    24 MW MAN POWER PLANT (Containerized), 50 Hz, 11kV

    Consisting of Six (6) units of MAN 18V28/32S, 4 MW each

    Benefits to Modular Design

    24 MW containerized HFO Power Plant.

    Uses straight forward foundations for Generator sets.

    Balance of the plant has been designed and inst alled into standard shipping containers for easy

    transport.

    The modular design minimizes set up time and cost on site.

    Can be put into operation 4 months from arrival to site.

    Basic Description

    MAN Diesel (HFO) 18V28/32 Containerized Generator Sets

    Siemens Control and Instrumentation

    Alfa Laval fuel processing equipment

    Chubb fire protection

  • 8/10/2019 198423_24 MW HFO Plan

    2/13

    Introduction to MAN 18V28/32S

    The MAN 18V28/32S Generator Set is a well-proven m edium-speed unit providing over 4 M W at

    ISO conditions. It is conservatively rated and offers exceptional reliability and operating economics.

    (see the attached)

    The prime mover for the Generating Sets is a MAN 28 cm bore Medium-Speed Diesel Engine with

    18 cylinders in VEE configuration. The Engine is turbochar ged and intercooled and is

    conservatively rated; both in terms of its piston speed and its operational pressures and temperatures.

    The Engine runs at 750 rev/min, and is suitable for continuous base load operation on HFO (Heavy

    Fuel Oil) with viscosity up to 700 centistokes (cSt) at 50 deg C and with a sulfur content up to 3.5%.

    Engine Jacket and Fuel Oil Hea ting Systems enable the Engines to operate without delay on HFO,

    reducing the consumption of expensive Light Diesel Fuel to an absolute minimum.

    Integral Fuel Injector C ooling Systems are provi ded, preventing the build up of fuel deposits and

    cold corrosion on the injector nozzle tips.

    This solution is constructed so that groups of three (3) G enerator Sets share fueling and other

    auxiliary systems to reduce both set up costs and installation time.

    These M3 Plants can be linked together to create Power Plants from 12 to 72 MW.

    Acoustic EnclosuresEach Gener ating Set is insta lled w ithin a pu rpose designe d and built enclosur e th at achieves a

    reduction in Plant noise levels by up to 50 db(A).

    The Enclosures are of su fficient size to enable al l Plant servicing and major overhauls to be carried

    out within the protected environment of the Enclosure.

    The Enclosure is designed to be transportable within ISO 40 ft c ontainers and then easily

    constructed at the generation site piece by piece.

  • 8/10/2019 198423_24 MW HFO Plan

    3/13

    Electrical Module

    The primary function of this Module is to s ynchronize the outputs from the individual Generating

    Sets. To provide the Plant output to a Power Transformer or to Switchgear.

    To provide auxiliary supplies throughout the Plant and to provide a Black-Start capability.

    Switchgear

  • 8/10/2019 198423_24 MW HFO Plan

    4/13

    HFO Fuel Tank

    Based upon a standard ISO 40-foot c ontainer, this Module provides suf ficient fuel to operate each

    group of three MAN Generating Sets at maximum continuous output for approximately 24 hours.

    A number of Tanks could be grouped together and stacked to increase fuel storage capacity.

    Constructed with an integral bund wall to contain spills, and with integral h eating coils, an HFO

    Buffer Tank is located adjacent to each group of Generating Sets.

    A Local Pumping Chamber with duty/standby units transfers the f uel oil dir ectly to th e HFO

    Treatment Module.

  • 8/10/2019 198423_24 MW HFO Plan

    5/13

    Water Pumping System

    The Engines have clos ed-circuit air-blast Radiat ors and water consum ption is f or initial f ill and

    occasional make-up only.

    The HFO and Lube Oil centrifuges use a sm all amount of water to maintain a gravity seal in the

    centrifuge bowls, but this water can be treated and re-used if required.

    Fire Pumps complying with current NFPA standards, and a Reverse Osmosis unit providing process

    and drinking quality water for the plant and domestic facilities are Contained in Module 7.

    Multi-function Skids

    The multi-function skid installed be tween the E ngine and the end wall of the a coustic Enclosu re

    contains the Engine starting air supplies, Air Compressors, Fuel Changeover System , Injector

    Cooling Module, Dosing System for Engine coo ling water , Lube Oil Centrifuges, and the

    Emergency Fuel Shut-Off System.

    Modular Radiators

    The Engine Cooling Radiators are a closed circuit, fan cooled design, with zero evaporation losses.

    They are suitable for continuous operation in high ambient and high humidity conditions.

    Fan operation is controlled therm ostatically to optimize operational efficiency, and pipe work and

    control cabling are already fitted into the Modules.

    The vulnerable soft alloys necessary for ef ficient cooling are encased in a robust space-fram e for

    transport.

    The frame then becomes the Radiator support stand when the unit is mounted adjacent to the Engine

    Enclosure

  • 8/10/2019 198423_24 MW HFO Plan

    6/13

  • 8/10/2019 198423_24 MW HFO Plan

    7/13

    Radiators

    Standard Pipe work and Connections

    The pipe Modules link the different items of Plant to enable them to run as a fully-integrated Power

    Station.

    The size of the individual Modules and thei r connection system s ha ve been designed and

    manufactured to minimize site work and to achieve the fastest possible installation times.

    These Modules carry the Fuel Oil, both Light and Heavy, from the bulk s torage facility to the Fuel

    Treatment and forwarding Plant and on to the Engines.

    They also carry the Engine Cooling Water to the Radiators and the site support services:-Fire Main,

    Domestic (Potable) Water and Compressed Air.

  • 8/10/2019 198423_24 MW HFO Plan

    8/13

    Air Filters

    Oil-bath Air Filte rs pre vent abra sive dusts and particles f rom entering the sensitive com bustion

    spaces within the Engines.

    Easy to clean and m aintain, these Air Filters enab le the Generating Sets to be used in dif ficult

    environmental conditions.

    Exhaust System

    Exhaust gas from the Engines is routed through an economizer to achieve high operating efficiency.

    The Silencer achieves approximately 45 bB(A) reduction in noise levels and the height of the S tack

    can be adjusted to meet gas dispersion requirements.

  • 8/10/2019 198423_24 MW HFO Plan

    9/13

    Control Centre

    Based upon an ISO 40-foot Contain er, this Module provides the air-conditioned heart of the Power

    Plant.

    All generating operations are controlled from t his point, including ener gy dispatch to the power

    purchaser, data logging and trend analysis of all key operating functions, communications with local

    and national control centers, and starting and stopping of the individual Generating Sets.

    Electrical Module Diagram

  • 8/10/2019 198423_24 MW HFO Plan

    10/13

    Other Technical Information

    The offered Six (6) units of MAN 18V28/32S are brand new and manufactured in year 2009. All unitswere never used for any commercial operation and are with full OEM warranty.

    Type and make of Control and Instrumentation.

    Control system was designed by Regulateurs Europaand set of Siemensmake SCADA controlequipment.

    Type and make of the components of the switchgear and circuit breakers

    Siemens Simoprime11KV Switchgear and Circuit Breakers.

    Output Voltage of the plant

    Generator voltage is 11KVStep-up transformers voltage is 11/33KV.

    Transformers and output power

    Two 11/33KV step-up Transformers.Each Transformer rating is 16MVAMake of Step-up Transformers is Winder Electricals.

    OneContainerized 33KVSwitchgearwithtwoincomingfeeders(each1250A)fromtwo11/33KV

    Transformersand6outgoingfeedersof1250Aeach.

    All6circuitbreakerswillhaveCopperbus.Besidesthatitwillalsoinclude2TransformerProtection

    Panels,GridProtectionPanel,SynchronizingPanel,InstrumentationandHTCabling(Copper).

    Wehaveconsidered10meterslengtheachbetweenTransformersand33KVSwitchgear.

    Scope of Supply plus engineering and supervision.

    The plant to be supplied is complete and containerized.It will be supplied with the complete design and engineering together with the execution drawings forinstallation.

    Alocalcontractorwilltakecareofthecivilwork,installationandcommissioning,asperthedesign

    andengineeringprovided.

    Warranty

    Allsixunitsareunderfullwarranty(1year)fromMAN.

    YearofManufacture

    Theyearofmanufactureof6MANenginesandBalanceofPlantis2008/2009.

  • 8/10/2019 198423_24 MW HFO Plan

    11/13

    FuelConsumptionatfullload

    Pleaseseefuelconsumptionatvaryingambienttemperaturesandcorrespondingloadsincludingfull

    loadpertrain(3units,12MWISO). Wehaveassumed100m elevation and a calorific value of fuel at42,700 kJ/kg:

    Temp (C) Plant net output capacity (MW) at 11kVtaking into account the site parasiticlosses.

    Plant net fuel efficiency/consumption(g/kWh) at 11kV taking into accountthe site parasitic losses.

    20 C

    11.60 MW

    216.4 g/kWh

    25 C

    11.60 MW

    217.8 g/kWh

    30 C

    11.60 MW

    219.2 g/kWh

    35 C 11.60 MW 220.6 g/kWh

    40 C 11.26 MW 222.3 g/kWh

    45 C 10.82 MW 224.2 g/kWh

    50 C 10.41 MW 226.1 g/kWh

    Fuel Tanks

    TheHFOtankper3unittrainisincludedasperthescopesentearlier.ThecapacityofeachHFO

    tank/containerwillcaterHFOfuelfor3enginesfor24hoursoperation.

    Dimensions:The plant consists of two 12 MW blocks (3 x 4 MW). They can be used together and independently.Each 12MW self-contained block (3 units) requires a site with dimensions 55m x 35m.The layout/position of each component is fixed within the design and cannot be altered beingcontainerized.

    The position of the two 12MW blocks with respect to each other is flexible.

    Within the generic layout drawing the 24MW power plant occupies a site with approx. 18,000 meterssquare (dimensions: 140m x 130m).This includes a bulk HFO storage tank and HT electrical switch yard (in your case 33KV) as well as agenerous access/perimeter road and perimeter fence buffer.

  • 8/10/2019 198423_24 MW HFO Plan

    12/13

    ERECTION & COMMISSIONING

    Technical Description of Erection

    All items and systems indicated below including piping, cabling and accessories (containerized) will beerected and prepared for commissioning.

    6 units of MAN 18V28/32S HFO based Containerized Gensets

    Siemens Controls and Instrumentation

    Alfa Laval Fuel processing equipment

    Chubb Fire protection

    Tank Farm house including HFP and Diesel Tanks

    Water Pumping Station

    Modular Radiators

    HFO Modules

    Pipe work and connections

    Control center

    Control panels

    Step-up Transformers (11/33 kV) 33kV HT Switchyard

    Cables, wiring, etc.

    If required, Flushing of oil, water, fuel lines

    Workers of erection team will take all safety precautions during their work (safety belts, glass,handgloves, barret, etc.)

    Engineering team will support engineering work for any change or modifications.

    Technical Description of Commissioning

    All commissioning work will be done by erection team and their qualified engineers.

    Checking of all power plant equipment, piping, cabling

    Checking of main engines, generators, etc. Valve clearance adjustments

    Alignment check

    Adjustment of speed governors, voltage regulators, transformers, synchronizing, load shedding,etc.

    Short running of electrical motors, pumps for correct running

    Simulation of all alarm points

    Simulation of all shut-down points

    Re-adjustment or re-calibration of sensing elements

    Inspection of HFO, Lube oil, compressed air, water, etc. lines

    Flushing of pipes, if required

    Turbochargers inspection

    Getting into operation of all auxiliaries

    Running-in process for engines

    Booster module viscosity/temperature/pressure adjustment

    Getting into operation separators, filters, pumps, preheating modules, compressors, etc.

    Getting into operation of complete power plant and delivery to owner

    Civil work (whatever required), ground leveling, etc. will be carried out by erection team

    Respons ibilities of Owner for Erection and Commissioning

    Supply of compressed air

  • 8/10/2019 198423_24 MW HFO Plan

    13/13

    Supply of power and lighting

    Supply of HFO, Diesel, Lube oil

    Supply of oxygen/acetilen for welding

    Supply of available crane facility during all erection time

    Accommodation and food for all erection and commissioning workers/engineers at site

    Supply of security, in case of any danger providing fastest and safest way to leave the site

    Preheater for engine oil by steam or electricity Treated water supply for engine cooling water, separators

    Cleaning of equipments and engines, engine components, etc.

    All statutory clearances, permits, licenses, etc.