    South Pars Gas Field Development Phases 15&16

    INVOICING PROCEDURE

    Prj ID Field code Discipli ne Doc Type Serial Pars Oil and GasCompany

    1516 COM FN PR 0001 Rev. No. 0 Cl ass: 1

    INVOICING PROCEDURE

    CONTRACT NO. POGC-801-84/240

    PROJECT South Pars Gas Field Development Phases 15&16

    COMPANY Pars Oil and Gas Company

    CONSORTIUM GHORB, IOEC, ISOICO and SAFF

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    2/34

    South Pars Gas Field Development Phases 15&16

    INVOICING PROCEDURE

    Prj ID Field code Discipli ne Doc Type Serial Pars Oil and GasCompany

    1516 COM FN PR 0001 Rev. No. 0 Cl ass: 1

    TABULATION OF REVISED PAGES

    PAGE REV 0 REV 1 REV 2 REV 3 REV 4 PAGE REV 0 REV 1 REV 2 REV 3 REV 4

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    3/34

    South Pars Gas Field Development Phases 15&16

    INVOICING PROCEDURE

    Prj ID Field code Discipli ne Doc Type Serial Pars Oil and GasCompany

    1516 COM FN PR 0001 Rev. No. 0 Cl ass: 1

    1. TABLE OF CONTENTS

    1. INTRODUCTION

    2. DISBURSEMENT OF INITIAL CONTRACT PRICE

    3. INVOICING and PAYMENT

    4. WORK STATEMENT

    5. INVOICE FOR VARIATION ORDER

    6. INVOICE FOR REIMBURSABLE ITEMS

    7. FINAL ASSESSMENT AND FINAL INVOICE

    8. CONTRACTORS DESIGNATED ACCOUNT

    9 ATTACHMENT

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    4/34

    South Pars Gas Field Development Phases 15&16

    INVOICING PROCEDURE

    Prj ID Field code Discipli ne Doc Type Serial Pars Oil and GasCompany

    1516 COM FN PR 0001 Rev. No. 0 Cl ass: 1

    1. INTRODUCTION

    The purpose of this procedure is to define and identify the Invoicing Procedure for the LumpSum Parts of Contract, Variation Orders and Reimbursable Items in accordance with Sub-Article15.3 Progress Control and Article 32 Financing, Invoicing and Payment of the AGREEMENT,Section 4 Invoicing Schedule of Exhibit B, Section 8 Invoicing and Work Statement of ExhibitG-G1 and Section 6 Assessment of Physical Progress of Exhibit G-G5.

    This procedure neither abrogate nor modifies the CONTRACT DOCUEMNTS between theCOMPANY and CONTRACTOR but supplement the CONTRACT DOCUMENTS by providingthe guidance and instructions needed to implement the various elements/requirements of the

    CONTRACT DOCUMENTS.

    2. DISBURSEMENT OF INITIAL CONTRACT PRICE

    2.1 Advance Payment

    Against provision to COMPANY of unconditional and irrevocable Advance Payment BankGuarantee, CONTRACTOR shall be entitled to submit an Invoice for Advance Payment equal to

    five percent (5 %) of the initial CONTRACT PRICE in the following manner.

    (1) Two point five percent (2.5 %) of the initial CONTRACT PRICE after signing date of theCONTRACT; and

    (2) Two point five percent (2.5 %) of the initial CONTRACT PRICE within six (6) months fromthe EFFECTIVE DATE.

    Each invoice shall be accompanied by an equivalent satisfactory irrevocable Bank Guarantee inthe form set out in Annex 1/B of the AGREEMENT and in accordance with the provisions ofSub-Article 33.2 Advance Payment Bank Guarantee of the AGREEMENT.

    COMPANY shall pay the amount of the Advance Payment by telegraphic transfer to themembers bank account designated by CONTRACTOR.

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    5/34

    South Pars Gas Field Development Phases 15&16

    INVOICING PROCEDURE

    Prj ID Field code Discipli ne Doc Type Serial Pars Oil and GasCompany

    1516 COM FN PR 0001 Rev. No. 0 Cl ass: 1

    The remaining five percent (5 %) of the initial CONTRACT PRICE shall be invoiced at theissuance of the PROVISIONAL ACCEPTANCE CERTIFICATE.

    3. INVOICING and PAYMENT

    3.1 Assessment of Physical Progress

    The assessment of Physical Progress shall be in accordance with the following.

    a) Within seven (7) days from cut-off date, CONTRACTOR shall submit the Physical ProgressReport for COMPANY APPROVAL in three (3) copies to COMPANY REPRESENTATIVE.

    b) Within seven (7) days of receipt of CONTRACTORs Physical Progress Report, COMPANYshall review and approve Physical Progress Report.c) If COMPANY disputes Physical Progress, COMPANY shall return such Physical Progress

    to CONTRACTOR within seven (7) days specifying in writing the items to which COMPANYobjects and the reasons for such objection.

    d) CONTRACTOR shall resubmit to COMPANY the revised Physical Progress Report takinginto account COMPANYs objection or promptly ask COMPANY to have joint assessment onthe disputed Physical Progress.

    e) CONTRACTOR shall then be entitled to submit his Invoice(s) for the WORK performed inaccordance with Physical Progress Report approved by COMPANY.

    Physical Progress Report for Offshore Part (Part - I&II) and Onshore Part (Part - III) will beseparately submitted for COMPANY APPROVAL.

    The detailed computation procedure for WORK progress figures is shown in Procedure forProgress Measurement (PMS).

    3.2 Invoicing

    CONTRACTOR shall, on a monthly basis, submit Invoices, for COMPANY APPROVAL, for theLump sum Part of the initial CONTRACT PRICE for the WORK actually performed during the

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    6/34

    South Pars Gas Field Development Phases 15&16

    INVOICING PROCEDURE

    Prj ID Field code Discipli ne Doc Type Serial Pars Oil and GasCompany

    1516 COM FN PR 0001 Rev. No. 0 Cl ass: 1

    b) clearly indicate the part of the WORK for which payment is requested as per the Schedule ofinvoicing or Monthly Progress Report,

    c) be established without Value Added Tax, which is not applicable to this CONTRACT, as theWORK is performed for the purposes of the construction of the PLANT in the IslamicRepublic of Iran,

    d) be established in accordance with invoicing procedures under the CONTRACT,e) be supported by all necessary documents to enable COMPANYs review,f) clearly indicate all credits for sums due by CONTRACTOR including reimbursement of

    advance payments, if any, with the respective amounts to be paid to the consortiummembers Bank accounts,

    g) be in the name of COMPANY,

    h) be sent in one (1) original (clearly stamped ORIGINAL) and three (3) copies, attachments,toFor the attention of : COMPANY REPRESENTATIVE

    CONTRACTOR shall submit a single Invoice for the both of Offshore Part and Onshore Part toCOMPANY.

    3.3 Disputed Invoice

    COMPANY shall review and approve the Invoice(s) within twenty one (21) days from submissiondate. If COMPANY disputes on any Invoice, COMPANY shall return such Invoice toCONTRACTOR within twenty one (21) days specifying in writing the items to which COMPANYobjects and the reason for such objections.

    CONTRACTOR shall resubmit COMPANY a revised Invoice taking into account COMPANYsobjections, or shall promptly establish and resubmit to COMPANY two (2) separate Invoices,one in respect of the undisputed part of the original Invoice and the other in respect of therevised part of the original Invoice.

    3.4 Term of Payment

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    7/34

    South Pars Gas Field Development Phases 15&16

    INVOICING PROCEDURE

    Prj ID Field code Discipli ne Doc Type Serial Pars Oil and GasCompany

    1516 COM FN PR 0001 Rev. No. 0 Cl ass: 1

    Work statement is a document established by CONTRACTOR on a monthly basis, with thepurpose to assess the quantity of work achieved during the period in order to support Invoicesrelated to this same period.

    4.2 Principle

    A Work Statement is always established on a cumulative basis. The value to be invoiced forthe month (or any other period of time) will be obtained by difference with the value approved forthe previous month.

    4.3 Presentation of Document

    The form of the Work Statement document shall be in conformity with the form in Appendix 3 ofExhibit G.1.

    The breakdown structure of the work shall correspond to the breakdown structure of theCONTRACT PRICE, per sub-work unit, per work unit and work package as shown in the ExhibitB of the CONTRACT, the evaluation of the work starting at the lowest element of price identified,and summarized at work package level.

    4.4 Addi tional w orks (approved VARIATION ORDERS)

    Additional works related to approved VARIATION ORDER shall be reported on a separatedetailed sheet and evaluated on a separate line on the summary document.

    4.5 Identification of Work Statement

    All Work Statement shall be identified by a serial number which shall be reported on eachrelated invoice.

    5. INVOICE FOR VARIATION ORDERS

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    8/34

    South Pars Gas Field Development Phases 15&16

    INVOICING PROCEDURE

    Prj ID Field code Discipli ne Doc Type Serial Pars Oil and GasCompany

    1516 COM FN PR 0001 Rev. No. 0 Cl ass: 1

    CONTRACTOR will on the monthly basis submit a separate invoice for such reimbursable itemswith the supporting documentation to verify the incurred expenditure.

    The reimbursement will be made within 30 (thirty) days from the date of the receipt byCOMPANY of the relevant invoice.

    7. FINAL ASSESSMENT AND FINAL INVOICE

    7.1 Final Assessment

    Within sixty (60) days after the date of issue of the last PROVISIONAL ACCEPTANCE

    CERTIFICATE, or, subject to provisions of Article 49 and 51 with respect to termination of theCONTRACT, CONTRACTOR shall submit for APPROVAL a detailed Final Assessment of allsums payable by COMPANY to CONTRACTOR in accordance with CONTRACT.

    7.2 Final Invoice

    In accordance with the APPROVED Final Assessment, CONTRACTOR shall submit his FinalInvoice for the balance due and accompanied by a duly signed Final Account Certificate in the

    form set out in Annex 2 of the AGREEMENT.

    Within forty (40) days from the date of receipt of the Final Invoice and all other documentationrelated thereto, COMPANY shall pay to CONTRACTOR the amount of the Final Invoice,provided that, when payment is made, CONTRACTOR shall have met all foregoingrequirements and that there are no liens registered against COMPANY property in connectionwith the WORK.

    The Final Invoice shall conclude accounts between the Consortium members , and no furtherinvoices submitted for the WORK shall be accepted by COMPANY.

    8. CONTRACTORS DESIGNATED ACCOUNT

    Onshore (Part III) Offshore (Part I & II)

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    9/34

    South Pars Gas Field Development Phases 15&16

    INVOICING PROCEDURE

    Prj ID Field code Discipli ne Doc Type Serial Pars Oil and GasCompany

    1516 COM FN PR 0001 Rev. No. 0 Cl ass: 1

    9. ATTACHMENT

    #1. Invoice for Lump Sum Part of Contract 2 sheets#2. Work Statement (Part I) 1 sheet#3. Detailed Work Statement (Part I) 9 sheets#4. Work Statement (Part II) 1 sheet#5. Detailed Work Statement (Part II) 7 sheets#6. Work Statement (Part III) 1 sheet#7. Detailed Work Statement (Part III) 12 sheets

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    10/34

    Attachment #1

    INVOICE FOR LUMP SUM PART OF CONTRACT FOR MONTH OF : ..

    In accordance with Article 32 of Agreement, we hereby are pleased to invoice you as follow s ;

    TO : PARS OIL AND GAS CO. Date :

    133, POGC Building, Parvin Etasemi Corn er,

    Fatemi Ave., Tehran, Iran Invoice No. :

    ATTENTION : Mr. A. Nobakhti

    Project Director & Company Representative Analytical Code :

    Unit : US$

    A. Value of w ork Perfo rmed Th is Month

    B. Gross Invo ice Value (uplif ted by 10%)

    C. Deduction (a+b+c)

    a. Advance Paymentb. Corporate Income Tax

    c. Social Security Organization

    D. Net Invoice Value (B-C)

    BANK REFERENCE & ACCOUNT NO. PAYMENT DUE DATE :

    USD Ac co un t No . :

    Bank Name : Bank Melli Iran

    Branch Name : Markazi Branch 1. Invoice Register

    Swift Code : MELI IRTH060 2. Approved Progress Report

    500031

    Pars Oil andGas Company

    SOUTH PARS GAS FIELD DEVELOPMENT( PHASES 15 & 16 )

    POGC-801-84/240

    TOTAL(PART I+II+III)

    PART I :OFFSHOREPLATFORMS

    PART II :OFFSHOREPIPELINES

    PART III :ONSHOREFACILITIES

    TOTALOFFSHORE(PART I+II)

    Onshore (Part III) Offshore (Part I & II)

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    11/34

    INVOICE REGISTER FOR LUMP SUM PART OF CONTRACT

    PROJECT : South Pars Gas Field Development Phase 15&16 DATE :

    CONTRACT NO. : POGC-801-84/240 Unit : US$

    INVOICE NO MONTH DESCRIPTIONINVOICE

    AMOUNT

    CUMULATIVEINVOICE

    AMOUNTISSUED DATE

    PAYMENTDUE DATE

    RECEIVEDDATE

    CUMULATIVERECEIVED AMOUNT

    REMARKS

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    12/34

    Attachment #2

    CONTRACT NO. : POGC-801-84/240 CONTRACTOR :

    COST CODE :

    CUT OFF DATE :

    SUMMARY

    WORK PACKAGENO.

    DESCRIPTIONCONTRACT

    VALUE (US$) VALUE OF WORK

    PERFORMED

    1 Engineering

    2 Procurement Contractor Items

    3 Not used

    4 Yard fabrication

    5 Mobilization and Demobilization

    6 Site work

    7 Pre-commissioning, Commissioning, Start-up and Performance Test

    8 Management Project Control, Administration

    9 General Services

    Fiber Optic Net work

    GROSS INVOICE VALUE (Uplifeted by 10%)

    DEDUCTIONS

    PREVIOUS MONTH STATEMENT

    VALUE TO BE INVOICED FOR THE MONTH

    TOTAL CUMULATIVE AS OF

    CURRENCY : US$

    PARS OIL & GAS COMPANY

    SOUTH PARS GAS DEVELOPMENT( PHASES 15 & 16 )

    WORK STATEMENT

    NO :

    MONTH :

    TITLE OF CONTRACT : OFFSHORE PLATFORMS

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    13/34

    Attachment #3

    CONTRACT NO. : POGC-801-84/240 CONTRACTOR :

    COST CODE :

    CUT OFF DATE :

    SUMMARY

    WORK PACKAGENO.

    DESCRIPTIONCONTRACT

    VALUE (US$) VALUE OF WORK

    PERFORMED

    1 Engineering

    2 Procurement Contractor Items

    3 Not used

    4 Yard fabrication

    5 Mobilization and Demobilization

    6 Site work

    7 Pre-commissioning, Commissioning, Start-up and Performance Test

    8 Management Project Control, Administration

    9 General Services

    Fiber Optic Net work

    GROSS INVOICE VALUE (Uplifeted by 10%)

    DEDUCTIONS

    PREVIOUS MONTH STATEMENT

    VALUE TO BE INVOICED FOR THE MONTH

    TOTAL CUMULATIVE AS OF

    CURRENCY : US$

    PARS OIL & GAS COMPANY

    SOUTH PARS GAS DEVELOPMENT( PHASES 15 & 16 )

    WORK STATEMENT

    NO :

    MONTH :

    TITLE OF CONTRACT : OFFSHORE PLATFORMS

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    14/34

    Attachment #4

    CONTRACT NO. : POGC-801-84/240 CONTRACTOR :

    COST CODE :

    CUT OFF DATE :

    SUMMARY

    WORK PACKAGENO.

    DESCRIPTIONCONTRACT

    VALUE (US$) VALUE OF WORK

    PERFORMED

    1 Engineering

    2 Procurement contractor items

    3 Not used

    4 Yard fabrication

    5 Mobilization and Demobilization

    6 Site work

    7 General services

    GROSS INVOICE VALUE (Uplifeted by 10%)

    DEDUCTIONS

    CURRENCY : US$

    PARS OIL & GAS COMPANY

    SOUTH PARS GAS DEVELOPMENT( PHASES 15 & 16 )

    WORK STATEMENT

    NO :

    MONTH :

    TITLE OF CONTRACT : OFFSHORE PIPELINES

    PREVIOUS MONTH STATEMENT

    VALUE TO BE INVOICED FOR THE MONTH

    TOTAL CUMULATIVE AS OF

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    15/34

    Attachment #5

    PARS OIL & GAS COMPANY NO.

    DATE :

    MONTH :

    1

    2

    3

    4

    5

    6

    7

    TOTAL GRAND TOTAL US ( $ )

    General Services

    Not Used

    Yard Fabrication

    Mobilization and Demobilization

    Site work

    SOUTH PARS GAS FIELD DEVELOPMENT( PHASES 15 & 16 )

    DETAILED WORK STATEMENT

    PART II : OFFSHORE PIPELINES

    VALUE OF WORKPERFORMED

    Engineering

    Procurement Contractor Items

    WORK UNITNO.

    DESCRIPTION CONTRACT VALUE (US$)

    PROGRESS %

    Cumulative last

    This monthCumulative this month

    Page 1 of 7

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    16/34

    PARS OIL & GAS COMPANY NO.

    DATE :

    MONTH :

    1.1

    1.2 Detailed Engineering

    1.3 Installation Engineering

    1.4 Management of EXTERNAL INTERFACE

    1.5

    1.6 FINAL DOCUMENTATION

    TOTAL TOTAL US ( $ )

    PROGRESS %

    VALUE OF WORKPERFORMEDCumulative

    lastThis month

    Cumulative this month

    WORK UNITNO.

    SUBW.U.NO

    DESCRIPTION

    Material Tracking System Implementation

    Basic Engineering

    CONTRACT VALUE (US$)

    SOUTH PARS GAS FIELD DEVELOPMENT( PHASES 15 & 16 )

    DETAILED WORK STATEMENT

    PART II : OFFSHORE PIPELINES

    Work Package No.1 : Engineering

    Page 2 of 7

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    17/34

    PARS OIL & GAS COMPANY NO.

    DATE :

    MONTH :

    2.1

    2.2

    2.3

    2.4

    2.5

    2.6

    2.7

    SOUTH PARS GAS FIELD DEVELOPMENT( PHASES 15 & 16 )

    DETAILED WORK STATEMENT

    PART II : OFFSHORE PIPELINES

    Work Package No.2 : Procurement

    WORK UNITNO.

    SUBW.U.NO

    DESCRIPTION CONTRACT VALUE (US$)

    PROGRESS %

    VALUE OF WORKPERFORMEDCumulative

    lastThis month

    Cumulative this month

    Commissioning and Start-up

    Spare Parts

    TOTAL GRAND TOTAL US ( $ )

    Line Pipe Materials

    Piggyback Line Materials

    Anti-corrosion Coating Materials

    Weight Coating Materials

    Cathodic Protection Items (excluding Rectifier)

    Other Contractor Items

    Page 3 of 7

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    18/34

    PARS OIL & GAS COMPANY NO.

    DATE :

    MONTH :

    4.1

    4.1.1

    4.1.2

    4.1.3

    4.2

    4.3

    4.4 Load out and Sea Fastening

    TOTAL GRAND TOTAL US ( $ )

    Coating Application and Anode Installation

    External Anti-corrosion Coating

    Sacrificial Anode Installation

    Weight Coating

    Welding/ NDT Qualification

    Prefabrication Work

    PROGRESS %

    VALUE OF WORKPERFORMEDCumulative

    lastThis month

    Cumulative this month

    WORK UNITNO.

    SUBW.U.NO

    DESCRIPTION CONTRACT VALUE (US$)

    SOUTH PARS GAS FIELD DEVELOPMENT( PHASES 15 & 16 )

    DETAILED WORK STATEMENT

    PART II : OFFSHORE PIPELINES

    Work Package No.4 : Yard Fabrication

    Page 4 of 7

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    19/34

    PARS OIL & GAS COMPANY NO.

    DATE :

    MONTH :

    5.1

    5.2

    5.2.1

    5.2.2

    5.2.3

    5.2.4

    5.2.5

    5.3

    5.3.1

    5.3.2

    Mobilization and Demobilisation of CONSTRUCTION EQUIPMENT for Line Laying WORKS Mobilisation and Demobilisation of CONSTRUCTIONON EQUIPMENT for Other WORK

    SOUTH PARS GAS FIELD DEVELOPMENT( PHASES 15 & 16 )

    DETAILED WORK STATEMENTPART II : OFFSHORE PIPELINES

    Work Package No.5 : Mobilization/Demobilization

    WORK UNITNO.

    SUBW.U.NO

    DESCRIPTION CONTRACT VALUE (US$)PROGRESS %

    VALUE OF WORKPERFORMEDCumulative

    lastThis month

    Cumulative this month

    Logistic Support for Laying Operations

    TOTAL GRAND TOTAL US ( $ )

    Mobilization Manual and Inspection of CONSTRUCTION EQUIPMENT Mobilisation/Demobilisation of CONSTRUCTION EQUIPMENT

    Onshore/ Offshore Logistic Support

    Logistic Support for Shore Approach

    Mobilization and Demobilisation of CONSTRUCTION EQUIPMENT for On-shore WORKS Mobilization and Demobilisation of CONSTRUCTION EQUIPMENT for Shore Approach WORKS Mobilization and Demobilisation of CONSTRUCTION EQUIPMENT for Tie-in WORKS

    Page 5 of 7

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    20/34

    PARS OIL & GAS COMPANY NO.

    DATE :

    MONTH :

    6.1

    6.2

    6.3

    6.4

    6.5

    6.6

    6.7

    TOTAL GRAND TOTAL US ( $ )

    Surveys

    Temporary Protection / Crossings / SITE Preparation Transportation from WORKSITE to SITE

    Lines Laying

    Free Span Reduction

    Dog Leg Installation and Hyperbaric Tie-in to Risers Pre-commissioning, Commissioning,

    Hydrotesting

    PROGRESS %

    VALUE OF WORKPERFORMEDCumulative

    lastThis month

    Cumulative this month

    WORK UNITNO.

    SUBW.U.NO

    DESCRIPTION CONTRACT VALUE (US$)

    SOUTH PARS GAS FIELD DEVELOPMENT( PHASES 15 & 16 )

    DETAILED WORK STATEMENT

    PART II : OFFSHORE PIPELINES

    Work Package No.6 : Site Work

    Page 6 of 7

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    21/34

    PARS OIL & GAS COMPANY NO.

    DATE :

    MONTH :

    7.1

    7.2

    7.2.1

    7.2.2

    7.3 Services to Company Training

    Vendor Assistance

    Third Party Services

    Third Party Agency Services

    Marine Warranty Surveyor Services

    CONTRACT VALUE (US$)

    SOUTH PARS GAS FIELD DEVELOPMENT( PHASES 15 & 16 )

    DETAILED WORK STATEMENT

    PART II : OFFSHORE PIPELINES

    Work Package No.7 : General Services

    TOTAL GRAND TOTAL US ( $ )

    PROGRESS %

    VALUE OF WORKPERFORMEDCumulative

    lastThis month

    Cumulative this month

    WORK UNITNO.

    SUBW.U.NO

    DESCRIPTION

    Page 7 of 7

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    22/34

    Attachment #6

    CONTRACT NO. : POGC-801-84/240 CONTRACTOR :

    COST CODE :

    CUT OFF DATE :

    SUMMARY

    WORK PACKAGENO.

    DESCRIPTIONCONTRACT

    VALUE (US$) VALUE OF WORK

    PERFORMED

    1 Management, Project Control and Administration

    2 General Services

    3 Engineering

    4 Procurement, Supply and Transportation

    5 Not Used

    6 Plant Construction

    7 Construction Camp

    8 Commissioning

    9 Start-up & Performance Tests

    GROSS INVOICE VALUE (Uplifeted by 10%)

    PREVIOUS MONTH STATEMENT

    VALUE TO BE INVOICED FOR THE MONTH

    TOTAL CUMULATIVE AS OF

    CURRENCY : US$

    PARS OIL & GAS COMPANY

    SOUTH PARS GAS DEVELOPMENT( PHASES 15 & 16 )

    WORK STATEMENT

    NO :

    MONTH :

    TITLE OF CONTRACT : ONSHORE FACILITIES

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    23/34

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    24/34

    PARS OIL & GAS COMPANY NO.

    DATE :

    MONTH :

    1.1

    1.2

    SOUTH PARS GAS FIELD DEVELOPMENT( PHASES 15 & 16 )

    DETAILED WORK STATEMENT

    Work Package No.1 : Management, Project Control & Administration

    PART III : ONSHORE FACILITIES

    TOTAL US ( $ )

    PROGRESS %

    TOTAL GRAND

    Management

    Project Control & Administration

    VALUE OF WORKPERFORMED

    SUBW.U.NO

    WORK UNITNO. Cumulative

    last

    DESCRIPTIONThis month

    Cumulative this month

    CONTRACT VALUE (US$)

    Page 2 of 12

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    25/34

    PARS OIL & GAS COMPANY NO.

    DATE :

    MONTH :

    2.1

    2.2

    2.2.1

    2.2.2

    2.2.32.2.4

    2.3

    2.3.1

    2.3.2

    2.3.3

    2.3.42.3.5

    2.3.6

    2.3.7

    At Contractor's/Subcontractors Iranian Offices

    At Harbour At SITE

    At Construction Camp

    Civils Inspection TPA

    Services & Facilities to COMPANY

    At Contractor Main Office

    At Major Subcontractors

    VALUE OF WORKPERFORMED

    SUBW.U.NO

    WORK UNITNO. Cumulative

    lastDESCRIPTION This month Cumulative

    this month

    TOTAL US ( $ )

    PROGRESS %

    TOTAL GRAND

    Work Package No.2 : General Services

    Training Services

    CONTRACT VALUE (US$)

    Certification TPA

    Marine Warranty Surveyor TPA

    Electrical Inspection TPA

    Vendor Assistance

    Third Party Authorities

    SOUTH PARS GAS FIELD DEVELOPMENT( PHASES 15 & 16 )

    DETAILED WORK STATEMENT

    PART III : ONSHORE FACILITIES

    Page 3 of 12

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    26/34

    PARS OIL & GAS COMPANY NO.

    DATE :

    MONTH :

    3.1

    3.2

    3.2.1

    3.2.2

    3.2.3

    3.2.4

    3.2.5

    3.2.6

    3.2.7

    3.2.8

    3.2.9

    3.2.10

    3.2.11

    3.2.12

    3.2.13

    3.3

    3.3.1

    3.3.2

    3.3.3

    3.3.4

    PROGRESS %

    Structural Steel

    Civil and Underground

    SOUTH PARS GAS FIELD DEVELOPMENT( PHASES 15 & 16 )

    DETAILED WORK STATEMENTPART III : ONSHORE FACILITIESWork Package No.4 : Procurement, Supply & Transportation

    WORK UNITNO.

    SUBW.U.NO

    DESCRIPTION CONTRACT VALUE (US$)

    Building/Architectural/HVAC

    Electrical

    Instrumentation

    Process

    Piping/Layout

    Painting/Insulation/Fireproofing

    Pressure Vessels / Heat Exchangers / Air Coolers and Storage Tanks

    Telecommunication

    Safety and Environmental

    Miscellaneous

    Process

    Mechanical Equipment

    This month VALUE OF WORK

    PERFORMEDCumulative this month

    Construction Engineering

    Fornt End Engineering & Design

    Detailed Engineering

    Civil and Underground

    Cumulative last

    Structural Steel

    Mechanical Equipment

    Page 4 of 12

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    27/34

    PARS OIL & GAS COMPANY NO.

    DATE :

    MONTH :

    3.3.5

    3.3.6

    3.3.7

    3.3.8

    3.3.9

    3.3.10

    3.3.11

    3.3.12

    3.3.13

    3.3.14

    3.5

    VALUE OF WORKPERFORMEDCumulative

    this month

    Miscellaneous

    Instrumentation

    Electrical

    Building/Architectural/HVAC

    Pressure Vessels / Heat Exchangers / Air Coolers and Storage Tanks

    Painting/Insulation/Fireproofing

    Piping/Layout

    PROGRESS %

    TOTAL US ( $ )TOTAL GRAND

    Safety and Environmental

    Telecommunication

    SITE

    Final Documentation

    SOUTH PARS GAS FIELD DEVELOPMENT( PHASES 15 & 16 )

    DETAILED WORK STATEMENTPART III : ONSHORE FACILITIESWork Package No.4 : Procurement, Supply & Transportation

    Cumulative last

    This monthWORK UNIT

    NO.SUB

    W.U.NODESCRIPTION CONTRACT VALUE (US$)

    Page 5 of 12

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    28/34

    PARS OIL & GAS COMPANY NO.

    DATE :

    MONTH :

    4.1

    4.2

    VALUE OF WORKPERFORMED

    SUBW.U.NO Cumulative

    this month

    Electrical Generators

    Procurement, Supply & Transportation Procurement ActivitiesPurchasingExpeditingInspection and TestingMaterial Control System

    SOUTH PARS GAS FIELD DEVELOPMENT( PHASES 15 & 16 )

    DETAILED WORK STATEMENT

    PROGRESS %

    Work Package No.4 : Procurement, Supply & TransportationPART III : ONSHORE FACILITIES

    WORK UNITNO. Cumulative

    lastDESCRIPTION

    This monthCONTRACT VALUE (US$)

    ForwardingCustoms Clearance

    Supply Equipment

    Vessels, Columns, DrumsExchangers / CondensorsTanksPackage EquipmentCompressorsFilters

    Miscellaneous Lifting DevicesHVAC

    Electric Motors

    TelecomsSafety / Fire FightingInstrumentationSwitchgears

    Page 6 of 12

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    29/34

    PARS OIL & GAS COMPANY NO.

    DATE :

    MONTH :

    4.3

    4.64.74.8

    Protective Coatings Insulation Other

    TOTAL US ( $ )

    Operating Consumables & First Aids Supply of Spare Parts Procurement for 2 Years Sparts

    TOTAL GRAND

    Telecoms HVAC Buildings / Architectural Fire Protection

    Valves Pipe Supports Electrical Instrumentation

    CivilsStructuralPipingFittings

    DESCRIPTIONThis month

    CONTRACT VALUE (US$)

    Supply of Bulk Materials

    VALUE OF WORKPERFORMED

    SUBW.U.NO Cumulative

    this month

    SOUTH PARS GAS FIELD DEVELOPMENT( PHASES 15 & 16 )

    DETAILED WORK STATEMENT

    PROGRESS %

    Work Package No.4 : Procurement, Supply & TransportationPART III : ONSHORE FACILITIES

    WORK UNITNO. Cumulative

    last

    Page 7 of 12

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    30/34

    PARS OIL & GAS COMPANY NO.

    DATE :

    MONTH :

    6.1

    6.1.1

    6.1.2

    6.1.3

    6.2

    6.2.1

    6.2.2

    6.2.3

    6.2.4

    6.2.5

    6.3

    SITE Utilities

    Disposals

    Welding and NDT Procedures

    Electrical

    Piping

    Civil & Underground works

    Qualification

    d) Construction Communication Systems e) Housekeeping

    SITE Facilities

    Demobilisation

    a) Power

    b) Fresh Water c) Wastes from SITE

    SOUTH PARS GAS FIELD DEVELOPMENT( PHASES 15 & 16 )

    DETAILED WORK STATEMENT

    PROGRESS %

    Work Package No.6 : Plant ConstructionPART III : ONSHORE FACILITIES

    WORK UNITNO. Cumulative

    lastDESCRIPTION

    This monthCONTRACT VALUE (US$)

    VALUE OF WORKPERFORMED

    SUBW.U.NO Cumulative

    this month

    Plant Construction

    Site Preparation & Site Access

    Site Preparation

    Site Access & Roads

    Bridge Crossing/By-passing

    Site Establishment

    Mobilisation

    Page 8 of 12

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    31/34

    PARS OIL & GAS COMPANY NO.

    DATE :

    MONTH :

    6.4

    6.5

    6.6

    6.7

    HVAC

    VALUE OF WORKPERFORMED

    SUBW.U.NO Cumulative

    this month

    Telecommunications

    Instrumentation

    Preservation / Protection of Equipment & Systems Any other Construction Work

    Any other Disciplines

    Safety and Security

    Safety and Fire fighting

    Painting and Coating

    Insulation

    Buildings and Architectural

    Equipment Packages

    Steel Work

    Pre-Commissining

    SOUTH PARS GAS FIELD DEVELOPMENT( PHASES 15 & 16 )

    DETAILED WORK STATEMENT

    PROGRESS %

    Work Package No.6 : Plant ConstructionPART III : ONSHORE FACILITIES

    WORK UNITNO. Cumulative

    lastDESCRIPTION

    This monthCONTRACT VALUE (US$)

    Page 9 of 12

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    32/34

    PARS OIL & GAS COMPANY NO.

    DATE :

    MONTH :

    7.1

    7.2

    7.3

    7.3.1

    7.3.2

    7.3.3

    7.3.4

    7.3.5

    7.3.6

    7.4

    Site utilities for camp construction

    Camp Operation and Maintenance

    Administration and Operation

    Maintenance

    Wastes Disposal

    Communication Systems

    SITE/PLANT/CAMP Access and

    TransportSafety and Security

    VALUE OF WORKPERFORMED

    SUBW.U.NO Cumulative

    this monthCumulative

    last

    DESCRIPTIONThis month

    CONTRACT VALUE (US$)

    SOUTH PARS GAS FIELD DEVELOPMENT( PHASES 15 & 16 )

    DETAILED WORK STATEMENT

    TOTAL US ( $ )

    PROGRESS %

    TOTAL GRAND

    Work Package No.7 : Construction Camp

    Construction

    WORK UNITNO.

    Dismantling and Removal of Camp

    PART III : ONSHORE FACILITIES

    Page 10 of 12

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    33/34

    PARS OIL & GAS COMPANY NO.

    DATE :

    MONTH :

    8.1

    8.2

    VALUE OF WORKPERFORMED

    SUBW.U.NO

    WORK UNITNO. Cumulative

    last

    DESCRIPTIONThis month

    Cumulative this month

    CONTRACT VALUE (US$)

    SOUTH PARS GAS FIELD DEVELOPMENT( PHASES 15 & 16 )

    DETAILED WORK STATEMENT

    TOTAL US ( $ )

    PROGRESS %

    TOTAL GRAND

    Work Package No.8 : Commissioning

    PART III : ONSHORE FACILITIES

    Commissioning

    Pre-Start up Activities & Reinstatement

    Page 11 of 12

  • 8/10/2019 Invoicing_Procedure 1516-Rev00 (Submitted by IOEC)

    34/34

    PARS OIL & GAS COMPANY NO.

    DATE :

    MONTH :

    9.1

    9.2

    SOUTH PARS GAS FIELD DEVELOPMENT( PHASES 15 & 16 )

    DETAILED WORK STATEMENT

    TOTAL US ( $ )

    PROGRESS %

    TOTAL GRAND

    Work Package No.9 : Start-up & Performance Tests

    PART III : ONSHORE FACILITIES

    Start-up Activities

    Performance Tests

    CONTRACT VALUE (US$) VALUE OF WORKPERFORMED

    SUBW.U.NO

    WORK UNITNO. Cumulative

    last

    DESCRIPTIONThis month

    Cumulative this month

    Page 12 of 12