Redoubt Road – Mill Road corridor project Project overview Covers the 8.9km section of the Redoubt Road-Mill Road corridor Starting at the State Highway One (SH1) on and off ramps on Redoubt Road running east then south along Redoubt Road to the Redoubt Road-Mill Road intersection The corridor continues south along Mill Road, concluding south of Alfriston Road near the intersection of Mill Road and Popes Road It also includes a short section along Hollyford Drive to the north of Redoubt Road and a portion of Murphys Road from a new intersection on Redoubt Road to Flat Bush School Road. Why is the project required? Changing land use, population growth and planned housing developments will increase pressure on local infrastructure in south Auckland Significant crash hotspots along the route make it necessary to improve the road’s safety Improvements to the Mill Road corridor between Manukau, Papakura and Drury are identified as a priority in the Auckland Long Term Plan (LTP). Mill Road approaching new proposed Redoubt / Murphys Road intersection.

Transcript of Redoubt Road – Mill Road corridor project · PDF fileRedoubt Road – Mill Road...

Page 1: Redoubt Road – Mill Road corridor project · PDF fileRedoubt Road – Mill Road corridor project ... transport network ... • On-going environmental monitoring after works are completed

Redoubt Road – Mill Road corridor project

Project overview• Covers the 8.9km section of the Redoubt

Road-Mill Road corridor

• Starting at the State Highway One (SH1) on and off ramps on Redoubt Road running east then south along Redoubt Road to the Redoubt Road-Mill Road intersection

• The corridor continues south along Mill Road, concluding south of Alfriston Road near the intersection of Mill Road and Popes Road

• It also includes a short section along Hollyford Drive to the north of Redoubt Road and a portion of Murphys Road from a new intersection on Redoubt Road to Flat Bush School Road.

Why is the project required?• Changing land use, population growth

and planned housing developments will increase pressure on local infrastructure in south Auckland

• Significant crash hotspots along the route make it necessary to improve the road’s safety

Improvements to the Mill Road corridor between Manukau, Papakura and Drury are identified as a priority in the Auckland Long Term Plan (LTP).

Mill Road approaching new proposed Redoubt / Murphys Road intersection.

Page 2: Redoubt Road – Mill Road corridor project · PDF fileRedoubt Road – Mill Road corridor project ... transport network ... • On-going environmental monitoring after works are completed

Manukau Harbour

Pararekau Island

Wao

kauri Creek

Pukaki Creek

Drury

Cre

ek

Pahurehure Inlet

20A

20A

20

20

20 1

1

1

1

Puhinui

Takanini

Middlemore

Homai

Papatoetoe

Manurewa

Te Mahia

Papakura

Otara

Flat Bush

Manukau Heights

Takanini

Manurewa East

Randwick Park

Manurewa

Goodwood Heights

Totara Heights

Wattle Downs

MangereAscot Industrial

Mangere East

Puhinui

Wiri

Hill Park

Clover Park

Chapel Downs

Weymouth

Clendon

Conifer Grove

Papakura

Opaheke

Red HillPahurehure

The Gardens

Donegal Park

Papatoetoe

Kingseat

Waiau Pa

eagroveKaraka

Hingaia

Runciman

Ramarama

Drury

Homai

Te Hihi

Wesley

Ardmore

10,000 new houses in special housing areas

6000 jobs in new industrial areas

Redoubt Road-Mill Road corridor route

Future urban zone

Special housing area

New industrial areas

Special Housing Areas announced for the area provide for 10,000 new homes – placing pressure on the current transport network

• An estimated 10,000 new houses will be fast tracked in special housing areas under the Housing Accord in southern parts of Auckland, this includes 4470 houses in Flat Bush, and 1770 houses in Takanini

• A further 12,000 – 14,000 houses are anticipated to be constructed in the Takanini, Opaheke, Drury and Karaka future urban zone as indicated in the Proposed Auckland Unitary Plan

• New industrial areas in Takanini and Drury south will create 6,000 new jobs

• Traffic volumes will increase to a level more than the current Redoubt and Mill Roads can cope with

• Congestion is already affecting parts of Redoubt Road and Mill Road and traffic will almost double in 10 to 15 years.

Growth map for the Mill Road – Redoubt Road area

South Auckland is growing

Page 3: Redoubt Road – Mill Road corridor project · PDF fileRedoubt Road – Mill Road corridor project ... transport network ... • On-going environmental monitoring after works are completed

Features and benefits• A safer and more efficient route that can support future growth in the area

• More reliable journeys by providing a four lane road with more capacity and upgraded intersections

• Improved public transport infrastructure and services

• More reliable bus journey times, the ability to move more people and remove constraints on the public transport network by creating bus priority lanes through Hollyford Drive and Redoubt Road intersections

• Improved travel time and safety for drivers, pedestrians and cyclists

• New footpaths on both sides of Redoubt and Murphys Road improving pedestrian connectivity

• Safe pedestrian crossing opportunities at all traffic signals

• An alternative north-south corridor in case of major disruption or emergencies on the other southern arterial routes

Safety• Improves safety and provides for increases in traffic that

will come with significantly more people living in the area and using this route

• Significant crash hot spots at a number of dangerous junctions and curves along the route make it necessary to improve the road alignment

• 283 vehicle crashes and four fatalities (2009-2013)

• Without the upgrades there are expected to be further safety issues and more traffic than the existing road can cope with by 2026.

Safety

Accident hotspots along the Redoubt Road – Mill Road Corridor.

Page 4: Redoubt Road – Mill Road corridor project · PDF fileRedoubt Road – Mill Road corridor project ... transport network ... • On-going environmental monitoring after works are completed

Key project featuresFeatures and benefits• Redoubt Road widened to four lanes (two in

each direction) between SH1 and Murphys Road

• Westbound bus lane along Hollyford Drive and Redoubt Road towards Manukau

• Replacement of the existing Mill Road with a new four lane arterial (two in each direction) between Murphys Road and Popes Road

• New roundabouts at Ranfurly Road and Alfriston Road with pedestrian facilities including safe crossing facilities in the medians

• New and improved signalised intersections at Diorella Drive, Hollyford Drive, Santa Monica Place and Murphys Road. These intersections will have pedestrian crossings and stop boxes for cyclists

• Widening of Murphys Road to four lanes (two in each direction) between Flat Bush School Road and Redoubt Road

• Murphys Road-Redoubt Road intersection realigned and traffic lights added to improve safety

• On road cycle lanes on both sides for the length of the upgrade

• Off-road cycle and foot paths (shared path) for the length of the upgrade

Proposed Viaduct over Puhinui Creek.

• Widened footpaths on both sides of Redoubt Road, Mill Road and Murphys Road with pedestrian crossings at key intersections

• Improved access to local community services and facilities such as Totara Park and Murphys Bush

• Replacement planting and stream restoration

• Improved stormwater facilities for the entire corridor which includes wetlands areas for stormwater treatment and retention

• Landscaping of the new road corridor

Towards Flat Bush / Manukau

Proposed Mill Road

Towards Papakura

Existin

g M

ill Ro

ad

Page 5: Redoubt Road – Mill Road corridor project · PDF fileRedoubt Road – Mill Road corridor project ... transport network ... • On-going environmental monitoring after works are completed

Santa

Monica Pl

Hollyford Dr

Dio

r ella Dr

Redoubt Road

Mill RdProposed Route - 4 Lanes

Murphys RdProposed Route - 4 Lanes

AlfristonSchool

Ranf

urly

Rd

Alfrist

on R

d

Hill Rd

Popes Rd

Sout

h M

ill R

d

Gul

ly V

iadu

ct

Puhi

nui C

reek

Gul

ly V

iadu

ct

Hilltop Rd

Redoubt Rd

Flat Bush School Rd

Thomas Rd

EquestrianCentre

Murphys Bush - scenic reserve

Auckland Regional Botanical Gardens

Watercare Reservoir

Mur

phys

Rd

Phillip RdStratford Rd

St Johns Redoubt

Everglade Dr

Te Ir

irang

i Dr

Mill Rd

Key

Bus lane

On Road Cycle Lane

Off Road Shared Path

New roundabout

New signalised intersection

Existing signal remains*

Existing signal-

ised intersection

remains

Redoubt Rd Proposed route -4 lanes + bus lane

TotaraPark

State Highway 1

Goodwood Dr*

Mill Road corridor map

Page 6: Redoubt Road – Mill Road corridor project · PDF fileRedoubt Road – Mill Road corridor project ... transport network ... • On-going environmental monitoring after works are completed

Background and milestones

2009

Consultation on the Northern section began in 2009 with Manukau City Council asking the public for feedback on options for sections of the corridor.

2015 / 2016

Southern section: Progress work to identify a route alignment.

2012

Auckland Transport consulted with directly affected landowners and the wider community in October and November 2012 with six information days. Responses from the public were evaluated and incorporated in planning the project.

2015 / 2016

Northern section: Notice of requirement decision to confirm designation.

October 2014

Northern section: Route identified and Notices of Requirement lodged.

2020+

Northern section: Phased construction along Redoubt Road, Mill Road and Murphys Road driven by growth.

2015

Northern section: Public submissions and hearing on Notices of Requirement.

2025+

Southern section: Finalisation of route and construction dependent on growth.

Page 7: Redoubt Road – Mill Road corridor project · PDF fileRedoubt Road – Mill Road corridor project ... transport network ... • On-going environmental monitoring after works are completed

Road runoff Filterstrip

Swales (vegetation)

Riparian buffer (vegetation)

Wetlands

Environmental considerations and ecology

• Implementing a noise and vibration management plan

• Managing any soil contamination, stormwater runoff and dust

• Replacement planting and stream restoration

• Creating new wetland areas and habitats for local birdlife

• A pest eradication programme

• Monitoring environmental issues during construction

• On-going environmental monitoring after works are completed

• The route was selected at Puhinui Creek to avoid mature forest

• It crosses two areas of native forest via 17m and 23m high viaducts. These will be built at Puhinui Creek gully and South Mill Road gully

• At least 22,000 sq. m of native planting

• Environmental monitoring during and after construction

• Mitigating effects by planting native trees adjoining to existing bush areas

• Monitoring mature trees for bat habitation before felling

• Minimise road lighting and where lights are necessary use downward facing low pressure sodium lamps

• Rescue and relocate native geckos and skinks

• Provide fish passage and appropriate stream restoration where culverts are built

• Retain a habit linkage beneath the Puhinui Creek Gully viaduct during construction of piers which will remain after completion

A large number of routes were investigated and potential effects assessed before the final route was selected. A number of conditions are proposed to reduce or mitigate any long-term impacts:

Secondary and tertiary treatmenteg: raingardens, wetlands and riparian buffers

Primary treatmenteg: filterstrips and swales

Stormwater treatment removes contaminants through an evironmentally friendly staged design.

Page 8: Redoubt Road – Mill Road corridor project · PDF fileRedoubt Road – Mill Road corridor project ... transport network ... • On-going environmental monitoring after works are completed

Noise and vibrationConstruction noise and vibration• Noise and vibration will be produced from construction activities, laydown

areas and worksites.

What will be done about it?• The team will comply with procedures set out in the New Zealand standards

6803:1999, Acoustics – Construction Noise

• This standard sets out limits and provides methods of predicting and managing noise

• Before commencing any work, Auckland Transport will prepare a detailed plan to show how the project will comply with the standards

Operational noise and vibration• Once operational, the project will comply with procedures set out in the

New Zealand standards 6806:2010, Acoustics – Road Traffic Noise – New and Altered Roads

• This is the accepted method in New Zealand to address road-traffic noise

• It provides performance targets and requires assessment of a number of different options for noise mitigation

Mitigation options include

• Acoustic barriers

• Landscaping

• Use of low noise road surfaces (for example open graded porous asphalt)

• Dwelling modifications including double glazing and insulation

• The mitigation processes will change as the design progresses and decisions are made on detailed design

Page 9: Redoubt Road – Mill Road corridor project · PDF fileRedoubt Road – Mill Road corridor project ... transport network ... • On-going environmental monitoring after works are completed

Cycling and walking improvements• On road cycle lanes for the length of the upgrade, varying between

1.5 and 2 metres wide

• Off road shared use paths for less confident cyclists and pedestrians on one side of the length of the upgrade

• Advanced stop boxes for cyclists at intersections with traffic lights.

• Two metre wide footpath on both sides of Redoubt Road between SH1 and Hollyford Drive intersections

• A mix of footpaths and the shared use path will be provided for the rest of Redoubt Road, Mill Road and Murphys Road

• Pedestrian crossings on all legs of intersections with traffic lights (Hollyford/Redoubt, Diorella/Redoubt, Murphys/Redoubt)

• Safe crossing refuges in medians at Ranfurly Road and Alfriston Road roundabouts

FootpathBerm Berm Cyclepath

2m 1m 1.6m

Lane Lane

7m2.7m

Berm

1.7mMed

ian

Lane Lane

7m

BermCyclepath

1m1.6m

Shared path

3mSep

arat

ion

med

ian

Sep

arat

ion

med

ian

Redoubt Road typical cross section

Footpath Berm Cyclepath

2.2m 1.2m 1.8m

Lane Lane

6.4 Med

ian

Lane Lane

6.4m

BermCyclepath

1.2m1.8m

Shared path

3mSep

arat

ion

med

ian

Sep

arat

ion

med

ian

Murphy’s Road typical cross section

CyclepathBerm

2m

Lane Lane

7m5.2m

Berm

1.mMed

ian

Lane Lane

7m

BermCyclepath

1m2m

Shared path

3m5.2m Sep

arat

ion

med

ian

Sep

arat

ion

med

ian

Mill Road typical cross section

Page 10: Redoubt Road – Mill Road corridor project · PDF fileRedoubt Road – Mill Road corridor project ... transport network ... • On-going environmental monitoring after works are completed

Public transport improvements• Public transport improvements to the Mill Road Corridor will provide more

frequent and more reliable public transport services

• Bus priority facilities will be provided at the Hollyford Drive/Redoubt Road intersection, including a dedicated right turn lane for buses turning out of Hollyford Drive into Redoubt Road

• A new westbound bus lane is proposed between Hollyford Drive and SH1 intersection

• The proposed bus lane will allow buses to travel unimpeded between Hollyford Drive and Diorella Drive, and between Diorella Drive and the motorway

• The frequency of bus services will increase which will provide a better level of service for public transport users

• Improvements to bus priority facilities and frequency will enable a strong integration with connector routes and local services

• Bus priority facilities will be provided at the Hollyford Drive/Redoubt Road intersection, including a dedicated right turn lane for buses turning out of Hollyford Drive into Redoubt Road

Redoubt Road bus lane cross section

FootpathBerm Berm Cyclepath

2m 1.5m1.5m

Berm

1.5m

Lane Lane

6.6m1m

Berm

0.9mMed

ian

Lane Lane Bus lane

6.6m

Cyclepath

1.6m

Footpath

2m3.4mSep

arat

ion

med

ian

Page 11: Redoubt Road – Mill Road corridor project · PDF fileRedoubt Road – Mill Road corridor project ... transport network ... • On-going environmental monitoring after works are completed

Planning process and how to get involved

• Auckland Transport has lodged three separate Notices of Requirement (NoR) with Auckland Council

• The intention is for Auckland Council to publicly notify the NoRs in April 2015

• The NoR process provides an opportunity for you to provide comment (make a submission)

• If you wish to make a submission on these documents and be involved in the process you will be able to find the notified documents and submission instructions at the following Auckland Council website location: tinyurl.com/o65z5yr

Lodged late 2014Resource Consent applications and alteration for designation

January 2014Council asks for further information

April – MayPublic notification – 17 April 2015 Submisssions close – 19 May 2015

May – JuneSubmissions received and reviewed

JuneCouncil will ask for further information (if required)

June – JulyResolving of pre-hearing issues

August (to be confirmed)Council hearing

width of road minimised

opportunity to reinforce bush edge

Murphys Road widening, adjacent to Murphys Bush.