable Room thermostats

Supply No 16

Install No 16

Carried to Collection

SPACE HEATING

JULY 2016 155

Page 156: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

MEDIA CENTER

1.0 2400l Hot Water Storage Tank with insulation &

cladding to DID SQS standards specification

with Heating element 36kW as backup or approved

Working Pressure-400kpa

Supply No 1

Install No 1

2.0 Hot Water Pumps

Variable speed Circulating Pump

Liquid temperature Range -Upto 100 degrees

Working Pressure -TBC

Flow rate-20l/min

2.1 Supply No 2

2.2 Install No 2

3.0 Solar Panels:Thermal Solar Collectors

Type ;Evacuated Tubes

Capacity: 2400Litres /6hour to 60 deg C including

Mounting stands or approved

3.1 Supply Sum lot

3.2 Install Sum lot

3.3 Allow for a plinth and palisade fencing for storage No 1

tank and pumps ;Size-3000X2000x300mm

4.0 Underfloor Space Heating

4.1 Pipes

4.2 Supply and install

4.3 12mm Pex or Multilayer or PTFE pipes m 1232

4.4 25mm Pex or Multilayer or PTFE pipes m 8

4.1 Bends

4.2 Supply and install

4.3 15mm 90 deg bend no. 210

4.4 25mm 90 deg bend no. 0

no. 6

6.0 Reducers

6.1 Supply and install

6.2 25mm to 12mm no. 4

7 Pipe Fixing

Steel Mesh

Area-220 sqm

Supply Sum lot

Install Sum lot

7.1 Staples ,Clips,Wire

Supply Sum lot

Install Sum lot

Carried to Collection

SPACE HEATING

JULY 2016 156

Page 157: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

7.2 Manifold

Supply No 1

Install No 1

7.3 Floor Insulation

Supply Sum lot

Install Sum lot

7.4 Edge strip Insulation

Supply Sum lot

Install Sum lot

7.5 Temperature Mixing Valve to maintain temperature

of water @ 40-55 degrees celcius

Supply No 2

Install No 2

7.8 Actuactors

Supply No 2

Install No 2

7.9 Underfloor Pump

Supply No 2

Install No 2

8 Central Programmer for overall on/off control

Supply No 1

Install No 1

8.1 Zoned area Thermostats

Supply No 3

Install No 3

8.2 15mm Isolation Valves

8.4 Supply No 8

8.5 Install No 8

8.6 25mm Isolation Valves

8.7 Supply No 2

8.8 Install No 2

7.111 Injection Valves to inject water @ 40 -55 degrees

celcuis

Supply No 1

Install No 1

8.9 Allow for Removal of wooden floor panels Sum lot

9 Keep wooden floor panels in storeroom Sum lot

9.11 Transport back for reinstallation Sum lot

Carried to Collection

SPACE HEATING

JULY 2016 157

Page 158: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

9.12 Reinstate wooden floor as was before Sum lot

9.13 Sanding and sealing Sum lot

9.14 Allow for a cement additive Sum lot

9.15 Allow for feasibility study by hvac specilists lot Sum

9.17 Allow for specilist installation drawings lot sum

9.17b Allow for glycol as a heat transfer medium lot sum

Testing and Commissioning

9.18

Allow for testing of equipments and training of the end

user on all the equipment installation after completion.

Sum 1

Gurantee and Maintenance

9.19Provision of Guarantee of equipment and 12-month

maintenance period.

Sum 1

Operating and Maintenance Procedures

9.2Compilation and submission of Operation &

Maintenance procedures for all the Equipments.

No 4

9.3 completion of the work but not included in this bill of

quantities. Please specify: Sum 1

9.4 Testing and commission of the completed

installation Item 1

9.5 Attendance and profits on tests

9.6 Allow for inspections and measurements as

9.7 required for the shop drawings and detailed

9.8 design of installation 1

9.9 Allow for monthly site meetings and managing of

10 project and for senior supervision by a qualified

10.11 person 1

10.12 Allow for samples and technical information 1

10.13

Allow for record drawings and operating instructions 1

10.14 Allow for transportation/travelling charges 1

10.15 Allow for maintenance and specialist maintenance

10.16 as specified 1

10.17 Allow for 12 months guarantee in terms of the

Document 1

Carried to Collection

SPACE HEATING

JULY 2016 158

Page 159: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

10.18

Allow for all transport and rigging, lifting gear, cranes

etc, that may be required for moving of plant and

equipment setting out works 1

10.19 Allow for attendance on main contractor and for

switching off, removing all redundant items and

earthing to make supply safe and re-energise after

installation 1

AS-BUILT INFORMATION AND OPERATING AND

MAINTENANCE MANUALS

10.2 Obtaining of all available information, compiling,

reproducing and finalising three sets of as-built and

Operating and Maintenance manuals as specified in

Sb 05,01 and FF 03 and handing over to the Engineer 3

SHOP AND "AS BUILT" DRAWINGS

10.21 Allow for preparation of detailed, dimensioned shop

drawings and 'as built" drawings to the entire works

and all its components include for 3 copies of all

drawings for approval carring out corrections as

required by engineer No. 3

TRAINING

10.22 Presenting a training course for operators 1

10.23 Presenting training course for maintenance staff 1

INSPECTION OF SITE AND SITE MEASUREMENT

10.24 Allow for detailed inspection of the site,

site measurement and setting out as necessary to

carryout the contract and to provide detailed

dimensioned shop drawings of all works 1

EQUIPMENT SELECTIONS

10.25 Provide detailed selections and samples as

required for approval before installing

OPERATION AND MAINTENANCE MANUALS

10.26 Provide Operating and Maintenance Manuals:

including "as built" drawings and equpment

selection information No. 3

SERVICE INSTALLATIONS AND CONNECTIONS

10.27 Electrical work: carry out complete connection from

local isolator, connect and gland off with water

proofed pvc sheathed copex and test electrical

installation to SANS 10142 and issue COC

certificates No. 0

Carried to Collection

SPACE HEATING

JULY 2016 159

Page 160: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

10.28 Plumbing and drainage work: carry out complete

connection to water services and to drains, connect

SS flexible 15mm water connection installation and

with compression fitting for easy access- use

stainless steel for isolation of the ball valves(and

balls with viton seats)supply at each equipment item 0

10.29 Test the complete installation at full load and in

cooking mode and all associated components of

the installation in phases as the work proses as

work proceeds, demostrate and hand over to the

user; sign off at hand over as beingfully operational

and satisfactory Sum 1

Other

10.3 Any other items required for the successful

completion of the work but not included in this

bill of quantities. Please specify :

Carried to Collection

SUB-TOTAL FOR SPACE HEATING

CARRIED TO SUMMARY PAGE

SPACE HEATING

JULY 2016 160

Page 161: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

LG GAS INSTALLATIONS-M5

(a) This part of the BoQ must be priced by a specialist

LP Gas sub-contractors to reduce failure due

financial risk.

(b) The main contractor shall provide a CV or brochure

for a specialist LP gas sub-contractor before

work starts for approval by engineer.

( c) Allow for the specialist LP gas sub-contractor

to visit the site and take measurements Sum 1

(d) Allow for production of factory shop drawings Sum 1

( e) Allow for submission of brochures and datsheets for

equipment to before it is purchased

(f) Contractor must study carefully the DID, GP SQS

specifications, project specification, SANS

standards and the site before submitting

tenders.Contractors will be expected to submit

SABS Mark samples and SABS certificates before

purchasing all materials.

(g) All work should conform to the requirements of the

Standard Quality Specification for Liquefied

Petroleum Gas(LPG)-DID-E/M5 latest revision

LP Gas Installation

(h) All materials and workmanship for the LP Gas

installation shall be in accordance with SANS

10087:2008, SANS 1237:2007 and SANS 1156:2007

and is to be carried out by an approved, qualified and

registered LP Gas contractor.

Carried to Collection

LPG INSTALLATION

JULY 2016 161

Page 162: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

KITCHEN

Purpose-Made Gas Cylinder Cage

1.0 Allow for the supply and fixing of approved

lockable,purpose-made prefabricated,vandal proof

and robust steel cage enclosure for the LP Gas

cylinder containers capable of housing a maximum

of 4-off standard 48kg Gas cylinder containers,

manifold and associated valves, pigtails, piping

and fittings.

Supply No 1

Install No 1

LP Gas Pipe Manifold

1.1 Allow for fixing of LP Gas pipe mainifold support

brackets to wall in LP Gas containers enclosure,

including flexible hose connections to 4 No LP gas

containers, support chains and clamps, etc,

for containers. Sum 1

Regulator

1.2 Low pressure first stage gas regulator. No 1

Valves

1.3 Shut-off valves in LP Gas cage enclosure. No 4

1.4 Changeover valve in LP Gas container enclosure. No 1

1.5 Isolating valves to kitchen appliances. No 1

1.6 Allow for emergency shut-off valve in kitchen. No 1

Carried to Collection

LPG INSTALLATION

JULY 2016 162

Page 163: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

2.0 Pipework

Copper Piping

LP Gas grade Class 1 minimum copper pipes to

SANS 460 and SANS 1067 with capillary type

soldered joints done in accordance with the

manufacturer's specifications, and installed in

accordance with SANS 10400:2011 and SANS

10252-1:2004, including couplers in the running

length, and all necessary supports, fixing, brackets,

saddles, holderbats, etc, and colour-coded in

accordance with SANS 10140-3:2003. Installation

to comply with the Department's document GP/M2

Rev 1.

2.1 15mm diameter pipe fixed to walls. m 40

Extra over LP Gas copper pipework for fittings, as

shown on the LP Gas drawing:

2.2 22mm diameter tees, reducers, plugs, bends, etc. Sum 1

Composite Piping

2.3 2025mm composite LP Gas piping fixed to external

walls. m 40

Extra over LP Gas copper pipework for fittings,

as shown on the LP Gas drawing:

2.4 2025mm diameter bends, tees, reducers, plugs,

etc. Sum 1

2.5 Muti-layer / Composite to copper pipe connector. No 1

Fire Extinguisher

3.0 Supply and install 10kg Carbon Dioxide (CO2) type

fire extingusher

3.1 Supply No. 1

Install No. 1

3.2 Supply and install a tamper proof translucent

polycarbonate enclosure for the 10 kg Carbon Dioxide

(CO2) Fire Extinguisher

3.3 Supply No. 13.4 Install No. 1

Carried to Collection

LPG INSTALLATION

JULY 2016 163

Page 164: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Photoluminescent signage and warning notices in

accordance with SANS 1186-1:2008, and

incorporating the pictographs in the standard,

size 150 x 150mm, securely fixed to wall or gate at

the LP Gas cylinders enclosure:

4.1 Type F13 red figure on white background with 4mm

red border line: Fire extinguisher. No 1

4.2 Type PV1, black figure on white background with

4mm red circular border line: Smoking prohibited. No 1

4.3 Type PV2, black figure on white background with

4mm red circular border line: Fire and open flames

prohibited. No 1

4.4 Type PV27, black figure on white background with

4mm red circular border line: Cellphone prohibited. No 1

Carried to Collection

LPG INSTALLATION

JULY 2016 164

Page 165: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

HOME ECONOMICS

1.0 Allow for the supply and fixing of approved

lockable,purpose-made prefabricated,vandal proof

and robust Steel Cage enclosure for the LP Gas

Cylinder containers capable of housing a maximum

of 6-off standard 48kg Gas cylinder containers,

manifold and associated valves, pigtails, piping

and fittings. No 1

LP Gas Pipe Manifold

1.1 Allow for fixing of LP Gas pipe mainifold support

brackets to wall in LP Gas containers enclosure,

including flexible hose connections to 6 No LP gas

containers, support chains and clamps, etc,

for containers. Sum 1

Regulator

1.2 Low pressure first stage gas regulator. No 1

Valves

1.3 Shut-off valves in LP Gas cage enclosure. No 6

1.4 Changeover valve in LP Gas container enclosure. No 1

1.5 Isolating valves to Kitchen appliances. No 1

1.6 Allow for emergency shut-off valve in Kitchen. No 1

Carried to Collection

LPG INSTALLATION

JULY 2016 165

Page 166: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

2.0 Pipework

Copper Piping

LP Gas grade Class 1 minimum copper pipes to

soldered joints done in accordance with the

manufacturer's specifications, and installed in

accordance with SANS 10400:2011 and SANS

10252-1:2004, including couplers in the running

length, and all necessary supports, fixing, brackets,

saddles, holderbats, etc, and colour-coded in

accordance with SANS 10140-3:2003. Installation

to comply with the Department's document GP/M2

Rev 1.

2.1 15mm diameter pipe fixed to walls. m 90

Extra over LP Gas copper pipework for fittings, as

shown on the LP Gas drawing:

2.2 22mm diameter tees, reducers, plugs, bends, etc. Sum 1

Composite Piping

2.3 2025mm composite LP Gas piping fixed to external

walls. m 90

Extra over LP Gas copper pipework for fittings,

as shown on the LP Gas drawing:

2.4 2025mm diameter bends, tees, reducers, plugs,

etc. Sum 1

2.5 Muti-layer / Composite to copper pipe connector. No 1

Fire Extinguisher

3.0 Supply and install 10kg Carbon Dioxide (CO2) type

fire extingusher

3.1 Supply No. 1

3.2 Supply and install a tamper proof translucent

polycarbonate enclosure for the 10 kg Carbon Dioxide

(CO2) Fire Extinguisher

3.3 Supply No. 13.4 Install No. 1

Carried to Collection

LPG INSTALLATION

JULY 2016 166

Page 167: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

4.0 Signage

Photoluminescent signage and warning notices in

accordance with SANS 1186-1:2008, and

incorporating the pictographs in the standard,

size 150 x 150mm, securely fixed to wall or gate at

the LP Gas cylinders enclosure:

4.1 Type F13 red figure on white background with 4mm

red border line: Fire extinguisher. No 1

4.2 Type PV1, black figure on white background with

4mm red circular border line: Smoking prohibited. No 1

4.3 Type PV2, black figure on white background with

4mm red circular border line: Fire and open flames

prohibited. No 1

4.4 Type PV27, black figure on white background with

4mm red circular border line: Cellphone prohibited. No 1

Testing and Commissioning

5.0 Allow for testing of entire LP Gas installation after

completion and provide a signed certificate in an

aluminium frame with transparent protective

material in front. Sum 1

Operating and Maintenance Procedures

Compilation and submission of 4 No. Operation &

Maintenance procedures for the LP Gas

installation. No 4

Carried to Collection

LPG INSTALLATION

JULY 2016 167

Page 168: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

5.01 Any other items required for the successful

completion of the work but not included in this bill of

quantities. Please specify: Sum 1

5.03 Attendance and profits on tests

5.04 Allow for inspections and measurements as

5.05 required for the shop drawings and detailed

design of installation 1

5.06 Allow for monthly site meetings and managing of

project and for senior supervision by a qualified

person 1

5.07 Allow for samples and technical information 1

5.08 Allow for record drawings and operating instructions 1

5.09 Allow for transportation/travelling charges 1

5.10 Allow for maintenance and specialist maintenance

as specified 1

5.11 Allow for 12 months guarantee in terms of the

Document 1

5.12 Allow for all transport and rigging, lifting gear, cranes

etc, that may be required for moving of plant and

equipment setting out works 1

5.13 Allow for attendance on main contractor and for

switching off, removing all redundant items and

earthing to make supply safe and re-energise after

installation 1

AS-BUILT INFORMATION AND OPERATING AND

MAINTENANCE MANUALS

5.14 Obtaining of all available information, compiling,

reproducing and finalising three sets of as-built and

Operating and Maintenance manuals as specified in

Sb 05,01 and FF 03 and handing over to the Engineer 3

SHOP AND "AS BUILT" DRAWINGS

5.15 Allow for preparation of detailed, dimensioned shop

drawings and 'as built" drawings to the entire works

and all its components include for 3 copies of all

drawings for approval carring out corrections as

required by engineer No. 3

TRAINING

5.16 Presenting a training course for operators 1

5.17 Presenting training course for maintenance staff 1

Carried to Collection

LPG INSTALLATION

JULY 2016 168

Page 169: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

INSPECTION OF SITE AND SITE MEASUREMENT

5.18 Allow for detailed inspection of the site,

site measurement and setting out as necessary to

carryout the contract and to provide detailed

dimensioned shop drawings of all works 1

EQUIPMENT SELECTIONS

required for approval before installing

OPERATION AND MAINTENANCE MANUALS

5.20, Provide Operating and Maintenance Manuals:

including "as built" drawings and equpment

selection information No. 3

SERVICE INSTALLATIONS AND CONNECTIONS

5.21 Electrical work: carry out complete connection from

local isolator, connect and gland off with water

proofed pvc sheathed copex and test electrical

installation to SANS 10142 and issue COC

certificates No. 0

5.22 Plumbing and drainage work: carry out complete

connection to water services and to drains, connect

SS flexible 15mm water connection installation and

with compression fitting for easy access- use

stainless steel for isolation of the ball valves(and

balls with viton seats)supply at each equipment item 0

5.23 Test the complete installation at full load and in

cooking mode and all associated components of

the installation in phases as the work proses as

work proceeds, demostrate and hand over to the

user; sign off at hand over as beingfully operational

and satisfactory Sum 1

Other

5.24 Any other items required for the successful

completion of the work but not included in this

bill of quantities. Please specify :

Carried to CollectionSUB-

TOTA SUB-TOTAL FOR LPG

CARRIED TO SUMMARY PAGE

LPG INSTALLATION

JULY 2016 169

Page 170: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEAPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

HVAC INSTALLATIONS-M6

(a) This part of the BoQ must be priced by a specialist

HVAC sub-contractors to reduce failure due

financial risk.

(b) The main contractor shall provide a CV or brochure

for a specialist hvac sub-contractor before

work starts for approval by engineer.

( c) Allow for the specialist hvac sub-contractor

to visit the site and take measurements Sum 1

(d) Allow for production of factory shop drawings Sum 1

( e) Allow for submission of brochures for equipment to

be purchased before equipment is purchased

(f) Contractor must study carefully the DID, GP SQS

specifications, project specification, SANS

standards and the site before submitting

tenders.Contractors will be expected to submit

SABS Mark samples and SABS certificates before

purchasing all materials.

(g) All work should conform to the requirements of the

Standard Quality Specification for Ventilation

and Air Conditioning -DID-E/M6 latest revision

1 HVAC INSTALLATION

Space Heating -Air Conditioning GP/M6

Contractor must study the DID, GP SQS specifications,

ADMIN BUILDING

(Removals)

AB 100 (all mechanical equipment to be removed within

a Disconnect Wall mounted heaters No. 6

b Disconnect Air conditioning Units (Midwall Unit

Console Unit and any AC of any other type

including all piping and any other equipment related

c to such exiting installation. No. 3

d Disconnect Existing Ceiling Fans No. 3

e Disconnect electric geyser, piping and all the

existing associated accessories. No. 1

Carried to Collection

HVAC

JULY 2016 170

Page 171: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEAPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

f Removal of Wall mounted heaters No. 6

g Removal of Air conditioning Units (Midwall Unit

Console Unit and any AC of any other type

including all piping and any other equipment related

h to such exiting installation. No. 3

i Removal of Existing Ceiling Fans No. 3

j Removal of electric geyser, piping and all the

existing associated accessories. No. 1

l Transport Wall mounted heaters to storage No. 6

m Transport Air conditioning Units (Midwall Unit

Console Unit and any AC of any other type

including all piping and any other equipment related

n to such exiting installation to storage No. 3

o Transport Existing Ceiling Fans to storage No. 3

l Transportelectric geyser, piping and all the

existing associated accessories to storage No. 1

2 (New Installations)

Supply, install, test and commission a VRV heat

recovery type air cooled air conditioning system,

including refrigerant piping, insulation and all other

necessary accessories to ensure a functional AC

All pipes to be run within trunking

Outdoor Units

2.01 20 kW Heating and Cooling Capacity

Supply No. 2

Install No. 2

2.02 Isolator at Condenser -Electrician to bring

power to isolator

Supply No. 1

install No. 1

2.03 1.1 kW Midwall Unit

Supply No. 1

Install No. 1

2.04 2.1 kW Midwall Unit

Supply No. 6

Install No. 6

2.05 2.3 kW Midwall Unit

Supply No. 2

Install No. 2

Carried to Collection

HVAC

JULY 2016 171

Page 172: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEAPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

2.06 2.5 kW Midwall Unit

Supply No. 1

Install No. 1

2.07 4.0kW Midwall Unit

Supply No. 1

Install No. 1

2.08 4.5 kW Midwall Unit

Supply No. 2

Install No. 2

2.09 4.2 kW Ceiling Cassette

Supply No. 2

Install No. 2

2.1 8 Port BC Box

Supply No. 2

Install No. 2

2.11 REFRIGERATION PIPEWORK

Copper pipework

Supply m 250

Install m 250

PVC Draining Pipe φ 25

Supply m 100

Install m 100

Extra over for pipe fittings

Supply lot 1

Install lot 1

2.12 COMMUNICATION

Interconnecting cables

Brackets

Supply lot lot

Install lot lot

2.13 SUPPORT & PROTECTION

Cable tray for refrigerant piping and wiring

complete with all support,clamps,brackets etc

Supply lot lot

Install lot lot

2.14 POWER SUPPLY

Supply lot lot

Install lot lot

Carried to Collection

HVAC

JULY 2016 172

Page 173: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEAPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

3 OFFICES

(Removals)

OFF 100 (all mechanical equipment to be removed within

3.01 STAFF ROOM

SR 100 (all mechanical equipment to be removed within

3.02 Disconnect Wall mounted heaters No. 6

3.03 Disconnect Air conditioning Units (Midwall Unit

3.04 Console Unit and any AC of any other type

including all piping and any other equipment related

to such exiting installation. No. 3

3.05 Disconnect Existing Ceiling Fans No. 3

3.06 Disconnect electric geyser, piping and all the

existing associated accessories. No. 1

3.07 Removal of Wall mounted heaters No. 6

3.08 Removal of Air conditioning Units (Midwall Unit

3.09 Console Unit and any AC of any other type

including all piping and any other equipment related

to such exiting installation. No. 3

3.1 Removal of Existing Ceiling Fans No. 3

3.11 Removal of electric geyser, piping and all the

existing associated accessories. No. 1

3.12 Transport Wall mounted heaters to storage No. 6

3.13 Transport Air conditioning Units (Midwall Unit

3.14 Console Unit and any AC of any other type

including all piping and any other equipment related

to such exiting installation to storage No. 3

3.15 Transport Existing Ceiling Fans to storage No. 3

3.16 Transportelectric geyser, piping and all the

existing associated accessories to storage No. 1

4 MEDIA CENTRE

MC 100 (all mechanical equipment to be removed within

4.01 Disconnect Air conditioning Units (Midwall Unit

Console Unit and any AC of any other type

including all piping and any other equipment related

to such exiting installation. No. 3

4.02 Disconnect Existing Ceiling Fans

existing associated accessories. No. 1

4.03 Removal of Air conditioning Units (Midwall Unit

4.04 Console Unit and any AC of any other type

including all piping and any other equipment related

to such exiting installation. No. 3

4.05 Removal of Existing Ceiling Fans No. 3

Carried to Collection

HVAC

JULY 2016 173

Page 174: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEAPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

4.06 Transport Wall mounted heaters to storage No. 6

4.07 Transport Air conditioning Units (Midwall Unit

4.08 Console Unit and any AC of any other type

including all piping and any other equipment related

to such exiting installation to storage No. 3

4.09 Transport Existing Ceiling Fans to storage No. 3

OFFICES

(New Installations)

5 Supply, install, test and commission a VRV units

heat recovery type air cooled air conditioning system,

including refrigerant piping, insulation and all other

necessary accessories to ensure a functional AC

All pipes to be run within trunking

Outdoor Units

5.01 25 kW Heating and Cooling Capacity or approved

Supply No. 1

Install No. 1

5.02 15 kW Heating and Cooling Capacity or approved

Supply No. 1

Install No. 1

Indoor Units

5.03 2.6 kW Midwall Unit

Supply No. 5

Install No. 5

5.04 2.2 kW Midwall Unit

Supply No. 1

Install No. 1

5.05 1.7 kW Midwall Unit

Supply No. 1

Install No. 1

5.06 2.7 kW Midwall Unit

Supply No. 1

Install No. 1

5.07 3.4 kW Midwall Unit

Supply No. 2

Install No. 2

5.08 4.0kW Ceiling Cassette

Supply No. 1

Install No. 1

5.09 4.38kW Ceiling Cassette

Supply No. 1

Install No. 1

5.1 4.3 kW Midwall Unit

Supply No. 1

Install No. 1

Carried to Collection

HVAC

JULY 2016 174

Page 175: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEAPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

5.11 8 Port BC Box

Supply No. 2

Install No. 2

REFRIGERATION PIPEWORK

5.12 Copper pipework

Supply m 250

Install m 250

5.13 PVC Draining Pipe φ 25

Supply m 100

Install m 100

5.14 Extra over for pipe fittings

Supply lot 1

Install lot 1

COMMUNICATION

5.15 Interconnecting cables

Brackets

Supply lot lot

Install lot lot

SUPPORT & PROTECTION

5.16 Cable tray for refrigerant piping and wiring

complete with all support,clamps,brackets etc

Supply lot lot

Install lot lot

5.17 POWER SUPPLY

Supply lot lot

Install lot lot

Carried to Collection

HVAC

JULY 2016 175

Page 176: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEAPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

KITCHEN VENTILATION

6 KITCHEN CANOPY

(Removals)

All mechanical equipment to be removed including

all electrical wiring6.01 Disconnect and Remove extraction fans No. 6

6.02 Transport removed extraction fans to storage No. 6

200m away

6.03 Disconnect and Remove Kitchen Canopy No. 3

6.04 Transport removed kitchen Canopy to storage No. 3

200m away

6.05 Disconnect and Remove canopy ductwork No. 3

6.06 Transport removed Canopy ductwork to No. 3

storage 200m away

New Installations

6.07 Supply and install canopy 6400 x 2400 with roof fan,

attenuators and S/S 304 ductwork through roof.

installed complete with roof pod, weather skirt, GMS

steel support work and roof discharge to

atomsphere c/w start-stop control panel for fans

supply No. 1

install No. 1

EXTRACTION FANS

6.08 Supply, install, test and commission axial flow .

kitchen canopy air extract fan c/w mating flange

,mounting feet,antivibration mounts,P1.5D Silencer

flexible connection

Air quantity: 2300l/s

supply No 2

install No 2

MAKE UP AIR SUPPLY FANS

6.09 Supply, install, test and commission axial flow .

make up air supply fan c/w mating flange

,mounting feet,antivibration mounts,P1.5D Silencer

flexible connection

Air quantity: 3680l/s

supply No 1

install No 1

Carried to Collection

HVAC

JULY 2016 176

Page 177: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEAPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Ducting

6.1 Supply and install Circular black steel sheetmetal

ductwork for Kitchen canopy air extract system,

including transformation pieces, bends, tees,

spigots, etc installed on the Kitchen roof and in the

Kitchen,and make up air ducting, manufactured in

accordance with SANS1238:2005 & SANS 10173:2003 `

as amended, including all necessary supports,fixing,

brackets, flexible connections, etc, all as may be

shown on the mechanical ventilation drawing.

304SS ducting, all transforms, fittings, flanges fixing to

fans and canopy c/w discharge cowls, supports,

weather proofing etc

6.11 1240X 550mm

Supply m 5

install m 5

6.12 900x400mm

Supply m 12

install m 12

6.13 580X 350mm

Supply m 4

install m 4

6.14 650X 550mm

Supply m 6

install m 6

6.15 650X450mm

Supply m 6

install m 6

6.16 650X350mm

Supply m 3

install m 3

6.16 550X450mm

Supply m 4

install m 4

6.16 350X350mm

Supply m 6

install m 6

Duct Reducers

6.17 900X400mm to 840X350mm

Supply No 1

Carried to Collection

HVAC

JULY 2016 177

Page 178: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEAPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

6.18 840x350mm -600x350mm

Supply No 1

install No 1

6.19 600x350mm-350x350mm

Supply No 1

install No 1

6.2 1240x550mm-750x550mm

Supply No 1

install No 1

6.2 750x550mm-650x550mm

Supply No 1

install No 1

6.2 650x550-650x450

Supply No 1

install No 1

6.2 650x450mm-550x450mm

Supply No 1

install No 1

6.2 550x450mm-350x350mm

Supply No 1

install No 1

Supply Air Grilles

6.21 Supply and Install drum louvers

Flow -400l/s

Supply No 9

install No 9

6.21b Allow for demolition of walls and making right for new lot sum

installations

Carried to Collection

HVAC

JULY 2016 178

Page 179: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEAPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

LAUNDRY EXTRACTION

Removal of existing extraction fan and transporting

to storage No 1

6.22 Supply and install wall mounted extraction fan

Flow rate =550l/s

Supply No 1

6.23 install No 1

WORKSHOP 105 EXTRACTION

Removal of existing extraction fans and transporting

to storage No 4

6.24 Replacement of dust extraction fan and with same

Duty as existing dust extraction fan

DCE Unimaster MT100L28-2 or equivalent

6.25 3.3kW 4.3HP

Rev - 3179 rev/min

Supply No 1

install No 1

Dust Extraction system ductwork

Diameter 150mm

Supply m 45

6.26 install m 45

WORKSHOP 206 EXTRACTION

Replacement of Extract fan

Flow rate =240 l/s

6.27 Supply No 2

install No 2

6.28 HOSPITALITY CLASSROOM

600mm CHIMNEY EXTRACTOR STAINLESS

STEEL

Supply new a domestic extraction canopy for the

hotplate installed in the work room in Block E-

Library complete with ducting to above roof height,

grease filters light, upper chimney, lower chimney,

fan and light switches

flow rate- 600m3/h

Input Power- 0.16KW

Width-600mm

Depth- 480mm

Minimum Height- 1040mm

Maximum Height-6800mm

supply No. 6

install No. 6

Carried to Collection

HVAC

JULY 2016 179

Page 180: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEAPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

6.29 BAKERY

Supply and install canopy 6400 x 2400 with roof fan,

attenuators and S/S 304 ductwork through roof.

installed complete with roof pod, weather skirt, GMS

steel support work and roof discharge to

atomsphere c/w start-stop control panel for fans

supply No. 1

install No. 1

6.3 EXTRACTION FANS

Supply, install, test and commission axial flow .

kitchen canopy air extract fan c/w mating flange

,mounting feet,antivibration mounts,P1.5D Silencer

flexible connection

Air quantity: 2300l/s

supply No 2

install No 2

TRAINING

Presenting a training course for operators 1

Presenting training course for maintenance staff 1

7.08

INSPECTION OF SITE AND SITE MEASUREMENT

Allow for detailed inspection of the site,site

measurement and setting out as necessary to carry

7.09 out the contract and to provide detailed dimensioned

shop drawings of all works 1

EQUIPMENT SELECTIONS

Provide detailed selections and samples as

required for approval before installing Sum 1

7.1

OPERATION AND MAINTENANCE MANUALS

Provide Operating and Maintenance Manuals:

including "as built" drawings and equpment

7.11 selection information No. 3

Carried to Collection

HVAC

JULY 2016 180

Page 181: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEAPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

SERVICE INSTALLATIONS AND CONNECTIONS

Electrical work: carry out complete connection from

local isolator, connect and gland off with water

7.12 proofed pvc sheathed copex and test electrical

installation to SANS 10142 and issue COC

certificates No. 6

Plumbing and drainage work: carry out complete

connection to water services and to drains, connect

SS flexible 15mm water connection installation and

with compression fitting for easy access- use

stainless steel for isolation of the ball valves(and

balls with viton seats)supply at each equipment item 3

Carried to Collection

Other

Any other items required for the successful

completion of the work but not included in this

bill of quantities. Please specify :

SUB-TOTAL FOR HVAC

CARRIED TO SUMMARY PAGE

HVAC

JULY 2016 181

Page 182: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

REFRIGERATION INSTALLATIONS-M7

(a) This part of the BoQ must be priced by a specialist

refrigeration sub-contractors to reduce failure due

financial risk.

(b) The main contractor shall provide a CV or brochure

for a specialist refrigeration sub-contractor before

work starts for approval by engineer.

( c) Allow for the specialist refrigeration sub-contractor

to visit the site and take measurements Sum 1

(d) Allow for production of factory shop drawings Sum 1

( e) Allow for submission of brochures and datasheets

for equipment to be purchased before purchasing

Contractor must study carefully the DID, GP SQS

specifications, project specification, SANS

standards and the site before submitting

tenders.Contractors will be expected to submit

SABS Mark samples and SABS certificates before

purchasing all materials.

All work should conform to the requirements of the

Standard Quality Specification for Refrigeration

Installations -DID-E/M7 latest revision

Refrigeration; GP/M7

New Cold Room Complete

1.0 Cold room 2950W refrigeration package plant

and evaporator installation complete or approved

1.1 Supply and install cold room chromadeck enclosure

3060x 2290x 2400 high complete as specified with

lights, swing door, fully sealed and vapour proof c/w

condensate drains

1.2 The cold room should be complete with shelving

Set temperature should be between 1 and 4 deg

Estimated design capacity is 1000kg fruit and

vegetable

1.3 Supply No. 1

1.4 Install No. 1

1.5 Supply and install blower coil

1.6 Supply No. 1

1.7 Install No. 1

1.8 Supply and install cold room vapour proof light

fittings (2 x 28W vapour)

1.9 Supply No. 4

1.10 Install No. 4

Carried to Collection

REFRIGERATION

JULY 2016 182

Page 183: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

2.0 Supply and install complete electrical installation

and control DB for cold room

2.1 Supply No. 1

2.2 Install No. 1

3.0 Supply and install temperature gauge and high

temperature flashing allarm

3.1 Supply No. 2

3.2 Install No. 2

4.0 Supply and install cambro shelving 1220(L)

x 460(W) No. 6

4.2 Supply and install cambro shelving 960(L)

x 460(W) No. 2

5.0 Traveling cost of technicians Sum 1

5.1 Test and commission entire system Sum 1

6.0 New Freezer room Complete

Cold room 4200W refrigeration package plant

and evaporator installation complete or approved

Freezer room -150mm Polystyrene

Size -3060x 2290x 2400

Door: STD Hinge Door

Finish: White Chromadeck with alum angles

6.1 Supply No 1

6.2 Install No 1

6.3 Energy Saving ZX Refrigeration Pack &

Blower Coil

6.4 Supply No 1

6.5 Install No 1

6.6 Copper pipe, spares & gas

6.7 Supply No Sum

6.8 Install No Sum

6.9 Electrical

6.10 Supply No Sum

6.11 Install No Sum

Allow for Freezer room and Cold room hire during

decommissioning period of existing ones Lot Sum

Carried to Collection

REFRIGERATION

JULY 2016 183

Page 184: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

TRAINING

7.0 Development of syllabus for training of

maintenance staff Sum Sum

7.1 Presenting a training course for maintenace staff No. 1

7.2 Testing and commission of the completed

installation Item 1

7.3 Attendance and profits on tests

7.4 Credit for redundant materials and equipment

7.5 Allow for inspections and measurements required

for shop drawings and detailed design of installation 1

7.6 Allow for record drawings and operating instructions

7.7 Allow for transportation/travelling charges 1

7.8Allow for maintenance and specialist maintenance as

specified

7.1 Allow for 12 months guarantee in terms of the

Document 1

7.12 Allow for all transport and rigging, lifting gear, cranes

etc. that may be required for moving of plant and

equipment setting out works Sum 1

7.13 Allow for attendance on main contractor and for

switchingoff, removing all redundant items and

earthing to make supply safe and re-energise

after installation 1

AS-BUILT INFORMATION AND OPERATING AND

MAINTENANCE MANUALS

7.14 SHOP AND "AS BUILT" DRAWINGS

Allow for preparation of detailed, dimensioned shop

drawings and 'as built" drawings to the entire works

and all its components include for 3 copies of all

drawings for approval carring out corrections as

required by engineer No. 3

Carried to Collection

REFRIGERATION

JULY 2016 184

Page 185: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

TRAINING

7.16 Presenting a training course for operators No 1

7.17 Presenting training course for maintenance staff No 1

INSPECTION OF SITE AND SITE MEASUREMENT

7.18 Allow for detailed inspection of the site,site

measurement and setting out as necessary to carry

out the contract and to provide detailed dimensioned

shop drawings of all works 1

EQUIPMENT SELECTIONS

7.19 Provide detailed selections and samples as

required for approval before installing Sum 1

including "as built" drawings and equpment

OPERATION AND MAINTENANCE MANUALS

7.20 Provide Operating and Maintenance Manuals:

including "as built" drawings and equpment

selection information No. 3

SERVICE INSTALLATIONS AND CONNECTIONS

7.21 Electrical work: carry out complete connection from

local isolator, connect and gland off with water

proofed pvc sheathed copex and test electrical

installation to SANS 10142 and issue COC

certificates No. 1

7.22 Plumbing and drainage work: carry out complete

connection to water services and to drains, connect

SS flexible 15mm water connection installation and

with compression fitting for easy access- use

stainless steel for isolation of the ball valves(and

balls with viton seats)supply at each equipment item 2

Other

7.23 Any other items required for the successful

completion of the work but not included in this

bill of quantities. Please specify :

Carried to Collection

CARRIED TO SUMMARY PAGE

SUB-TOTAL FOR REFRIGERATION

REFRIGERATION

JULY 2016 185

Page 186: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

KITCHEN EQUIPMENT INSTALLATIONS-M8

(a) This part of the BoQ must be priced by a specialist

Commercial kitchen sub-contractors to reduce failure

due

financial risk.

(b) The main contractor shall provide a CV or brochure

for a specialist commercial kitchen sub-contractor

before

work starts for approval by engineer.

( c)Allow for the specialist commercial kitchen sub-

contractor

to visit the site and take measurements Sum 1

(d) Allow for production of factory shop drawings Sum 1

( e) Allow for submission of brochures and datasheet for

equipment to be purchased before purchasing

Contractor must study carefully the DID, GP SQS

specifications, project specification, SANS

standards and the site before submitting

tenders.Contractors will be expected to submit

SABS Mark samples and SABS certificates before

purchasing all materials.CD available in DID offices

EQUIPMENT; GP/M8 (1)

1.0 Supply and installation of kitchen equipment is to be

carried out in conjuction with the main contractor.

The contractor is to present a detailed programe for

the scheduled installation of new equipment

1.1 The specialist kitchen contractor shall submit

detailed shop drawings depicting the proposed

layout of all new equipment associated services for

approval before ordering any new equipment for

services installation by others

Carried to Collection

EQUIPMENT- KITCHEN

JULY 2016

Page 187: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Main Kitchen

Removals (kitchen)

Old redundant kitchen Equipment must remain

2.0 Disconnect power and existing Hydroboils No. 2

2.1 Disconnect power to existing Boiling Pan No. 1

2.2 Disconnect Gas Stove No. 1

2.3 Disconnect Tilting Pan No. 1

2.4 Disconnect power to solid Top Stove with Oven No. 1

2.5 Disconnect power to Wall Mounted Heaters No. 14

2.6 Disconnect All Existing LP Gas infrastructure No. 1

2.7 Disconnect existing Extraction Fans No. 2

3.0 Removal of existing Hydroboils No. 2

3.1 Removal of existing Boiling Pan No. 1

3.2 Removal of existing Gas Stove No. 1

3.3 Removal of existing Tilting Pan No. 1

3.4 Removal of existing solid Top Stove with Oven No. 1

3.5 Removal of existing Wall Mounted Heaters No. 14

3.6 Removal of existing All Existing LP Gas

infrastructure No. 1

3.7 Removal of existing Extraction Fans No. 2

4.0 Transport existing Hydroboils to storage No. 2

4.1 Transport existing Boiling Pan to storage No. 1

4.2 Transport existing Gas Stove to storage No. 1

4.3 Transport existing Tilting Pan to storage No. 1

4.4 Transport existing solid Top Stove with Oven to

storage No. 1

4.5Transport existing Wall Mounted Heaters to storage

No. 14

4.6 Transport existing All Existing LP Gas

infrastructure to storage No. 1

4.7 Transport existing Extraction Fans to storage No. 2

Carried to Collection

EQUIPMENT- KITCHEN

JULY 2016

Page 188: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

NEW INSTALLATION KITCHEN

installed complete, connected to water, drainage

requirements, and power complete to manufactures

operating requirements

Dish washer Hood Type(12,5 kW, 380 V, 3ph)

5.0 Supply No. 1

5.1 Install No. 1

5.2Double Stainless Dirties Table with Scraphole

(1650x650)

5.3 Supply No. 1

5.4 Install No. 1

5.5 Stainless Steel Table (1800x650x915)

5.6 Supply No. 2

5.7 Install No. 2

5.8 Stainless Steel Table no SBR (1800x650x915)

5.9 Supply No. 5

5.10 Install No. 5

5.11 Stainless Steel Table with SBR (1400x650x915)

5.12 Supply No. 3

5.13 Install No. 3

5.14 S/Steel Bain Marie with Hot Closet

5.15 (6kW, 380V, 3ph)

Supply No. 2

5.16 Install No. 2

5.17 Double Bowl Pot Sink(2300x 650 x915)

5.18 Supply No. 2

5.19 Install No. 2

5.20 3 Solid Top Range with Oven (18KW, 400, 3ph)

5.21 Supply No. 1

5.22 Install No. 1

5.23 Mobile Food Warmer ( Low Height) (1kW, 220V)

5.24 Supply No. 2

5.25 Install No. 2

5.26 40L Tilting Frying Pan(Electrical)(7.5kW, 3ph)

5.27 Supply No. 1

5.28 Install No. 1

5.29 80L Tilting Frying Pan(Gas)(72000KJ/hr)

5.30 Supply No. 1

5.31 Install No. 1

5.32 Pot Rack(1790x600) Tier

5.33 Supply No. 3

5.34 Install No. 3

5.35 2 Tier Stainless Steel Wall Mounted Shelfing

5.36 (1800x350)

Supply No. 3

5.37 Install No. 3

5.38 Turbo Fryer(Electrical)

5.39 Supply No. 2

5.40 Install No. 2

5.41

Carried to Collection

EQUIPMENT- KITCHEN

JULY 2016

Page 189: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Turbo Fryer(Gas)(10000kJ/H) 10L

5.42 Supply No. 1

5.43 Install No. 1

5.44 Imperial 6 Burner (203 kJ/H)

5.45 Supply No. 1

5.46 Install No. 1

5.47 225 Boiling Pan (106KJ/H)

Supply No. 1

5.49 Install No. 1

5.50 Confectionary Mixer (1.5 KW, 400V, 3ph)

5.51 Supply No. 1

5.52 Install No. 1

5.53 10 Pan Convection Oven (Electric)

5.54 (10.6 KW, 400V, 3ph)

Supply No. 1

5.55 Install No. 1

5.56 50 liter Hydroboil water heater (3x2,4 KW, 380V)

5.57 Supply No. 2

5.58 Install No. 2

5.59

Stainless Steel Grease Traps

6.0 Herbish' HB GT 700' stainless steel grease trap

6.1 including handles, lids, perforated plates and baskets. No.

Supply No. 2

6.2 Install No. 2

6.3

'Herbish' HB GT 500' stainless steel grease trap

6.4

including handles, lids, perforated plates and baskets.

Supply No. 2

6.5 Install No. 2

6.6

Schedule of new staffroom kitchen equipment,

supplied,installed complete, connected to water,

drainagerequirements, and power complete to

manufactures

10 liter Hydroboil water heater (2,4 KW, 220V)

7.0 Supply No. 1

7.1 Install No. 1

7.2

Industrial type three burner gas cookers

7.3 It must be of a steel construction with good

corrosion protection. Each burner must have

regulating valves.

Supply No. 2

7.4 Install No. 2

7.5

Carried to Collection

EQUIPMENT- KITCHEN

JULY 2016

Page 190: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

HOME ECONOMICS

Supply and install 21 of 4 plates gas cooker hobs

7.6 Supply No. 21

7.7 Install No. 21

7.8

Testing and commission of the completed

8.0 installation Item 1

8.6 Allow for transportation/travelling charges 1

8.7 Allow for maintenance and specialist maintenance

as specified

8.9 Allow for all transport and rigging, lifting gear, cranes

etc. that may be required for moving of plant and

equipment setting out works Sum 1

Allow for attendance on main contractor and for

8.10 switching off, removing all redundant items and

earthing to make supply safe and re-energise

after installation 1

AS-BUILT INFORMATION AND OPERATING AND

MAINTENANCE MANUALS

Obtaining of all available information, compiling,

Carried to Collection

EQUIPMENT- KITCHEN

JULY 2016

Page 191: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

SHOP AND "AS BUILT" DRAWINGS

8.12

Allow for preparation of detailed, dimensioned shop

drawings and 'as built" drawings to the entire works

and all its components include for 3 copies of all

drawings for approval carring out corrections as

required by engineer No. 3

TRAINING

Presenting a training course for operators Sum 1

8.13 Presenting training course for maintenance staff Sum 1

8.14

INSPECTION OF SITE AND SITE MEASUREMENT

Allow for detailed inspection of the site, site

8.15 measurement and setting out as necessary to carry

out the contract and to provide detailed dimensioned

shop drawings of all the works 1

EQUIPMENT SELECTIONS

Provide detailed selections and samples as

8.17 required for approval before installing Sum 3

Carried to Collection

EQUIPMENT- KITCHEN

JULY 2016

Page 192: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Other

Any other items required for the successful

7.23 completion of the work but not included in this

bill of quantities. Please specify :

Carried to Collection

SUB-TOTAL FOR EQUIPMENT

CARRIED TO SUMMARY PAGE

EQUIPMENT- KITCHEN

JULY 2016

Page 193: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

LAUNDRY EQUIPMENT INSTALLATIONS-M8

(a) This part of the BoQ must be priced by a specialist

Laundry equipment sub-contractors to reduce failure

due financial risk.

(b) The main contractor shall provide a CV or brochure

for a specialist laundry equipment sub-contractor

before work starts for approval by engineer.

( c) Allow for the specialist laundry sub-contractor

to visit the site and take measurements Sum 1

(d) Allow for production of factory shop drawings Sum 1

( e) Allow for submission of brochures and Datasheets for

equipment to be purchased before purchasing

Contractor must carefully study the DID, GP SQS

specifications, project specification, SANS

standards and the site before submitting

tenders.Contractors will be expected to submit

SABS Mark samples and SABS certificates before

purchasing all materials.

LAUNDRY EQUIPMENT GP/M8(2)

Contractor must study the DID, GP SQS specifications,

project specification, SANS standards and the site carefully

before submitting tenders. Contractors will be expected to

submit SABS Mark samples and SABS certificates before

purchasing all materials.

(Removals)

LH (all mechanical equipment to be removed within these

Disconnect electric geyser, piping and all the existing associated accessories. No. 1

Disconnect Existing Washing Machine No. 1

Disconnect Existing Industrial Spinner/Drier No. 3

Disconnect Existing Industrial Washing Machine No. 2

Disconnect Existing Extraction Fan No. 1

Removal of electric geyser, piping and all the existing

associated accessories. No. 1

Removal of Existing Washing Machine No. 1

Removal of an Existing Industrial Spinner/Drier No. 3

Removal of Existing Industrial Washing Machine No. 2

Removal of Existing Extraction Fan No. 1

Carried to Collection

EQUIPMENT-LAUNDRY

JULY 2016 193

Page 194: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Transport of electric geyser, piping and all the existing

associated accessories to storage No. 1

Transport Existing Washing Machine to storage No. 1

Transport Existing Industrial Spinner/Drier to storage No. 3

Transport Existing Industrial Washing Machine to storage No. 2

Transport Existing Extraction Fan to storage No. 1

Supply, install, test and commission including rigging

1.0 Fixed Iron Board Omega 2000

Supply No. 6

install No. 6

Roller Iron 3ph/60A 11kW

Supply No. 1

install No. 1

Top Loader 35 kg

Supply No. 2

install No. 2

Folding Table 1650x750

Supply No. 2

install No. 2

Slow/Medium Speed Washer 30 kg

Supply No. 2

install No. 2

12 Tumble Drier 40 kg

Supply No. 1

install No. 1

13 Portable Iron 1ph/380V 2000W

Supply No. 7

14 Concrete Plinth

Strength: 250kpa/m2

Size: 2500x2000

Supply No. 1

install No. 1

Testing and Commissioning

15 Allow for testing of equipments and training of the end Sum 1

Carried to Collection

EQUIPMENT-LAUNDRY

JULY 2016 194

Page 195: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Gurantee and Maintenance

16 Provision of Guarantee of equipment and 12-month Sum 1

Operating and Maintenance Procedures

17 Compilation and submission of Operation & Maintenance No 4

Other

18 Any other items required for the successful completion of Sum

5.1 Any other items required for the successful

completion of the work but not included in this bill of

quantities. Please specify: Sum 1

5.2 Testing and commission of the completed laundry

installation Item 1

5.3 Attendance and profits on tests

5.4 Allow for inspections and measurements as

5.5 required for the shop drawings and detailed

design of installation 1

5.6 Allow for monthly site meetings and managing of

project and for senior supervision by a qualified

person 1

5.7 Allow for samples and technical information 1

5.8 Allow for record drawings and operating instructions 1

5.9 Allow for transportation/travelling charges 1

5.10 Allow for maintenance and specialist maintenance

as specified 1

5.11 Allow for 12 months guarantee in terms of the

Document 1

5.12 Allow for all transport and rigging, lifting gear, cranes

etc, that may be required for moving of plant and

equipment setting out works 1

5.13 Allow for attendance on main contractor and for

switching off, removing all redundant items and

earthing to make supply safe and re-energise after

installation 1

AS-BUILT INFORMATION AND OPERATING AND

MAINTENANCE MANUALS

5.14 Obtaining of all available information, compiling,

reproducing and finalising three sets of as-built and

Operating and Maintenance manuals as specified in

Sb 05,01 and FF 03 and handing over to the Engineer 3

Carried to Collection

EQUIPMENT-LAUNDRY

JULY 2016 195

Page 196: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

SHOP AND "AS BUILT" DRAWINGS

5.15 Allow for preparation of detailed, dimensioned shop

drawings and 'as built" drawings to the entire works

and all its components include for 3 copies of all

drawings for approval carring out corrections as

required by engineer No. 3

TRAINING

5.16 Presenting a training course for operators 1

5.17 Presenting training course for maintenance staff 1

INSPECTION OF SITE AND SITE MEASUREMENT

5.18 Allow for detailed inspection of the site,

site measurement and setting out as necessary to

carryout the contract and to provide detailed

dimensioned shop drawings of all works 1

EQUIPMENT SELECTIONS

5.19 Provide detailed selections and samples as

required for approval before installing

OPERATION AND MAINTENANCE MANUALS

5.20, Provide Operating and Maintenance Manuals:

selection information No. 3

SERVICE INSTALLATIONS AND CONNECTIONS

5.21 Electrical work: carry out complete connection from

local isolator, connect and gland off with water

proofed pvc sheathed copex and test electrical

installation to SANS 10142 and issue COC

certificates

5.23 Test the complete installation at full load and in

cooking mode and all associated components of

the installation in phases as the work proses as

work proceeds, demostrate and hand over to the

user; sign off at hand over as beingfully operational

and satisfactory Sum 1

Carried to Collection

EQUIPMENT-LAUNDRY

JULY 2016 196

Page 197: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Other

5.24 Any other items required for the successful

completion of the work but not included in this

bill of quantities. Please specify :

Carried to CollectionSUB-

TOTA SUB-TOTAL FOR LAUNDRY EQUIPMENT

EQUIPMENT-LAUNDRY

JULY 2016 197

Page 198: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

WORKSHOP INSTALLATIONS-M8

(a) This part of the BoQ must be priced by a specialist

sub-contractors to reduce failure due financial risk

(b) The main contractor shall provide a CV or brochure

for a specialist sub-contractor before work starts

for approval by engineer.

( c) Allow for the specialist sub-contractor to visit the site

and take measurements Sum 1

(d) Allow for production of factory shop drawings Sum 1

( e) Allow for submission of brochures and datasheets for

equipment to be purchased before purchasing

Contractor must study carefully the DID, GP SQS

specifications, project specification, SANS

standards and the site before submitting

tenders.Contractors will be expected to submit

SABS Mark samples and SABS certificates before

purchasing all materials.

LAUNDRY EQUIPMENT GP/M8(2)

Contractor must study the DID, GP SQS specifications,

project specification, SANS standards and the site carefully

before submitting tenders. Contractors will be expected to

submit SABS Mark samples and SABS certificates before

purchasing all materials.

(Removals)

LH (all mechanical equipment to be removed within these

area are excluding striping of electrical wiring). The details

of the equipments to be removed are to be clarified at

Compulsory Site Inspection and the pricing must include all

the necessary work to be done. (All Machine Weights to be

taken into consideration)

Carried to Collection

EQUIPMENT- OTHER

JULY 2016 198

Page 199: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

WORKSHOP 100

Disconnect electric geyser, piping and all the existing

associated accessories. No. 1

Disconnect Existing Wall Mounted Heaters No. 6

Disconnect Existing Pedestal Drilling Machings No. 4

Disconnect Existing work benches No. 6

Disconnect Existing Pedestal Saw No. 2

Disconnect Existing Pedestal Grinder No. 1

Disconnect Existing Saw Benches No. 4

Disconnect all other machines No. 3

Disconnect all extraction system including ducting

geyser No. 1

Removal of electric geyser, piping and all the

existing associated accessories. No. 1

Removal of Existing Wall Mounted Heaters No. 6

Removal of Existing Pedestal Drilling Machings No. 4

Removal of Existing work benches No. 6

Removal of Existing Pedestal Saw No. 2

Removal of Existing Pedestal Grinder No. 1

Removal of Existing Saw Benches No. 4

Removal of all other machines No. 3

removal of all extraction system including ducting

and all other related equipment No. 1

Transport of electric geyser, piping and all the

existing associated accessories to storage No. 1

Transport of Existing Wall Mounted Heaters to

storage No. 6

Transport Existing Pedestal Drilling Machings

to storage No. 4

Transport Existing work benches to storage No. 6

Transport Existing Pedestal Saw to storage No. 2

Transport Existing Pedestal Grinder to storage No. 1

Transport Existing Saw Benches to storage No. 4

Transport all other machines to storage No. 3

Transport of all extraction system including ducting

and all other related equipment to storage No. 1

Carried to Collection

EQUIPMENT- OTHER

JULY 2016 199

Page 200: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Transport Existing Pedestal Drilling Machings

to workshop No. 4

Transport Existing work benches to workshop No. 6

Transport Existing Pedestal Saw to workshop No. 2

Transport Existing Pedestal Grinder to workshop No. 1

Transport Existing Saw Benches to workshop No. 4

Transport all other machines to workshop No. 3

Reconnect Existing Pedestal Drilling Machings No. 4

Reconnect Existing work benches No. 6

Reconnect Existing Pedestal Saw No. 2

Reconnect Existing Pedestal Grinder No. 1

Reconnect Existing Saw Benches No. 4

Reconnect all other machines No. 3

Carried to Collection

EQUIPMENT- OTHER

JULY 2016 200

Page 201: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

WORKSHOP 200

Disconnect electric geyser, piping and all the existing

associated accessories. No. 1

Disconnect Existing Arc Welding Maching No. 6

Disconnect Existing Other Welding Machines No. 2

Disconnect Existing Centre Lathe No. 2

Disconnect Existing Drilling Machines No. 3

Disconnect Existing galentine Machines No. 1

Disconnect all other machines No. 1

Disconnect all extraction system including ducting

and all other related equipment No. 6

Disconnect and make safe existing hot water

geyser No. 1

Removal of electric geyser, piping and all the

existing associated accessories. No. 1

Removal of Existing Arc Welding Machines No. 6

Removal of Existing Other Welding Machines No. 2

Removal of Existing Centre Lathe No. 2

Removal of Existing Pedestal Drilling Machines No. 3

Removal of Existing Gilantine Machines No. 1

Removal of all other machines No. 1

removal of all extraction system including ducting

and all other related equipment No. 1

existing associated accessories to storage No. 1

Transport of Existing arc welding machine to

storage No. 6

Transport Existing other welding machine

to storage No. 2

Transport Existing Centre Lathe to storage No. 2

Transport Existing Pedestal Drilling Machine to

storage No. 3

Transport Existing Gilantine Machine to storage No. 1

Transport Existing Saw Benches to storage No. 1

Transport all other machines to storage No. 1

Transport of all extraction system including ducting

and all other related equipment to storage No. 6

Carried to Collection

EQUIPMENT- OTHER

JULY 2016 201

Page 202: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Transport Existing Pedestal Drilling Machinge

to workshop No. 3

Transport existing arc welding machine to workshop No. 6

Transport other arc welding machine to workshop No. 2

Transport Existing centre lather to workshop No. 2

Transport Existing Gilantine to workshop No. 1

Transport all other machines to workshop No. 1

Reconnect Existing Arc Welding Maching No. 6

Reconnect Existing Other Welding Machines No. 2

Reconnect Existing Centre Lathe No. 2

Reconnect Existing Drilling Machines No. 3

Reconnect Existing galentine Machines No. 1

Reconnect all other machines No. 1

Carried to Collection

EQUIPMENT- OTHER

JULY 2016 202

Page 203: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

WORKSHOP 300

Disconnect all other machines No. 1

Removal of all other machines No. 1

Transport all other machines to storage No. 1

Transport all other machines to workshop No. 1

Reconnect all other machines No. 1

CLASSROOM

Classroom 100- Classroom 500

Disconnect LPG infrastructure ( First floor CR 100) No. 6

Disconnect Existing Wall Mounted Heaters No. 2

Disconnect Existing Extraction Fans (CR200-

201) No. 2

DiSsonnect Existing Ceiling Fans (CR 200-CR207) No. 3

Disconnect electric geyser, piping and all the existing

associated accessories. No. 1

Removal of LPG infrastructure ( First floor CR 100) No. 6

Removal of Existing Wall Mounted Heaters No. 2

Removal of Existing Extraction Fans (CR200-

201) No. 2

Removal of Existing Ceiling Fans (CR 200-CR207) No. 3

Removal of electric geyser, piping and all the

existing associated accessories. No. 1

Transport LPG infrastructure to storage No. 6

Transport Existing Wall Mounted Heaters to

storage No. 2

Transport Existing Extraction Fans (CR200-

201) to storage No. 2

Transport Existing Ceiling Fans (CR 200-CR207) No. 3

to storage

Transport electric geyser, piping and all the

existing associated accessories to storage No. 1

Carried to Collection

EQUIPMENT- OTHER

JULY 2016 203

Page 204: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Testing and Commissioning

15 Allow for testing of equipments and training of the end Sum 1

Gurantee and Maintenance

16 Provision of Guarantee of equipment and 12-month Sum 1

Operating and Maintenance Procedures

17 Compilation and submission of Operation & Maintenance No 4

Other

18 Any other items required for the successful completion of Sum

5.1 Any other items required for the successful

completion of the work but not included in this bill of

quantities. Please specify: Sum 1

5.2 Testing and commission of the completed machine

installations Item 1

5.3 Attendance and profits on tests

5.4 Allow for inspections and measurements as

5.5 required for the shop drawings and detailed

design of installation 1

5.6 Allow for record drawings and operating instructions 1

5.7 Allow for transportation/travelling charges 1

5.8 Allow for maintenance and specialist maintenance

as specified 1

5.11 Allow for 12 months guarantee in terms of the

Document 1

5.12 Allow for all transport and rigging, lifting gear, cranes

etc, that may be required for moving of plant and

equipment setting out works 1

5.13 Allow for attendance on main contractor and for

switching off, removing all redundant items and

earthing to make supply safe and re-energise after

installation 1

Carried to Collection

EQUIPMENT- OTHER

JULY 2016 204

Page 205: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

SHOP AND "AS BUILT" DRAWINGS

5.15 Allow for preparation of detailed, dimensioned shop

drawings and 'as built" drawings to the entire works

and all its components include for 3 copies of all

drawings for approval carring out corrections as

required by engineer No. 3

TRAINING

5.16 Presenting a training course for operators 1

5.17 Presenting training course for maintenance staff 1

INSPECTION OF SITE AND SITE MEASUREMENT

5.18 Allow for detailed inspection of the site,

site measurement and setting out as necessary to

carryout the contract and to provide detailed

dimensioned shop drawings of all works 1

EQUIPMENT SELECTIONS

5.19 Provide detailed selections and samples as

required for approval before installing

OPERATION AND MAINTENANCE MANUALS

5.20, Provide Operating and Maintenance Manuals:

including "as built" drawings and equpment

selection information No. 3

SERVICE INSTALLATIONS AND CONNECTIONS

5.21 Electrical work: carry out complete connection from

local isolator, connect and gland off with water

proofed pvc sheathed copex and test electrical

installation to SANS 10142 and issue COC

certificates No. 0

5.22 Plumbing and drainage work: carry out complete

connection to water services and to drains, connect

SS flexible 15mm water connection installation and

with compression fitting for easy access- use

stainless steel for isolation of the ball valves(and

balls with viton seats)supply at each equipment item 0

5.23 Test the complete installation at full load and in

cooking mode and all associated components of

the installation in phases as the work proses as

work proceeds, demostrate and hand over to the

user; sign off at hand over as beingfully operational

and satisfactory Sum 1

Carried to Collection

EQUIPMENT- OTHER

JULY 2016 205

Page 206: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ

DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Other

5.24 Any other items required for the successful

completion of the work but not included in this

bill of quantities. Please specify :

Carried to CollectionSUB-

TOTA SUB-TOTAL FOR LAUNDRY EQUIPMENT

CARRIED TO SUMMARY PAGE

EQUIPMENT- OTHER

JULY 2016 206

Page 207: TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ … Part E.2... · TRANSORANJE SCHOOL FOR THE DEAF, MECHANICAL BOQ DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT ITEM DESCRIPTION UNIT QTY

Transoranje School for the Deaf - Mechanical Installations BoQs

TOTAL

Bill No. 1 FIRE PRTOTECTION

Bill No. 2 WET SERVICES

Bill No. 3 SPACE HEATING

Bill No. 4 LP GAS INSTALLATION

Bill No. 5 HVAC

Bill No. 6 REFRIGERATION

Bill No. 7 EQUIPMENT -KITCHEN

Bill No. 8 EQUIPMENT -LAUNDRY

Bill No. 9 EQUIPMENT -WORKSHOPS

GRAND TOTAL EXCLUDING VAT

MECHANICAL INSTALLATIONS BILL SUMMARY

TransOranje School for the Deaf - Mechanical Installations Bills of Quantities

July 2016