Page 1: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

Modelling and

Simulation for

Signalling System

Design

Tim Gray

([email protected])

February 2015

Page 2: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

Introductions

• Tim Gray

• TRE

• Simulation

• Modelling

• Our interest

• Simulate, Validate

• …Control

2

Page 3: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

Simulate - High fidelity simulators

3

• Mandated following Ladbroke Grove

• 100% replica of live railway

• c.150 TREsims now installed

• Safe off-line environment for;

• Training & assessment

• Response to disruption/emergency

• Operational analysis

• Engineering and maintenance

• Most VDU-based control workstations

• + Accurate model of interlocking

• A fully controlled virtual railway

Page 4: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

Validate – the Project Life Cycle

Business

Case

Concept

Operations

Work

Station

Evaluation /

Human

Factors

Scheme

Optioneering

Final

Design /

Data Test

Pre-

Commissioning

Training

Operational

Phase

Future

Change

Page 5: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

Why is it needed? • Other sectors use it more vigorously

• Modelling and Decision Support (NR Technical Strategy)

• CP5 volume & efficiency challenges

– Test & refine the end users’ specification – reduce rework

– Efficient design process – reduce rework/human intervention

– Reduce cost

• Systematic use brings many benefits

• Fits with industry initiatives such as;

– ‘Safety in Signalling Projects’

– Assured Project Delivery

– ‘Safe by Design’

• Enhances the NR GRIP Process

5

Page 6: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

GRIP

0.

Conception

1.

Output

Definition

2.

Feasibility

3.

Option

Selection

4.

Single Option

Development

5.

Detailed

Design

7.

Scheme

Hand Back

8.

Project

Close Out

6.

Construction

Test and

Commission

Page 7: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

Potential users/stakeholders

0.

Conception

1.

Output

Definition

2.

Feasibility

3.

Option

Selection

4.

Single Option

Development

5.

Detailed

Design

7.

Scheme

Hand Back

8.

Project

Close Out

6.

Construction

Test and

Commission

Who might consider this?

• Network Rail – HQ, SDG, Routes, Ops

• Framework Contractors

• Signalling designers/OEMs

• Consultants – engineering, operations, HF, financials

• Equipment/solution providers

• Operators/Users • Other stakeholders

Page 8: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

Some Examples

Business

Case

Concept

Operations

Work

Station/HF

Evaluation

Scheme

Optioneering

Final

Design /

Data Test

Pre-

Commissioning

Training

Operational

Phase

Future

Change

Page 9: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

Business Case - TREmodel

Business

Case

Concept

Operations

Work

Station/HF

Evaluation

Scheme

Optioneering

Final

Design /

Data Test

Pre-

Commissioning

Training

Operational

Phase

Future

Change

• Check performance benefit with new layouts

• Check journey time improvements

• Is business benefit delivered? • E.g. TREmodel • E.g. Derby re-modelling

Page 10: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

Optioneering - TREmodel

Business

Case

Concept

Operations

Work

Station/HF

Evaluation

Scheme

Optioneering

Final

Design /

Data Test

Pre-

Commissioning

Training

Operational

Phase

Future

Change

• Layout evaluations • Model Operations • Confirm Operational

Requirements • e.g. London Bridge • e.g. Any project!

Page 11: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

Design & Test - TREsure

Business

Case

Concept

Operations

Work

Station/HF

Evaluation

Scheme

Optioneering Final

Design /

Data Test

Pre-

Commissioning

Training

Operational

Phase

Future

Change

• Automate design & testing • Use simulation for principles

checking • Reduce reliance on testers • Free up resource • Safety benefits • Accelerate projects • e.g. TREsure - Interlocking Test Tool

Page 12: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

TREsure: Origins/Concept

Questions from RIA

• Can TREsim be used to test for

situations that are difficult to

observe using traditional

techniques – particularly across

interlocking boundaries?

• Can this testing be automated?

12

Network Rail request • To test from entrance into the interlocking under test all the way through

to exit from the interlocking – for all possible route paths

• To test for locking (or absence!) for all moveable infrastructure and

opposing routes at locking level (+ aspects?)

Page 13: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

TREsure: TRE designed data

Outline existing process for interlocking design & test

13

NR Scheme Plan

Control Tables

Interlocking Data Design

TRE Test FAT SAT

TRE

TRE

Page 14: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

TREsure: TRE designed data

Can aid the data design and reduce the amount of manual testing

14

NR Scheme Plan

Control Tables

Interlocking Data Design

TREsure

TRE Test FAT SAT

TRE

TRE

Page 15: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

TREsure: External Projects

Outline existing process for interlocking design & test

15

NR Scheme Plan

Control Tables

Interlocking Data Design

Interlocking Data Check

Principles Test

System Test &

Commission

NR Acceptance Into Service

DESIGNER

Independent (but may be the same company)

Page 16: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

TREsure: External Projects

Ensures that data is ready for formal testing

16

NR Scheme Plan

Control Tables

Interlocking Data Design

Interlocking Data Check

Principles Test

System Test &

Commission

NR Acceptance Into Service

Independent (but may be the same company)

TREsure

Page 17: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

TREsure: External Projects

Checks for errors introduced by re-work & alterations

17

NR Scheme Plan

Control Tables

Interlocking Data Design

Interlocking Data Check

Principles Test

System Test &

Commission

NR Acceptance Into Service

Independent (but may be the same company)

TREsure

TREsure

Page 18: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

How Does TREsure Work?

18

TREsim Simulation

SSI Data

Interlocking

Control

Table

Interlocking

Simulation Layout

Scheme Plan

Scheme Plan

Page 19: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

How Does TREsure Work?

19

TREsim Simulation

SSI Data

Interlocking

Control

Table

TREsure

Test

Scripts

TREsure

Control

Table

Interlocking

Simulation Layout

Scheme Plan

Scheme Plan

Page 20: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

How Does TREsure Work?

20

TREsim Simulation

SSI Data

Interlocking

Control

Table

TREsure

Test

Scripts

TREsure

Control

Table

Interlocking

Simulation Layout

Scheme Plan

Scheme Plan

Page 21: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

How Does TREsure Work?

21

TREsim Simulation

SSI Data

Interlocking

Control

Table

TREsure

Test

Scripts

TREsure

Control

Table

Interlocking

Simulation Layout

Scheme Plan

Scheme Plan

Page 22: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling

Summary

• Modelling and Simulation a benefit throughout the project life cycle

• Good examples, but more work to do

• Improves the efficiency of the process

– Better specification

– Faster test

– Less rework

– Less live railway access needed

• Reduced cost and programme duration

• Safety can be enhanced

• Early adoption = early benefit!

Page 23: Modelling and Simulation for Design - IRSE - TG - IRSE IRO Conf... · Modelling and Simulation for ... February 2015. Introductions • Tim Gray • TRE • Simulation • Modelling