CITY OF LEANDER
CITY OF LEANDER
June 10, 2013
Williamson County Bond Projects
2014-15 Requests
Williamson County Bond Projects
CITY OF LEANDER
Trails2014-15 RequestsJune 10, 2013WilliamsonCounty Bond ProjectsTrails
Bagdad Heritage Trail Continuation Phase One TxDOT STP Grant$1.2 million
Bledsoe ParkCrystal Falls PkwyProposed Trail to connect existing Heritage Trail (constructed in 2006 T-21 grant) at Bledsoe Park to Crystal Falls ParkwayBagdad RoadTOTAL PROJECT$900,000.00
WILCO Request (80%)$720,000.00City Match (20%)$180,000.00PRIORITY 1WilliamsonCounty Bond ProjectsTrails
Bagdad Heritage Trail ContinuationPhase One TxDOT STP Grant$1.2 million
Proposed Trail to connect existing Heritage Trail at Bledsoe Park to Crystal Falls ParkwayTOTAL PROJECT$900,000.00
WILCO Request (80%)$720,000.00City Match (20%)$180,000.00PRIORITY 1Williamson County Bond ProjectsTrails183A/Metro Trail
Proposed Trail to connect existing 183A Trail to Metro Station to Hwy.183Approx. 7500 ftHero WayMel Mathis BlvdFM 2243Capitol Metro StationHWY 183AHwy 183TOTAL PROJECT$600,000.00
WILCO Request (80%) $480,000.00City Match(20%)$120,000.00PRIORITY 2
Williamson County Bond Projects
CITY OF LEANDER
Roadways2014-15 RequestsJune 10, 2013Williamson County Bond ProjectsRoadwaysHero Way East and West
Proposed Roadway Improvements connect from Reagan Blvd to Lakeline ExtensionFM 2243Hero WayCrystal Falls PkwyReagan BlvdFM 2243HWY 183AHWY 183Lakeline ExtensionBagdad RdTOTAL PROJECT (PH 2)$9,000,000.00
WILCO Request (50%)$4,500,000.00City Match(50%)$4,500,000.00TOTAL PROJECT (PH 1)$17,000,000.00
WILCO Request (50%)$8,500,000.00City Match (50%)$8,500,000.00PHASE ONEPHASE TWOPRIORITY 1
Williamson County Bond ProjectsRoadwaysHero Way WestProposed Roadway Improvements connect from Reagan Blvd to Lakeline Extension
Western Phase heavily constrained with utility lines and open drainage
PRIORITY 1Williamson County Bond ProjectsRoadwaysHero Way EastProposed Roadway Improvements connect from Reagan Blvd to Lakeline Extension
PRIORITY 1Williamson County Bond Projects
Roadways
Bagdad Road North
Proposed Roadway Improvements from FM2243 to CR 280CR280FM2243San Gabriel PkwyHalsey DrCollaborative WayHigh School #6TOTAL PROJECT $9,000,000.00
WILCO Request (50%)$4,500,000.00City Match (50%)$4,500,000.00PRIORITY 2
Williamson County Bond Projects
Roadways
Bagdad Road North
Proposed Roadway Improvements from FM2243 to CR 280TOTAL PROJECT $9,000,000.00
WILCO Request (50%)$4,500,000.00City Match (50%)$4,500,000.00PRIORITY 2
Williamson County Bond ProjectsRoadwaysSan Gabriel ParkwayProposed Roadway Improvements from CR170 to Reagan Blvd.
CR170San Gabriel PkwyReagan BlvdKittie Hill AirportTOTAL PROJECT $7.500,000.00
WICO Request (50%)$3,750,000.00City Match (50%)$3,750,000.00183APRIORITY 3Williamson County Bond ProjectsRoadwaysSan Gabriel ParkwayProposed Roadway Improvements from CR170 to Reagan Blvd.TOTAL PROJECT $7,500,000.00
WICO Request (50%)$3,750,000.00City Match (50%)$3,750,000.00PRIORITY 3
CITY OF LEANDER
June 10, 2013
Williamson County Bond Projects2014-15 RequestsSummary
TrailsTotal$1,500,000.00Wilco$1,200,000.00 (80%)City$300,000.00 (20%)RoadwaysTotal$42,500,000.00Wilco$21,250,000.00 (50%)City$21,250,000.00 (50%)CombinedTotal$44,000,000.00Wilco$22,450,000.00 (51%)City$21,550,000.00 (49%)