Weekly Job Report- Chp 1-6,March-15

4
CHP WEEKLY JOB REPORT S.No Date Area Equipment Job Description 1 01-03-15 16853 CHP PVS-1,BC5,BC1 2 2 3 6 2 02-03-15 16854 CHP PSV 1 PVS 1 Mesh replacement work done, 5 5 3 15 6 6 2 12 3 03-03-15 CHP BC1,Coal Bunker 2 6 6 4 24 Doser 34 Reverse gear problem work under progress 3 3 2 6 4 04-03-15 CHP 7 7 11 77 Doser 34 4 4 3 12 5 05-03-15 CHP 6 6 5 30 Doser 34 2 2 2 4 OPERATIONAL ENERGY GROUP INDIA PVT.LTD SITE:M/S IND BARATH POWER GEN COM 3 X 63 MW ,IPP 250 TPH/110 KSC/ Work Permit No. Planned time Time Taken No of Persons Total Man hours PVS 1 Full jam condition cleaning work done,PVS 2 lubrication work done,BC5 2 Return & Carrying rollers changed,BC1 2 return & Ider rollers changed JCB FL,BEML FL,Doser 34 & 35 JCB FL full water service & grease service,BEML FL Doser 34 & 35 pm work greasing of joints transmission filter changing,transmission oil engine oil top 4132 & 16855 BC1 Pm work the motor bed & gear box bed plumber block fluid coupling bolt tightness,DE/NDE bearing grease condition,gear box & fluid coupling oil level,discharge chute leakage,scraper belt condition,take off pulley bearing & grease condition all checked,Coal Bunker 2 chute grill welding work 16858 & 16857 &16856 BC5 & BC1,PVS1,Crusher 1,Tunnel vibro feeder 1&2 checking work & control room pm work done by instrumentation,PVS 1 pm work the motor casing bolts & jack bolt tightness checked,bearing housing bolt tightness checked,bearing grease checked,bearing condition & clearance,belt guard cover bolts,pedestal spring condition,dischrge chute leakage checked,all spporting of screens,Crusher 1 pm work the v-belt pulley,motor & mother base bolts & jack bolt tightness,plumber block base fasteners,crusher foundation bolts,coupling condition,bearing housing & grese,liner bolt tightness,crushing hmmer tooth condition,inlet & discharge chute leakage,roller & liner adjusting bolts tightness all checked,Vibro feeder 1& 2 the Motor counter weight angle condition,sling & spring condition,chute leakage bolt Doser 34 reverse gear problem gearing assembly bearing heavy wear and tear work under progress 16859 & 4135 Coal Bunker unit 1,PVS-2 Coal bunker unit 1 1 inch fire line welding work done,PVS 2 pm work the screen cloth tension & jamming checked,motor casing bolts & jack bolt tightness checked,screen mat condition,bearing housing bolt tightness checked,bearing grese checked,bearing condition & clearance,belt guard cover bolts,pedestal spring condition,dischrge chute leakage checked,marsh melloe spring condition,all spporting of screens,dust sealing cloth fastners checked Doser 34 reverse gear problem gearing assembly lifting hydra needed so work stalled other minor checking going on

description

Weekly Job Report- Chp 1-6,March-15

Transcript of Weekly Job Report- Chp 1-6,March-15

1OPERATIONAL ENERGY GROUP INDIA PVT.LTD SITE:M/S IND BARATH POWER GEN COM 3 X 63 MW ,IPP 250 TPH/110 KSC/540 DEG CCHP WEEKLY JOB REPORTDate:1-6 March,2015S.NoDateWork Permit No.AreaEquipmentJob DescriptionPlanned timeTime TakenNo of PersonsTotal Man hoursSpares usedName of Persons101-03-1516853CHPPVS-1,BC5,BC1PVS 1 Full jam condition cleaning work done,PVS 2 lubrication work done,BC5 2 Return & Carrying rollers changed,BC1 2 return & Ider rollers changed2236Navaneethan,Vallinayagam,durai202-03-1516854CHPPSV 1PVS 1 Mesh replacement work done,55315Charles,Navaneethan,DuraiJCB FL,BEML FL,Doser 34 & 35JCB FL full water service & grease service,BEML FL Doser 34 & 35 pm work greasing of joints transmission filter changing,transmission oil engine oil top66212Rajesh,Manickam303-03-154132 & 16855CHPBC1,Coal Bunker 2BC1 Pm work the motor bed & gear box bed plumber block fluid coupling bolt tightness,DE/NDE bearing grease condition,gear box & fluid coupling oil level,discharge chute leakage,scraper belt condition,take off pulley bearing & grease condition all checked,Coal Bunker 2 chute grill welding work66424Charles,Vallinayagam,Durai,PramothDoser 34Reverse gear problem work under progress3326Rajesh,Manickam404-03-1516858 & 16857 &16856CHPBC5 & BC1,PVS1,Crusher 1,Tunnel vibro feeder 1&2BC5 Belt Patch work done;BC1 3 Rollers Replaced & pull chord checking work & control room pm work done by instrumentation,PVS 1 pm work the motor casing bolts & jack bolt tightness checked,bearing housing bolt tightness checked,bearing grease checked,bearing condition & clearance,belt guard cover bolts,pedestal spring condition,dischrge chute leakage checked,all spporting of screens,Crusher 1 pm work the v-belt pulley,motor & mother base bolts & jack bolt tightness,plumber block base fasteners,crusher foundation bolts,coupling condition,bearing housing & grese,liner bolt tightness,crushing hmmer tooth condition,inlet & discharge chute leakage,roller & liner adjusting bolts tightness all checked,Vibro feeder 1& 2 the Motor counter weight angle condition,sling & spring condition,chute leakage bolt tightness,spring tension all checked771177Charles,Vallinayagam,Durai,Ganesh(inst),CL 7Doser 34Doser 34 reverse gear problem gearing assembly bearing heavy wear and tear work under progress44312Rajesh,NavaneethaKrishnan,Manickam505-03-1516859 & 4135CHPCoal Bunker unit 1,PVS-2Coal bunker unit 1 1 inch fire line welding work done,PVS 2 pm work the screen cloth tension & jamming checked,motor casing bolts & jack bolt tightness checked,screen mat condition,bearing housing bolt tightness checked,bearing grese checked,bearing condition & clearance,belt guard cover bolts,pedestal spring condition,dischrge chute leakage checked,marsh melloe spring condition,all spporting of screens,dust sealing cloth fastners checked66530Charles,Vallinayagam,Durai,Pramoth+1Doser 34Doser 34 reverse gear problem gearing assembly lifting hydra needed so work stalled other minor checking going on2224Rajesh,Manickam606-03-154139 & 16866CHPBC5 & BC6BC6 belt patch up work done,BC5 pm work the motor bed & gear box bed plumber block fluid coupling bolt tightness,DE/NDE bearing grease condition,gear box & fluid coupling oil level,discharge chute leakage,scraper belt condition,take off pulley bearing & grease condition all checked44312Charles,Durai,VallinayagamDoser 34Doser 34 transmission is lifted using hydra nd work under progress on the mechanical workshop44312RajeshNavaneethaKrishnan,Manickam