4
CHP WEEKLY JOB REPORT S.No Date Area Equipment Job Description 1 01-03-15 16853 CHP PVS-1,BC5,BC1 2 2 3 6 2 02-03-15 16854 CHP PSV 1 PVS 1 Mesh replacement work done, 5 5 3 15 6 6 2 12 3 03-03-15 CHP BC1,Coal Bunker 2 6 6 4 24 Doser 34 Reverse gear problem work under progress 3 3 2 6 4 04-03-15 CHP 7 7 11 77 Doser 34 4 4 3 12 5 05-03-15 CHP 6 6 5 30 Doser 34 2 2 2 4 OPERATIONAL ENERGY GROUP INDIA PVT.LTD SITE:M/S IND BARATH POWER GEN COM 3 X 63 MW ,IPP 250 TPH/110 KSC/ Work Permit No. Planned time Time Taken No of Persons Total Man hours PVS 1 Full jam condition cleaning work done,PVS 2 lubrication work done,BC5 2 Return & Carrying rollers changed,BC1 2 return & Ider rollers changed JCB FL,BEML FL,Doser 34 & 35 JCB FL full water service & grease service,BEML FL Doser 34 & 35 pm work greasing of joints transmission filter changing,transmission oil engine oil top 4132 & 16855 BC1 Pm work the motor bed & gear box bed plumber block fluid coupling bolt tightness,DE/NDE bearing grease condition,gear box & fluid coupling oil level,discharge chute leakage,scraper belt condition,take off pulley bearing & grease condition all checked,Coal Bunker 2 chute grill welding work 16858 & 16857 &16856 BC5 & BC1,PVS1,Crusher 1,Tunnel vibro feeder 1&2 checking work & control room pm work done by instrumentation,PVS 1 pm work the motor casing bolts & jack bolt tightness checked,bearing housing bolt tightness checked,bearing grease checked,bearing condition & clearance,belt guard cover bolts,pedestal spring condition,dischrge chute leakage checked,all spporting of screens,Crusher 1 pm work the v-belt pulley,motor & mother base bolts & jack bolt tightness,plumber block base fasteners,crusher foundation bolts,coupling condition,bearing housing & grese,liner bolt tightness,crushing hmmer tooth condition,inlet & discharge chute leakage,roller & liner adjusting bolts tightness all checked,Vibro feeder 1& 2 the Motor counter weight angle condition,sling & spring condition,chute leakage bolt Doser 34 reverse gear problem gearing assembly bearing heavy wear and tear work under progress 16859 & 4135 Coal Bunker unit 1,PVS-2 Coal bunker unit 1 1 inch fire line welding work done,PVS 2 pm work the screen cloth tension & jamming checked,motor casing bolts & jack bolt tightness checked,screen mat condition,bearing housing bolt tightness checked,bearing grese checked,bearing condition & clearance,belt guard cover bolts,pedestal spring condition,dischrge chute leakage checked,marsh melloe spring condition,all spporting of screens,dust sealing cloth fastners checked Doser 34 reverse gear problem gearing assembly lifting hydra needed so work stalled other minor checking going on
-
Upload
nalasekaran -
Category
Documents
-
view
1 -
download
0
description
Weekly Job Report- Chp 1-6,March-15
Transcript of Weekly Job Report- Chp 1-6,March-15
1OPERATIONAL ENERGY GROUP INDIA PVT.LTD SITE:M/S IND BARATH
POWER GEN COM 3 X 63 MW ,IPP 250 TPH/110 KSC/540 DEG CCHP WEEKLY
JOB REPORTDate:1-6 March,2015S.NoDateWork Permit
No.AreaEquipmentJob DescriptionPlanned timeTime TakenNo of
PersonsTotal Man hoursSpares usedName of
Persons101-03-1516853CHPPVS-1,BC5,BC1PVS 1 Full jam condition
cleaning work done,PVS 2 lubrication work done,BC5 2 Return &
Carrying rollers changed,BC1 2 return & Ider rollers
changed2236Navaneethan,Vallinayagam,durai202-03-1516854CHPPSV 1PVS
1 Mesh replacement work done,55315Charles,Navaneethan,DuraiJCB
FL,BEML FL,Doser 34 & 35JCB FL full water service & grease
service,BEML FL Doser 34 & 35 pm work greasing of joints
transmission filter changing,transmission oil engine oil
top66212Rajesh,Manickam303-03-154132 & 16855CHPBC1,Coal Bunker
2BC1 Pm work the motor bed & gear box bed plumber block fluid
coupling bolt tightness,DE/NDE bearing grease condition,gear box
& fluid coupling oil level,discharge chute leakage,scraper belt
condition,take off pulley bearing & grease condition all
checked,Coal Bunker 2 chute grill welding
work66424Charles,Vallinayagam,Durai,PramothDoser 34Reverse gear
problem work under progress3326Rajesh,Manickam404-03-1516858 &
16857 &16856CHPBC5 & BC1,PVS1,Crusher 1,Tunnel vibro feeder
1&2BC5 Belt Patch work done;BC1 3 Rollers Replaced & pull
chord checking work & control room pm work done by
instrumentation,PVS 1 pm work the motor casing bolts & jack
bolt tightness checked,bearing housing bolt tightness
checked,bearing grease checked,bearing condition &
clearance,belt guard cover bolts,pedestal spring condition,dischrge
chute leakage checked,all spporting of screens,Crusher 1 pm work
the v-belt pulley,motor & mother base bolts & jack bolt
tightness,plumber block base fasteners,crusher foundation
bolts,coupling condition,bearing housing & grese,liner bolt
tightness,crushing hmmer tooth condition,inlet & discharge
chute leakage,roller & liner adjusting bolts tightness all
checked,Vibro feeder 1& 2 the Motor counter weight angle
condition,sling & spring condition,chute leakage bolt
tightness,spring tension all
checked771177Charles,Vallinayagam,Durai,Ganesh(inst),CL 7Doser
34Doser 34 reverse gear problem gearing assembly bearing heavy wear
and tear work under
progress44312Rajesh,NavaneethaKrishnan,Manickam505-03-1516859 &
4135CHPCoal Bunker unit 1,PVS-2Coal bunker unit 1 1 inch fire line
welding work done,PVS 2 pm work the screen cloth tension &
jamming checked,motor casing bolts & jack bolt tightness
checked,screen mat condition,bearing housing bolt tightness
checked,bearing grese checked,bearing condition &
clearance,belt guard cover bolts,pedestal spring condition,dischrge
chute leakage checked,marsh melloe spring condition,all spporting
of screens,dust sealing cloth fastners
checked66530Charles,Vallinayagam,Durai,Pramoth+1Doser 34Doser 34
reverse gear problem gearing assembly lifting hydra needed so work
stalled other minor checking going
on2224Rajesh,Manickam606-03-154139 & 16866CHPBC5 & BC6BC6
belt patch up work done,BC5 pm work the motor bed & gear box
bed plumber block fluid coupling bolt tightness,DE/NDE bearing
grease condition,gear box & fluid coupling oil level,discharge
chute leakage,scraper belt condition,take off pulley bearing &
grease condition all checked44312Charles,Durai,VallinayagamDoser
34Doser 34 transmission is lifted using hydra nd work under
progress on the mechanical
workshop44312RajeshNavaneethaKrishnan,Manickam