![Page 1: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility.](https://reader035.fdocuments.us/reader035/viewer/2022062423/5697c0261a28abf838cd5c11/html5/thumbnails/1.jpg)
F A C I L I T I E S M A S T E R P L A N
FMP ReviewO c t o b e r 2 0 1 5
![Page 2: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility.](https://reader035.fdocuments.us/reader035/viewer/2022062423/5697c0261a28abf838cd5c11/html5/thumbnails/2.jpg)
T I M E L I N E
2014 November
2015February
March
April
May
October /
November
December
Education / Facility Master Plan kick-off
Review existing buildings with Maintenance & Operations StaffSurvey Students, Faculty, Staff
Review SWOT findings & solicit input
Updated District BoardCAC & President’s Cabinet – First Draft of Facilities Master Plan
Facilities & Safety Committee SWOT Review & First Draft of Facilities Master Plan
Review of Facilities Master PlanOpen Forum
Recommendation to Board
D R A F T10.19.2015
![Page 3: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility.](https://reader035.fdocuments.us/reader035/viewer/2022062423/5697c0261a28abf838cd5c11/html5/thumbnails/3.jpg)
O B J E C T I V E S
Supporting student access to learning
Balancing & supporting socialization & formal learning.
Maintaining student safety
Fostering environmental responsibility
Highest & Best Use of Existing Facilities
Building Upon your current planning documents
Creating unique “places”
D R A F T10.19.2015
![Page 4: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility.](https://reader035.fdocuments.us/reader035/viewer/2022062423/5697c0261a28abf838cd5c11/html5/thumbnails/4.jpg)
San Jose City College
c a m p u s e d g e / a c c e s s
ONE WAY Vehicular Access
TWO WAY Vehicular Access
Campus Entry
Interior Vehicular Circulation
Restricted Interior Vehicular
Circulation
Drop Off
Plaza
Signalized Intersection
Moorpark Ave
Parkmoor AveS
Bascom
Ave
Leig
h A
ve
Change Access on Moorpark Ave
• Allow 3-WAY traffic @ Leland Ave Traffic Light
• Allow Vehicle to exit campus directly onto Leland (North Bound)
• Improve Main Drop-Off (@ Leleand Ave)
• Provide drop-off @ Science Building
• Provide drop-off @ Wellness Center
Lela
nd
Ave
Today
FMP
D R A F T10.19.2015
![Page 5: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility.](https://reader035.fdocuments.us/reader035/viewer/2022062423/5697c0261a28abf838cd5c11/html5/thumbnails/5.jpg)
San Jose City College
c a m p u s e d g e / a c c e s s
ONE WAY Vehicular Access
TWO WAY Vehicular Access
Campus Entry
Interior Vehicular Circulation
Restricted Interior Vehicular
Circulation
Drop Off
Plaza
Signalized Intersection
Kingman Ave
S B
ascom
Ave
Leig
h A
ve
Change Access on Kingman Ave
• Allow 4-WAY traffic @ Kingman Ave Traffic Light
• On-Campus Road• 2-way traffic (1 lane each)
• Multiple Access points for Parking Structure
• Allow loop connection East of Football fieldToday
FMP
Kingman Ave
S B
ascom
Ave
Leig
h A
ve
D R A F T10.19.2015
![Page 6: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility.](https://reader035.fdocuments.us/reader035/viewer/2022062423/5697c0261a28abf838cd5c11/html5/thumbnails/6.jpg)
San Jose City College
p a r k i n g c o u n t
Kingman Ave
Leig
h A
ve
Parking Counts:
Today: 1,775 Stalls
2014 Enroll. : 8,953 = 5 students / stall
2030 Enroll. : 13,699 = 7.7 students / stall
FMP: 2,281 Stalls
2014 Enroll. : 8,953 = 3.4 students / stall
2030 Enroll. : 13,699 = 6 students / stall
Increase = 506 Parking stalls = +28%
Square Footage
Today = 612,771 GSF
FMP POW = 691,805 GSF = +13%
FMP ALL = 808,805 GSF = +32%
S B
ascom
Ave
Leig
h A
ve
Moorpark Ave
Parkmoor Ave
620
900180/plate @ 5 plates
40145
76
4439
8726
20
91
1631614
D R A F T10.19.2015
![Page 7: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility.](https://reader035.fdocuments.us/reader035/viewer/2022062423/5697c0261a28abf838cd5c11/html5/thumbnails/7.jpg)
San Jose City CollegeMoorpark Ave
S B
ascom
Ave
Leig
h A
ve
SWOT
• Limited drop-off
• Restricted pedestrian circulation
• Limited purposeful outdoor student spaces
• Pedestrian Safety
p e d e s t r i a n a c c e s s a n d o p e n s p a c e
T Public Transit
Drop Off
Plaza
Activity Node
Improved Pedestrian Circulation
Campus Open Space
Food Service (Existing and
Potential)
D R A F T10.19.2015
![Page 8: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility.](https://reader035.fdocuments.us/reader035/viewer/2022062423/5697c0261a28abf838cd5c11/html5/thumbnails/8.jpg)
San Jose City College
Moorpark Ave
S B
ascom
Ave
Leig
h A
ve
Remove GE Buildings
• Allow for drop-off and vista into campus
• Ease E/W pedestrian circulation
Create Campus Quad
• Repurpose Jaguar Gym into Student Activities
Improve North / South pedestrian circulation
• Provide connection from parking to campus core
p e d e s t r i a n a c c e s s a n d o p e n s p a c e
Drop Off
Plaza
Activity Node
Improved Pedestrian Circulation
Campus Open Space
Food Service (Existing and
Potential)
D R A F T10.19.2015
![Page 9: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility.](https://reader035.fdocuments.us/reader035/viewer/2022062423/5697c0261a28abf838cd5c11/html5/thumbnails/9.jpg)
San Jose City College
Moorpark Ave
S B
ascom
Ave
Leig
h A
ve
Service
• Perimeter Road
• M&O relocated to south of Kingman
• Maintain perimeter access to service buildings
s e r v i c eD R A F T10.19.2015
![Page 10: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility.](https://reader035.fdocuments.us/reader035/viewer/2022062423/5697c0261a28abf838cd5c11/html5/thumbnails/10.jpg)
San Jose City College
Moorpark Ave
S B
ascom
Ave
Leig
h A
ve
N
f a c i l i t i e s m a s t e r p l a n
Lela
nd
Ave
Parkmoor Ave
S
T
M
A
TH6
X
5
C
CT
L
SC7
AWAW
AAW CCTMLRSTTHSC
Fine Arts Center Athletics / Wellness (Under Construction)Cosmetology / EstheticianCareer TechnologyMulti-Disciplinary BuildingLibrary / Learning Resource CenterReprographics Science ComplexTechnology CenterTheaterStudent Center
1 23
45678910X
Relocate Softball FieldCTE BuildingMaintenance & Operations / ReprographicsGE / Business / AdministrationCosmetology Expansion / Adaptive PEDrama / Theater LobbyStudent Activities (Repurp. Jaguar Gym)Parking StructureChild Development CenterTechnology Center – Expansion of Current Future Building Pad
2
9
4
X
8
Kingman Ave
3
6
Program of Work
1
D R A F T10.19.2015
10
![Page 11: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility.](https://reader035.fdocuments.us/reader035/viewer/2022062423/5697c0261a28abf838cd5c11/html5/thumbnails/11.jpg)
SJCC M&O / Grounds / Reprographics Softball Field Relocation Student Activities Drama Building /
Theater Renovation
Adaptive PE / Esthetician Expansion
CTE Building w/ Food Service
GE / Business / Administration
South Parking Structure /
On-Campus Road: Kingman
New Campus Drop Off (Moorpark)
p r o g r a m o f w o r k : fl o w c h a r tD R A F T10.19.2015
![Page 12: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility.](https://reader035.fdocuments.us/reader035/viewer/2022062423/5697c0261a28abf838cd5c11/html5/thumbnails/12.jpg)
1. Adopt a Facilities Master Plan
2. Link Current Planning
3. Work with City / Community
4. Larger/ Multi-Story Buildings
5. Structured Parking
D R A F T10.19.2015r e c o m m e n d a t i o n s
![Page 13: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility.](https://reader035.fdocuments.us/reader035/viewer/2022062423/5697c0261a28abf838cd5c11/html5/thumbnails/13.jpg)
D I S C U S S I O N :
Q U E S T I O N S & A N S W E R S
D R A F T10.19.2015