Currency: US Dollars Project No: Project Title: Ai Khanem Border Crossing Point Facilities Location: Takhar, Afghanistan Tender No: 04 Tender Title: Customs and Police Office Buildings Original Issue: February 25, 2010 810 Customs and Police Office Buildings NOTICE TO ALL BIDDERS - COMPLETE PROJECT PRICE: 3. Eventual claims for extra works are covered by project general documentation of contract. 1. All bidders MUST examine the complete project documents. These documents include the Drawings, BOQ, Schedules and Specifications. Any discrepancies between these documents are to be brought to the immediate attention of UNOPS Engineer. 2. Quotation given by the contractor on this BOQ are to cover any and all additional materials, labor or associated costs to complete the works as documented on the complete project documents. UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES BILL OF QUANTITIES Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Transcript of BOQ Office Buildings

Page 1: BOQ Office Buildings

Currency: US Dollars

Project No:Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Tender Title: Customs and Police Office BuildingsOriginal Issue: February 25, 2010

810

Customs and Police Office Buildings

NOTICE TO ALL BIDDERS - COMPLETE PROJECT PRICE:

3. Eventual claims for extra works are covered by project general documentation of contract.

1. All bidders MUST examine the complete project documents. These documents include the Drawings, BOQ, Schedules and Specifications. Any discrepancies between these documents are to be brought to the immediate attention of UNOPS Engineer.

2. Quotation given by the contractor on this BOQ are to cover any and all additional materials, labor or associated costs to complete the works as documented on the complete project documents.

UNOPS

UNITED NATIONS OFFICE FOR PROJECT SERVICES

BILL OF QUANTITIES

Ai Khanem Border Crossing Point Facilities

Takhar, Afghanistan

Page 2: BOQ Office Buildings

Ai Khanem Border Crossing Point Facilities

Takhar, Afghanistan

Customs Office Building

Page 3: BOQ Office Buildings

Currency: US Dollars

Project No: 810Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Component: Customs Office BuildingOriginal Issue: February 25, 2010

Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost1. General

1.1 Preliminaries 1.1 Occupied Areas, 1.1 Existing Services Schedule and 1.1 Items to be supplied schedules

1 Pre-construction work, mobilisation activities including paper/ documentation tasks. LS 1.00 -

2 Post construction works and clean up.LS 1.00 -

1.2 General Requirements 1.2 Inspection notification schedule and 1.2 Warranty schedules

1 Testing and Operation/Maintenance Manuals.LS 1.00 -

Subtotal General -

2. Site

2.3 Earthwork 2.1 Identified hazardous materials and 2.3 Earthwork schedules

1 Excavation (any soil type) for foundation. This item includes all excavations, disposal and temporary support or shoring if needed. See drawing and schedule for details.

CU.M 246.00 -

2 Ground improvement under foundations. This includes supplying of filling materials and compacting the layers according to schedule and drawings. CU.M 110.00 -

3 Soil backfilling on RCC math foundation up to ground level. This includes supplying of needed materials. See drawings and schedules for levels/dimensions and details. CU.M 190.00 -

4 Gravel compaction, Class 2, at any places under the PCC/RCC shown inside the building or at sidewalk/ramp. This includes supplying of needed materials. See drawing and project schedules for dimensions and details.

CU.M 75.00 -

Subtotal Site -

3. Structure

3.1 Concrete-General 3.1 Non reinforced concrete, 3.1 Reinforced concrete and 3.2 Concrete- Integral Finishes schedules

1 PCC lean concrete (10 Mpa) under the RCC foundations. CU.M 13.00 -

2 RCC (20 Mpa) foundations, rectangular and trapezoidal foundation beams. CU.M 140.00 -

3 PCC, 40mm thick, lean concrete (10 Mpa) at the floor over the gravel compaction. CU.M 19.00 -

NOTE: Cost for concrete items in this section includes reinforcement, steel anchorage embedded in concrete, shuttering, concrete, concrete curing and all to the complete job.

Pos.

UNOPS

DETAILS OF COMPONENTVertical Structures Unit

3/24

Page 4: BOQ Office Buildings

Currency: US Dollars

Project No: 810Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Component: Customs Office BuildingOriginal Issue: February 25, 2010

Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total CostPos.

4 PCC concrete, 100mm thick, (20 Mpa) at the floor over the water-proofing layer. This item includes the stairs steps at the entrances and the ramps. CU.M 47.00 -

5 RCC Columns, includes all columns (from -1.65 to +3.55) and supporting columns/ring beams for trusses on the roof. CU.M 82.00 -

6 RCC (20 Mpa) slabs and beams. The items covers all slabs, beams and RCC floor for the bank. CU.M 86.00 -

7 RCC Pavement (20 Mpa), for 1000mm-wide side walks. This includes entrances and ramps. The cost includes expansion joint on side walk surface as shown and as well as the broom finish to the side walk/ ramp surfaces.

CU.M 15.00 -

3.3 Pre-cast RC Concrete 3.3 Precast Concrete Prototypes Schedule

1 Precast RCC (20 Mpa) exterior window sill for all windows as per drawings. This includes all work need for complete installation.

Lin M 29.00 -

3.5 Brickwork 3.5 Brickwork construction schedule

1 Second Class Brick masonry with mortar. This includes all brick walls/ brick masonry in the entire building. The cost includes steel bars shown in the walls and their connection to the perimeter RCC elements. CU.M 60.00 -

3.9 Light Timberwork 3.9 Light Timberwork schedule, 6.6 Interior painting and 6.6 Exterior painting schedules

1 Roof timber structure on the trusses. The cost includes 30mm thick wooden planks as shown on the drawing. This also cover all auxiliary and needed materials and supplying and installation of members including painting to make the surface ready for folded metal sheet roofing according to the drawing, schedule and specifications. SQ.M 680.00 -

3.10 Concrete Unit Masonry 3.10 Concrete Unit Masonry

1 CMU masonry with mortar. This item covers all CMU works shown on the drawings for the building. The cost includes all needed materials, steel bars, anchors etc and works. CU.M 60.00 -

3.11 Structural Steel 3.11 Structural Steel Schedules

1 Steel support, purlin, at the metal sheet roof as (C-shape 140x65mm + L-shape 50x50mm). See drawing for details. Lin M 560.00 -

2 Steel truss (TRUSS 1) at the roof. See drawing for details. No 6.00 -

3 Steel truss (TRUSS 2) at the roof. See drawing for details. No 4.00 -

4 Steel truss (TRUSS 3) at the roof. See drawing for details. No 2.00 -

NOTE: Cost for steel related items in this section includes supplying materials and installation to the complete condition for all members, gussets, fasteners, connections, welding and other accessories and works needed to complete the job. The cost also includes painting according to the schedules and specifications for steel member painting, which is at least on coat of anti-rust followed by 2 other coats of oil-based painting for all surfaces and sides of the steel members.

4/24

Page 5: BOQ Office Buildings

Currency: US Dollars

Project No: 810Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Component: Customs Office BuildingOriginal Issue: February 25, 2010

Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total CostPos.

5 Steel truss (TRUSS 4) at the roof. See drawing for details. No 8.00 -

6 Steel truss (TRUSS 5) at the roof. See drawing for details. No 2.00 -

7 Steel truss (TRUSS 6) at the roof. See drawing for details. No 2.00 -

8 Steel truss (TRUSS 7) at the roof. See drawing for details. No 8.00 -

9 Steel truss (TRUSS 8) at the roof. See drawing for details. No 2.00 -

10 Steel truss (TRUSS 9) at the roof. See drawing for details. No 4.00 -

11 Steel truss (TRUSS 10) at the roof. See drawing for details. No 4.00 -

12 Steel truss (TRUSS 11) at the roof. See drawing for details. No 1.00 -

13 Steel frame fixed ladder inside the toilet as the access way to the roof. The work and the cost includes construction of fixed later to the wall and the opening pane, its hardware and other accessories to complete the installation as per drawing and schedule. This also includes painting according to the schedules and specifications for steel surfaces painting.

LS 1.00 -

Subtotal Structure -

4. Enclosure

4.1 Waterproofing 4.1 Waterproofing system schedule

1 Bitumen water-proofing coat. This is a 3-5mm thick hot bitumen painting coats on dried PCC surface. The item applies on 40mm PCC at the floor beneath the 20 Mpa, 100mm thick PCC layer. This cost includes supplying and applying the coats with all needed accessories and work to do the job as per manufacturer's data and to the full satisfaction of UNOPS engineer.

SQ.M 470.00 -

2 Single layer bitumen membrane at the floor and walls of toilets/kitchen. This includes preparation of base layers shown on the drawings. Refer to schedule/drawing for details.

SQ.M 55.00 -

4.2 Roofing 4.2 Roofing materials, and 4.2 Gutter and Down pipe Schedules

1 Standing seam metal roofing (using GI sheet gauge 24). This includes all accessories required for installation of roof on the prepared timber plank (see item 3.9.1 for the cost of timber plank on roof). The cost also includes all flashings, capping etc needed on the metal roof.

SQ.M 680.00 -

2 Metallic gutter around the roof (using GI sheet gauge 20). The cost includes all accessories required for complete installation of gutter such as supplying, fixing and others as per drawing and schedules.

Lin M 116.00 -

3 Down pipes, PVC pipe class-B. This includes all accessories required for complete installation such as supplying, fixing and others as per drawing and schedules.

Lin M 45.00 -

5/24

Page 6: BOQ Office Buildings

Currency: US Dollars

Project No: 810Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Component: Customs Office BuildingOriginal Issue: February 25, 2010

Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total CostPos.

4.3 Windows and Window Hardware 4.3 Window, 4.3 Window Hardware, 4.5 Annealed Glasses, and 4.6 Glassblock work schedules

1 Wooden frame windows. The work includes making, transportation, installation, hardware, glazing, glass-block work around window, insect screen, 3 coats of oil-based painting, and other accessories required for complete installation as per drawings and schedule.

SQ.M 63.00 -

4.4 Doors and Door Hardware 4.4 Joinery doors 4.4 PVC doors, 4.4 Steel doors and 4.5 Annealed Glasses schedules

1 Wooden frame doors. The work includes making, transportation, installation, hardware, glazing, and other accessories required for complete installation as per drawings and schedule. SQ.M 76.00 -

2 PVC frame doors. The work includes making, transportation, installation, hardware, glazing, and other accessories required for complete installation as per drawings and schedule.

SQ.M 6.00 -

3 Steel frame doors. The work includes making, transportation, installation, hardware, glazing, 1 coat of anti-rust followed by 2 other coats of oil-based painting, and other accessories required for complete installation as per drawings and schedule.

SQ.M 2.00 -

4.5 Glazing 4.5 Mirrors schedules

1 Mirrors (40x60cm) at toilets. This includes complete installation. No 5.00 -

4.7 Insulation and Vapour Barriers 4.7 Insulation Schedules

1 Glasswool thermal insulation on RCC roof, beneath roof structure. See drawings and schedules for details. SQ.M 640.00 -

4.8 Exterior Insulation and Finish System 4.8 EFIS Schedules

1 External wall insulation system, STOTHERM CLASSIC, (expanded polystyrene foam and organically bound render) "or equivalent ". See drawing and schedule for location and detail. The cost includes one preparation layer of cement render and all other process required for a complete job as per product's manufacturer data and UNOPS engineer satisfaction.

SQ.M 310.00 -

Subtotal enclosure -

5. Interior

5.4 Suspended Ceiling 5.4 Suspended Ceiling Schedule

NOTE: Prior to work, samples must be approved by UNOPS Engineer.

NOTE: Prior to work, samples must be approved by UNOPS Engineer.

NOTE: Prior to work, samples must be approved by UNOPS Engineer.

6/24

Page 7: BOQ Office Buildings

Currency: US Dollars

Project No: 810Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Component: Customs Office BuildingOriginal Issue: February 25, 2010

Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total CostPos.

1 Lasani wooden board, 16mmm, fixed ceiling for all soffits around the building. The cost includes all framing, fixing, oil based painting and needed work for a complete job to the full satisfaction of Engineer. SQ M 152.00 -

2 Gypsum board, 16mmm, reflected ceiling for the side entrances of the building. The cost includes all framing, fixing, and needed work for complete job. SQ M 4.00 -

5.5 Joinery 5.5 Joinery fixtures schedule

1 Wooden frame, MDF finish, wall mounted cabinet at the kitchen. See drawings for details. The cost includes making, installation, framing, hardware, finish, 3 coats oil-based painting and all to the complete job.

LS 1.00 -

2 Wooden frame, MDF finish, floor mounted cupboard at the kitchen. See drawings for details. The cost includes making, installation, framing, finish, hardware, stone table top, splash back, 3 coats oil-based painting and all to the complete job. LS 1.00 -

5.6 Metalwork 5.6 Metal Fixtures Schedule

1 Metallic plaster beads for outer corners at the corridors only, including edge of walls. This includes any needed work for complete installation. See schedules and drawings for details. Lin M 70.00 -

2 Toilet roll holders. This also includes installation.No 3.00 -

3 Grab rail for handicap toilet. One complete set. This includes supplying and complete installation. LS 1.00 -

4 Soap dishes. This also includes installation.No 4.00 -

5.8 Fire Extinguishers and Blankets 5.8 Fire Extinguishers Schedule

1 Extinguishers, wall mounted, powder-type (9kg).No 4.00 -

Subtotal Interior -

6. Finish

6.1 Plastering 6.1 Plastering Schedule

Internal surfaces

1 Cement render medium CRM followed by cement render fine CRF on all internal surfaces of walls/ ceilings/ beams/ columns/ reveals. See schedule for detail. SQ.M 1,100.00 - External surfaces

2 Gypsum board, decorative finish, at both main entrances foreheads. The cost includes supplying, making, installation and all to the complete condition as per Engineer's approval.

SQ.M 40.00 - 6.2 Cementitious Toppings 6.2 Cementitious Toppings

ScheduleNOTE: Prior to work, samples must be approved by UNOPS Engineer.

NOTE: Prior to work, samples must be approved by UNOPS Engineer.

7/24

Page 8: BOQ Office Buildings

Currency: US Dollars

Project No: 810Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Component: Customs Office BuildingOriginal Issue: February 25, 2010

Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total CostPos.

1 In situ colored chips, colored mortar terrazzo, including marble trims for joints, for all floors as shown on the drawing. See schedule for details. The cost also includes stainless steel nosing at the outer edges of the stair steps at the entrances. SQ.M 510.00 -

6.3 Tiling 6.3 Wall tiling and 6.3 Floor tiling schedules

1 Ceramic wall tiles for toilets, kitchen, around the drinking water fountain and any place shown. The cost includes bed preparation, bedding and grout. SQ.M 70.00 -

2 Ceramic floor tiles for toilets including bed preparation, bedding and grout. SQ.M 35.00 -

3 Marble skirting for all rooms and halls where did not receive ceramic tiles. The cost includes bedding and grout. Lin M 450.00 -

6.6 Painting 6.6 Interior/Exterior painting schedule

Internal surfaces

1 Flat water based: Interior, on all surfaces that receive cement plaster. The cost includes wall putty (gypsum filling) layer before painting and all needed preparation of the surfaces for painting. See schedule for detail on this paint system SQ.M 1,100.00 -

Subtotal Finishes -

8. Water Services

8.1 Water Services 8.1 Water services samples, 8.1 Water system piping, 8.1 Sanitary fixtures, 8.1 Water heater schedules and 8.1 Water Services Testing schedules

NOTE: The cost for all pipes exposed to weather includes glass wool thermal insulation cover. The cost given for all GI and PVC pipes with diameter less than 60mm includes all required fittings, accessories and work for complete system installation.Water supply piping

1 GI water supply pipe D=32mm, including fittings and installation. Lin M 30.00 -

2 GI water supply pipe D=25mm, including fittings and installation. Lin M 22.00 -

3 GI water supply pipe D=20mm, including fittings and installation. Lin M 25.00 -

4 GI water supply pipe D=15mm, including fittings and installation. Lin M 50.00 -

5 Water supply bronze Valve D=32mm, including fittings and installation. No 2.00 -

6 Water supply bronze Valve D=20mm, including fittings and installation. No 1.00 -

7 Damp proof Insulation rubber tape for all GI Piping. Lin M 150.00 -

8 Water supply inspection manhole less than 1200mm deep. This includes excavation and any needed work to make the manhole as per drawings and schedule. No 3.00 -

NOTE: Prior to work, samples must be approved by UNOPS Engineer.

NOTE: Prior to work, samples must be approved by UNOPS Engineer.

8/24

Page 9: BOQ Office Buildings

Currency: US Dollars

Project No: 810Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Component: Customs Office BuildingOriginal Issue: February 25, 2010

Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total CostPos.Sanitation Piping

9 PVC pipe D=100mm, including supply and installation. This also includes supply and installation of PVC pipe from GI sheet downpipes to the open channel collector at the side walks. Lin M 34.00 -

10 PVC pipe D=50mm, including fittings and installation. Lin M 50.00 -

11 Ventilation PVC pipes D=100mm (from toilets to roof). This also includes supplying and installation of PVC screen at the pipe inlets inside the toilets. See drawing and schedule for details. Lin M 15.00 -

12 Ventilation PVC pipes D=50mm (from toilets to roof). This also includes supplying and installation of PVC screen at the pipe inlets inside the toilets. See drawing and schedule for details. Lin M 10.00 -

13 PVC Elbow D=100x100,45ْ, including supply and installation. No 4.00 -

14 PVC Tee D=100x100, 45ْ, including supply and installation. No 8.00 -

15 Sanitation Grease Trap less than 1200mm deep. This includes excavation and any needed work to make the manhole according to the drawings and schedules. No 1.00 - Sanitary and other fixtures

16 Western toilet, including supply, installation and accessories. No 3.00 -

17 Water fountain , including supply, installation and accessories. No 2.00 -

18 Ceramic sink at toilets and labs, including mixer and all accessories, supplying and installation.

No 4.00 - 19 Floor trap D=50mm, including supply and

installation. No 6.00 - 20 Stainless steel sink, including supply and

installation. No 1.00 - 21 Ventilation cap D=100mm, including supply

and installation. No 2.00 - 22 Ventilation cap D=50mm, including supply and

installation. No 1.00 - 23 Service Sink, including supply and installation.

No 1.00 - 24 Electrical water boiler with capacity of 50 Liter,

including supply and installation. No 2.00 - 25 Electrical water boiler with capacity of 30 Liter,

including supply and installation. No 1.00 - 26 Sewer Manholes More than 1200mm deep.

This includes excavation and any needed work to make the manhole according to the drawings and schedules. No 2.00 -

Subtotal Water Services -

9. Electrical Services

9.1 Electrical Services 9.1 Electrical systems, 9.1 Electrical supply mains, 9.1 Electrical switchboard design, 9.1 Main 380VAC Distribution System, 9.1 Panel Construction, 9.1 Power accessories, 9.1 Lighting control and fittings, 9.1 Fire Detection Equipment Schedule Schedules and the Attachments

9/24

Page 10: BOQ Office Buildings

Currency: US Dollars

Project No: 810Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Component: Customs Office BuildingOriginal Issue: February 25, 2010

Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total CostPos.Note: for all items below the cost includes complete/installations with all needed accessories and works.Switchboard and sub boards

1 Sub distribution panel, 750x500x250 mm, powder coated, weatherproof, outdoor mounted metal. With Digital Measurement equipments.

No. 1.00 -

2 Main circuit breaker, MCCB, 3x160Amps, Type-C. No. 1.00 -

3 Circuit breaker, MCB, 1x32Amps, Type-CNo. 16.00 -

4 Circuit breaker, MCB, 1x20Amps, Type-CNo. 38.00 -

Distribution wiring

5 3 (1X6mm2) wires pulled in 24mm PVC Conduit, assorted colors as per phase requirement RST/UVW, white color for neutral and green color for grounding. Lin M 600.00 -

6 3 (1X4mm2) wires pulled in 24mm PVC Conduit, assorted colors as per phase requirement RST/UVW, white color for neutral and green color for grounding. Lin M 1,500.00 - Fittings/Fixtures

7 Single pole/double pole or two way light switch.No 42.00 -

8 32W circular surface ceiling mount, IP54 fluorescent light fixture. No 35.00 -

9 60W circular Pendant ceiling mount, IP54 fluorescent light fixture with all accessories. No 21.00 -

10 60W Circular Surface ceiling mount, IP54 fluorescent light fixture with all accessories. No 7.00 -

11 2x36W pendant ceiling mounted fluorescent light fixture, IP-44.with all accessories. No 25.00 -

12 1x36W pendant ceiling mounted fluorescent light fixture, IP-56. with all accessories. No 2.00 -

13 16 Amp Duplex power receptacle.No 98.00 -

14 16 Amp single water proof power receptacle.No 9.00 -

15 25 Amp single water proof power receptacle for electrical water heater and kitchen. No 9.00 - AC/Split Units and Exhaust fans

16 12000 BTU AC/ Split unit 220 V, 50 HZ Samsung made in Italy with all accessories. No 15.00 -

17 Roof mounted exhaust fans .No 3.00 -

18 25 Amp single electrical non-fuse disconnecting switch for AC/ Split unit. No 15.00 - Emergency evacuation lighting

19 2x10 watt IP-65 wall mounted Emergency Light Fixture. No 7.00 -

20 1X10W surface mounted IP-40 Exit light.No 4.00 -

Fire alarm system (including all associated cabling, wiring, mounting, etc)

21 Addressable fire alarm panel, with all accessories, to the complete and functioning job. LS 1.00 -

22 Fire alarm push button, double action type, UL Listed No 4.00 -

23 Fire alarm No 4.00 -

24 Photoelectric type smoke detectors, UL ListedNo 22.00 -

Electrical Grounding and Lightning Protection.

10/24

Page 11: BOQ Office Buildings

Currency: US Dollars

Project No: 810Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Component: Customs Office BuildingOriginal Issue: February 25, 2010

Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total CostPos.

25 Lightening protection as mentioned in lightening protection drawing with air terminal, electrodes, tape, connectors, clamp and grounding cable

Set 1.00 -

26 Grounding system as mentioned in grounding drawing with electrodes, tape, connectors, clamp and grounding cable Set 1.00 - Labeling

27 Proper and correct all circuits numbering, cable circuit drawings, cable and switchboard labeling to the full satisfaction of UNOPS engineer.

LS 1.00 -

Subtotal Electrical Services -

11/24

Page 12: BOQ Office Buildings

Currency: US Dollars

Project No: 810

Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04

Component: Customs Office BuildingOriginal Issue: February 25, 2010

Work Type

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total for General

Total for Site

UNOPS

SUMMARY OF COMPONENT

Vertical Structures Unit

Total for Customs Office Building 0.00

Total for Electrical Services

Total for Structure

Total for Enclosure

Total for Interior

Total for Finish

Total for Water Supply Services

Page 13: BOQ Office Buildings

Ai Khanem Border Crossing Point Facilities

Takhar, Afghanistan

Police Office Building

Page 14: BOQ Office Buildings

Currency: US Dollars

Project No: 810Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Component: Police Office BuildingOriginal Issue: February 25, 2010

Description of Work/Items Unit Quantity Unit Cost Total Cost1. General

1.1 Preliminaries 1.1 Occupied Areas, 1.1 Existing Services Schedule and 1.1 Items to be supplied schedules

1 Pre-construction work, mobilisation activities including paper/ documentation tasks.

LS 1.00 - 2 Post construction works and clean up.

LS 1.00 - 1.2 General Requirements 1.2 Inspection notification schedule and

1.2 Warranty schedules1 Testing and Operation/Maintenance Manuals.

LS 1.00 - Subtotal General -

2. Site

2.3 Earthwork 2.1 Identified hazardous materials and 2.3 Earthwork schedules

1 Excavation (any soil type) for foundation. This item includes all excavations, disposal and temporary support or shoring if needed. See drawing and schedule for details.

CU.M 190.00 -

2 Ground improvement under foundations. This includes supplying of filling materials and compacting the layers according to schedule and drawings. CU.M 85.00 -

3 Soil backfilling on RCC math foundation up to ground level. This includes supplying of needed materials. See drawings and schedules for levels/dimensions and details.

CU.M 147.00 -

4 Gravel compaction, Class 2, at any places under the PCC/RCC shown inside the building or at sidewalk/ramp. This includes supplying of needed materials. See drawing and project schedules for dimensions and details.

CU.M 60.00 -

Subtotal Site -

3. Structure

3.1 Concrete-General 3.1 Non reinforced concrete, 3.1 Reinforced concrete and 3.2 Concrete- Integral Finishes schedules

1 PCC lean concrete (10 Mpa) under the RCC foundations. CU.M 10.00 -

2 RCC (20 Mpa) foundations, rectangular and trapezoidal foundation beams. CU.M 108.00 -

3 PCC, 40mm thick, lean concrete (10 Mpa) at the floor over the gravel compaction. CU.M 15.00 -

NOTE: Cost for concrete items in this section includes reinforcement, steel anchorage embedded in concrete, shuttering, concrete, concrete curing and all to the complete job.

Pos.

UNOPS

DETAILS OF COMPONENTVertical Structures Unit

14/24

Page 15: BOQ Office Buildings

Currency: US Dollars

Project No: 810Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Component: Police Office BuildingOriginal Issue: February 25, 2010

Description of Work/Items Unit Quantity Unit Cost Total CostPos.

4 PCC concrete, 100mm thick, (20 Mpa) at the floor over the water-proofing layer. This item includes the stairs steps at the entrances and the ramps. CU.M 36.00 -

5 RCC Columns, includes all columns (from -1.65 to +3.55) and supporting columns/ring beams for trusses on the roof. CU.M 66.00 -

6 RCC (20 Mpa) slabs and beams. The items covers all slabs, beams and RCC floor for the bank. CU.M 66.00 -

7 RCC Pavement (20 Mpa), for 1000mm-wide side walks. This includes entrances and ramps. The cost includes expansion joint on side walk surface as shown and as well as the broom finish to the side walk/ ramp surfaces.

CU.M 12.00 -

3.3 Pre-cast RC Concrete 3.3 Precast Concrete Prototypes Schedule

1 Precast RCC (20 Mpa) exterior window sill for all windows as per drawings. This includes all work need for complete installation.

Lin M 23.00 -

3.5 Brickwork 3.5 Brickwork construction schedule

1 Second Class Brick masonry with mortar. This includes all brick walls/ brick masonry in the entire building. The cost includes steel bars shown in the walls and their connection to the perimeter RCC elements. CU.M 46.00 -

3.7 Light Steelwork 3.7 Light Steelwork, 6.6 Interior painting and 6.6 Exterior painting schedules

NOTE: The following steel items include painting according to the schedules and specifications for steel member painting for complete installation. See drawing for details.

1 Steel frame cabinet for First-Aid-Kits at the hall of Police Office Building. The item and its cost include making, transportation, installation, hardware, finishes and all other accessories and work required for a complete cabinet to the full satisfaction of the Engineer.

LS 1.00 - 2 Steel frame cabinets for Weapon Storages at

the hall of Police Office Building. The item and its cost include making, transportation, installation, hardware, finishes and all other accessories and work required for a complete cabinet to the full satisfaction of the Engineer.

LS 1.00 - 3.9 Light Timberwork 3.9 Light Timberwork schedule, 6.6

Interior painting and 6.6 Exterior painting schedules

1 Roof timber structure on the trusses. The cost includes 30mm thick wooden planks as shown on the drawing. This also cover all auxiliary and needed materials and supplying and installation of members including painting to make the surface ready for folded metal sheet roofing according to the drawing, schedule and specifications.

SQ.M 495.00 - 3.10 Concrete Unit Masonry 3.10 Concrete Unit Masonry

15/24

Page 16: BOQ Office Buildings

Currency: US Dollars

Project No: 810Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Component: Police Office BuildingOriginal Issue: February 25, 2010

Description of Work/Items Unit Quantity Unit Cost Total CostPos.

1 CMU masonry with mortar. This item covers all CMU works shown on the drawings for the building. The cost includes all needed materials, steel bars, anchors etc and works.

CU.M 46.00 - 3.11 Structural Steel 3.11 Structural Steel Schedules

3.7 Light Steelwork Schedule

1 Steel support, purlin, at the metal sheet roof as (C-shape 140x65mm + L-shape 50x50mm). See drawing for details. Lin M 440.00 -

2 Steel truss (TRUSS 1) at the roof. See drawing for details. No 3.00 -

3 Steel truss (TRUSS 2) at the roof. See drawing for details. No 4.00 -

4 Steel truss (TRUSS 3) at the roof. See drawing for details. No 2.00 -

5 Steel truss (TRUSS 4) at the roof. See drawing for details. No 8.00 -

6 Steel truss (TRUSS 5) at the roof. See drawing for details. No 2.00 -

7 Steel truss (TRUSS 6) at the roof. See drawing for details. No 2.00 -

8 Steel truss (TRUSS 7) at the roof. See drawing for details. No 8.00 -

9 Steel truss (TRUSS 8) at the roof. See drawing for details. No 2.00 -

10 Steel truss (TRUSS 9) at the roof. See drawing for details. No 4.00 -

11 Steel truss (TRUSS 10) at the roof. See drawing for details. No 4.00 -

12 Steel truss (TRUSS 11) at the roof. See drawing for details. No 1.00 -

13 Steel frame fixed ladder inside the toilet as the access way to the roof. The work and the cost includes construction of fixed later to the wall and the opening pane, its hardware and other accessories to complete the installation as per drawing and schedule. This also includes painting according to the schedules and specifications for steel surfaces painting.

LS 1.00 -

Subtotal Structure -

4. Enclosure

4.1 Waterproofing 4.1 Waterproofing system schedule

1 Bitumen water-proofing coat. This is a 3-5mm thick hot bitumen painting coats on dried PCC surface. The item applies on 40mm PCC at the floor beneath the 20 Mpa, 100mm thick PCC layer. This cost includes supplying and applying the coats with all needed accessories and work to do the job as per manufacturer's data and to the full satisfaction of UNOPS engineer. SQ.M 360.00 -

NOTE: Cost for steel related items in this section includes supplying materials and installation to the complete condition for all members, gussets, fasteners, connections, welding and other accessories and works needed to complete the job. The cost also includes painting according to the schedules and specifications for steel member painting, which is at least on coat of anti-rust followed by 2 other coats of oil-based painting for all surfaces and sides of the steel members.

16/24

Page 17: BOQ Office Buildings

Currency: US Dollars

Project No: 810Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Component: Police Office BuildingOriginal Issue: February 25, 2010

Description of Work/Items Unit Quantity Unit Cost Total CostPos.

2 Single layer bitumen membrane at the floor and walls of toilets/kitchen. This includes preparation of base layers shown on the drawings. Refer to schedule/drawing for details. SQ.M 55.00 -

4.2 Roofing 4.2 Roofing materials, and 4.2 Gutter and Down pipe Schedules

1 Standing seam metal roofing (using GI sheet gauge 24). This includes all accessories required for installation of roof on the prepared timber plank (see item 3.9.1 for the cost of timber plank on roof). The cost also includes all flashings, capping etc needed on the metal roof. SQ.M 495.00 -

2 Metallic gutter around the roof (using GI sheet gauge 20). The cost includes all accessories required for complete installation of gutter such as supplying, fixing and others as per drawing and schedules.

Lin M 98.00 -

3 Down pipes, PVC pipe class-B. This includes all accessories required for complete installation such as supplying, fixing and others as per drawing and schedules.

Lin M 38.00 -

4.3 Windows and Window Hardware 4.3 Window, 4.3 Window Hardware, 4.5 Annealed Glasses, and 4.6 Glassblock work schedules

1 Wooden frame windows. The work includes making, transportation, installation, hardware, glazing, glass-block work around window, insect screen, 3 coats of oil-based painting, and other accessories required for complete installation as per drawings and schedule.

SQ.M 50.00 -

4.4 Doors and Door Hardware 4.4 Joinery doors 4.4 PVC doors, 4.4 Steel doors and 4.5 Annealed Glasses schedules

1 Wooden frame doors. The work includes making, transportation, installation, hardware, glazing, and other accessories required for complete installation as per drawings and schedule. SQ.M 60.00 -

2 PVC frame doors. The work includes making, transportation, installation, hardware, glazing, and other accessories required for complete installation as per drawings and schedule.

SQ.M 6.00 -

3 Steel frame doors. The work includes making, transportation, installation, hardware, glazing, 1 coat of anti-rust followed by 2 other coats of oil-based painting, and other accessories required for complete installation as per drawings and schedule.

SQ.M 2.00 -

4.5 Glazing 4.5 Mirrors schedules

1 Mirrors (40x60cm) at toilets. This includes complete installation. No 5.00 -

4.7 Insulation and Vapour Barriers 4.7 Insulation Schedules

1 Glasswool thermal insulation on RCC roof, beneath roof structure. See drawings and schedules for details. SQ.M 495.00 -

NOTE: Prior to work, samples must be approved by UNOPS Engineer.

NOTE: Prior to work, samples must be approved by UNOPS Engineer.

17/24

Page 18: BOQ Office Buildings

Currency: US Dollars

Project No: 810Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Component: Police Office BuildingOriginal Issue: February 25, 2010

Description of Work/Items Unit Quantity Unit Cost Total CostPos.

4.8 Exterior Insulation and Finish System 4.8 EFIS Schedules

1 External wall insulation system, STOTHERM CLASSIC, (expanded polystyrene foam and organically bound render) "or equivalent ". See drawing and schedule for location and detail. The cost includes one preparation layer of cement render and all other process required for a complete job as per product's manufacturer data and UNOPS engineer satisfaction. SQ.M 250.00 -

Subtotal enclosure -

5. Interior

5.4 Suspended Ceiling 5.4 Suspended Ceiling Schedule

1 Lasani wooden board, 16mmm, fixed ceiling for all soffits around the building. The cost includes all framing, fixing, oil based painting and needed work for a complete job to the full satisfaction of Engineer.

SQ M 117.00 -

2 Gypsum board, 16mmm, reflected ceiling for the side entrances of the building. The cost includes all framing, fixing, and needed work for complete job. SQ M 4.00 -

5.5 Joinery 5.5 Joinery fixtures schedule

1 Wooden frame, MDF finish, wall mounted cabinet at the kitchen. See drawings for details. The cost includes making, installation, framing, hardware, finish, 3 coats oil-based painting and all to the complete job.

LS 1.00 -

2 Wooden frame, MDF finish, floor mounted cupboard at the kitchen. See drawings for details. The cost includes making, installation, framing, finish, hardware, stone table top, splash back, 3 coats oil-based painting and all to the complete job. LS 1.00 -

5.6 Metalwork 5.6 Metal Fixtures Schedule

1 Metallic plaster beads for outer corners at the corridors only, including edge of walls. This includes any needed work for complete installation. See schedules and drawings for details. Lin M 54.00 -

2 Toilet roll holders. This also includes installation. No 3.00 -

3 Grab rail for handicap toilet. One complete set. This includes supplying and complete installation. LS 1.00 -

4 Soap dishes. This also includes installation.No 4.00 -

5.8 Fire Extinguishers and Blankets 5.8 Fire Extinguishers Schedule

1 Extinguishers, wall mounted, powder-type (9kg). No 4.00 -

Subtotal Interior -

6. Finish

6.1 Plastering 6.1 Plastering Schedule

NOTE: Prior to work, samples must be approved by UNOPS Engineer.

NOTE: Prior to work, samples must be approved by UNOPS Engineer.

18/24

Page 19: BOQ Office Buildings

Currency: US Dollars

Project No: 810Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Component: Police Office BuildingOriginal Issue: February 25, 2010

Description of Work/Items Unit Quantity Unit Cost Total CostPos.Internal surfaces

1 Cement render medium CRM followed by cement render fine CRF on all internal surfaces of walls/ ceilings/ beams/ columns/ reveals. See schedule for detail. SQ.M 880.00 - External surfaces

2 Gypsum board, decorative finish, at both main entrances foreheads. The cost includes supplying, making, installation and all to the complete condition as per Engineer's approval.

SQ.M 40.00 - 6.2 Cementitious Toppings 6.2 Cementitious Toppings Schedule

1 In situ colored chips, colored mortar terrazzo, including marble trims for joints, for all floors as shown on the drawing. See schedule for details. The cost also includes stainless steel nosing at the outer edges of the stair steps at the entrances. SQ.M 390.00 -

6.3 Tiling 6.3 Wall tiling and 6.3 Floor tiling schedules

1 Ceramic wall tiles for toilets, kitchen, around the drinking water fountain and any place shown. The cost includes bed preparation, bedding and grout. SQ.M 70.00 -

2 Ceramic floor tiles for toilets including bed preparation, bedding and grout. SQ.M 35.00 -

3 Marble skirting for all rooms and halls where did not receive ceramic tiles. The cost includes bedding and grout. Lin M 360.00 -

6.6 Painting 6.6 Interior/Exterior painting schedule

Internal surfaces

1 Flat water based: Interior, on all surfaces that receive cement plaster. The cost includes wall putty (gypsum filling) layer before painting and all needed preparation of the surfaces for painting. See schedule for detail on this paint system SQ.M 880.00 -

Subtotal Finishes -

8. Water Services

8.1 Water Services 8.1 Water services samples, 8.1 Water system piping, 8.1 Sanitary fixtures, 8.1 Water heater schedules and 8.1 Water Services Testing schedules

NOTE: The cost for all pipes exposed to weather includes glass wool thermal insulation cover. The cost given for all GI and PVC pipes with diameter less than 60mm includes all required fittings, accessories and work for complete system installation.

Water supply piping

1 GI water supply pipe D=32mm, including fittings and installation. Lin M 30.00 -

NOTE: Prior to work, samples must be approved by UNOPS Engineer.

NOTE: Prior to work, samples must be approved by UNOPS Engineer.

NOTE: Prior to work, samples must be approved by UNOPS Engineer.

19/24

Page 20: BOQ Office Buildings

Currency: US Dollars

Project No: 810Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Component: Police Office BuildingOriginal Issue: February 25, 2010

Description of Work/Items Unit Quantity Unit Cost Total CostPos.

2 GI water supply pipe D=25mm, including fittings and installation. Lin M 22.00 -

3 GI water supply pipe D=20mm, including fittings and installation. Lin M 59.00 -

4 GI water supply pipe D=15mm, including fittings and installation. Lin M 78.00 -

5 Water supply bronze Valve D=32mm, including fittings and installation. No 2.00 -

6 Water supply bronze Valve D=20mm, including fittings and installation. No 2.00 -

7 Damp proof Insulation rubber tape for all GI Piping. Lin M 200.00 -

8 Water supply inspection manhole less than 1200mm deep. This includes excavation and any needed work to make the manhole as per drawings and schedule. No 4.00 - Sanitation Piping

9 PVC pipe D=100mm, including supply and installation. This also includes supply and installation of PVC pipe from GI sheet downpipes to the open channel collector at the side walks. Lin M 50.00 -

10 PVC pipe D=50mm, including fittings and installation. Lin M 45.00 -

11 Ventilation PVC pipes D=100mm (from toilets to roof). This also includes supplying and installation of PVC screen at the pipe inlets inside the toilets. See drawing and schedule for details. Lin M 23.00 -

12 Ventilation PVC pipes D=50mm (from toilets to roof). This also includes supplying and installation of PVC screen at the pipe inlets inside the toilets. See drawing and schedule for details. Lin M 8.00 -

13 PVC Elbow D=100x100,45ْ, including supply and installation. No 10.00 -

14 PVC Tee D=100x100, 45ْ, including supply and installation. No 15.00 -

15 Sanitation Grease Trap less than 1200mm deep. This includes excavation and any needed work to make the manhole according to the drawings and schedules. No 1.00 - Sanitary and other fixtures

16 Western toilet, including supply, installation and accessories. No 5.00 -

17 Water fountain , including supply, installation and accessories. No 2.00 -

18 Ceramic sink at toilets and labs, including mixer and all accessories, supplying and installation. No 6.00 -

19 Floor trap D=50mm, including supply and installation. No 7.00 -

20 Stainless steel sink, including supply and installation. No 1.00 -

21 Ventilation cap D=100mm, including supply and installation. No 3.00 -

22 Ventilation cap D=50mm, including supply and installation. No 1.00 -

23 Service Sink, including supply and installation.No 1.00 -

24 Electrical water boiler with capacity of 50 Liter, including supply and installation. No 2.00 -

25 Electrical water boiler with capacity of 30 Liter, including supply and installation. No 2.00 -

20/24

Page 21: BOQ Office Buildings

Currency: US Dollars

Project No: 810Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Component: Police Office BuildingOriginal Issue: February 25, 2010

Description of Work/Items Unit Quantity Unit Cost Total CostPos.

26 Sewer Manholes More than 1200mm deep. This includes excavation and any needed work to make the manhole according to the drawings and schedules. No 3.00 -

Subtotal Water Services -

9. Electrical Services

9.1 Electrical Services 9.1 Electrical systems, 9.1 Electrical supply mains, 9.1 Electrical switchboard design, 9.1 Main 380VAC Distribution System, 9.1 Panel Construction, 9.1 Power accessories, 9.1 Lighting control and fittings, 9.1 Fire Detection Equipment Schedule Schedules and the Attachments

Note: for all items below the cost includes complete/installations with all needed accessories and works.Switchboard and sub boards

1 Sub distribution panel, 750x500x250 mm, powder coated, weatherproof, outdoor mounted metal. With Digital Measurement equipments. No. 1.00 -

2 Main circuit breaker, MCCB, 3x160Amps, Type-C. No. 1.00 -

3 Circuit breaker, MCB, 1x32Amps, Type-CNo. 12.00 -

4 Circuit breaker, MCB, 1x20Amps, Type-CNo. 30.00 -

Distribution wiring

5 3 (1X6mm2) wires pulled in 24mm PVC Conduit, assorted colors as per phase requirement RST/UVW, white color for neutral and green color for grounding. Lin M 400.00 -

6 3 (1X4mm2) wires pulled in 24mm PVC Conduit, assorted colors as per phase requirement RST/UVW, white color for neutral and green color for grounding. Lin M 900.00 - Fittings/Fixtures

7 Single pole/double pole or two way light switch. No 38.00 -

8 32W circular surface ceiling mount, IP54 fluorescent light fixture. No 26.00 -

9 60W circular Pendant ceiling mount, IP54 fluorescent light fixture with all accessories. No 16.00 -

10 60W Circular Surface ceiling mount, IP54 fluorescent light fixture with all accessories. No 2.00 -

11 2x36W pendant ceiling mounted fluorescent light fixture, IP-44.with all accessories.

No 16.00 -

12 1x36W pendant ceiling mounted fluorescent light fixture, IP-56. with all accessories.

No 3.00 -

13 16 Amp Duplex power receptacle.No 54.00 -

14 16 Amp single water proof power receptacle.No 16.00 -

15 25 Amp single water proof power receptacle for electrical water heater and kitchen.

No 12.00 - AC/Split Units and Exhaust fans

16 12000 BTU AC/ Split unit 220 V, 50 HZ Samsung made in Italy with all accessories.

No 8.00 -

21/24

Page 22: BOQ Office Buildings

Currency: US Dollars

Project No: 810Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Component: Police Office BuildingOriginal Issue: February 25, 2010

Description of Work/Items Unit Quantity Unit Cost Total CostPos.

17 Roof mounted exhaust fans .No 5.00 -

18 25 Amp single electrical non-fuse disconnecting switch for AC/ Split unit. No 8.00 - Emergency evacuation lighting

19 2x10 watt IP-65 wall mounted Emergency Light Fixture. No 5.00 -

20 1X10W surface mounted IP-40 Exit light.No 4.00 -

Fire alarm system (including all associated cabling, wiring, mounting, etc)

21 Addressable fire alarm panel, with all accessories, to the complete and functioning job. LS 1.00 -

22 Fire alarm push button, double action type, UL Listed No 4.00 -

23 Fire alarm No 4.00 -

24 Photoelectric type smoke detectors, UL ListedNo 16.00 -

Electrical Grounding and Lightning Protection.

25 Lightening protection as mentioned in lightening protection drawing with air terminal, electrodes, tape, connectors, clamp and grounding cable Set 1.00 -

26 Grounding system as mentioned in grounding drawing with electrodes, tape, connectors, clamp and grounding cable Set 1.00 - Labeling

27 Proper and correct all circuits numbering, cable circuit drawings, cable and switchboard labeling to the full satisfaction of UNOPS engineer. LS 1.00 -

Subtotal Electrical Services -

22/24

Page 23: BOQ Office Buildings

Currency: US Dollars

Project No: 810

Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04

Component: Police Office BuildingOriginal Issue: February 25, 2010

Work Type

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total for Water Supply Services

Total for Electrical Services

Total for Structure

Total for Enclosure

Total for Interior

Total for Finish

Total for Police Office Building 0.00

Total for General

Total for Site

UNOPS

SUMMARY OF COMPONENT

Vertical Structures Unit

Page 24: BOQ Office Buildings

Currency: US Dollars

Project No: 810Project Title: Ai Khanem Border Crossing Point FacilitiesLocation: Takhar, Afghanistan

Tender No: 04Tender Title: Customs and Police Office BuildingsOriginal Issue: February 25, 2010

CONTRACT COMPONENTS

Signature

Total for Customs Office BuildingTotal for Police Office Building

UNOPS

SUMMARY BILL OF QUANTITIESVertical Structures Unit

Signature

Address and Mobile Number

Name Name

Position Position

Agreed on behalf of Contractor UNOPS

BOQ Value for whole tender in words:

Zero