boq

40
PP Item-No Dept. Type No. A 110 A 110 A 110 A 110 A 110 BC 2 A 110 BC 2 A 110 BC 3 A 110 BC 3 A 110 BC 3 A 110 TT 1 A 110 TT 1 A 110 TT 1 A 110 BC 4 A 110 BC 4 A 110 TT 2 A 110 TT 2 A 110 TT 2 A 110 BC 5 A 110 BC 5 A 110 BC 6 A 110 BC 6 A 110 TT 3 A 110 TT 3 A 110 TT 3 A 110 BC 7 A 110 BC 7 A 110 TT 4 A 110 TT 4 A 110 TT 4 A 111 A 111 A 111 A 111 A 111 FH 1 A 111 BC 8 A 111 BC 8 A 111 BC 8 A 111 BC 8 A 115 A 115 A 115 A 115 FH 1 A 115 TT 1 A 115 TT 1 A 115 TT 1

Transcript of boq

Page 1: boq

PP Item-No Designation of Structure Dept. Type No.

A 110 Crusher building A 110 Steel superstructure A 110 Concrete building up to feed hopper inlet level A 110 Retaining wall besides crusher building A 110 BC 2 Conveyor bridge for 110BC02 A 110 BC 2 Concrete tunnel below ground level A 110 BC 3 Conveyor bridge for 110BC03, 111BC02, 155BC02 A 110 BC 3 starts below ground level in concrete tunnel for 2 conveyor 50 m A 110 BC 3 steel bridge with housing for 3 conveyor, approx. 600 m long, 25 columns A 110 TT 1 Transfer tower A 110 TT 1 l*w*h = 14x13x27,50 m A 110 TT 1 2 Filters installed, no wall cladding A 110 BC 4 Conveyor bridge for 110BC04, 111BC03 A 110 BC 4 bridge with housing for 2 conveyors, 1 support column, 27m A 110 TT 2 Transfer tower A 110 TT 2 l*w*h = 12x12x30 m A 110 TT 2 2 Filters installed, no wall cladding A 110 BC 5 Conveyor bridge for 110BC05 A 110 BC 5 bridge with housing for 1 conveyer to circular storage , 1 support column A 110 BC 6 Conveyor bridge for 110BC06, 111BC04 A 110 BC 6 bridge with housing for 2 conveyors, no column, 18m A 110 TT 3 Transfer tower A 110 TT 3 l*w*h = 12x12x28 m A 110 TT 3 2 Filters installed, no wall cladding A 110 BC 7 Conveyor bridge for 110BC07, 111BC05 A 110 BC 7 bridge with housing for 2 conveyors, 3 support columns, 75m A 110 TT 4 Transfer tower A 110 TT 4 l*w*h = 12x12x31 m A 110 TT 4 1 Filter installed, no wall cladding A 111 Crusher building A 111 Steel superstructure A 111 Concrete building up to feed hopper inlet level A 111 Retaining wall besides crusher building A 111 FH 1 Feed Hopper Building for iron or sand A 111 BC 8 Conveyor bridge for 111BC08, 155BC08 A 111 BC 8 Tunnel below ground level for 2 conveyors, 40m A 111 BC 8 Conveyor bridge for 111BC06 A 111 BC 8 bridge with housing for 1 conveyor to circular storage, 1 support column A 115 Prehomogenization storage 50000 t Limestone A 115 Circular storage : Dia of rails 90 m A 115 Channel for conveyor 115BC01 A 115 FH 1 Feed hopper building for Limestone 30m³ A 115 TT 1 Transfer tower A 115 TT 1 l*w*h = 8x8x20,5 m A 115 TT 1 1 Filter installed, no wall cladding

Page 2: boq

A 115 BC 2 Conveyor bridge for 115BC02, 117BC02 A 115 BC 2 bridge with housing for 2 conveyors, no column, 18m A 115 TT 2 Transfer tower A 115 TT 2 l*w*h = 12x9x22 m A 115 TT 2 3 Filter installed, no wall cladding A 115 BC 3 Conveyor bridge for 115BC03, 116BC03, 117BC03 A 115 BC 3 bridge with housing for 3 conveyors , 3 support columns, 88m A 116 Prehomogenization storage 50000t Premix A 116 Circular storage : Dia of rails 90 m A 116 Channel for conveyor 116BC01 A 116 FH 1 Feed hopper building for Premix 30m³ A 116 TT 1 Transfer tower A 116 TT 1 l*w*h = 8x6x16 m A 116 TT 1 1 Filter installed, no wall cladding A 116 BC 2 Conveyor bridge for 116BC02 A 116 BC 2 bridge with housing for 1 conveyor, 3 support columns, 79m A 117 SS 1 Conveyor bridge for 117SS01 A 117 SS 1 1 conveyor with housing to additive storage , 1 support column,37m A 117 / 141 Additive Storage 2 x 20000t A 117 / 141 Longitudinal Storage including Feed Hopper 117FH01 A 117 TT 1 Transfer tower A 117 TT 1 l*w*h = 5x5x16 m A 117 TT 1 1 Filter installed, no wall cladding A 141 TT 1 Transfer tower Additives transport A 141 TT 1 l*w*h = 5x5x15 m A 141 TT 1 1 Filter installed, no wall cladding A 141 BC 2 Conveyor bridge for additive conveyor 141BC02 A 141 BC 2 bridge with housing for 1 conveyor, 4 support columns, 115m A 141 TT 2 Transfer tower Additives transport A 141 TT 2 l*w*h = 7x12x25 m A 141 TT 2 1 Filter installed, no wall cladding A 141 BC 3 Conveyor bridge for additive conveyor 141BC03 A 141 BC 3 bridge with housing for 1 conveyor, 11 support columns, 260m horizontal A 141 TT 3 Transfer tower Additives transport A 141 TT 3 l*w*h = 5x5x20 m A 141 TT 3 1 Filter installed, no wall cladding A 141 BC 4 Conveyor bridge for additive conveyor 141BC04 A 141 BC 4 bridge with housing for 1 conveyor, 4 support columns, 120m A 141 Conveyor bridge for additive conveyor 141BC05,06,07 A 141 included in feed hopper building 145 A 141 BC 8 Conveyor bridge for additive conveyor 141BC08 A 141 BC 8 closed bridge for 1 conveyor between feed hopper buildings, no support columns, A 141 Conveyor bridge for additive conveyor 141BC09,10,11,12,13 A 141 included in feed hopper building 146 A 155 FH 01, 02 2 Feed hoppers for coal 50t A 155 SS 1 Conveyor bridge for 155SS01 A 155 SS 1 1 conveyor with housing to additive storage , 1 support column, 37m A 155 Coal Storage 2 x 12500t

Page 3: boq

A 155 BC 5 Conveyor bridge for coal conveyor 155BC05 A 155 BC 5 bridge with housing for 1 conveyor, no column, 11m A 155 BC 6 Conveyor bridge for coal conveyor 155BC06 A 155 BC 6 bridge with housing for 1 conveyor, 5 support columns, 130m A 155 TT 1 Transfer Tower Coal Transport A 155 TT 1 l*w*h = 7x4x35 m A 155 BC 7 Conveyor bridge for 155BC07 A 155 BC 7 bridge with housing for 1 conveyor, 1 support column, 27m A 210 Weigh Bridges A 210 18x6m 4 pcs.

Total

Page 4: boq

140

10

1000

150

35

130

120

19

125

100

140

140

30

120

6001020

40

Structural Steel

[to]

Manufacturing Unit Price

Erection Unit Price

Total Price

Page 5: boq

16

72

126

6001020

20

55

30

540

10

8

80

65

190

12

110

10

30

21 540

Page 6: boq

6

100

25

26

5.651

Page 7: boq

PP Item-No Designation of Structure Dept. Type No.

A 110 Crusher building A 110 Steel superstructure A 110 Concrete building up to feed hopper inlet level A 110 Retaining wall besides crusher building A 110 BC 2 Conveyor bridge for 110BC02 A 110 BC 2 Concrete tunnel below ground level A 110 BC 3 Conveyor bridge for 110BC03, 111BC02, 155BC02 A 110 BC 3 starts below ground level in concrete tunnel for 2 conveyor 50 m A 110 BC 3 steel bridge with housing for 3 conveyor, approx. 600 m long, 25 columns A 110 TT 1 Transfer tower A 110 TT 1 l*w*h = 14x13x27,50 m A 110 TT 1 2 Filters installed, no wall cladding A 110 BC 4 Conveyor bridge for 110BC04, 111BC03 A 110 BC 4 bridge with housing for 2 conveyors, 1 support column, 27m A 110 TT 2 Transfer tower A 110 TT 2 l*w*h = 12x12x30 m A 110 TT 2 2 Filters installed, no wall cladding A 110 BC 5 Conveyor bridge for 110BC05 A 110 BC 5 bridge with housing for 1 conveyer to circular storage , 1 support column A 110 BC 6 Conveyor bridge for 110BC06, 111BC04 A 110 BC 6 bridge with housing for 2 conveyors, no column, 18m A 110 TT 3 Transfer tower A 110 TT 3 l*w*h = 12x12x28 m A 110 TT 3 2 Filters installed, no wall cladding A 110 BC 7 Conveyor bridge for 110BC07, 111BC05 A 110 BC 7 bridge with housing for 2 conveyors, 3 support columns, 75m A 110 TT 4 Transfer tower A 110 TT 4 l*w*h = 12x12x31 m A 110 TT 4 1 Filter installed, no wall cladding A 111 Crusher building A 111 Steel superstructure A 111 Concrete building up to feed hopper inlet level A 111 Retaining wall besides crusher building A 111 FH 1 Feed Hopper Building for iron or sand A 111 BC 8 Conveyor bridge for 111BC08, 155BC08 A 111 BC 8 Tunnel below ground level for 2 conveyors, 40m A 111 BC 8 Conveyor bridge for 111BC06 A 111 BC 8 bridge with housing for 1 conveyor to circular storage, 1 support column A 115 Prehomogenization storage 50000 t Limestone A 115 Circular storage : Dia of rails 90 m A 115 Channel for conveyor 115BC01

Page 8: boq

A 115 FH 1 Feed hopper building for Limestone 30m³ A 115 TT 1 Transfer tower A 115 TT 1 l*w*h = 8x8x20,5 m A 115 TT 1 1 Filter installed, no wall cladding A 115 BC 2 Conveyor bridge for 115BC02, 117BC02 A 115 BC 2 bridge with housing for 2 conveyors, no column, 18m A 115 TT 2 Transfer tower A 115 TT 2 l*w*h = 12x9x22 m A 115 TT 2 3 Filter installed, no wall cladding A 115 BC 3 Conveyor bridge for 115BC03, 116BC03, 117BC03 A 115 BC 3 bridge with housing for 3 conveyors , 3 support columns, 88m A 116 Prehomogenization storage 50000t Premix A 116 Circular storage : Dia of rails 90 m A 116 Channel for conveyor 116BC01 A 116 FH 1 Feed hopper building for Premix 30m³ A 116 TT 1 Transfer tower A 116 TT 1 l*w*h = 8x6x16 m A 116 TT 1 1 Filter installed, no wall cladding A 116 BC 2 Conveyor bridge for 116BC02 A 116 BC 2 bridge with housing for 1 conveyor, 3 support columns, 79m A 117 SS 1 Conveyor bridge for 117SS01 A 117 SS 1 1 conveyor with housing to additive storage , 1 support column,37m A 117 / 141 Additive Storage 2 x 20000t A 117 / 141 Longitudinal Storage including Feed Hopper 117FH01 A 117 TT 1 Transfer tower A 117 TT 1 l*w*h = 5x5x16 m A 117 TT 1 1 Filter installed, no wall cladding A 141 TT 1 Transfer tower Additives transport A 141 TT 1 l*w*h = 5x5x15 m A 141 TT 1 1 Filter installed, no wall cladding A 141 BC 2 Conveyor bridge for additive conveyor 141BC02 A 141 BC 2 bridge with housing for 1 conveyor, 4 support columns, 115m A 141 TT 2 Transfer tower Additives transport A 141 TT 2 l*w*h = 7x12x25 m A 141 TT 2 1 Filter installed, no wall cladding A 141 BC 3 Conveyor bridge for additive conveyor 141BC03 A 141 BC 3 bridge with housing for 1 conveyor, 11 support columns, 260m horizontal A 141 TT 3 Transfer tower Additives transport A 141 TT 3 l*w*h = 5x5x20 m A 141 TT 3 1 Filter installed, no wall cladding A 141 BC 4 Conveyor bridge for additive conveyor 141BC04 A 141 BC 4 bridge with housing for 1 conveyor, 4 support columns, 120m A 141 Conveyor bridge for additive conveyor 141BC05,06,07 A 141 included in feed hopper building 145 A 141 BC 8 Conveyor bridge for additive conveyor 141BC08 A 141 BC 8 closed bridge for 1 conveyor between feed hopper buildings, no support columns, A 141 Conveyor bridge for additive conveyor 141BC09,10,11,12,13 A 141 included in feed hopper building 146

Page 9: boq

A 155 FH 01, 02 2 Feed hoppers for coal 50t A 155 SS 1 Conveyor bridge for 155SS01 A 155 SS 1 1 conveyor with housing to additive storage , 1 support column, 37m A 155 Coal Storage 2 x 12500t A 155 BC 5 Conveyor bridge for coal conveyor 155BC05 A 155 BC 5 bridge with housing for 1 conveyor, no column, 11m A 155 BC 6 Conveyor bridge for coal conveyor 155BC06 A 155 BC 6 bridge with housing for 1 conveyor, 5 support columns, 130m A 155 TT 1 Transfer Tower Coal Transport A 155 TT 1 l*w*h = 7x4x35 m A 155 BC 7 Conveyor bridge for 155BC07 A 155 BC 7 bridge with housing for 1 conveyor, 1 support column, 27m A 210 Weigh Bridges A 210 18x6m 4 pcs.

Total

Page 10: boq

Roof & Wall Cladding

850 1200 2050

5400 3600 9000

200 200

200 160 360

160 160

300 530 830

110 200 310

160 160

570 470 1040

160 160

850 1200 2050

150 150

300 530 830

8700 3500 12200

Roof

[ m² ]

Wall

[ m² ]

Total cladding [

m² ]

Normal Cladding Quantity

Translucent Cladding Quantity

Supply Unit Price

Of NC Material

Supply Unit Price

Of TC Material

Execusion Unit Price

Of Cladding

Works

Page 11: boq

135 370 505

75 75

110 110 220

130 130

700 550 1250

8700 3500 12200

135 370 505

85 85

340 490 830

175 230 405

7700 3700 11400

30 30

30 30

460 710 1170

100 100

1100 1600 2700

30 30

500 740 1240

85 125 210

Page 12: boq

150 150

150 230 380 7700 1900 9600

40 70 110

480 800 1280

35 35

100 165 265

47.385 27.050 74.435

Page 13: boq

Total Price

Page 14: boq

PP Item-No Designation of Structure Dept. Type No.

A 110 Crusher building A 110 Steel superstructure A 110 Concrete building up to feed hopper inlet level A 110 Retaining wall besides crusher building A 110 BC 2 Conveyor bridge for 110BC02 A 110 BC 2 Concrete tunnel below ground level A 110 BC 3 Conveyor bridge for 110BC03, 111BC02, 155BC02 A 110 BC 3 starts below ground level in concrete tunnel for 2 conveyor 50 m A 110 BC 3 steel bridge with housing for 3 conveyor, approx. 600 m long, 25 columns A 110 TT 1 Transfer tower A 110 TT 1 l*w*h = 14x13x27,50 m A 110 TT 1 2 Filters installed, no wall cladding A 110 BC 4 Conveyor bridge for 110BC04, 111BC03 A 110 BC 4 bridge with housing for 2 conveyors, 1 support column, 27m A 110 TT 2 Transfer tower A 110 TT 2 l*w*h = 12x12x30 m A 110 TT 2 2 Filters installed, no wall cladding A 110 BC 5 Conveyor bridge for 110BC05 A 110 BC 5 bridge with housing for 1 conveyer to circular storage , 1 support column A 110 BC 6 Conveyor bridge for 110BC06, 111BC04 A 110 BC 6 bridge with housing for 2 conveyors, no column, 18m A 110 TT 3 Transfer tower A 110 TT 3 l*w*h = 12x12x28 m A 110 TT 3 2 Filters installed, no wall cladding A 110 BC 7 Conveyor bridge for 110BC07, 111BC05 A 110 BC 7 bridge with housing for 2 conveyors, 3 support columns, 75m A 110 TT 4 Transfer tower A 110 TT 4 l*w*h = 12x12x31 m A 110 TT 4 1 Filter installed, no wall cladding A 111 Crusher building A 111 Steel superstructure A 111 Concrete building up to feed hopper inlet level A 111 Retaining wall besides crusher building A 111 FH 1 Feed Hopper Building for iron or sand A 111 BC 8 Conveyor bridge for 111BC08, 155BC08 A 111 BC 8 Tunnel below ground level for 2 conveyors, 40m A 111 BC 8 Conveyor bridge for 111BC06 A 111 BC 8 bridge with housing for 1 conveyor to circular storage, 1 support column A 115 Prehomogenization storage 50000 t Limestone A 115 Circular storage : Dia of rails 90 m A 115 Channel for conveyor 115BC01 A 115 FH 1 Feed hopper building for Limestone 30m³ A 115 TT 1 Transfer tower A 115 TT 1 l*w*h = 8x8x20,5 m

Page 15: boq

A 115 TT 1 1 Filter installed, no wall cladding A 115 BC 2 Conveyor bridge for 115BC02, 117BC02 A 115 BC 2 bridge with housing for 2 conveyors, no column, 18m A 115 TT 2 Transfer tower A 115 TT 2 l*w*h = 12x9x22 m A 115 TT 2 3 Filter installed, no wall cladding A 115 BC 3 Conveyor bridge for 115BC03, 116BC03, 117BC03 A 115 BC 3 bridge with housing for 3 conveyors , 3 support columns, 88m A 116 Prehomogenization storage 50000t Premix A 116 Circular storage : Dia of rails 90 m A 116 Channel for conveyor 116BC01 A 116 FH 1 Feed hopper building for Premix 30m³ A 116 TT 1 Transfer tower A 116 TT 1 l*w*h = 8x6x16 m A 116 TT 1 1 Filter installed, no wall cladding A 116 BC 2 Conveyor bridge for 116BC02 A 116 BC 2 bridge with housing for 1 conveyor, 3 support columns, 79m A 117 SS 1 Conveyor bridge for 117SS01 A 117 SS 1 1 conveyor with housing to additive storage , 1 support column,37m A 117 / 141 Additive Storage 2 x 20000t A 117 / 141 Longitudinal Storage including Feed Hopper 117FH01 A 117 TT 1 Transfer tower A 117 TT 1 l*w*h = 5x5x16 m A 117 TT 1 1 Filter installed, no wall cladding A 141 TT 1 Transfer tower Additives transport A 141 TT 1 l*w*h = 5x5x15 m A 141 TT 1 1 Filter installed, no wall cladding A 141 BC 2 Conveyor bridge for additive conveyor 141BC02 A 141 BC 2 bridge with housing for 1 conveyor, 4 support columns, 115m A 141 TT 2 Transfer tower Additives transport A 141 TT 2 l*w*h = 7x12x25 m A 141 TT 2 1 Filter installed, no wall cladding A 141 BC 3 Conveyor bridge for additive conveyor 141BC03 A 141 BC 3 bridge with housing for 1 conveyor, 11 support columns, 260m horizontal A 141 TT 3 Transfer tower Additives transport A 141 TT 3 l*w*h = 5x5x20 m A 141 TT 3 1 Filter installed, no wall cladding A 141 BC 4 Conveyor bridge for additive conveyor 141BC04 A 141 BC 4 bridge with housing for 1 conveyor, 4 support columns, 120m A 141 Conveyor bridge for additive conveyor 141BC05,06,07 A 141 included in feed hopper building 145 A 141 BC 8 Conveyor bridge for additive conveyor 141BC08 A 141 BC 8 closed bridge for 1 conveyor between feed hopper buildings, no support columns, 20m A 141 Conveyor bridge for additive conveyor 141BC09,10,11,12,13 A 141 included in feed hopper building 146 A 155 FH 01, 02 2 Feed hoppers for coal 50t A 155 SS 1 Conveyor bridge for 155SS01 A 155 SS 1 1 conveyor with housing to additive storage , 1 support column, 37m

Page 16: boq

A 155 Coal Storage 2 x 12500t A 155 BC 5 Conveyor bridge for coal conveyor 155BC05 A 155 BC 5 bridge with housing for 1 conveyor, no column, 11m A 155 BC 6 Conveyor bridge for coal conveyor 155BC06 A 155 BC 6 bridge with housing for 1 conveyor, 5 support columns, 130m A 155 TT 1 Transfer Tower Coal Transport A 155 TT 1 l*w*h = 7x4x35 m A 155 BC 7 Conveyor bridge for 155BC07 A 155 BC 7 bridge with housing for 1 conveyor, 1 support column, 27m A 210 Weigh Bridges A 210 18x6m 4 pcs.

Total

Page 17: boq

Concrete

Iskele Kalıp

1600 1100 2700200 200

90 90

170 170350 350

185 185

25 25

150 150

25 25

25 25

150 150

45 45

150 150

1600 1100 2700200 200200 200

200 200

25 25

2700 2700650 650150 50 200

70 70

Brick Walls [ m² ]

Building [ m³ ]

Foundation [ m³ ]

Total [ m³ ]

Demir donatı

Page 18: boq

25 25

110 110

50 50

2700 2700650 650150 50 200

90 90

15 15

10 10

5700 5700

25 25

25 25

50 50

90 90

150 150

25 25

50 50

closed bridge for 1 conveyor between feed hopper buildings, no support columns, 20m

400 400

10 10

Page 19: boq

5300 5300

60 60

30 30

10 10

650 650 16.400 11.235 27.635 0

Page 20: boq

PP Item-No Designation of Structure Dept. Type No.

A 110 Crusher building A 110 Steel superstructure A 110 Concrete building up to feed hopper inlet level A 110 Retaining wall besides crusher building A 110 BC 2 Conveyor bridge for 110BC02 A 110 BC 2 Concrete tunnel below ground level A 110 BC 3 Conveyor bridge for 110BC03, 111BC02, 155BC02 A 110 BC 3 starts below ground level in concrete tunnel for 2 conveyor 50 m A 110 BC 3 steel bridge with housing for 3 conveyor, approx. 600 m long, 25 columns A 110 TT 1 Transfer tower A 110 TT 1 l*w*h = 14x13x27,50 m A 110 TT 1 2 Filters installed, no wall cladding A 110 BC 4 Conveyor bridge for 110BC04, 111BC03 A 110 BC 4 bridge with housing for 2 conveyors, 1 support column, 27m A 110 TT 2 Transfer tower A 110 TT 2 l*w*h = 12x12x30 m A 110 TT 2 2 Filters installed, no wall cladding A 110 BC 5 Conveyor bridge for 110BC05 A 110 BC 5 bridge with housing for 1 conveyer to circular storage , 1 support column A 110 BC 6 Conveyor bridge for 110BC06, 111BC04 A 110 BC 6 bridge with housing for 2 conveyors, no column, 18m A 110 TT 3 Transfer tower A 110 TT 3 l*w*h = 12x12x28 m A 110 TT 3 2 Filters installed, no wall cladding A 110 BC 7 Conveyor bridge for 110BC07, 111BC05 A 110 BC 7 bridge with housing for 2 conveyors, 3 support columns, 75m A 110 TT 4 Transfer tower A 110 TT 4 l*w*h = 12x12x31 m A 110 TT 4 1 Filter installed, no wall cladding A 111 Crusher building A 111 Steel superstructure A 111 Concrete building up to feed hopper inlet level A 111 Retaining wall besides crusher building A 111 FH 1 Feed Hopper Building for iron or sand A 111 BC 8 Conveyor bridge for 111BC08, 155BC08 A 111 BC 8 Tunnel below ground level for 2 conveyors, 40m A 111 BC 8 Conveyor bridge for 111BC06 A 111 BC 8 bridge with housing for 1 conveyor to circular storage, 1 support column A 115 Prehomogenization storage 50000 t Limestone A 115 Circular storage : Dia of rails 90 m A 115 Channel for conveyor 115BC01 A 115 FH 1 Feed hopper building for Limestone 30m³ A 115 TT 1 Transfer tower

Page 21: boq

A 115 TT 1 l*w*h = 8x8x20,5 m A 115 TT 1 1 Filter installed, no wall cladding A 115 BC 2 Conveyor bridge for 115BC02, 117BC02 A 115 BC 2 bridge with housing for 2 conveyors, no column, 18m A 115 TT 2 Transfer tower A 115 TT 2 l*w*h = 12x9x22 m A 115 TT 2 3 Filter installed, no wall cladding A 115 BC 3 Conveyor bridge for 115BC03, 116BC03, 117BC03 A 115 BC 3 bridge with housing for 3 conveyors , 3 support columns, 88m A 116 Prehomogenization storage 50000t Premix A 116 Circular storage : Dia of rails 90 m A 116 Channel for conveyor 116BC01 A 116 FH 1 Feed hopper building for Premix 30m³ A 116 TT 1 Transfer tower A 116 TT 1 l*w*h = 8x6x16 m A 116 TT 1 1 Filter installed, no wall cladding A 116 BC 2 Conveyor bridge for 116BC02 A 116 BC 2 bridge with housing for 1 conveyor, 3 support columns, 79m A 117 SS 1 Conveyor bridge for 117SS01 A 117 SS 1 1 conveyor with housing to additive storage , 1 support column,37m A 117 / 141 Additive Storage 2 x 20000t A 117 / 141 Longitudinal Storage including Feed Hopper 117FH01 A 117 TT 1 Transfer tower A 117 TT 1 l*w*h = 5x5x16 m A 117 TT 1 1 Filter installed, no wall cladding A 141 TT 1 Transfer tower Additives transport A 141 TT 1 l*w*h = 5x5x15 m A 141 TT 1 1 Filter installed, no wall cladding A 141 BC 2 Conveyor bridge for additive conveyor 141BC02 A 141 BC 2 bridge with housing for 1 conveyor, 4 support columns, 115m A 141 TT 2 Transfer tower Additives transport A 141 TT 2 l*w*h = 7x12x25 m A 141 TT 2 1 Filter installed, no wall cladding A 141 BC 3 Conveyor bridge for additive conveyor 141BC03 A 141 BC 3 bridge with housing for 1 conveyor, 11 support columns, 260m horizontal A 141 TT 3 Transfer tower Additives transport A 141 TT 3 l*w*h = 5x5x20 m A 141 TT 3 1 Filter installed, no wall cladding A 141 BC 4 Conveyor bridge for additive conveyor 141BC04 A 141 BC 4 bridge with housing for 1 conveyor, 4 support columns, 120m A 141 Conveyor bridge for additive conveyor 141BC05,06,07 A 141 included in feed hopper building 145 A 141 BC 8 Conveyor bridge for additive conveyor 141BC08 A 141 BC 8 closed bridge for 1 conveyor between feed hopper buildings, no support columns, A 141 Conveyor bridge for additive conveyor 141BC09,10,11,12,13 A 141 included in feed hopper building 146 A 155 FH 01, 02 2 Feed hoppers for coal 50t A 155 SS 1 Conveyor bridge for 155SS01

Page 22: boq

A 155 SS 1 1 conveyor with housing to additive storage , 1 support column, 37m A 155 Coal Storage 2 x 12500t A 155 BC 5 Conveyor bridge for coal conveyor 155BC05 A 155 BC 5 bridge with housing for 1 conveyor, no column, 11m A 155 BC 6 Conveyor bridge for coal conveyor 155BC06 A 155 BC 6 bridge with housing for 1 conveyor, 5 support columns, 130m A 155 TT 1 Transfer Tower Coal Transport A 155 TT 1 l*w*h = 7x4x35 m A 155 BC 7 Conveyor bridge for 155BC07 A 155 BC 7 bridge with housing for 1 conveyor, 1 support column, 27m A 210 Weigh Bridges A 210 18x6m 4 pcs.

Total

Page 23: boq

Roof & Wall Cladding Concrete

140 850 1200 2050 271600 1100 2700

200 200

10 90 90

170 1701000 5400 3600 9000 117 350 350

150 200 200 3 185 185

35 200 160 360 4.7 25 25

130 160 160 2 150 150

120 300 530 830 10.8 25 25

19 110 200 310 4 25 25

125 160 160 2 150 150

100 570 470 1040 13.5 45 45

140 160 160 2 150 150

140 850 1200 2050 271600 1100 2700

200 20030 150 150 2 200 200

200 200

120 300 530 830 10.8 25 25

600 8700 3500 12200 159 2700 270010 650 65020 135 370 505 7 150 50 200

Structural Steel

[to] Roof

[ m² ]

Wall

Total cladding [

m² ]

Weight roof/wall

[to] Building [ m³ ]

Foundation [ m³ ]

Total [ m³ ]

Page 24: boq

40 75 75 1 70 70

16 110 110 220 2.9 25 25

72 130 130 2 110 110

126 700 550 1250 16.3 50 50

600 8700 3500 12200 159 2700 270010 650 65020 135 370 505 7 150 50 200

20 85 85 1 90 90

55 340 490 830 10.8 15 15

30 175 230 405 5.3 10 10

540 7700 3700 11400 148 5700 5700

10 30 30 0.4 25 25

8 30 30 0.4 25 25

80 460 710 1170 15.2 50 50

65 100 100 1.3 90 90

190 1100 1600 2700 35.1 150 150

12 30 30 0.4 25 25

110 500 740 1240 16.1 50 50

10 85 125 210 2.7

30 150 150 2.0 400 400

Page 25: boq

21 150 230 380 4.9 10 10540 7700 1900 9600 124.8 5300 5300

6 40 70 110 1.4

100 480 800 1280 16.6 60 60

25 35 35 0.5 30 30

26 100 165 265 3.4 10 10

650 6505.651 47.385 27.050 74.435 967,7 16.400 11.235 27.635

Page 26: boq

Brick Walls [ m² ]

Page 27: boq
Page 28: boq

0