Communication, Collaboration and Risk - BIMMEPAUS€¦ · Communication, Collaboration and Rodd...
Transcript of Communication, Collaboration and Risk - BIMMEPAUS€¦ · Communication, Collaboration and Rodd...
Proudly partnered with
Communication,
Collaboration and
Rodd Perey
Risk
Principal, Architectus
Building C
45 Waterloo Road,
Macquarie Park
Project Aspirations
At Building C 45 Waterloo Road John
Holland aim to incorporate the highest
level of BIM and smart building
technology
Project Aspirations
✓Clash Detection and Coordination
Project Aspirations
✓Clash Detection and Coordination
✓Cost Estimating
Project Aspirations
✓Clash Detection and Coordination
✓Cost Estimating
✓Construction Sequencing
Project Aspirations
✓Clash Detection and Coordination
✓Cost Estimating
✓Construction Sequencing
✓Integrated Building Automation
Project Aspirations
✓Clash Detection and Coordination
✓Cost Estimating
✓Construction Sequencing
✓Integrated Building Automation
✓BIM Dashboard and Digital Twin
Project Aspirations
✓Clash Detection and Coordination
✓Cost Estimating
✓Construction Sequencing
✓Integrated Building Automation
✓BIM Dashboard and Digital Twin
✓BIM to Support FM
Project Aspirations
✓Clash Detection and Coordination
✓Cost Estimating
✓Construction Sequencing
✓Integrated Building Automation
✓BIM Dashboard and Digital Twin
✓BIM to Support FM
✓On Site Verification to LOD500
Project strategy
Consultants and subcontractors chosen on the basis of professional backgrounds for optimal building design and performance
Partner Page
Project strategy
Digital capabilities augmented by Atlas
• single point of responsibility
• consistent, complete, and high quality models
• Subcontractors may access to Atlas’ services, ensuring a
competitive environment
1 | Februaruy 2018www.atlasindustries.com
Macquaire Park Stage 1 – Digital PresentationMacquarie Park Stage 1
Using Connected Digital Data to Improve Construction Productivity, Quality and Safety
Management,
Project Control
Design
Modelling
Documentation
Administration
Management,
Project Control
Design
Modelling
Documentation
Administration
Partner Page
Explore. Collaborate. Create.
International Collaborations
We have been early adopters of BIM, not just authoring, but have attempted to extend its use at every opportunity
Currently we are exploring the ability of BIM to: facilitate the collaborative process
To obtain benefits of IPDIn a traditional structure
Building C
9 Storey Building
2 Basement Levels 34,500
sqm Office NLA 932 sqm
Retail NLA
PCA A Grade Office Quality
5 Star Green Star Design and As Built
5 Star NABERS Energy
4 Star NABERS Water
• 4270 sqm NLA - Total
• 1876 sqm NLA - North Plate
• 2094 sqm NLA - South Plate
• 300 sqm NLA - Bridge Link
• Atrium
• Central Amenities
• Vertical Transportation
• Communication Stairs
• 360° Vista
Typical Levels
Digital Strategy
• Developed by Ridley with John Holland –
– The key Principal objectives for Digital are to drive a
Digital process right from Design through to
Construction & Operations for 3D models (6D, LOD
500), asset data & linked to Live Building Controls in
order to increase innovation & consistency, reduce the
risk of rework & improve the project outcome in both
delivery & operations.
Macquarie Park Stage 1
Atlas Supporting the Digital Delivery Teams
Model Creation Delivery Structure
1Collaborate.
consultant team focusses on designand management
Autodesk have created a BIM ecosystem in the
Revit Cloud Worksharing BIM360 platform
High and low trust connections.
Real-time and managed connections.
Full engagement with the models by all parties
High and low trust connections.
Real-time and managed connections.
1 | Februaruy 2018www.atlasindustries.com
Macquaire Park Stage 1 – Digital PresentationMacquarie Park Stage 1
Using Connected Digital Data to Improve Construction Productivity, Quality and Safety
• expertise in arcane tools • each discipline at the same level of
completeness• timeliness across all disciplines• flexibility in resourcing
1 | Februaruy 2018www.atlasindustries.com
Macquaire Park Stage 1 – Digital PresentationMacquarie Park Stage 1
Using Connected Digital Data to Improve Construction Productivity, Quality and Safety
1 | Februaruy 2018www.atlasindustries.com
Macquaire Park Stage 1 – Digital PresentationMacquarie Park Stage 1
Using Connected Digital Data to Improve Construction Productivity, Quality and Safety
• maintain the BIM environment• reliable models with all aspects of
the design up to date• all discipline models in context, in
the original authoring environment
Aconex Stack
Communication:• Documentation Guidelines• complex parametric families
Revit Worksharing Collaboration – All
Documentation
Communication:• We are active in the model• We communicate through the
model
Manage systems ourselves: • fire compartmentation,• doors, • acoustics, • thermal performance
We produce example views and provide view templates, and then have the work completed by Atlas
CAPTURE, CONNECT, COLLABORATE
• Create tasks
• Add tags
• Assign
• Attach
• Comment
• Resolve
2Coordination
Multiple Lines of Defence• internal processes and
engagement• Atlas’ project team review and
issue-raising• regular reports and issue
tracking
Working
multidisciplinary
views in Revit
Clash Avoidance
Level Room IDs Room Name Room Number Room Area Ceiling HeightPercentage Area of
Encroachment into
300mm Tenancy Zone
Level 2 1118831 COMMERCIAL OFFICE L2.01 2059.303857 2700 11.55
Level 3 1118829 COMMERCIAL OFFICE L3.02 2067.872072 2700 11.55
Level 5 1118825 COMMERCIAL OFFICE L5.02 2059.278803 2700 11.54
Level 6 1118823 COMMERCIAL OFFICE L6.02 2059.278803 2700 11.54
Level 7 1118821 COMMERCIAL OFFICE L7.02 2059.278803 2700 11.54
Level 8 1118819 COMMERCIAL OFFICE L8.02 2059.465335 2700 11.54
Level 4 1118827 COMMERCIAL OFFICE L4.02 2064.547312 2700 11.54
Level 1 1154853 COMMERCIAL OFFICE L1.01 4007.149681 3900 10.49
Level 3 4336709 COMMERCIAL OFFICE 1835.272233 2700 9.35
Level 5 4336737 COMMERCIAL OFFICE L.04 1839.36996 2700 9.32
Level 6 4336751 COMMERCIAL OFFICE 1839.36996 2700 9.32
Level 7 4336764 COMMERCIAL OFFICE 1839.370526 2700 9.32
Level 8 4336778 COMMERCIAL OFFICE 1839.555053 2700 9.32
Level 2 3849406 COMMERCIAL OFFICE L2.05 1840.494728 2700 9.3
Level 4 4336721 COMMERCIAL OFFICE 1843.550646 2700 9.3
Not Clash Detection it’s
Clash Avoidance
Benefits of adopting BIM is
the potential for better
avoidance of clashes, that
is, it can help ensure there
is spatial co-ordination
between the different
components that make up
the asset.
Coordination – Validation
When Accuracy Matters, Validation
Is Crucial
An important part of our BIM strategy
is the validation and auditing of our
BIM Geometry models.
Use of Dynamo scripting has helped
us automate this process to ensure
consistency over each models
Macquarie Park Stage 1
5D Data Transfer Workflow
Independent Model ValidationMB Deliverables - Leveraging the BIM
Independent Model Verification
Point Cloud Verification
Verify the accuracy of installed elements
Verity™ software from ClearEdge3D resultis in more
more accurate as-builts, and fewer schedule delays.
3Risk
BIM as a Single
Point of Truth
A ‘risk aware’ process
217
217Aconex Distribution List
4,500
4,500Aconex Messages
I’m Copied Into
40,519
40,519Files in our
Project Folder
21
00
mm
HIG
H
DDA ENVELOPE
Mission Control | Real-time Revit Usage and Model-Data Reporting
Image: NASA
WINDOWS CLOUD
Synchronizing Event• CentralPath• LocalPath• SyncTimeStart• SyncTimeEnd• SyncMbSizeStart• SyncMbSizeEnd• Comments• Compact• EventTime
Document Changed Event• TransactionName• ElementId
Hardware Information• Processor• Hard Drive space• RAM
Application Initialized Event• WindowsUser• MachineName• RevitUser• VersionName• VersionNumber• VersionBuild• Product• FamilyTemplatePath• SharedParametersFilename
Software Information• Windows Version• Revit Versions Installed• Add-ins Installed
Data Visualization• User activity information.• User hardware.• User software.• Revit sessions per user.• Revit models active.• Revit opening and sync times.• Has Central been compacted• Time worked in all the models.• Elements deleted in models.• Model errors.
Automate• Send Model alerts.• User Notifications.
Mission Control | Real-time Revit Usage and Model-Data ReportingWHY
Summary
The end goal is to
build the BIM as it
is in real life
Surprising how many people don’t get it
“It’s correct in the CAD file”
“its in the standard detail”
Its in the (PDF schedule)
Its in the Bluebeam markup
It cannot be in any of those places. It needs to be in the model. That is what “single point of truth” means
Team collaborating to produce rigorous models that support defined documentation standards and optimal design and process
Coordination processes have enabled multiple lines of defence against errors and have allowed the team to deal with changing project requirements
BIM has been used to provide a single point of truth that genuinely improves design outcomes and lowers risks
Rodd Perey Principal,Group Design Technology Manager ArchitectusM +61 412 451 493