Project: Birmingham Children’s Hospital
ACSAP Roofing Case Study
![Page 2: Industrial Roofing Case Study - Birmingham Childrens Hospital](https://reader034.fdocuments.us/reader034/viewer/2022042716/55b51b15bb61eb1a698b468b/html5/thumbnails/2.jpg)
www.acsap-roofing.com
Major re-roofing project: Birmingham Children’s Hospital
This was a major re-roofing project of various parts of the hospital comprising of:
• Stripping of some 2000sqm of 120 year old Westmoreland Random Slate.
• Sarking over with Klober Permo Forte.
• Re-battening with treated batten.
• Re-slating with 120 tonnes of Burlington 's Westmoreland Random slate from the Elterwater quarry in the Lake district.
•Torch-on mineral felting of 1500sqm to flat roofs elsewhere on site.
![Page 3: Industrial Roofing Case Study - Birmingham Childrens Hospital](https://reader034.fdocuments.us/reader034/viewer/2022042716/55b51b15bb61eb1a698b468b/html5/thumbnails/3.jpg)
www.acsap-roofing.com
Major re-roofing project: Birmingham Children’s Hospital
The project also included much complicated detailing:
• Spires
• Multiple jack roofs with cloaked mitred hips.
• Ridges.
• Lead roofs and flashings.
• Cast aluminium guttering.
![Page 4: Industrial Roofing Case Study - Birmingham Childrens Hospital](https://reader034.fdocuments.us/reader034/viewer/2022042716/55b51b15bb61eb1a698b468b/html5/thumbnails/4.jpg)
www.acsap-roofing.com
Major re-roofing project: Birmingham Children’s Hospital
In addition to the original Scope of Works, an area of the roof that had been burnt out and truncated as a result of a German incendiary bomb was rebuilt, including all carpentry work and was restored to its" pre-war glory.
All works were carried out to the highest standards of quality, over fully operational children's wards.
The project was carried over a period of 3 years, where of necessity, much of the work was progressing through the winters.
There was no disruption to the hospitals activities.
![Page 5: Industrial Roofing Case Study - Birmingham Childrens Hospital](https://reader034.fdocuments.us/reader034/viewer/2022042716/55b51b15bb61eb1a698b468b/html5/thumbnails/5.jpg)
www.acsap-roofing.com
Major re-roofing project: Birmingham Children’s Hospital
"A.C. Smith (Applications) carried out a competent job to the highest standards, with the minimum of fuss."
Mr Harrison, Hospital Estates Project Manager
![Page 6: Industrial Roofing Case Study - Birmingham Childrens Hospital](https://reader034.fdocuments.us/reader034/viewer/2022042716/55b51b15bb61eb1a698b468b/html5/thumbnails/6.jpg)
www.acsap-roofing.com
Contact us today!
For more information on industrial roofing services, and roof repairs in the West Midlands:
Visit: www.acsap-roofing.com
E-mail: [email protected]
Or like our Facebook page