PIPING BOQ OF UF CIP LINE FOR JP NIGRIE PROJECT S.NO DESCRIPTION SIZE NB MATERIAL SPECIFICATION QUANTITY UNIT SPEC 1 Pipe 80 NB SS 304 30 MTR. ASTM A - 312, ERW 2 FLANGE 80 NB SS 304 2 NOS. AS PER ANSI B 16.5 3 GASKET 2 NOS. IS 2712 4 M 16 x 140 Long MS / GI 4 NOS. 5 90° BEND 80 NB SS 304 4 NOS. ANSI B -16.9, BW 6 EQAUL TEE 80 NB SS 304 1 NOS. ANSI B -16.9, BW 7 STUB END 80 NB SS 304 2 NOS. ANSI B -16.9, BW NUT & BOLT WITH WASHER IS: 1367 CLASS 4.6/4.0

description

PIPING BOQ

Transcript of Piping Boq of Uf Cip Line for Jp Nigrie Project

PIPING BOQ OF UF CIP LINE PIPING BOQ OF UF CIP LINE FOR JP NIGRIE PROJECTS.NODESCRIPTIONSIZE NBMATERIAL SPECIFICATIONQUANTITYUNITSPECThickness/ Schedule/Rating.1Pipe80 NBSS 30430MTR.ASTM A - 312, ERWSch. 102FLANGE80 NBSS 3042NOS.AS PER ANSI B 16.5Rating 150 #3GASKET2NOS.IS 2712NEOPRENE RUBBER, 3MM THK.4NUT & BOLT WITH WASHERM 16 x 140 LongMS / GI4NOS.IS: 1367 CLASS 4.6/4.0590 BEND80 NBSS 3044NOS.ANSI B -16.9, BWSch. 106EQAUL TEE80 NBSS 3041NOS.ANSI B -16.9, BWSch. 107STUB END80 NBSS 3042NOS.ANSI B -16.9, BWSch. 10