Schedule 3: Erection Price Districts: East Champaran Bidder's Name & Add Sr. No. Description 1 2 A 1 2 Earth Filling & Site Levelling a Phase-II, Balance Work Of Phase-I for 17 dis Districts of North Bihar under Sp 33/11 KV Substation Works - Partly outdoor type substation ( 2x 10 MVA ) (with 33 KV outdoor type bay 2 nos. and 11 KV bay indoor type 8 Nos.) Civil works: Design, supply of all material, T&P, labour etc for the following civil works complete as per TS Soil Investigation & Contour Survey of Substation area as per Technical Specification Earth work in PSS site with ordinary soil (vide classification of soil item - A) obtained from borrow pits free from logs, stumps, roots, rubbish or any other ingredients likely to deteriorate or affect the stability of the (1.00 meter filling considered size 60*40) site surface including breaking the clods maximum to 60 mm. cube, placing the earth in layers not exceeding 225 mm in loose thickness, rough dressing including cost of cutting and removing shrubs, roots falling in borrow area all complete as per approved design & technical specification and as per direction of Engineer in Charge (payment will be made as per actual requirement per cubic meter)

description

hjgj

Transcript of Erection BOQ - Champaran

Page 1: Erection BOQ - Champaran

Schedule 3: Erection Price Component

Districts: East Champaran and West ChamparanBidder's Name & Address: 0

NIT No:-

Sr. No. Description Unit

1 2 3 4

A

1 PER S/S 1

2 Earth Filling & Site Levelling

a 2400

Name of Work: “Strengthening Of Distribution Network in Bihar Under Special Plan (BRGF) Phase-II, Balance Work Of Phase-I for 17 districts and Phase-II-Part-C for all 21 Districts of North Bihar under Special Plan (BRGF) Schemes

Unit Quantit

y

33/11 KV Substation Works - Partly outdoor type substation ( 2x 10 MVA ) (with 33 KV outdoor type bay 2 nos. and 11 KV bay indoor type 8 Nos.)

Civil works: Design, supply of all material, T&P, labour etc for the following civil works complete as per TS

Soil Investigation & Contour Survey of Substation area as per Technical Specification

Earth work in PSS site with ordinary soil (vide classification of soil item - A) obtained from borrow pits free from logs, stumps, roots, rubbish or any other ingredients likely to deteriorate or affect the stability of the (1.00 meter filling considered size 60*40) site surface including breaking the clods maximum to 60 mm. cube, placing the earth in layers not exceeding 225 mm in loose thickness, rough dressing including cost of cutting and removing shrubs, roots falling in borrow area all complete as per approved design & technical specification and as per direction of Engineer in Charge (payment will be made as per actual requirement per cubic meter)

Cubic Meters

Page 2: Erection BOQ - Champaran

3 Sq. m 600

4 Mtr 200

5 Mtr 40

6 Sqm 160

7 Mtr 120

Antiweded treatment and stone spreading in switchyard area excluding road, Cable trench, Drainage etc (Stone Spreading 6 inches over 4 inches lean cement concrete layer as per technical specification, approved desgn and drawing and as per directon of Engineer in Charge. (payment will be made as per actual requirement per Square meter)

Construction of Boundary Wall including Barbed Wire Fencing on MS angle over the Boundary Wall and one Gate per Substation, including Supply, Fabrication, Fixing, Painting all complete as per approved Drawing & Technical Specification and as per directon of Engineer in Charge in all 33/11 kV new sub-stations (payment will be made as per actual requirement per meter)

Security fencing along with one switchyard gate per Substation as per Technical specifications in all 33/11 kV new sub-stations - to isolate electrical yard and as per directon of Engineer in Charge in all 33/11 kV new sub-stations (payment will be made as per actual requirement per meter)

Design, engineering and construction of Control Room Building ( Hall of control room building -16 x 8 Mtr. (size may vary as per availability of land) and Guard room, store room, Battery room, Incharge room & Wash room etc.) including supply of T&P, Labour, Cement, Reinforcement Steel, Form Work, Excavation etc, all complete as per Technical Specification and Approved Drawing and as per directon of Engineer in Charge in all 33/11 kV new sub-stations (payment will be made as per actual requirement per Sq. meter plinth area)

Design, engineering and construction of Cable Trench of 0.75 Mtr wide , 1.0 Mtr. depth, precast RCC Trench Cover, Water stops, Brick Work wherever required including supply of T&P, Labour, Cement, Sand, Reinforcement Steel, Steel Angles, Flats, Form Work, Excavation and providingcement plaster (1:4) including floating coat of cement punning (1.5 MM) with clean pores sand etc, all complete as per Technical Specification, approved Drawing and as per directon of Engineer in Charge in all 33/11 kV new sub-stations (payment will be made as per actual requirement per meter)

Page 3: Erection BOQ - Champaran

8 Mtr 50

9

a Mtr 60

b Mtr 10

10 50

11 Per PSS 1

Design, engineering and construction of Drainage System in the Substation premises including supply of T&P, Labour, Cement, , bricks, Form Work, Excavation etc, all complete as per design, Technical Specification and Tender Drawings in all 33/11 kV new sub-stationas as per directon of Engineer in Charge in all 33/11 kV new sub-stations (payment will be made as per actual requirement per meter)

Design, engineering and construction of PCC road, footpath including supply of T and P, labour, brick, stone and stonechips, earth, and excavation, compaction etc. all complete as per Technical specifications.

width of PCC road 3.75 m- in M20, 200 mm Thick over compacted WBM in three layers (Grade-I-100 mm thick, Grade-II-75 mm thick, Grade - III - 75mm thick) etc as per PWD Specification and direction of Engineer In Charge. (payment will be made as per actual requirement per meter)

width of footpath 1.5 m-PCC in M15, 150 mm Thick over Brick on edge soling over 75 mm thick local sand filling etc as per PWD Specification and direction of Engineer In Charge. (payment will be made as per actual requirement per meter)

Stone pitching over sloping including supply of stone and surface preparation as per drawing and as per direction of Engineer in charge.(payment will be made as per actual requirement per Sq. meter)

Sq. Meter

Sinking of tube well and installation of motor operated submersible pump of suitable capacity with 1000 ltr. Sintex or reputed make water tank including GI Pipe(heavy duty) pipe line and sanitary fittings complete in all respect for toilets , drinking water and providing water tap near the power transformer for watering the earth pit as per requirement. The depth of Tube-Well should be minimum 80 mtr.

Page 4: Erection BOQ - Champaran

12

a 10 MVA with off load tap changer Set 2

13 Set 1

14 MT 16

Design, Engineering and construction of transformer foundation, erection, filtration, testing and commissioning of 33/11 kV, 3 ph, 50 Hz, ONAN, Cu Wound, Outdoor Conventional type Power Transformer along with transformer oil, Buchholtz relay, breather, OTI & WTI, Marshalling Box, Conservator tank, oil level indicator, valves, 2 sets of 50x8 mm GS Neutral Earthing strips with braided conductor on bushing end supported with insulators, OTI & WTI Indicators, Vent explosion plug, control wiring / cabling, cable supporting tray on the body, transformer wheels, bushing and extended copper connector made of 50x10 mm copper flat for connection of 11 KV side bushing with suitable bolts nuts and washers of Brass etc as required . 2 sets of body earthing with 50x8 mm GS Strip as per TS , approved drawing and direction of Engineer in Charge.

Design, Engineering, providing and construction of transformer support/foundation, erection, testing and commissioning of 100 KVA, 11/0.433 kV, 3 ph, 50 Hz, ONAN, aluminium would outdoor type (three star rated) Station Transformer on double pole structure alongwith HG Fuse set, AB Switch/ Isolator, LA, Earthing, etc complete to complete the erection testing & commissioning of SST as required as per specifications, approved drawing and direction of Engineer in Charge complete in all respect.

Excavation, erection, cement concrete foundation, erection, testing and commissioning of all type of structures i.e. Gantry/Swing bus/isolator/CT/PT/PI/S.S.T structures etc. made of joist / channel / angle / flat of different sections as per approved drawings and direction of Engineer in Charge complete in all respect

Page 5: Erection BOQ - Champaran

15 Set 4

16

a No 2

b No 2

17 Set 9

18 Set 4

Design, Engineering and construction of foundation , erection, testing and commissioning of 36kV, 1250A, 25kA for 3 seconds, 3-ph, Outdoor type Vacuum Circuit breaker along with 36kV, 1-Phase, 25kA for 3 seconds, 800-400-200/1-1-1 Amp.or 800-400-200/1-1, Amps outdoor type Current Transformer along with junction box (1 no junction box for 3 no of 1-phase CTs)], Jumpers, earthing, supporting structures, maintenance platform, marshalling box, control & Power cabling between VCB and indoor control panel and required accessories complete as per approved drawings, technical specifications and direction of Engineer in Charge and scope of the work.

Design, Engineering providing and installation of ISMC 75 channel on top of indoor trench, erection of panels on ISMC 75 channels, welding, testing and commissioning of 33kV indoor Control & Relay panel along with E/F & O/C relays, control and power supply cabling in trench between field equipment and panels, Mimic Diagram, Voltmeter, Ammeter, Annunciation Windows with annunciation relays and other components etc as per approved drawings, technical specifications and scope of the work for controlling complete in all respect

33 kV feeder Panel (without diffirential relays) with DLMS (modem compactible ) Trivector Static Energy Meter complete33 kV Transformer Panel (with diffirential relays) with DLMS (modem compactible ) Trivector Static Energy Meter complete

Design, Engineering and construction , Erection, testing and commissioning of 36kV, 800 A, 25kA , 3-ph double break center rotating type (DBCR), Gang Operated, isolator along with Support Insulators, Operating Mechanism, Base Channel down Pipe and all required accessories complete as per approved drawings, technical specifications and scope of the work,(with and without Earth Switch)

Design, Engineering , Erection, testing and Commissioning of 30 kV, 10kA, 1-ph Station Class Lightening Arresters with mounting on erected structures, jumpering from bus bar, earthing connection using 50x6mm GS flat, hardware etc as required, as per approved drawings, technical specifications and scope of the work complete in all respect (1 Set= 3 Nos)

Page 6: Erection BOQ - Champaran

19 Set 9

20 Set 2

21

a For Transformer Protection No 2

b For Feeder Protection No 9

c For Bus Coupler No 1

22 Set 1

Design, Engineering, Erection, testing and Commissioning of 9kV, 10kA, 1-ph Station Class Lightening Arrester with mounting on erected structure, jumpering from bus bar, earthing connection using 50x6mm GS flat, hardware, etc as required as per approved drawings, technical specifications and scope of the work. (1 Set=3 Nos)

Design, Engineering and construction , Erection, testing and Commissioning of 36 kV, 1-Phase, 33kV/110 volt, Single core outdoor type Potential transformer along with junction box (1 no junction box for 3 no of 1-phase PTs) including control and power supply cabling, earthing connection using 50x6mm GS flat and required accessories etc., complete as per as per approved drawings, technical specifications and scope of the work,

Design, Engineering and construction , erection, wiring, testing and commissioning of 12 kV, 1250 A/630 A , 25kA, 3-ph, indoor type Vacuum Circuit breaker along with 12 kV, 1-Phase, 25kA for 3 seconds, 600-300-150/5-5 A and 1200-600-300/1-1-1 A CT , PT, and along with control and relay panel consisting of Ammeter, volt-meter, E/F, O/C ,diff. Relay and 3 Phase Energy meter & accessories complete cabling between VCB and indoor control panel and required accessories complete as per approved drawings, technical specifications and scope of the work,

Installation, initial charging, cabling, interconnection cabling, testing and commissioning of 30 V, 100 AH Pb Acid battery on battery stand made of teak wood duly painted with anti acid resistive paint, battery insulators, inter-battery wiring using 30 sqm copper single core multi strand cable, terminal connectors, & all other accessories and connectors as per as per approved drawings, technical specifications and scope of the work complete in all respect,

Page 7: Erection BOQ - Champaran

23 No 1

24 No 1

25 No 1

25

a 75 x 8 mm MS flat for ground mat MT 2

b 50 x 6 mm Galvanized GS flat (risers) MT 2

c 25 mm dia MS Rod 3 m long for earth mat MT 0.5

26 Set 40

27 Per PSS 1

28 Per PSS 1

29 Set 1

Design, engineering, construction , Installation, interconnection cabling, testing and commissioning of 30V, 40 Amp. Float-Cum-Boost Battery Charger with full wave rectification for 230 V, 1 phase, 50 Hz AC Input Supply with DCDB (as per supply schedule) as per approved drawings, technical specifications and scope of the work complete in all respect

Design, engineering, construction , Installation, interconnection cabling, testing and commissioning of 30V Supply DCDB as per approved drawings, technical specifications and scope of the work & supply schedule complete in all respect.

Design, engineering, construction , Installation, interconnection cabling, testing and commissioning of 433V, ACDB as per approved drawings, technical specifications and scope of the work,

Excavation, laying, welding, refilling, earthing & grounding of MS Flat as per Approved drawing and erection of riser up to various equipment/structures as per scope of the work, specifications and approved drawings,

Excavation, erection, testing and commissioning of 40 mm dia., 3000 mm long GI pipe earth electrode by providing test link, RCC pit, RCC cover, placed on GI frame, Charcoal & Salt in alternate layer as per REC Specification and other accessories complete as per approved drawings, technical specifications and scope of the work for power transformer neutral, station transformer neutral, lightening arresters direct earthing.

Erection, testing and commissioning of Bus Bar, jumpering and Dropper (Zebra Conductor), by using all types of insulators, clamps and connectors (by providing & using) etc. with all accessories complete in all respect.

Erection, testing and commissioning of Sub-Station Lighting System (External+Internal) with proper illumination levels complete for Switchyard, Control Room building, Main gate and Sub station boundary including all associated materials etc complete in all respect as per applicable TS and approved drawing.

Erection, testing and commissioning of Fire Fighting Equipment as per Supply Schedule

Page 8: Erection BOQ - Champaran

30

a 1200 KVAr Set 0

b 3600 KVAr Set 2

31 Per PSS 1

32

a 1Cx 630 sqmm (Un -armoured) km 0.5

b 3Cx 185 sqmm (armoured) km 0.9

c 3Cx35 Sqmm (Un -armoured) km 0.1

33 Set 9

34 Mtr. 50

Sub Total

B

1 PER S/S 1

2 Earth Filling & Site Levelling

Design, engineering,Erection, testing and commissioning ofFully automatic Capacitor bank with automatic control panel, isolator,indoor type suitable Vacuum Circuit Breaker, mounting structures, All types of cable (11 KV grade 185 sqmm, XLPE & control cable etc.) & its accessories complete , earthing etc as required as per technical specifications, approved drawings, scope of the works of following capacities: (Banks in Muiltiple of 600 KVAR as per REC Specification)

Erection, testing and commissioning of All types control cable and LT power cable required for the commissioning of sub-station

Laying & termination, Testing and commissioning of 11 KV grade, XLPE, power cable armored, aluminium conductor, stranded complete in all respect as per Technical Specification.

Design, Engineering and construction , Erection, testing and commissioning of 12 kV, 630 A, 25 kA, 3-ph double break center rotating type (DBCR), Gang Operated, isolator along with Support Insulators, Operating Mechanism, Base Channel down Pipe and all required accessories complete as per approved drawings, technical specifications and scope of the work, (with and without earth Switch)

Erection, testing & commissioning of pipe bus by using IPS Aluminium Pipe 65 mm. dia.with all types of Clamps and Connectors and insulator as per TS & approved drawings

33/11 KV Substation Works - Partly outdoor type substation ( 2x 5 MVA ) (with 33 KV outdoor type bay 2 nos. and 11 KV bay indoor type 4 Nos.)

Civil works: Design, supply of all material, T&P, labour etc for the following civil works complete as per TS

Soil Investigation & Contour Survey of Substation area as per Technical Specification

Page 9: Erection BOQ - Champaran

a 2400

3 Sq. m 600

4 Mtr 200

5 Mtr 40

6 Sqm 160

Earth work in PSS site with ordinary soil (vide classification of soil item - A) obtained from borrow pits free from logs, stumps, roots, rubbish or any other ingredients likely to deteriorate or affect the stability of the (1.00 meter filling considered size 60*40) site surface including breaking the clods maximum to 60 mm. cube, placing the earth in layers not exceeding 225 mm in loose thickness, rough dressing including cost of cutting and removing shrubs, roots falling in borrow area all complete as per approved design & technical specification and as per direction of Engineer in Charge (payment will be made as per actual requirement per cubic meter)

Cubic Meters

Antiweded treatment and stone spreading in switchyard area excluding road, Cable trench, Drainage etc (Stone Spreading 6 inches over 4 inches lean cement concrete layer as per technical specification, approved desgn and drawing and as per directon of Engineer in Charge. (payment will be made as per actual requirement per Square meter)

Construction of Boundary Wall including Barbed Wire Fencing on MS angle over the Boundary Wall and one Gate per Substation, including Supply, Fabrication, Fixing, Painting all complete as per approved Drawing & Technical Specification and as per directon of Engineer in Charge in all 33/11 kV new sub-stations (payment will be made as per actual requirement per meter)

Security fencing along with one switchyard gate per Substation as per Technical specifications in all 33/11 kV new sub-stations - to isolate electrical yard and as per directon of Engineer in Charge in all 33/11 kV new sub-stations (payment will be made as per actual requirement per meter)

Design, engineering and construction of Control Room Building ( Hall of control room building -16 x 8 Mtr. (size may vary as per availability of land) and Guard room, store room, Battery room, Incharge room & Wash room etc.) including supply of T&P, Labour, Cement, Reinforcement Steel, Form Work, Excavation etc, all complete as per Technical Specification and Approved Drawing and as per directon of Engineer in Charge in all 33/11 kV new sub-stations (payment will be made as per actual requirement per Sq. meter plinth area)

Page 10: Erection BOQ - Champaran

7 Mtr 120

8 Mtr 50

9

a Mtr 60

b Mtr 10

10 50

Design, engineering and construction of Cable Trench of 0.75 Mtr wide , 1.0 Mtr. depth, precast RCC Trench Cover, Water stops, Brick Work wherever required including supply of T&P, Labour, Cement, Sand, Reinforcement Steel, Steel Angles, Flats, Form Work, Excavation and providingcement plaster (1:4) including floating coat of cement punning (1.5 MM) with clean pores sand etc, all complete as per Technical Specification, approved Drawing and as per directon of Engineer in Charge in all 33/11 kV new sub-stations (payment will be made as per actual requirement per meter)

Design, engineering and construction of Drainage System in the Substation premises including supply of T&P, Labour, Cement, , bricks, Form Work, Excavation etc, all complete as per design, Technical Specification and Tender Drawings in all 33/11 kV new sub-stationas as per directon of Engineer in Charge in all 33/11 kV new sub-stations (payment will be made as per actual requirement per meter)

Design, engineering and construction of PCC road, footpath including supply of T and P, labour, brick, stone and stonechips, earth, and excavation, compaction etc. all complete as per Technical specifications.

width of PCC road 3.75 m- in M20, 200 mm Thick over compacted WBM in three layers (Grade-I-100 mm thick, Grade-II-75 mm thick, Grade - III - 75mm thick) etc as per PWD Specification and direction of Engineer In Charge. (payment will be made as per actual requirement per meter)

width of footpath 1.5 m-PCC in M15, 150 mm Thick over Brick on edge soling over 75 mm thick local sand filling etc as per PWD Specification and direction of Engineer In Charge. (payment will be made as per actual requirement per meter)

Stone pitching over sloping including supply of stone and surface preparation as per drawing and as per direction of Engineer in charge.(payment will be made as per actual requirement per Sq. meter)

Sq. Meter

Page 11: Erection BOQ - Champaran

11 Per PSS 1

12

a 5 MVA with off load tap changer Set 2

13 Set 1

14 MT 14

Sinking of tube well and installation of motor operated submersible pump of suitable capacity with 1000 ltr. Sintex or reputed make water tank including GI Pipe(heavy duty) pipe line and sanitary fittings complete in all respect for toilets , drinking water and providing water tap near the power transformer for watering the earth pit as per requirement. The depth of Tube-Well should be minimum 80 mtr.

Design, Engineering and construction of transformer foundation, erection, filtration, testing and commissioning of 33/11 kV, 3 ph, 50 Hz, ONAN, Cu Wound, Outdoor Conventional type Power Transformer along with transformer oil, Buchholtz relay, breather, OTI & WTI, Marshalling Box, Conservator tank, oil level indicator, valves, 2 sets of 50x8 mm GS Neutral Earthing strips with braided conductor on bushing end supported with insulators, OTI & WTI Indicators, Vent explosion plug, control wiring / cabling, cable supporting tray on the body, transformer wheels, bushing and extended copper connector made of 50x10 mm copper flat for connection of 11 KV side bushing with suitable bolts nuts and washers of Brass etc as required . 2 sets of body earthing with 50x8 mm GS Strip as per TS and as per direction of Engineer in Charge

Design, Engineering, providing and construction of transformer support/foundation, erection, testing and commissioning of 100 KVA, 11/0.433 kV, 3 ph, 50 Hz, ONAN, aluminium would outdoor type (three star rated) Station Transformer on double pole structure alongwith HG Fuse set, AB Switch/ Isolator, LA, Earthing, etc complete to complete the erection testing & commissioning of SST as required as per specifications & drawings complete in all respect.as per direction of Engineer in Charge

Excavation, erection, cement concrete foundation, erection, testing and commissioning of all type of structures i.e. Gantry/Swing bus/isolator/CT/PT/PI/S.S.T structures etc. made of joist / channel / angle / flat of different sections as per approved drawings complete in all respect as per direction of Engineer in Charge

Page 12: Erection BOQ - Champaran

15 Set 4

16

a No 2

b No 2

17 Set 9

18 Set 4

Design, Engineering and construction of foundation , erection, testing and commissioning of 36kV, 1250A, 25kA for 3 seconds, 3-ph, Outdoor type Vacuum Circuit breaker along with 36kV, 1-Phase, 25kA for 3 seconds, 800-400-200/1-1-1 Amp.or 800-400-200/1-1, Amps outdoor type Current Transformer along with junction box (1 no junction box for 3 no of 1-phase CTs)], Jumpers, earthing, supporting structures, maintenance platform, marshalling box, control & Power cabling between VCB and indoor control panel and required accessories complete as per approved drawings, technical specifications and scope of the work. as per direction of Engineer in Charge

Design, Engineering providing and installation of ISMC 75 channel on top of indoor trench, erection of panels on ISMC 75 channels, welding, testing and commissioning of 33kV indoor Control & Relay panel along with E/F & O/C relays, control and power supply cabling in trench between field equipment and panels, Mimic Diagram, Voltmeter, Ammeter, Annunciation Windows with annunciation relays and other components etc as per approved drawings, technical specifications and scope of the work for controlling complete in all respect

33 kV feeder Panel (without diffirential relays) with DLMS (modem compactible ) Trivector Static Energy Meter complete33 kV Transformer Panel (with diffirential relays) with DLMS (modem compactible ) Trivector Static Energy Meter complete

Design, Engineering and construction , Erection, testing and commissioning of 36kV, 800 A, 25kA , 3-ph double break center rotating type (DBCR), Gang Operated, isolator along with Support Insulators, Operating Mechanism, Base Channel down Pipe and all required accessories complete as per approved drawings, technical specifications and scope of the work,(with and without Earth Switch)

Design, Engineering , Erection, testing and Commissioning of 30 kV, 10kA, 1-ph Station Class Lightening Arresters with mounting on erected structures, jumpering from bus bar, earthing connection using 50x6mm GS flat, hardware etc as required, as per approved drawings, technical specifications and scope of the work complete in all respect (1 Set= 3 Nos)

Page 13: Erection BOQ - Champaran

19 Set 5

20 Set 2

21

a For Transformer Protection No 2

b For Feeder Protection No 5

c For Bus Coupler No 1

22 Set 1

Design, Engineering, Erection, testing and Commissioning of 9kV, 10kA, 1-ph Station Class Lightening Arrester with mounting on erected structure, jumpering from bus bar, earthing connection using 50x6mm GS flat, hardware, etc as required as per approved drawings, technical specifications and scope of the work. (1 Set=3 Nos)

Design, Engineering and construction , Erection, testing and Commissioning of 36 kV, 1-Phase, 33kV/110 volt, Single core outdoor type Potential transformer along with junction box (1 no junction box for 3 no of 1-phase PTs) including control and power supply cabling, earthing connection using 50x6mm GS flat and required accessories etc., complete as per as per approved drawings, technical specifications and scope of the work,

Design, Engineering and construction , erection, wiring, testing and commissioning of 12 kV, 1250 A/630 A , 25kA, 3-ph, indoor type Vacuum Circuit breaker along with 12 kV, 1-Phase, 25kA for 3 seconds, 600-300-150/5-5 A and 1200-600-300/1-1-1 A CT , PT, and along with control and relay panel consisting of Ammeter, volt-meter, E/F, O/C ,diff. Relay and 3 Phase Energy meter & accessories complete cabling between VCB and indoor control panel and required accessories complete as per approved drawings, technical specifications and scope of the work,

Installation, initial charging, cabling, interconnection cabling, testing and commissioning of 30 V, 100 AH Pb Acid battery on battery stand made of teak wood duly painted with anti acid resistive paint, battery insulators, inter-battery wiring using 30 sqm copper single core multi strand cable, terminal connectors, & all other accessories and connectors as per as per approved drawings, technical specifications and scope of the work complete in all respect,

Page 14: Erection BOQ - Champaran

23 No 1

24 No 1

25 No 1

25

a 75 x 8 mm MS flat for ground mat MT 2

b 50 x 6 mm Galvanized GS flat (risers) MT 2

c 25 mm dia MS Rod 3 m long for earth mat MT 0.5

26 Set 40

27 Per PSS 1

28 Per PSS 1

29 Set 1

Design, engineering, construction , Installation, interconnection cabling, testing and commissioning of 30V, 40 Amp. Float-Cum-Boost Battery Charger with full wave rectification for 230 V, 1 phase, 50 Hz AC Input Supply with DCDB (as per supply schedule) as per approved drawings, technical specifications and scope of the work complete in all respect

Design, engineering, construction , Installation, interconnection cabling, testing and commissioning of 30V Supply DCDB as per approved drawings, technical specifications and scope of the work & supply schedule complete in all respect.

Design, engineering, construction , Installation, interconnection cabling, testing and commissioning of 433V, ACDB as per approved drawings, technical specifications and scope of the work,

Excavation, laying, welding, refilling, earthing & grounding of MS Flat as per Approved drawing and erection of riser up to various equipment/structures as per scope of the work, specifications and approved drawings,

Excavation, erection, testing and commissioning of 40 mm dia., 3000 mm long GI pipe earth electrode by providing test link, RCC pit, RCC cover, placed on GI frame, Charcoal & Salt in alternate layer as per REC Specification and other accessories complete as per approved drawings, technical specifications and scope of the work for power transformer neutral, station transformer neutral, lightening arresters direct earthing.

Erection, testing and commissioning of Bus Bar, jumpering and Dropper (Zebra Conductor), by using all types of insulators, clamps and connectors etc. with all accessories complete in all respect.

Erection, testing and commissioning of Sub-Station Lighting System (External+Internal) with proper illumination levels complete for Switchyard, Control Room building, Main gate and Sub station boundary including all associated materials etc complete in all respect as per applicable TS and approved drawing.

Erection, testing and commissioning of Fire Fighting Equipment as per Supply Schedule

Page 15: Erection BOQ - Champaran

30

a 1200 KVAr Set 2

b 3600 KVAr Set 0

31 Per PSS 1

32

a 1Cx 630 sqmm (Un -armoured) km 0.5

b 3Cx 185 sqmm (armoured) km 0.6

c 3Cx35 Sqmm (Un -armoured) km 0.1

33 Set 5

34 Mtr. 50

Sub Total

C Additional/Augmentation of Power Transformers No

Design, engineering,Erection, testing and commissioning ofFully automatic Capacitor bank with automatic control panel, isolator,indoor type suitable Vacuum Circuit Breaker, mounting structures, All types of cable (11 KV grade 185 sqmm, XLPE & control cable etc.) & its accessories complete , earthing etc as required as per technical specifications, approved drawings, scope of the works of following capacities: (Banks in Muiltiple of 600 KVAR as per REC Specification)

Erection, testing and commissioning of All types control cable and LT power cable required for the commissioning of sub-station

Laying & termination, Testing and commissioning of 11 KV grade, XLPE, power cable armored, aluminium conductor, stranded complete in all respect as per Technical Specification.

Design, Engineering and construction , Erection, testing and commissioning of 12 kV, 630 A, 25 kA, 3-ph double break center rotating type (DBCR), Gang Operated, isolator along with Support Insulators, Operating Mechanism, Base Channel down Pipe and all required accessories complete as per approved drawings, technical specifications and scope of the work, (with and without earth Switch)

Erection, testing & commissioning of pipe bus by using IPS Aluminium Pipe 65 mm. dia.with all types of Clamps and Connectors and insulator as per TS & approved drawings

Addl. 5 MVA

Addl.10 MVA

5-10 MVA

3.15-10

MVA

Page 16: Erection BOQ - Champaran

C Additional/Augmentation of Power Transformers No

Total

A

1 Earth Filling & Site Levelling Cu.m 25

2 Sq. m 25

3 Mtr 5

4 Mtr 2

B Substation works

3.15/1.6-5

MVA

3.15-5 MVA

(Released)

1.6-5 MVA

(Released)

Civil works: Design, supply of all material, T&P, labour etc for the following civil works complete as per TS

Gravel filling in switchyard area excluding road and footpath as per TS.

Design, engineering and construction of Cable Trench of 0.75 Mtr wide , 1.0 Mtr. depth, precast RCC Trench Cover, Water stops, Brick Work wherever required including supply of T&P, Labour, Cement, Sand, Reinforcement Steel, Steel Angles, Flats, Form Work, Excavation and providingcement plaster (1:4) including floating coat of cement punning (1.5 MM) with clean pores sand etc, all complete as per Technical Specification, approved Drawing and as per direction of Engineer in Charge. (Payment will be made as per actual requirement per Mtr.)

Design, engineering and construction of Drainage System in the Substation premises including supply of T&P, Labour, Cement, , bricks, Form Work, Excavation etc, all complete as per design, Technical Specification and Tender Drawings in all 33/11 kV new sub-station as per direction of Engineer in Charge. (Payment will be made as per actual requirement per Mtr.)

Page 17: Erection BOQ - Champaran

5

a 5 MVA Set 1

b 10 MVA Set 1

6 Set 1

7 Nos 1

8 Nos 1

Design, Engineering and construction of transformer foundation, erection, filtration, testing and commissioning of 33/11 kV, 3 ph, 50 Hz, ONAN, Cu Wound, Outdoor Conventional type Power Transformer along with transformer oil , Buchholtz relay, breather, OTI & WTI, Marshalling Box, Conservator tank, oil level indicator, valves, 2 sets of 50x8 mm GS Neutral Earthing strips with braided conductor on bushing end supported with insulators, OTI & WTI Indicators, Vent explosion plug, control wiring / cabling, cable supporting tray on the body, transformer wheels, bushing and extended copper connector made of 50x10 mm copper flat for connection of 11 KV side bushing with suitable bolts nuts and washers of Brass etc as required . 2 sets of body earthing with 50x8 mm GS Strip as per TS and as per direction of Engineer in Charge.

Dismantaling, Transportation from existing site to proposed site, Installation, Erection, Testing and Commisiioning of 5 MVA released Power Transformers with suitable Clamps, Connectors, bolts nuts and washers of Brass etc as required with 2 sets each of body & neutral earthing with 50x8 mm GS Strip as per TS completely required for commissioning.

Modification of existing Power Transformer foundation required for installation and commissionig of augmented 5/10 MVA Power Transformers completely as per TS. (As per requirement)

Design, Engineering , erection, testing and commissioning of 36kV, 1250A, 25kA for 3 seconds, 3-ph, Outdoor type Vacuum Circuit breaker along with 36kV, 1-Phase, 25kA for 3 seconds, 800-400-200/1-1-1 Amp.or 800-400-200/1-1, Amps outdoor type Current Transformer along with junction box (1 no junction box for 3 no of 1-phase CTs)], Jumpers, earthing, supporting structures, maintenance platform, marshalling box, control & Power cabling between VCB and indoor control panel and required accessories complete as per approved drawings, technical specifications, scope of the work and as per direction of Engineer in Charge. (For released Power Transformers)

Page 18: Erection BOQ - Champaran

9 MT 2.5

10 Set 1

11

a 33 kV Transformer VCB (with diffirential relays) No 1

12 Set 2

Excavation, erection, cement concrete foundation, erection, testing and commissioning of all type of structures i.e. Swing bus/isolator/VCB/CT/PT/PI structure etc. made of joist / channel / angle / flat of different sections as per approved drawings

Design, Engineering and construction of VCB foundation , erection, testing and commissioning of 36kV, 1250A, 25kA for 3 seconds, 3-ph, Outdoor type Vacuum Circuit breaker along with 36kV, 1-Phase, 25kA for 3 seconds, 800-400-200/1-1-1 Amp.or 800-400-200/1-1, Amps outdoor type Current Transformer along with junction box (1 no junction box for 3 no of 1-phase CTs)], Jumpers, earthing, supporting structures, maintenance platform, marshalling box, control & Power cabling between VCB and indoor control panel and required accessories complete as per approved drawings, technical specifications and scope of the work.

Design, Engineering providing and installation of ISMC 75 channel on top of indoor trench, erection of panels on ISMC 75 channels, welding, testing and commissioning of 33kV indoor Control & Relay panel along with E/F & O/C relays, control and power supply cabling in trench between field equipment and panels, Mimic Diagram, Voltmeter, Ammeter, Annunciation Windows with annunciation relays and other components etc as per approved drawings, technical specifications and scope of the work for controlling:

Design, Engineering and construction , Erection, testing and commissioning of 36kV,800 A, 25kA, 3-ph double break center rotating type (DBCR), Gang Operated, isolator along with Support Insulators, Operating Mechanism, Base Channel down Pipe and all required accessories complete as per approved drawings, technical specifications and scope of the work, (with and without Earth Switch)

Page 19: Erection BOQ - Champaran

13 Set 1

14 No 1

15 1

16 1

17 Set 2

Design, Engineering and construction , erection, testing and commissioning of 12kV, 1250A, 25kA for 3 seconds, 3-ph, Outdoor type Vacuum Circuit breaker along with 12kV, 1-Phase, 25kA for 3 seconds, 1200-600-300/1-1-1 Amp.(having 3 secondary core), outdoor type Current Transformer along with junction box (1 no junction box for 3 no of 1-phase CTs)], Jumpers, earthing, supporting structures, maintenance platform, marshalling box, control & Power cabling between VCB and indoor control panel and required accessories complete as per approved drawings, technical specifications and scope of the work.

12 KV Control & Relay panel for 12 KV VCB (suitable for 30 V DC tripping/closing coil and associated control Circuitry) alongwith, ElF & O/C relays, Static energy meter (class 0.5 with communication port) , Mimic Diagram, Voltmete, Ammeter, etc complete as per REC

Excavation, laying, welding, refilling, earthing & grounding of conductor as per Approved Electrical Layout for each sub station with ten no of treated 40mm dia, 3000 mm long GI pipe (Medium gauge) earth electode by providing test link, RCC pit, RCC cover, placed on GI frame, Charcoal & Salt in alternate layer as per REC Specification and other accessories complete as per approved drawings, technical specifications and scope of the work for power transformer neutral, station transformer neutral up to various equipment/structures as per scope of the work, specifications and approved drawings etc (treated earthing)

Set per Power

Transformer bay

Erection, testing and commissioning of Bus Bar, jumpering and Dropper (Zebra conductor), by using all types of insulators, clamps and connectors etc. with all accessories complete in all respect.

Per Power

Transformer Bay

Design, Engineering and construction , Erection, testing and commissioning of 12 kV, 630 A, 25 kA , 3-ph double break center rotating type (DBCR), Gang Operated, isolator along with Support Insulators, Operating Mechanism, Base Channel down Pipe and all required accessories complete as per approved drawings, technical specifications and scope of the work,

Page 20: Erection BOQ - Champaran

18 1

Sub Total

D

1 CKm 1

2

a No. 18

3 Kg 700

4 CKM 1

5 Set 6

6 Set 51

7 Earthing

Dismentling of existing dismentled materials and devolution of the dismantled materials including storage, handling, insurance, loading, unloading, transportation to store of Utility as per the direction of Engineer-in-charge with propoer accounting as per the inventory.

Per Transfor

mer

Erection, testing commissioning of NEW 33 KV Line on rail pole with ACSR wolf Conductor

Survey, route alignment & pole spotting, preparation of survey report after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for 33 KV overhead line (by installing danger board and barbed Wires on DP/TP/FP Structures) and pole numbering as per scope of work, approved drawings and Technical specifications:

13 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat Red oxide, 2 coat Al-Paint and 1/6th part of the Rail pole from bottom with Black enamel paint cf Reputed make) including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with cement concreting foundation and top mopping (1:4:8) (0.65 cmt per pole).

Erection of galvanised fabricated steel materials- Channels, angle, flats for over head line structures by using Bolts, Nuts, Washer etc as per approved drawing and TS

Erection, testing and commissioning of ACSR Wolf Conductor including mid point jointing sleeves fixing and jumpering, binding of conductor with pin insulator and disc insulator by providing and using Aluminium tape at DP and all cut-points and angle points by using PG Clamp etc. including fixing & fitting of Danzer board, barbed wire at DP/TP/FP as required (1 CKm= 1 km line length of 3 phase conductor)

Erection, testing and commissioning of 33 KV porcelain Disc insulator assembly (1 set DI= 3 nos DI) 70 KN along with HW fittings complete by providing Al. Tape in all respect as per TS & approved drawings.

Erection, Testing and Commissioning of 33 KV porcelain Pin Insulators with GI PIN complete in all respect as per TS & approved drawings.

Page 21: Erection BOQ - Champaran

a) Set 1

b) Set 16

8 Set 6

9 Set 0.1

Sub-Total

E

1 CKm 1

2

a No. 5

Excavation, Erecting, Testing and Commissioning of Pipe type untreated earthing by providing & using 8 SWG GI wire for connections complete in all respect and approved drawing as per TS.

Excavation, Erecting, Testing and Commissioning of Coil type untreated earthing by providing & using 8 SWG GI wire for connections complete in all respect and approved drawing as per TS.

Excavation, Foundation and erection of galvanised Stay Set complete in all respect as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Design, Engineering and construction , Erection, testing and commissioning of 36kV, 800 A, 25kA , 3-ph double break center rotating type (DBCR), Gang Operated, isolator along with Support Insulators, Operating Mechanism, Base Channel down Pipe and all required accessories complete as per approved drawings, technical specifications and scope of the work,(with and without Earth Switch)

Erection, testing commissioning of Reconductoring of 33 KV Line By ACSR Wolf Conductorr

Survey, route alignment & pole spotting, preparation of survey report , Inventory after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for 33 KV overhead line by providing and installing danger board and barbed Wires on DP/TP/FP Structures and pole numbering as per scope of work, approved drawings and Technical specifications:

11 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat Red oxide, 2 coat Al-Paint and 1/6th part of the Rail pole from bottom with Black enamel paint cf Reputed make) including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with cement concreting foundation and top mopping (1:4:8) (0.54 cmt per pole).

Page 22: Erection BOQ - Champaran

b Kg 2

C Nos 1

3 Kg 300

4 CKM 1

5 Set 6

6 Set 30

7 Earthing

a) Set 1

13 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat Red oxide, 2 coat Al-Paint and 1/6th part of the Rail pole from bottom with Black enamel paint cf Reputed make) including fixing of RCC/Stone Base plate (500X500X100 mm) with cement concreting foundation and top mopping (1:4:8) (0.65 cmt per pole).

PSC Pole 9 Mtr 400 Kg including fixing of RCC Base plate (500x500x100 mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification. Fixing of Danger Board on DP/TP/FP & Pole numbering.

Erection of galvanised fabricated steel materials- Channels, angle, flats for over head line structures by providing and using Bolts, Nuts, Washer etc as per approved drawing and TS

Erection, testing and commissioning of ACSR Wolf Conductor including mid point jointing sleeves fixing and jumpering, binding of conductor with pin insulator and disc insulator by providing and using Aluminium tape at DP and all cut-points and angle points by using PG Clamp etc. as required (1 CKm= 1 km line length of 3 phase conductor)

Erection, testing and commissioning of 33 KV porcelain Disc insulator 70 KN along with HW fittings complete in all respect as per TS & approved drawings.

Erection, Testing and Commissioning of 33 KV porcelain Pin Insulators with GI PIN complete in all respect as per TS & approved drawings.

Excavation, Erecting, Testing and Commissioning of Pipe type untreated earthing by providing & using 8 SWG GI wire for connections complete in all respect and approved drawing as per TS.

Page 23: Erection BOQ - Champaran

b) Set 8

8 Set 6

9 Ckm 1

Sub Total

F 33 KV Bay Extension

1 MT 2.5

2 Set 1

Excavation, Erecting, Testing and Commissioning of Coil type untreated earthing by providing & using 8 SWG GI wire for connections complete in all respect and approved drawing as per TS.

Excavation, Foundation and erection of galvanised Stay Set complete in all respect as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Dismentling of existing defective/damaged pole-support (Rail/joist/tubular),conductor and other dismantled line materials from existing line and devolution of the dismentled pole, structure, conductor and other line materials including storage, handling, insurance, loading, unloading, transportation to designated store of Utility as per the direction of Engineer-in-charge and handing over the pole and other dismentled material to the store of Utility with propoer accounting as per the inventory.

Excavation, erection, cement concrete foundation, erection, testing and commissioning of all type of structures i.e. Gantry/Swing bus/isolator/VCB/CT/PT/PI structures etc. made of Lattice structures of equal angles sections, flat as per approved drawings.

Design, Engineering and construction , erection, testing and commissioning of 36kV, 1250A, 25kA for 3 seconds, 3-ph, Outdoor type Vacuum Circuit breaker along with 36kV, 1-Phase, 25kA for 3 seconds, 800-400-200/1-1-1 Amp. outdoor type Current Transformer along with junction box (1 no junction box for 3 no of 1-phase CTs)], Jumpers, earthing, supporting structures, maintenance platform, marshalling box, control & Power cabling between VCB and indoor control panel and required accessories complete as per approved drawings, technical specifications and scope of the work.

Page 24: Erection BOQ - Champaran

3

3a No 1

4 Set 2

5 Per Bay 1

6 Set 1

7 1

8 Set 6

Design, Engineering providing and installation of ISMC 75 channel on top of indoor trench, erection of panels on ISMC 75 channels, welding, testing and commissioning of 33kV indoor Control & Relay panel along with E/F & O/C relays, control and power supply cabling in trench between field equipment and panels, Mimic Diagram, Voltmeter, Ammeter, Annunciation Windows with annunciation relays and other components etc as per approved drawings, technical specifications and scope of the work for controlling:

33 kV VCB (without diffirential relays) and DLMS Trivector Static Energy Meter complete.

Design, Engineering and construction , Erection, testing and commissioning of 36kV, 800 A, 25kA 3-ph double break center rotating type (DBCR), Gang Operated, isolator along with Support Insulators, Operating Mechanism, Base Channel down Pipe and all required accessories complete as per approved drawings, technical specifications and scope of the work,

Erection, testing and commissioning of Bus Bar, jumpering and Dropper (Zebra Conductor), by using all types of insulators, clamps and connectors, Al tape etc. with all accessories complete in all respect.

Design, Engineeringi , Erection, testing and Commissioning of 30 kV, 10kA, 1-ph Station Class Lightening Arresters with mounting on erected structures, jumpering from bus bar, earthing connection using 50x6mm GS flat, hardware etc as required, as per approved drawings, technical specifications and scope of the work,

Excavation, laying, welding, refilling, earthing & grounding of MS Flat as per Approved drawing and erection of riser up to various equipment/structures as per scope of the work, specifications and approved drawings,

LS per bay

Excavation, erection, testing and commissioning of 40 mm dia., 3000 mm long GI pipe earth electrode by providing test link, RCC pit, RCC cover, placed on GI frame, Charcoal & Salt in alternate layer as per REC Specification and other accessories complete as per approved drawings, technical specifications and scope of the work for power transformer neutral, station transformer neutral, lightening arresters direct earthing.

Page 25: Erection BOQ - Champaran

9 Mtr 5

Sub Total

G 33 KV Railway Crossing (Double Circuit)

Mtr 115

Sub TotalH 33 KV Metering System

No 1

Sub Total

I

1 CKm 1

2

Design, engineering and construction of Cable Trench of 0.75 Mtr wide , 1.0 Mtr. depth, precast RCC Trench Cover, Water stops, Brick Work wherever required including supply of T&P, Labour, Cement, Sand, Reinforcement Steel, Steel Angles, Flats, Form Work, Excavation and providingcement plaster (1:4) including floating coat of cement punning (1.5 MM) with clean pores sand etc, all complete as per Technical Specification, approved Drawing and as per direction of Engineer In Charge (payment will be made as per actual requirement per Mtr.)

Laying,termination, Erection, Testing & commissioning of 33 KV grade 3-core 400 Sqmm XLPE power cable (Double Circuit) for underground Railway Crossing including using jointing/Termination Kit, GI pipe, CI pipe, clamps, conectors bolts, nuts, fixing and fitting of barbed wire, pipe earthing etc. with all accessories complete in all respect as per TS/ approved drawing

Erection, testing, commissioning of 33 kV Metering system along with DLMS Static Trivector Energy Meter alongwith combined CT- PT metering unit 33KV/110 V, CT ratio-800-400/1A with bimetalic connectors and DLMS Static Trivector feeder meter with communication port of 33 KV/110 v of CT ratio-400/1 A with 12cx2.5 Sqmm Control Cable complete alongwith earthing and all associated accessories complete in all respest

Construction of Single Circuit 11 KV Line with ACSR Dog Conductor on Rail Pole :

Survey, route alignment & pole spotting, preparation of survey report after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for 11 KV overhead line by installing danger board and barbed wire on DP/TP/FP structure and pole numbering as per scope of work, approved drawings and technical specifications:

Page 26: Erection BOQ - Champaran

a No. 16

3 Kg 425

4 CKM 1

5 Set 6

6 Set 45

7 Earthing

a) Set 1

b) Set 14

8 Set 6

9 Set 0.1

Sub-Total

J

13 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat Red oxide, 2 coat Al-Paint and 1/6th part of the Rail pole from bottom with Black enamel paint cf Reputed make) including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with cement concreting foundation and top mopping (1:4:8) (0.65 cmt per pole).

Erection of galvanised fabricated steel materials- Channels, angle, flats for over head line structures by using Bolts, Nuts, Washer etc as per approved drawing and TS

Erection, testing and commissioning of ACSR Dog Conductor including mid point jointing sleeves fixing and jumpering by using PG clamp, binding of conductor (by providing & using Al. tape) with pin insulator and disc insulator at DP and all cut-points and angle points etc. as required (1 CKm= 1 km line length of 3 phase conductor)

Erection, testing and commissioning of 11 KV porcelain Disc insulator 45 KN along with HW fittings complete in all respect as per TS & approved drawings.

Erection, Testing and Commissioning of 11 KV porcelain Pin Insulators with GI PIN complete in all respect as per TS & approved drawings.

Excavation, Erecting, Testing and Commissioning of Pipe type untreated earthing by providing & using 8 SWG GI wire, pipe clamp, bolts& Nuts etc. for connections as per TS/ REC construction standard.

Excavation, Erecting, Testing and Commissioning of Coil type untreated earthing by providing & using 8 SWG GI wire, pipe clamp, bolts& Nuts etc. for connections as per TS/ REC construction standard.

Excavation and erection of galvanised Stay Set as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Erection, Testing and Commissioning of 12 kV AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete as per technical specifications, scope of works and approved drawings

11 KV Lines on 13 M 52 Kg /M Rail Pole with ACSR Dog Conductor (Double Circuit)

Page 27: Erection BOQ - Champaran

1 CKm 1

2

a No. 20

3 Kg 1100

4 CKM 2

5 Set 12

6 Set 114

7 Earthing

a) Set 1

b) Set 18

8 Set 8

Survey, route alignment & pole spotting, preparation of survey report after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for 11 KV overhead line by installing danger board and barbed wire on DP/TP/FP structure and pole numbering as per scope of work, approved drawings and technical specifications:

13 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat Red oxide, 2 coat Al-Paint and 1/6th part of the Rail pole from bottom with Black enamel paint cf Reputed make) including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with cement concreting foundation and top mopping (1:4:8) (0.65 cmt per pole).

Erection of galvanised fabricated steel materials- Channels, angle, flats for over head line structures by using Bolts, Nuts, Washer etc as per approved drawing and TS

Erection, testing and commissioning of ACSR Dog Conductor including mid point jointing sleeves fixing and jumpering, binding of conductor with pin insulator and disc insulator by providing and using Aluminium tape at DP and all cut-points and angle points by using PG Clamp etc. including fixing & fitting of Danzer board, barbed wire at DP/TP/FP as required (1 CKm= 1 km line length of 3 phase conductor)

Erection, testing and commissioning of 11 KV porcelain Disc insulator 45 KN along with HW fittings complete in all respect as per TS & approved drawings.

Erection, Testing and Commissioning of 11 KV porcelain Pin Insulators with GI PIN complete in all respect as per TS & approved drawings.

Excavation, Erecting, Testing and Commissioning of Pipe type untreated earthing by providing & using 8 SWG GI wire, pipe clamp, bolts& Nuts etc. for connections as per TS/ REC construction standard.

Excavation, Erecting, Testing and Commissioning of Coil type untreated earthing by providing & using 8 SWG GI wire, pipe clamp, bolts& Nuts etc. for connections as per TS/ REC construction standard.

Excavation and erection of galvanised Stay Set as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Page 28: Erection BOQ - Champaran

Sub-Total

K

1 CKm 1

2

a No. 20

3 Kg 365

4 CKM 1

5 Set 6

6 Set 57

7 Earthing

a Set 1

Construction of Single Circuit 11 KV Line with ACSR Dog Conductor on 9 M, 400 Kg PSC Pole :

Survey, route alignment & pole spotting, preparation of survey report after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for 11 KV overhead line by installing danger board and barbed wire on DP/TP/FP structure and pole numbering as per scope of work, approved drawings and technical specifications:

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification. Fixing of Danger Board on DP/TP/FP & Pole numbering.

Erection of galvanised fabricated steel materials- Channels, angle, flats for over head line structures by using Bolts, Nuts, Washer etc as per approved drawing and TS

Erection, testing and commissioning of ACSR Dog Conductor including mid point jointing sleeves fixing and jumpering, binding of conductor with pin insulator and disc insulator by providing and using Aluminium tape at DP and all cut-points and angle points by using PG Clamp etc. including fixing & fitting of Danzer board, barbed wire at DP/TP/FP as required (1 CKm= 1 km line length of 3 phase conductor)

Erection, testing and commissioning of 11 KV porcelain Disc insulator 45 KN along with HW fittings complete in all respect as per TS & approved drawings.

Erection, Testing and Commissioning of 11 KV porcelain Pin Insulators with GI PIN complete in all respect as per TS & approved drawings.

Excavation, Erecting, Testing and Commissioning of Pipe type untreated earthing by providing & using 8 SWG GI wire, pipe clamp, bolts& Nuts etc. for connections as per TS/ REC construction standard.

Page 29: Erection BOQ - Champaran

b Set 18

8 Set 6

9 Set 0.1

Sub-Total

L

1 CKm 1

2

a No. 18

3 Kg 365

4 CKM 1

Excavation, Erecting, Testing and Commissioning of Coil type untreated earthing by providing & using 8 SWG GI wire, pipe clamp, bolts& Nuts etc. for connections as per TS/ REC construction standard.

Excavation and erection of galvanised Stay Set as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Erection, Testing and Commissioning of 12 kV AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete as per technical specifications, scope of works and approved drawings

11 KV Lines on 9 mtr./400 kgs PSC pole with ACSR Rabbit conductor

Survey, route alignment & pole spotting, preparation of survey report after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for 11 KV overhead line by installing danger board and barbed wire on DP/TP/FP structure and pole numbering as per scope of work, approved drawings and technical specifications:

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification. Fixing of Danger Board on DP/TP/FP & Pole numbering.

Erection of galvanised fabricated steel materials- Channels, angle, flats for over head line structures by using Bolts, Nuts, Washer etc as per approved drawing and TS

Erection, testing and commissioning of ACSR Rabbit Conductor including mid point jointing sleeves fixing and jumpering, binding of conductor with pin insulator and disc insulator by providing and using Aluminium tape at DP and all cut-points and angle points by using PG Clamp etc. including fixing & fitting of Danzer board, barbed wire at DP/TP/FP as required (1 CKm= 1 km line length of 3 phase conductor)

Page 30: Erection BOQ - Champaran

5 Set 6

6 Set 51

7 Earthing

a Set 1

b Set 16

8 Set 6

9 Set 0.1

Sub-Total

M

1 CKm 1

2

a No. 18

Erection, testing and commissioning of 11 KV porcelain Disc insulator 45 KN along with HW fittings complete in all respect as per TS & approved drawings.

Erection, Testing and Commissioning of 11 KV porcelain Pin Insulators with GI PIN complete in all respect as per TS & approved drawings.

Excavation, Erecting, Testing and Commissioning of Pipe type untreated earthing by providing & using 8 SWG GI wire, pipe clamp, bolts& Nuts etc. for connections as per TS/ REC construction standard.

Excavation, Erecting, Testing and Commissioning of Coil type untreated earthing by providing & using 8 SWG GI wire, pipe clamp, bolts& Nuts etc. for connections as per TS/ REC construction standard.

Excavation and erection of galvanised Stay Set as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Erection, Testing and Commissioning of 12 kV AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete as per technical specifications, scope of works and approved drawings

11 KV Lines on 8 m/ 200 kgs PSC pole with Rabbit conductor

Survey, route alignment & pole spotting, preparation of survey report after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for 11 KV overhead line by installing danger board and barbed wire on DP/TP/FP structure and pole numbering as per scope of work, approved drawings and technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification. Fixing of Danger Board on DP/TP/FP & Pole numbering.

Page 31: Erection BOQ - Champaran

3 Kg 365

4 CKM 1

5 Set 6

6 Set 51

7 Earthing

a Set 1

b Set 16

8 Set 6

9 Set 0.1

Sub-Total

N

1 CKm 1

Erection of galvanised fabricated steel materials- Channels, angle, flats for over head line structures by using Bolts, Nuts, Washer etc as per approved drawing and TS

Erection, testing and commissioning of ACSR Rabbit Conductor including mid point jointing sleeves fixing and jumpering, binding of conductor with pin insulator and disc insulator by providing and using Aluminium tape at DP and all cut-points and angle points by using PG Clamp etc. including fixing & fitting of Danzer board, barbed wire at DP/TP/FP as required (1 CKm= 1 km line length of 3 phase conductor)

Erection, testing and commissioning of 11 KV porcelain Disc insulator 45 KN along with HW fittings complete in all respect as per TS & approved drawings.

Erection, Testing and Commissioning of 11 KV porcelain Pin Insulators with GI PIN complete in all respect as per TS & approved drawings.

Excavation, Erecting, Testing and Commissioning of Pipe type untreated earthing by providing & using 8 SWG GI wire, pipe clamp, bolts& Nuts etc. for connections as per TS/ REC construction standard.

Excavation, Erecting, Testing and Commissioning of Coil type untreated earthing by providing & using 8 SWG GI wire, pipe clamp, bolts& Nuts etc. for connections as per TS/ REC construction standard.

Excavation and erection of galvanised Stay Set as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Erection, Testing and Commissioning of 12 kV AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete as per technical specifications, scope of works and approved drawings

11 KV Lines on 8 mtr./ 200 kgs PSC pole with ACSR Weasel conductor

Survey, route alignment & pole spotting, preparation of survey report after approval of Engineer-in-charge & redressal of ROW issues.

Page 32: Erection BOQ - Champaran

2

a No. 18

3 Kg 365

4 CKM 1

5 Set 6

6 Set 51

7 Earthing

a Set 1

b Set 16

8 Set 6

Excavation of pit, foundation, erection of following Support for 11 KV overhead line by installing danger board and barbed wire on DP/TP/FP structure and pole numbering as per scope of work, approved drawings and technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification. Fixing of Danger Board on DP/TP/FP & Pole numbering.

Erection of galvanised fabricated steel materials- Channels, angle, flats for over head line structures by using Bolts, Nuts, Washer etc as per approved drawing and TS

Erection, testing and commissioning of ACSR Weasel Conductor including mid point jointing sleeves fixing and jumpering, binding of conductor with pin insulator and disc insulator by providing and using Aluminium tape at DP and all cut-points and angle points by using PG Clamp etc. including fixing & fitting of Danzer board, barbed wire at DP/TP/FP as required (1 CKm= 1 km line length of 3 phase conductor)

Erection, testing and commissioning of 11 KV porcelain Disc insulator 45 KN along with HW fittings complete in all respect as per TS & approved drawings.

Erection, Testing and Commissioning of 11 KV porcelain Pin Insulators with GI PIN complete in all respect as per TS & approved drawings.

Excavation, Erecting, Testing and Commissioning of Pipe type untreated earthing by providing & using 8 SWG GI wire, pipe clamp, bolts& Nuts etc. for connections as per TS/ REC construction standard.

Excavation, Erecting, Testing and Commissioning of Coil type untreated earthing by providing & using 8 SWG GI wire, pipe clamp, bolts& Nuts etc. for connections as per TS/ REC construction standard.

Excavation and erection of galvanised Stay Set as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Page 33: Erection BOQ - Champaran

9 Set 0.1

Sub-Total

O

1 CKm 1

2

a No. 1

b No. 2

3 Kg 50

4 CKM 1

5 Set 3

Erection, Testing and Commissioning of 12 kV AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete as per technical specifications, scope of works and approved drawings

Reconductoring of 11 KV Line With ACSR Dog Conductor on Rail poleSurvey, route alignment & pole spotting, preparation of survey report , Inventory after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for 11 KV overhead line by providing and installing danger board and barbed Wires on DP/TP/FP Structures and pole numbering as per scope of work, approved drawings and Technical specifications:

13 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat Red oxide, 2 coat Al-Paint and 1/6th part of the Rail pole from bottom with Black enamel paint cf Reputed make) including fixing of RCC/Stone Base plate (500X500X100 mm) with cement concreting foundation and top mopping (1:4:8) (0.65 cmt per pole).

11 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat Red oxide, 2 coat Al-Paint and 1/6th part of the Rail pole from bottom with Black enamel paint cf Reputed make) including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with cement concreting foundation and top mopping (1:4:8) (0.54 cmt per pole).

Erection of galvanised fabricated steel materials- Channels, angle, flats for over head line structures by using Bolts, Nuts, Washer etc as per approved drawing and TS

Erection, testing and commissioning of ACSR Dog Conductor including mid point jointing sleeves fixing and jumpering, binding of conductor with pin insulator and disc insulator by providing and using Aluminium tape at DP and all cut-points and angle points by using PG Clamp etc. including fixing & fitting of Danzer board, barbed wire at DP/TP/FP as required (1 CKm= 1 km line length of 3 phase conductor)

Erection, testing and commissioning of 11KV porcelain Disc insulator 45 KN along with HW fittings complete in all respect as per TS & approved drawings.

Page 34: Erection BOQ - Champaran

6 Set 15

7 Earthing

a) Set 1

b) Set 3

8 Set 2

9 Ckm 1

Sub-Total

P

1 CKm 1

2

a No. 3

Erection, Testing and Commissioning of 11 KV porcelain Pin Insulators with GI PIN complete in all respect as per TS & approved drawings.

Excavation, Erecting, Testing and Commissioning of Pipe type untreated earthing by providing & using 8 SWG GI wire, pipe clamp, bolts& Nuts etc. for connections as per TS/ REC construction standard.

Excavation, Erecting, Testing and Commissioning of Coil type untreated earthing by providing & using 8 SWG GI wire, pipe clamp, bolts& Nuts etc. for connections as per TS/ REC construction standard.

Excavation, Foundation and erection of galvanised Stay Set complete in all respect as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Dismentling of existing defective/damaged pole-support (Rail/joist/tubular),conductor and other dismantled line materials from existing line and devolution of the dismentled pole, structure, conductor and other line materials including storage, handling, insurance, loading, unloading, transportation to designated store of Utility as per the direction of Engineer-in-charge and handing over the pole and other dismentled material to the store of Utility with propoer accounting as per the inventory.

Reconductoring of 11 KV Line With ACSR Dog Conductor on 9 mtr. 400 kg PSC poleSurvey, route alignment & pole spotting, preparation of survey report , Inventory after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for 11 KV overhead line by providing and installing danger board and barbed Wires on DP/TP/FP Structures and pole numbering as per scope of work, approved drawings and Technical specifications:

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm)) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification. Fixing of Danger Board on DP/TP/FP & Pole numbering.

Page 35: Erection BOQ - Champaran

3 Kg 50

4 CKM 1

5 Set 3

6 Set 18

7 Earthing

a) Set 1

b) Set 3

8 Set 2

9 Ckm 1

Sub-Total

Q

Erection of galvanised fabricated steel materials- Channels, angle, flats for over head line structures by using Bolts, Nuts, Washer etc as per approved drawing and TS

Erection, testing and commissioning of ACSR Dog Conductor including mid point jointing sleeves fixing and jumpering, binding (by providing & using Al. tape) of conductor with pin insulator and disc insulator at DP and all cut-points and angle points by providing and using PG Clamp etc. as required (1 CKm= 1 km line length of 3 phase conductor)

Erection, testing and commissioning of 11KV porcelain Disc insulator 45 KN along with HW fittings complete in all respect as per TS & approved drawings.

Erection, Testing and Commissioning of 11 KV porcelain Pin Insulators with GI PIN complete in all respect as per TS & approved drawings.

Excavation, Erecting, Testing and Commissioning of Pipe type untreated earthing by providing & using 8 SWG GI wire, pipe clamp, bolts& Nuts etc. for connections as per TS/ REC construction standard.

Excavation, Erecting, Testing and Commissioning of Coil type untreated earthing by providing & using 8 SWG GI wire, pipe clamp, bolts& Nuts etc. for connections as per TS/ REC construction standard.

Excavation, Foundation and erection of galvanised Stay Set complete in all respect as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Dismentling of existing defective/damaged pole-support (Rail/joist/tubular),conductor and other dismantled line materials from existing line and devolution of the dismentled pole, structure, conductor and other line materials including storage, handling, insurance, loading, unloading, transportation to designated store of Utility as per the direction of Engineer-in-charge and handing over the pole and other dismentled material to the store of Utility with propoer accounting as per the inventory.

Reconductoring of 11 KV Line With ACSR Rabbit Conductor on PSC Pole

Page 36: Erection BOQ - Champaran

1 CKm 1

2

a No. 3

b No 2

3 Kg 150

4 CKM 1

5 Set 3

6 Set 15

7 Earthing

a) Set 0

Survey, route alignment & pole spotting, preparation of survey report , Inventory after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for 11 KV overhead line by providing and installing danger board and barbed Wires on DP/TP/FP Structures and pole numbering as per scope of work, approved drawings and Technical specifications:

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification. Fixing of Danger Board on DP/TP/FP & Pole numbering.

PSC Pole 8 Mtr 200 Kg including fixing of RCC Base plate (500x500x100 mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification. Fixing of Danger Board on DP/TP/FP & Pole numbering.

Erection of galvanised fabricated steel materials- Channels, angle, flats for over head line structures by using Bolts, Nuts, Washer etc as per approved drawing and TS

Erection, testing and commissioning of ACSR Rabbit Conductor including mid point jointing sleeves fixing and jumpering, binding (by providing & using Al. tape) of conductor with pin insulator and disc insulator at DP and all cut-points and angle points by providing and using PG Clamp etc. as required (1 CKm= 1 km line length of 3 phase conductor)

Erection, testing and commissioning of 11KV porcelain Disc insulator 45 KN along with HW fittings complete in all respect as per TS & approved drawings.

Erection, Testing and Commissioning of 11 KV porcelain Pin Insulators with GI PIN complete in all respect as per TS & approved drawings.

Excavation, Erecting, Testing and Commissioning of Pipe type untreated earthing by providing & using 8 SWG GI wire, pipe clamp, bolts& Nuts etc. for connections as per TS/ REC construction standard.

Page 37: Erection BOQ - Champaran

b) Set 5

8 Set 2

9 Ckm 1

Sub-TotalR 11 KV Metering System

No. 1

Sub totalS 11 KV Railway Crossing (Double Circuit)

KMs 0.115

Sub TotalT 11 KV Bay Extension

Excavation, Erecting, Testing and Commissioning of Coil type untreated earthing by providing & using 8 SWG GI wire, pipe clamp, bolts& Nuts etc. for connections as per TS/ REC construction standard.

Excavation, Foundation and erection of galvanised Stay Set complete in all respect as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Dismentling of existing defective/damaged pole-support (Rail/joist/tubular),conductor and other dismantled line materials from existing line and devolution of the dismentled pole, structure, conductor and other line materials including storage, handling, insurance, loading, unloading, transportation to designated store of Utility as per the direction of Engineer-in-charge and handing over the pole and other dismentled material to the store of Utility with propoer accounting as per the inventory.

Erection, testing, commissioning of 11 kV Metering system along with Static Trivector Energy Meter alongwith combined CT- PT metering unit 11KV/110 V, CT ratio-600-300/5 A with bimetalic connectors and DLMS Static Trivector feeder meter with communication port of 11 KV/110 v of CT ratio-300/5 A with 12cx2.5 Sqmm Control Cable, earthing and all associated accessories complete in all respest

Laying,termination, Erection, Testing & commissioning of 11 KV grade 3-core 300 Sqmm XLPE power cable (Double Circuit) for underground Railway Crossing including using jointing/Termination Kit, GI pipe, CI pipe, clamps, conectors bolts, nuts, fixing and fitting of anti-climbing device with all accessories,Earthing in all respect etc. complete in all respect as per TS, approved drawing

Page 38: Erection BOQ - Champaran

1 MT 2.5

2 Set 1

3 Set 2

4 Set 1

5 Set 1

6 Per Bay 1

Excavation, erection, cement concrete foundation, erection, testing and commissioning of all type of structures i.e. Gantry/Swing bus/isolator/VCB/CT/PT/PI structures etc. made of Lattice structures of equal angles sections, flat as per approved drawings.

Design, Engineering and construction , erection, testing and commissioning of 12 kV,630 A, 25kA for 3 seconds, 3-ph, Outdoor type Vacuum Circuit breaker along with 12 kV, 1-Phase for 3 seconds , 25kA, 600-300-150/5-5 Amp. outdoor type Current Transformer along with junction box (1 no junction box for 3 no of 1-phase CTs)], Jumpers, earthing, supporting structures, maintenance platform, marshalling box, control & Power cabling between VCB and indoor control panel and required accessories complete as per approved drawings, technical specifications and scope of the work.

Design, Engineering and construction, Erection, testing and commissioning of 12 kV, 630 A, 25kA , 3-ph double break center rotating type (DBCR), Gang Operated, isolator along with Support Insulators, Operating Mechanism, Base Channel down Pipe and all required accessories complete as per approved drawings, technical specifications and scope of the work.

Design, Engineeringi , Erection, testing and Commissioning of 9 kV, 10kA, 1-ph Station Class Lightening Arresters with mounting on erected structures, jumpering from bus bar, earthing connection using 50x6mm GS flat, hardware etc as required, as per approved drawings, technical specifications and scope of the work,

12 KV Control & Relay panel for 12 KV VCB (suitable for 30 V DC tripping/closing coil and associated control) alongwith, ElF & O/C relays, Static energy meter (class 0.5 with communication port) , Mimic Diagram, Voltmete, Ammeter, etc complete as per REC

Erection, testing and commissioning of Bus Bar, jumpering and Dropper (Zebra/wolf Conductor),with using all type of insulator, Clamps and connectors, Bolts, Nuts and Washers, Al. Tape etc with all accessories complete in all respect.

Page 39: Erection BOQ - Champaran

7 1

8 Set 6

9 Mtr 5

Sub-TotalU Capacitor Banks

1

a 1200 KVAR Set 1

b 3600 KVAr Set 1

Sub Total

V

1

Excavation, laying, welding, refilling, earthing & grounding of MS Flat as per Approved drawing and erection of riser up to various equipment/structures as per scope of the work, specifications and approved drawings.

LS per bay

Excavation, erection, testing and commissioning of 40 mm dia, 3000 mm long GI pipe earth electrode by providing test link, RCC pit, RCC cover, placed on GI frame, Charcoal & Salt in alternate layer as per REC Specification and other accessories complete as per approved drawings, technical specifications and scope of the work for power transformer neutral, station transformer neutral, lightening arresters direct earthing.

Design, engineering and construction of Cable Trench of 0.5 Mtr wide , 1.0 Mtr. depth, precast RCC Trench Cover, Water stops, Brick Work wherever required including supply of T&P, Labour, Cement, Sand, Reinforcement Steel, Steel Angles, Flats, Form Work, Excavation and providingcement plaster (1:4) including floating coat of cement punning (1.5 MM) with clean pores sand etc, all complete as per Technical Specification and approved Drawing and as per direction of Engineer in charge (Payment will be made as per actual requirement per Mtr.)

Design, engineering,Erection, testing and commissioning of Fully automatic Capacitor bank with automatic control panel, isolator, outdoor type suitable Vacuum Circuit Breaker, mounting structures, All types of cable & its accessories complete , earthing etc as required as per technical specifications, approved drawings, scope of the works of following capacities: (Banks in Muiltiple of 600 KVAR as per REC Specification):

Distribution Transformer Substations ( 200 KVA) on Rail pole

Erection, Testing and Commissioning of 50 Hz, 11/0.433 KV, oil immersed naturally cooled, Aluminium wound outdoor type (Three Star Rated) Distribution Transformer Filled with Oil completely with all accessories and fittings as per technical specifications and approved Drawing.

Page 40: Erection BOQ - Champaran

a Three Phase 200 KVA No 1

2 Set 1

3

a No 2

4 Kg 280

5

6 11 KV 45 KN Disc Insulator with hardware fittings Set 3

7 Set 1

8 Sets 1

9 No 1

Erection, testing and Commissioning of 3-pole, Distribution Class 9 KV, 5 kA Lightening Arrester for Distribution Transformer Substation by providing and erecting Hot Dip galvanised stranded wire 7/3.15 mm as per scope of work, approved drawings and technical specifications. (1 Set= 3 Nos)

Excavation of pit, foundation, erection of following Support for DSS and installation with DT numbering as per scope of work, approved drawings and specifications:

13 m long 52 Kg/mtr. Rail Pole (Painted with 2 coat Red oxide, 2 coat Al-Paint and 1/6th part of the Rail pole from bottom with Black enamel paint of Reputed make) including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm)) with cement concreting foundation and top mopping (1:4:8) (0.65 cmt per pole).

Erection, fixing and fitting of galvanised fabricated steel materials- channel, angle, flats of various size for DTstructures with bolts, nuts and washers etc. complete in all respect as per TS and approved drawing.

Erection, fixing and fitting, Testing and Commissioning of Porcelain Insulators with mounting hardware fittings etc. complete in all respect as per TS and approved drawing.

Erection, Testing and Commissioning of 12kV, 200A, 25kA, 3-ph, 3 Pin type, Horizontal Mounting type, Gang Operated, AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete as per technical specifications etc.complete as per technical specifications, scope of works and approved drawings

Erection, testing and commissioning of 3 pole, 12 KV HG fuse set compleete on the DSS Structue complete in all respect for 3-ph DTs

Erection, testing and Commissioning of LT Distribution box with LTCT meter (CT Ratio 400/5 A ) with bar type CTs- 400/5 A metering, Al-Bus bar of Adequate Size and LT control mechanism and connections from LV Bushings to LTDB and LTDB to LT line with Cables by providing and using Lugs,Washer etc. complete in all respect with one no. Of TPMCCB as per technical specifications for Three Phase 200 KVA Distribution Transformer.

Page 41: Erection BOQ - Champaran

10 1

11 Per DT 1

12 Set 2

Sub-Total

W

1

a Three Phase 200 KVA No 1

2 Set 1

3

a No 2

Excavation, erection, testing and commissioning of a set of 3 Nos pipe earthing using 40 mm dia GI pipe 3000 mm long, as per IS 1161 and as per REC construction drawings complete with H/w and lugs etc by providing charcoal, salt,/Bitumen Clay in alternate layers and GI Wires 8 SWG for connections as per scope of work, approved drawings and technical specifications.(1 Set= 3 Nos earthing per DT)

Per DSS

Erection, testing and commissioning of ACSR Dog Conductor for jumpering by providing PG Clamps, bi-metallic/Al connectors, hardware, Al Tape etc as required complete in all respect for commissioning of DSS.

Excavation and erection of galvanised Stay Set as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Distribution Transformer Substations ( 200 KVA) on 9 Mtr. 400 Kg PSC Pole

Erection, Testing and Commissioning of 50 Hz, 11/0.433 KV, oil immersed naturally cooled, Aluminium wound outdoor type (Three Star Rated) Distribution Transformer Filled with Oil completely with all accessories and fittings as per technical specifications and approved Drawing.

Erection, testing and Commissioning of 3-pole, Distribution Class 9 KV, 5 kA Lightening Arrester for Distribution Transformer Substation by providing and erecting Hot Dip galvanised stranded wire 7/3.15 mm as per scope of work, approved drawings and technical specifications. (1 Set= 3 Nos)

Excavation of pit, foundation, erection of following Support for DSS and installation with DT numbering as per scope of work, approved drawings and specifications:

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work as per approved drawing & technical specification.

Page 42: Erection BOQ - Champaran

4 Kg 265

5

6 11 KV 45 KN Disc Insulator with hardware fittings Set 3

7 Set 1

8 Sets 1

9 No 1

10 1

11 Per DT 1

12 Set 2

Sub-Total

Erection, fixing and fitting of galvanised fabricated steel materials- channel, angle, flats of various size for DTstructures with bolts, nuts and washers etc. complete in all respect as per TS and approved drawing.

Erection, fixing and fitting, Testing and Commissioning of Porcelain Insulators with mounting hardware fittings etc. complete in all respect as per TS and approved drawing.

Erection, Testing and Commissioning of 12kV, 200A, 25kA, 3-ph, 3 Pin type, Horizontal Mounting type, Gang Operated, AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete as per technical specifications etc.complete as per technical specifications, scope of works and approved drawings

Erection, testing and commissioning of 3 pole, 12 KV HG fuse set compleete on the DSS Structue complete in all respect for 3-ph DTs

Erection, testing and Commissioning of LT Distribution box with LTCT meter (CT Ratio 400/5 A ) with bar type CTs- 400/5 A metering, Al-Bus bar of Adequate Size and LT control mechanism and connections from LV Bushings to LTDB and LTDB to LT line with Cables by providing and using Lugs,Washer etc. complete in all respect with one no. Of TPMCCB as per technical specifications for Three Phase 200 KVA Distribution Transformer.

Excavation, erection, testing and commissioning of a set of 3 Nos pipe earthing using 40 mm dia GI pipe 3000 mm long, as per IS 1161 and as per REC construction drawings complete with H/w and lugs etc by providing charcoal, salt,/Bitumen Clay in alternate layers and GI Wires 8 SWG for connections as per scope of work, approved drawings and technical specifications.(1 Set= 3 Nos earthing per DT)

Per DSS

Erection, testing and commissioning of ACSR Dog Conductor for jumpering by providing and using Al tape PG Clamps, bi-metallic/Al connectors, hardware etc as required complete in all respect for commissioning of DSS.

Excavation and erection of galvanised Stay Set as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Page 43: Erection BOQ - Champaran

X

1

a Three Phase 100 KVA No 1

2 Set 1

3

a No 2

3 Kg 250

4

a 11 KV 45 KN Disc Insulator with hardware fittings Set 3

5 Set 1

6 Sets 1

Distribution Transformer Substations 100 KVA on 9 Mtr. 400 kg PSC Pole

Erection, Testing and Commissioning of 50 Hz, 11/0.433 KV, oil immersed naturally cooled, Aluminium wound outdoor type (Three Star Rated) Distribution Transformer Filled with Oil completely with all accessories and fittings as per technical specifications and approved Drawing.

Erection, testing and Commissioning of 3-pole, Distribution Class 9 KV, 5 kA Lightening Arrester for Distribution Transformer Substation by providing and erecting Hot Dip galvanised stranded wire 7/3.15 mm as per scope of work, approved drawings and technical specifications. (1 Set= 3 Nos)

Excavation of pit, foundation, erection of following Support for DSS and installation with DT numbering as per scope of work, approved drawings and specifications:

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm)) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work as per approved drawing & technical specification.

Erection, fixing and fitting of galvanised fabricated steel materials- channel, angle, flats of various size for DTstructures with bolts, nuts and washers etc. complete in all respect as per TS and approved drawing.

Erection, fixing and fitting, Testing and Commissioning of Porcelain Insulators with mounting hardware fittings etc. complete in all respect as per TS and approved drawing.

Erection, Testing and Commissioning of 12kV, 200A, 25kA, 3-ph, 3 Pin type, Horizontal Mounting type, Gang Operated, AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete as per technical specifications etc.complete as per technical specifications, scope of works and approved drawings

Erection, testing and commissioning of 3 pole, 12 KV HG fuse set compleete on the DSS Structue complete in all respect for 3-ph DTs

Page 44: Erection BOQ - Champaran

7 No 1

8 1

9 Per DT 1

10 Set 2

Sub-Total

Y

1

a Three Phase 100 KVA No 1

2 Set 1

3

Erection, testing and Commissioning of LT Distribution box with LTCT meter (CT Ratio 200/5 A ) with bar type CTs- 200/5 A metering, Al-Bus bar of Adequate Size and LT control mechanism and connections from LV Bushings to LTDB and LTDB to LT line with Cables by providing and using Lugs,Washer etc. complete in all respect with one no. Of TPMCCB as per technical specifications for Three Phase 100 KVA Distribution Transformer.

Excavation, erection, testing and commissioning of a set of 3 Nos pipe earthing using 40 mm dia GI pipe 3000 mm long, as per IS 1161 and as per REC construction drawings complete with H/w and lugs etc by providing charcoal, salt,/Bitumen Clay in alternate layers and GI Wires 8 SWG for connections as per scope of work, approved drawings and technical specifications.(1 Set= 3 Nos earthing per DT)

Per DSS

Erection, testing and commissioning of ACSR Rabbit Conductor for jumpering by providing and using Al Tape PG Clamps, bi-metallic/Al connectors, hardware etc as required complete in all respect for commissioning of DSS.

Excavation and erection of galvanised Stay Set as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Distribution Transformer Substations ( 100 KVA) on 8 Mtr. 200 kg PSC Pole

Erection, Testing and Commissioning of 50 Hz, 11/0.433 KV, oil immersed naturally cooled, Aluminium wound outdoor type (Three Star Rated) Distribution Transformer Filled with Oil completely with all accessories and fittings as per technical specifications and approved Drawing.

Erection, testing and Commissioning of 3-pole, Distribution Class 9 KV, 5 kA Lightening Arrester for Distribution Transformer Substation by providing and erecting Hot Dip galvanised stranded wire 7/3.15 mm as per scope of work, approved drawings and technical specifications. (1 Set= 3 Nos)

Excavation of pit, foundation, erection of following Support for DSS and installation with DT numbering as per scope of work, approved drawings and specifications:

Page 45: Erection BOQ - Champaran

a No 2

3 Kg 250

4

a 11 KV 45 KN Disc Insulator with hardware fittings Set 3

5 Set 1

6 Sets 1

7 No 1

8 1

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work as per approved drawing & technical specification.

Erection, fixing and fitting of galvanised fabricated steel materials- channel, angle, flats of various size for DTstructures with bolts, nuts and washers etc. complete in all respect as per TS and approved drawing.

Erection, fixing and fitting, Testing and Commissioning of Porcelain Insulators with mounting hardware fittings etc. complete in all respect as per TS and approved drawing.

Erection, Testing and Commissioning of 12kV, 200A, 25kA, 3-ph, 3 Pin type, Horizontal Mounting type, Gang Operated, AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete as per technical specifications etc.complete as per technical specifications, scope of works and approved drawings

Erection, testing and commissioning of 3 pole, 12 KV HG fuse set compleete on the DSS Structue complete in all respect for 3-ph DTs

Erection, testing and Commissioning of LT Distribution box with LTCT meter (CT Ratio 200/5 A ) with bar type CTs- 200/5 A metering, Al-Bus bar of Adequate Size and LT control mechanism and connections from LV Bushings to LTDB and LTDB to LT line with Cables by providing and using Lugs,Washer etc. complete in all respect with one no. Of TPMCCB as per technical specifications for Three Phase 100 KVA Distribution Transformer.

Excavation, erection, testing and commissioning of a set of 3 Nos pipe earthing using 40 mm dia GI pipe 3000 mm long, as per IS 1161 and as per REC construction drawings complete with H/w and lugs etc by providing charcoal, salt,/Bitumen Clay in alternate layers and GI Wires 8 SWG for connections as per scope of work, approved drawings and technical specifications.(1 Set= 3 Nos earthing per DT)

Per DSS

Page 46: Erection BOQ - Champaran

9 Per DT 1

10 Set 2

Sub-Total

Z

1

a Three Phase 63 KVA No 1

2 Set 1

3

a No 2

3 Kg 250

4

a 11 KV 45 KN Disc Insulator with hardware fittings Set 3

Erection, testing and commissioning of ACSR Rabbit Conductor for jumpering by providing PG Clamps, bi-metallic connectors, hardware etc as required complete in all respect for commissioning of DSS.

Excavation and erection of galvanised Stay Set as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Distribution Transformer Substations 63 KVA on 8 Mtr. PSC pole

Erection, Testing and Commissioning of 50 Hz, 11/0.433 KV, oil immersed naturally cooled, Aluminium wound outdoor type (Three Star Rated) Distribution Transformer Filled with Oil completely with all accessories and fittings as per technical specifications and approved Drawing.

Erection, testing and Commissioning of 3-pole, Distribution Class 9 KV, 5 kA Lightening Arrester for Distribution Transformer Substation by providing and erecting Hot Dip galvanised stranded wire 7/3.15 mm as per scope of work, approved drawings and technical specifications. (1 Set= 3 Nos)

Excavation of pit, foundation, erection of following Support for DSS and installation with DT numbering as per scope of work, approved drawings and specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work as per approved drawing & technical specification.

Erection, fixing and fitting of galvanised fabricated steel materials- channel, angle, flats of various size for DTstructures with bolts, nuts and washers etc. complete in all respect as per TS and approved drawing.

Erection, fixing and fitting, Testing and Commissioning of Porcelain Insulators with mounting hardware fittings etc. complete in all respect as per TS and approved drawing.

Page 47: Erection BOQ - Champaran

5 Set 1

6 Sets 1

7 No 1

8 1

9 Per DT 1

10 Set 2

Sub-Total

AA

1

a Three Phase 200 KVA No 1

Erection, Testing and Commissioning of 12kV, 200A, 25kA, 3-ph, 3 Pin type, Horizontal Mounting type, Gang Operated, AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete as per technical specifications etc.complete as per technical specifications, scope of works and approved drawings

Erection, testing and commissioning of 3 pole, 12 KV HG fuse set compleete on the DSS Structue complete in all respect for 3-ph DTs

Erection, testing and Commissioning of LT Distribution box with LTCT meter (CT Ratio 200/5 A ) with bar type CTs- 200/5 A metering, Al-Bus bar of Adequate Size and LT control mechanism and connections from LV Bushings to LTDB and LTDB to LT line with Cables by providing and using Lugs,Washer etc. complete in all respect with one no. Of TPMCCB as per technical specifications for Three Phase 100 KVA Distribution Transformer.

Excavation, erection, testing and commissioning of a set of 3 Nos pipe earthing using 40 mm dia GI pipe 3000 mm long, as per IS 1161 and as per REC construction drawings complete with H/w and lugs etc by providing charcoal, salt,/Bitumen Clay in alternate layers and GI Wires 8 SWG for connections as per scope of work, approved drawings and technical specifications.(1 Set= 3 Nos earthing per DT)

Per DSS

Erection, testing and commissioning of ACSR Rabbit Conductor for jumpering by providing PG Clamps, bi-metallic connectors, hardware etc as required complete in all respect for commissioning of DSS.

Excavation and erection of galvanised Stay Set as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Augmentation of 100 KVA Distribution Transformer by 200 KVA new Distribution Transformer

Erection, Testing and Commissioning of 50 Hz, 11/0.433 KV, oil immersed naturally cooled, Aluminium wound outdoor type (Three Star Rated) Distribution Transformer Filled with Oil completely with all accessories and fittings as per technical specifications and approved Drawing.

Page 48: Erection BOQ - Champaran

2 per DT 1

Sub-Total

AB

1

a Three Phase 100 KVA No 1

2 per DT 1

Sub-Total

AC

1

a Three Phase 100 KVA (released DT will be Utilised) No 1

2 per DT 1

Sub-Total AD R & M of Existing Distribution Substations

Dismentling of existing dismentled Distt. Transformer including storage, handling, loading, unloading, transportation to designated store/proposed Site of Utility as per the direction of Engineer-in-charge and handing over the material to the authorised representative of Utility with propoer accounting as per the inventory.

Augmentation of 63 KVA Distribution Transformer by 100 KVA Distribution Transformer (NEW)Erection, Testing and Commissioning of 50 Hz, 11/0.433 KV, oil immersed naturally cooled, Aluminium wound outdoor type (Three Star Rated) Distribution Transformer Filled with Oil completely with all accessories and fittings as per technical specifications and approved Drawing.

Dismentling of existing dismentled Distt. Transformer including storage, handling, loading, unloading, transportation to designated store/proposed Site of Utility as per the direction of Engineer-in-charge and handing over the material to the authorised representative of Utility with propoer accounting as per the inventory.

Augmentation of 63 KVA Distribution Transformer by 100 KVA Released Distribution Transformer (Released)

Erection, Testing and Commissioning of 50 Hz, 11/0.433 KV, oil immersed naturally cooled, Aluminium wound outdoor type Distribution Transformer filled with oil complete required for proper commissioning of Distribution Transformers with all accessories and fittings as per technical specifications and approved Drawing.

Dismentling of existing dismentled Distt. Transformer including storage, handling, loading, unloading, transportation to designated store/proposed Site of Utility as per the direction of Engineer-in-charge and handing over the material to the authorised representative of Utility with propoer accounting as per the inventory.

Page 49: Erection BOQ - Champaran

1

a No. 0.05

b No. 0.05

2 Set 1

3 Kg 30

4 Set 0.75

5 Sets 0.5

Excavation of pit, foundation, erection of following Support for 11 KV overhead line by providing and installing danger board and barbed Wires on DP/TP/FP Structures and DT numbering as per scope of work, approved drawings and Technical specifications: for

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification. Fixing of Danger Board on DP/TP/FP & Pole numbering.

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification. Fixing of Danger Board on DP/TP/FP & Pole numbering.

Erection, testing and Commissioning of 3-pole, Distribution Class 9 KV, 5 kA Lightening Arrester for Distribution Transformer Substation by providing and erecting Hot Dip galvanised stranded wire 7/3.15 mm as per scope of work, approved drawings and technical specifications.(1 Set = 3 Nos)

Erection, fixing and fitting of galvanised pre-fabricated steel materials- channel, angle, flats of various size for DT structures with bolts, nuts and washers etc. complete in all respect as per TS and approved drawing.

Erection, Testing and Commissioning of 12kV, 200A, 25kA, 3-ph, 3 Pin type, Horizontal Mounting type, Gang Operated, AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete as per technical specifications etc.complete as per technical specifications, scope of works and approved drawings

Erection, testing and commissioning of 3 pole, 12 KV HG fuse set compleete on the DSS Structue complete in all respect for 3-ph DTs

Page 50: Erection BOQ - Champaran

6 1

7 Per DT 1

8 Set 1

9 Per DT 1

Sub Total

AE

1 Route Survey CKms 1

2 No 20

3 CKM 1.00

4 Kg 50

Excavation, erection, testing and commissioning of a set of 3 Nos pipe earthing using 40 mm dia GI pipe 3000 mm long, as per IS 1161 and as per REC construction drawings complete with H/w and lugs etc by providing charcoal, salt,/Bitumen Clay in alternate layers and GI Wires 8 SWG for connections as per scope of work, approved drawings and technical specifications.(1 Set= 3 Nos earthing per DT)

Per DSS

Erection, testing and commissioning of LT bus bar distribution system with kit-kat complete and jumpering Connections of 11 KV side complete by providing & using P G clamp/ connectors in all respect for commssioning of DSS.

Excavation and erection of galvanised Stay Set as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Dismentling of existing dismentled materials and devolution of the dismantled materials i.e Transformer angle, channel, clamp, AB Switch, HG fuse Set etc. including storage, handling, insurance, loading, unloading, transportation to store of Utility as per the direction of Engineer-in-charge with propoer accounting as per the inventory.

Construction of 3 Phase 4 Wire LT Line on 8M, 200 Kg PSC with ACSR Weasel Conductor in Vertical configuration

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm)with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work as per approved drawing & technical specification.

Erection, testing and commissioning of ACSR Weasel Conductor including mid point jointing (by providing and using PG clamps, Al Tape) and jumpering , binding of conductor with insulator, binding wire, fixing and fitting of LT PVC phase spacers etc. complete in all respect. (1 CKm= 1 km line length of 4 phase conductor)

Erection of galvanised fabricated steel materials- U clamp & stay clamp by using Bolts, Nuts, Washer etc as per approved drawing and TS

Page 51: Erection BOQ - Champaran

5 Set 5

6 Set 10

Sub-Total

AF

1 Route Survey CKms 1

2 No 20

3 CKM 1.00

4 Kg 200

5 Set 6

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Spiral type earthing as per REC construction drawing J-1 including supply of all materials like 8 SWG G.I. wire closely wound having 115 turns, 50mm dia & 450mm long coil (untreated without charcoal & salt) in all type of soil including excavation, refilling with earth, fixing of bolts, nuts, washers for connection with pole support/ metalic part all complete as per TS & direction of Engineer-in charge (individual pole earthing)

Construction of 3 Phase 4 Wire LT Line on 8M, 200 Kg PSC with ACSR Weasel Conductor in Horizontal configuration

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work as per approved drawing & technical specification.

Erection, testing and commissioning of ACSR Weasel Conductor including mid point jointing (by providing and using PG clamps, Al Tape) and jumpering , binding of conductor with insulator, binding wire, fixing and fitting of LT PVC phase spacers etc. complete in all respect. (1 CKm= 1 km line length of 4 phase conductor)

Erection of galvanised fabricated steel materials- angle, flats for over head line structures by using Bolts, Nuts, Washer etc as per approved drawing and TS

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Page 52: Erection BOQ - Champaran

6 Nos. 10

Sub-Total

AG

1 Route Survey Kms 1

2 No 20

3 CKM 1.00

4 Kg 200

5 Set 5

6 Nos. 10

Sub-Total

AH

1 Route Survey CKms 1

Spiral type earthing as per REC construction drawing J-1 including supply of all materials like 8 SWG G.I. wire closely wound having 115 turns, 50mm dia & 450mm long coil (untreated without charcoal & salt) in all type of soil including excavation, refilling with earth, fixing of bolts, nuts, washers for connection with pole support/ metalic part all complete as per TS & direction of Engineer-in charge (individual pole earthing)

Construction of 3 Phase 4 Wire LT Line on 8M, 200 Kg PSC with ACSR Rabbit Conductor in Horizontal configuration

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work as per approved drawing & technical specification.

Erection, testing and commissioning of ACSR Rabbit Conductor including mid point jointing (by providing and using PG clamps, Al Tape) and jumpering , binding of conductor with insulator, binding wire, fixing and fitting of LT PVC phase spacers etc. complete in all respect. (1 CKm= 1 km line length of 4 phase conductor)

Erection of galvanised fabricated steel materials- angle, flats for over head line structures by using Bolts, Nuts, Washer etc as per approved drawing and TS

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Spiral type earthing as per REC construction drawing J-1 including supply of all materials like 8 SWG G.I. wire closely wound having 115 turns, 50mm dia & 450mm long coil (untreated without charcoal & salt) in all type of soil including excavation, refilling with earth, fixing of bolts, nuts, washers for connection with pole support/ metalic part all complete as per TS & direction of Engineer-in charge (individual pole earthing)

R&M of 3-Ph, 4 Wire LT line with ACSR Rabbit conductor

Page 53: Erection BOQ - Champaran

2 No 20

3 CKM 1.00

4 Kg 60

5 Set 2

6 Nos. 5

7 Ckm 1

Sub-Total

AI

1 Route Survey CKms 1

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work as per approved drawing & technical specification.

Erection, testing and commissioning of ACSR Rabbit Conductor including mid point jointing (by providing and using PG clamps, Al Tape) and jumpering , binding of conductor with insulator, binding wire, fixing and fitting of LT PVC phase spacers etc. complete in all respect. (1 CKm= 1 km line length of 4 phase conductor)

Erection of galvanised fabricated steel materials- angle, flats for over head line structures by using Bolts, Nuts, Washer etc as per approved drawing and TS

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Spiral type earthing as per REC construction drawing J-1 including supply of all materials like 8 SWG G.I. wire closely wound having 115 turns, 50mm dia & 450mm long coil (untreated without charcoal & salt) in all type of soil including excavation, refilling with earth, fixing of bolts, nuts, washers for connection with pole support/ metalic part all complete as per TS & direction of Engineer-in charge (individual pole earthing)

Dismentling of existing defective/damaged pole-support (Rail/joist/tubular),conductor and other dismantled line materials from existing line and devolution of the dismentled pole, structure, conductor and other line materials including storage, handling, insurance, loading, unloading, transportation to designated store of Utility as per the direction of Engineer-in-charge and handing over the pole and other dismentled material to the store of Utility with propoer accounting as per the inventory.

R&M of 3-Ph, 4 Wire LT line with ACSR Weasel conductor

Page 54: Erection BOQ - Champaran

2 No 20

3 CKM 1.00

4 Kg 60

5 Set 2

6 Nos. 5

7 Ckm 1

Sub-Total

AJ

1 Route Survey CKms 1

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work as per approved drawing & technical specification.

Erection, testing and commissioning of ACSR Weasel Conductor including mid point jointing (by providing and using PG clamps, Al Tape) and jumpering , binding of conductor with insulator, binding wire, fixing and fitting of LT PVC phase spacers etc. complete in all respect. (1 CKm= 1 km line length of 4 phase conductor)

Erection of galvanised fabricated steel materials- angle, flats for over head line structures by using Bolts, Nuts, Washer etc as per approved drawing and TS

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Spiral type earthing as per REC construction drawing J-1 including supply of all materials like 8 SWG G.I. wire closely wound having 115 turns, 50mm dia & 450mm long coil (untreated without charcoal & salt) in all type of soil including excavation, refilling with earth, fixing of bolts, nuts, washers for connection with pole support/ metalic part all complete as per TS & direction of Engineer-in charge (individual pole earthing)

Dismentling of existing defective/damaged pole-support (Rail/joist/tubular),conductor and other dismantled line materials from existing line and devolution of the dismentled pole, structure, conductor and other line materials including storage, handling, insurance, loading, unloading, transportation to designated store of Utility as per the direction of Engineer-in-charge and handing over the pole and other dismentled material to the store of Utility with propoer accounting as per the inventory.

R&M of existing Single phase & 2 phase line with Conversion in to Three Phase , 4 wire Line by ACSR Weasel conductor

Page 55: Erection BOQ - Champaran

2 No 2

3 CKM 1.00

4 Kg 200

5 Set 2

6 Nos. 5

7 Ckm 1

Sub-Total

AK

1 CKm 1

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work as per approved drawing & technical specification.

Erection, testing and commissioning of ACSR Weasel Conductor with fixing & fitting of shackle/ pin insulator including mid point jointing (by providing and using PG clamps, Al Tape) and jumpering , binding of conductor with insulator, binding wire, fixing and fitting of LT PVC phase spacers etc. complete in all respect. (1 CKm= 1 km line length of 4 phase conductor )

Erection of galvanised fabricated steel materials- angle, flats for over head line structures by using Bolts, Nuts, Washer etc as per approved drawing and TS

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Spiral type earthing as per REC construction drawing J-1 including supply of all materials like 8 SWG G.I. wire closely wound having 115 turns, 50mm dia & 450mm long coil (untreated without charcoal & salt) in all type of soil including excavation, refilling with earth, fixing of bolts, nuts, washers for connection with pole support/ metalic part all complete as per TS & direction of Engineer-in charge (individual pole earthing)

Dismentling of existing defective/damaged pole-support (Rail/joist/tubular),conductor and other dismantled line materials from existing line and devolution of the dismentled pole, structure, conductor and other line materials including storage, handling, insurance, loading, unloading, transportation to designated store of Utility as per the direction of Engineer-in-charge and handing over the pole and other dismentled material to the store of Utility with propoer accounting as per the inventory.

Erection, testing commissioning of New LT Line on 3 phase ABC [3 X95Sq mm {Phase}+{1x70 Sq mm Messenger cum Neutral wire}]

Survey, route alignment & pole spotting, preparation of survey report , Inventory after approval of Engineer-in-charge & redressal of ROW issues.

Page 56: Erection BOQ - Champaran

2

a No 25

3 Set 6

4 Set 6

5

a Ckm 1

Sub Total

AL

Excavation of pit, foundation, erection of following Support for LT line and pole numbering as per scope of work, approved drawings and Technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm)) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification.

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Installation, testing and commissioning of Coil Earthing by providing GI wire no.-8SWG for connections with nuts, bolts and washers as per scope of work, technical specifications and approved drawings and REC Specification(untreated).

Erection, testing and Commissioning of LT Line on AB Cables: (average span 40 to 45 m approx.) including all erection accessories required for successful erection of AB Cable Complete in all respect as per approved drawing and Technical Specification etc as required as per scope for work for Branching/termination etc.

3 phase ABC [3 X95Sq mm {Phase}+{1x70 Sq mm Messenger cum Neutral wire}]

Erection, testing commissioning of New LT Line on 3 phase ABC [3 X70Sq mm {Phase}+{1x50 Sq mm Messenger cum Neutral wire}]

Page 57: Erection BOQ - Champaran

1 CKm 1

2

a No 25

3 Set 6

4 Set 6

5

a Ckm 1

Sub Total

Survey, route alignment & pole spotting, preparation of survey report , Inventory after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for LT line and pole numbering as per scope of work, approved drawings and Technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification.

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Installation, testing and commissioning of Coil Earthing by providing GI wire no.-8SWG for connections with nuts, bolts and washers as per scope of work, technical specifications and approved drawings and REC Specification(untreated).

Erection, testing and Commissioning of LT Line on AB Cables: (average span 40 to 45 m approx.) including all erection accessories required for successful erection of AB Cable Complete in all respect as per approved drawing and Technical Specification etc as required as per scope for work for Branching/termination etc.

3 phase ABC [3 X70Sq mm {Phase}+{1x50 Sq mm Messenger cum Neutral wire}]

Page 58: Erection BOQ - Champaran

AM

1 CKm 1

2

a No 25

3 Set 6

4 Set 6

5

Erection, testing commissioning of New LT Line on 3 phase ABC [3 X50 Sq mm {Phase}+{1x35 Sq mm Messenger cum Neutral wire}]

Survey, route alignment & pole spotting, preparation of survey report , Inventory after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for LT line and pole numbering as per scope of work, approved drawings and Technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification.

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Installation, testing and commissioning of Coil Earthing by providing GI wire no.-8SWG for connections with nuts, bolts and washers as per scope of work, technical specifications and approved drawings and REC Specification(untreated).

Erection, testing and Commissioning of LT Line on AB Cables: (average span 40 to 45 m approx.) including all erection accessories required for successful erection of AB Cable Complete in all respect as per approved drawing and Technical Specification etc as required as per scope for work for Branching/termination etc.

Page 59: Erection BOQ - Champaran

a Ckm 1

Sub Total

AN

1 CKm 1

2

a No 25

3 Set 6

4 Set 6

3 phase ABC [3 X50Sq mm {Phase}+{1x35 Sq mm Messenger cum Neutral wire}]

New LT Line on 1 phase ABC [1X16 Sq mm {Phase} + {1x25 Sq mm Messenger cum Neutral wire}]

Survey, route alignment & pole spotting, preparation of survey report , Inventory after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for LT line and pole numbering as per scope of work, approved drawings and Technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification.

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Installation, testing and commissioning of Coil Earthing by providing GI wire no.-8SWG for connections with nuts, bolts and washers as per scope of work, technical specifications and approved drawings and REC Specification(untreated).

Page 60: Erection BOQ - Champaran

5

a Ckm 1

Sub Total Total

BALANCE PART OF PHASE-I

BA

1

a Three Phase 200 KVA No 1

2 per DT 1

Sub-Total

BB

1

a Three Phase 100 KVA No 1

Erection, testing and Commissioning of LT Line on AB Cables: (average span 40 to 45 m approx.) including all erection accessories required for successful erection of AB Cable Complete in all respect as per approved drawing and Technical Specification etc as required as per scope for work for Branching/termination etc.

1 phase ABC [1 X 16 Sq mm {Phase}+{1x35 Sq mm Messenger cum Neutral wire}]

Augmentation of 100 KVA Distribution Transformer by 200 KVA new Distribution Transformer

Erection, Testing and Commissioning of 50 Hz, 11/0.433 KV, oil immersed naturally cooled, Aluminium wound outdoor type (Three Star Rated) Distribution Transformer Filled with Oil completely with all accessories and fittings as per technical specifications and approved Drawing.

Dismentling of existing dismentled Distt. Transformer including storage, handling, loading, unloading, transportation to designated store/Proposed site of Utility as per the direction of Engineer-in-charge and handing over the material to the authorised representative of Utility with propoer accounting as per the inventory.

Augmentation of 63 KVA Distribution Transformer by 100 KVA released Distribution TransformerErection, Testing and Commissioning of 50 Hz, 11/0.433 KV, oil immersed naturally cooled, Aluminium wound outdoor type (Three Star Rated) Distribution Transformer Filled with Oil completely with all accessories and fittings as per technical specifications and approved Drawing.

Page 61: Erection BOQ - Champaran

2 per DT 1

Sub-Total

BC

1

a Three Phase 63 KVA No 1

2 Set 1

3

a No 2

3 Kg 250

4

a 11 KV 45 KN Disc Insulator with hardware fittings Set 3

Dismentling of existing dismentled Distt. Transformer including storage, handling, loading, unloading, transportation to designated store/Proposed site of Utility as per the direction of Engineer-in-charge and handing over the material to the authorised representative of Utility with propoer accounting as per the inventory.

Distribution Transformer Substations ( 63 KVA ) on 8 Mtr. PSC pole (New)

Erection, Testing and Commissioning of 50 Hz, 11/0.433 KV, oil immersed naturally cooled, Aluminium wound outdoor type (Three Star Rated) Distribution Transformer Filled with Oil completely with all accessories and fittings as per technical specifications and approved Drawing.

Erection, testing and Commissioning of 3-pole, Distribution Class 9 KV, 5 kA Lightening Arrester for Distribution Transformer Substation by providing and erecting Hot Dip galvanised stranded wire 7/3.15 mm as per scope of work, approved drawings and technical specifications. (1 Set= 3 Nos)

Excavation of pit, foundation, erection of following Support for DSS and installation with DT numbering as per scope of work, approved drawings and specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work as per approved drawing & technical specification.

Erection, fixing and fitting of galvanised fabricated steel materials- channel, angle, flats of various size for DTstructures with bolts, nuts and washers etc. complete in all respect as per TS and approved drawing.

Erection, fixing and fitting, Testing and Commissioning of Porcelain Insulators with mounting hardware fittings etc. complete in all respect as per TS and approved drawing.

Page 62: Erection BOQ - Champaran

5 Set 1

6 Sets 1

7 No 1

8 1

9 Per DT 1

10 Set 2

Sub-Total

BD

1

a Three Phase 100 KVA (Released DT will be utilised) No 1

Erection, Testing and Commissioning of 12kV, 200A, 25kA, 3-ph, 3 Pin type, Horizontal Mounting type, Gang Operated, AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete as per technical specifications etc.complete as per technical specifications, scope of works and approved drawings

Erection, testing and commissioning of 3 pole, 12 KV HG fuse set compleete on the DSS Structue complete in all respect for 3-ph DTs

Erection, testing and Commissioning of LT Distribution box with LTCT meter (CT Ratio 200/5 A ) with bar type CTs- 200/5 A metering, Al-Bus bar of Adequate Size and LT control mechanism and connections from LV Bushings to LTDB and LTDB to LT line with Cables by providing and using Lugs,Washer etc. complete in all respect with one no. Of TPMCCB as per technical specifications for Three Phase 63 KVA Distribution Transformer.

Excavation, erection, testing and commissioning of a set of 3 Nos pipe earthing using 40 mm dia GI pipe 3000 mm long, as per IS 1161 and as per REC construction drawings complete with H/w and lugs etc by providing charcoal, salt,/Bitumen Clay in alternate layers and GI Wires 8 SWG for connections as per scope of work, approved drawings and technical specifications.(1 Set= 3 Nos earthing per DT)

Per DSS

Erection, testing and commissioning of ACSR Rabbit Conductor for jumpering by providing PG Clamps, bi-metallic connectors, hardware etc as required complete in all respect for commissioning of DSS.

Excavation and erection of galvanised Stay Set as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Distribution Transformer Substations 100 KVA on 8 Mtr. 200 kg PSC Pole by Released DT

Erection, Testing and Commissioning of 50 Hz, 11/0.433 KV, oil immersed naturally cooled, Aluminium wound outdoor type Distribution Transformer Filled with Oil completely with all accessories and fittings as per technical specifications and approved Drawing.

Page 63: Erection BOQ - Champaran

2 Set 1

3

a No 2

3 Kg 250

4

a 11 KV 45 KN Disc Insulator with hardware fittings Set 3

5 Set 1

6 Sets 1

7 No 1

Erection, testing and Commissioning of 3-pole, Distribution Class 9 KV, 5 kA Lightening Arrester for Distribution Transformer Substation by providing and erecting Hot Dip galvanised stranded wire 7/3.15 mm as per scope of work, approved drawings and technical specifications. (1 Set= 3 Nos)

Excavation of pit, foundation, erection of following Support for DSS and installation with DT numbering as per scope of work, approved drawings and specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work as per approved drawing & technical specification.

Erection, fixing and fitting of galvanised fabricated steel materials- channel, angle, flats of various size for DTstructures with bolts, nuts and washers etc. complete in all respect as per TS and approved drawing.

Erection, fixing and fitting, Testing and Commissioning of Porcelain Insulators with mounting hardware fittings etc. complete in all respect as per TS and approved drawing.

Erection, Testing and Commissioning of 12kV, 200A, 25kA, 3-ph, 3 Pin type, Horizontal Mounting type, Gang Operated, AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete as per technical specifications etc.complete as per technical specifications, scope of works and approved drawings

Erection, testing and commissioning of 3 pole, 12 KV HG fuse set compleete on the DSS Structue complete in all respect for 3-ph DTs

Erection, testing and Commissioning of LT Distribution box with LTCT meter (CT Ratio 200/5 A ) with bar type CTs- 200/5 A metering, Al-Bus bar of Adequate Size and LT control mechanism and connections from LV Bushings to LTDB and LTDB to LT line with Cables by providing and using Lugs,Washer etc. complete in all respect with one no. Of TPMCCB as per technical specifications for Three Phase 100 KVA Distribution Transformer.

Page 64: Erection BOQ - Champaran

8 1

9 Per DT 1

10 Set 2

Sub-Total

BE

1

a Three Phase 63 KVA (release DT will be utilised) No 1

2 Set 1

3

a No 2

Excavation, erection, testing and commissioning of a set of 3 Nos pipe earthing using 40 mm dia GI pipe 3000 mm long, as per IS 1161 and as per REC construction drawings complete with H/w and lugs etc by providing charcoal, salt,/Bitumen Clay in alternate layers and GI Wires 8 SWG for connections as per scope of work, approved drawings and technical specifications.(1 Set= 3 Nos earthing per DT)

Per DSS

Erection, testing and commissioning of ACSR Rabbit Conductor for jumpering by providing PG Clamps, bi-metallic connectors, hardware etc as required complete in all respect for commissioning of DSS.

Excavation and erection of galvanised Stay Set as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Distribution Transformer Substations 63 KVA on 8 Mtr. PSC pole by Release DT

Erection, Testing and Commissioning of 50 Hz, 11/0.433 KV, oil immersed naturally cooled, Aluminium wound outdoor type Distribution Transformer Filled with Oil completely with all accessories and fittings as per technical specifications and approved Drawing.

Erection, testing and Commissioning of 3-pole, Distribution Class 9 KV, 5 kA Lightening Arrester for Distribution Transformer Substation by providing and erecting Hot Dip galvanised stranded wire 7/3.15 mm as per scope of work, approved drawings and technical specifications. (1 Set= 3 Nos)

Excavation of pit, foundation, erection of following Support for DSS and installation with DT numbering as per scope of work, approved drawings and specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work as per approved drawing & technical specification.

Page 65: Erection BOQ - Champaran

3 Kg 250

4

a 11 KV 45 KN Disc Insulator with hardware fittings Set 3

5 Set 1

6 Sets 1

7 No 1

8 1

9 Per DT 1

10 Set 2

Sub-Total BF R & M of Existing Distribution Substations

Erection, fixing and fitting of galvanised fabricated steel materials- channel, angle, flats of various size for DTstructures with bolts, nuts and washers etc. complete in all respect as per TS and approved drawing.

Erection, fixing and fitting, Testing and Commissioning of Porcelain Insulators with mounting hardware fittings etc. complete in all respect as per TS and approved drawing.

Erection, Testing and Commissioning of 12kV, 200A, 25kA, 3-ph, 3 Pin type, Horizontal Mounting type, Gang Operated, AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete as per technical specifications etc.complete as per technical specifications, scope of works and approved drawings

Erection, testing and commissioning of 3 pole, 12 KV HG fuse set compleete on the DSS Structue complete in all respect for 3-ph DTs

Erection, testing and Commissioning of LT Distribution box with LTCT meter (CT Ratio 200/5 A ) with bar type CTs- 200/5 A metering, Al-Bus bar of Adequate Size and LT control mechanism and connections from LV Bushings to LTDB and LTDB to LT line with Cables by providing and using Lugs,Washer etc. complete in all respect with one no. Of TPMCCB as per technical specifications for Three Phase 63 KVA Distribution Transformer.

Excavation, erection, testing and commissioning of a set of 3 Nos pipe earthing using 40 mm dia GI pipe 3000 mm long, as per IS 1161 and as per REC construction drawings complete with H/w and lugs etc by providing charcoal, salt,/Bitumen Clay in alternate layers and GI Wires 8 SWG for connections as per scope of work, approved drawings and technical specifications.(1 Set= 3 Nos earthing per DT)

Per DSS

Erection, testing and commissioning of ACSR Rabbit Conductor for jumpering by providing PG Clamps, bi-metallic connectors, hardware etc as required complete in all respect for commissioning of DSS.

Excavation and erection of galvanised Stay Set as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Page 66: Erection BOQ - Champaran

1

a No. 0.05

b No. 0.05

2 Set 0.5

3 Kg 30

4 Set 0.75

5 Sets 0.5

Excavation of pit, foundation, erection of following Support for 11 KV overhead line by providing and installing danger board and barbed Wires on DP/TP/FP Structures and DT numbering as per scope of work, approved drawings and Technical specifications: for

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification. Fixing of Danger Board on DP/TP/FP & Pole numbering.

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification. Fixing of Danger Board on DP/TP/FP & Pole numbering.

Erection, testing and Commissioning of 3-pole, Distribution Class 9 KV, 5 kA Lightening Arrester for Distribution Transformer Substation by providing and erecting Hot Dip galvanised stranded wire 7/3.15 mm as per scope of work, approved drawings and technical specifications.(1 Set = 3 Nos)

Erection, fixing and fitting of galvanised pre-fabricated steel materials- channel, angle, flats of various size for DT structures with bolts, nuts and washers etc. complete in all respect as per TS and approved drawing.

Erection, Testing and Commissioning of 12kV, 200A, 25kA, 3-ph, 3 Pin type, Horizontal Mounting type, Gang Operated, AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete as per technical specifications etc.complete as per technical specifications, scope of works and approved drawings

Erection, testing and commissioning of 3 pole, 12 KV HG fuse set compleete on the DSS Structue complete in all respect for 3-ph DTs

Page 67: Erection BOQ - Champaran

6 1

7 Per DT 1

8 Set 1

9 Per DT 1

Sub Total

BG

1 CKm 1

2

a No 25

3 Set 6

Excavation, erection, testing and commissioning of a set of 3 Nos pipe earthing using 40 mm dia GI pipe 3000 mm long, as per IS 1161 and as per REC construction drawings complete with H/w and lugs etc by providing charcoal, salt,/Bitumen Clay in alternate layers and GI Wires 8 SWG for connections as per scope of work, approved drawings and technical specifications.(1 Set= 3 Nos earthing per DT)

Per DSS

Erection, testing and commissioning of LT bus bar distribution system with kit-kat complete and jumpering Connections of 11 KV side complete by providing & using P G clamp/ connectors in all respect for commssioning of DSS.

Excavation and erection of galvanised Stay Set as per supply schedule by providing 0.2 cum cement concrete (1:4:8) PCC foundations as per scope of work, specifications and approved drawings.

Dismentling of existing dismentled materials and devolution of the dismantled materials i.e Transformer angle, channel, clamp, AB Switch, HG fuse Set etc. including storage, handling, insurance, loading, unloading, transportation to store of Utility as per the direction of Engineer-in-charge with propoer accounting as per the inventory.

Erection, testing commissioning of New LT Line on 3 phase ABC [3 X95Sq mm {Phase}+{1x70 Sq mm Messenger cum Neutral wire}] Survey, route alignment & pole spotting, preparation of survey report , Inventory after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for LT line and pole numbering as per scope of work, approved drawings and Technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification.

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Page 68: Erection BOQ - Champaran

4 Set 6

5

a Ckm 1

Sub Total

BH

1 CKm 1

2

a No 25

3 Set 6

4 Set 6

Installation, testing and commissioning of Coil Earthing by providing GI wire no.-8SWG for connections with nuts, bolts and washers as per scope of work, technical specifications and approved drawings and REC Specification(untreated).

Erection, testing and Commissioning of LT Line on AB Cables: (average span 40 to 45 m approx.) including all erection accessories required for successful erection of AB Cable Complete in all respect as per approved drawing and Technical Specification etc as required as per scope for work for Branching/termination etc.

3 phase ABC [3 X95Sq mm {Phase}+{1x70 Sq mm Messenger cum Neutral wire}]

Erection, testing commissioning of New LT Line on 3 phase ABC [3 X70Sq mm {Phase}+{1x50 Sq mm Messenger cum Neutral wire}] Survey, route alignment & pole spotting, preparation of survey report , Inventory after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for LT line and pole numbering as per scope of work, approved drawings and Technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification.

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Installation, testing and commissioning of Coil Earthing by providing GI wire no.-8SWG for connections with nuts, bolts and washers as per scope of work, technical specifications and approved drawings and REC Specification(untreated).

Page 69: Erection BOQ - Champaran

5

a Ckm 1

Sub Total

BI

1 CKm 1

2

a No 25

3 Set 6

4 Set 6

5

a Ckm 1

Sub Total

Erection, testing and Commissioning of LT Line on AB Cables: (average span 40 to 45 m approx.) including all erection accessories required for successful erection of AB Cable Complete in all respect as per approved drawing and Technical Specification etc as required as per scope for work for Branching/termination etc.

3 phase ABC [3 X70Sq mm {Phase}+{1x50 Sq mm Messenger cum Neutral wire}]

Erection, testing commissioning of New LT Line on 3 phase ABC [3 X50 Sq mm {Phase}+{1x35 Sq mm Messenger cum Neutral wire}] Survey, route alignment & pole spotting, preparation of survey report , Inventory after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for LT line and pole numbering as per scope of work, approved drawings and Technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification.

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Installation, testing and commissioning of Coil Earthing by providing GI wire no.-8SWG for connections with nuts, bolts and washers as per scope of work, technical specifications and approved drawings and REC Specification(untreated).

Erection, testing and Commissioning of LT Line on AB Cables: (average span 40 to 45 m approx.) including all erection accessories required for successful erection of AB Cable Complete in all respect as per approved drawing and Technical Specification etc as required as per scope for work for Branching/termination etc.

3 phase ABC [3 X50Sq mm {Phase}+{1x35 Sq mm Messenger cum Neutral wire}]

Page 70: Erection BOQ - Champaran

BJ

1 Route Survey Kms 1

2 No 20

4 CKM 1.00

5 Kg 50

6 Set 5

7 Set 10

Sub-Total

BK

1 Route Survey Kms 1

2 No 20

3 CKM 1.00

Construction of 3 Phase 4 Wire LT Line on 8M, 200 Kg PSC with ACSR Weasel Conductor in Vertical configuration

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work as per approved drawing & technical specification.

Erection, testing and commissioning of ACSR Weasel Conductor including mid point jointing (by providing and using PG clamps, Al Tape) and jumpering , binding of conductor with insulator, binding wire, fixing and fitting of LT PVC phase spacers etc. complete in all respect. (1 CKm= 1 km line length of 4 phase conductor)

Erection of galvanised fabricated steel materials- U clamp & stay clamp by using Bolts, Nuts, Washer etc as per approved drawing and TS

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Spiral type earthing as per REC construction drawing J-1 including supply of all materials like 8 SWG G.I. wire closely wound having 115 turns, 50mm dia & 450mm long coil (untreated without charcoal & salt) in all type of soil including excavation, refilling with earth, fixing of bolts, nuts, washers for connection with pole support/ metalic part all complete as per TS & direction of Engineer-in charge (individual pole earthing)

Construction of 3 Phase 4 Wire LT Line on 8M, 200 Kg PSC with ACSR Weasel Conductor in Horizontal configuration

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work as per approved drawing & technical specification.

Erection, testing and commissioning of ACSR Weasel Conductor including mid point jointing (by providing and using PG clamps, Al Tape) and jumpering , binding of conductor with insulator, binding wire, fixing and fitting of LT PVC phase spacers etc. complete in all respect. (1 CKm= 1 km line length of 4 phase conductor)

Page 71: Erection BOQ - Champaran

4 Kg 200

5 Set 6

6 Nos. 10

Sub-Total

BL

1 Route Survey Kms 1

2 No 20

3 CKM 1.00

4 Kg 200

5 Set 5

6 Nos. 10

Sub-Total

Erection of galvanised fabricated steel materials- angle, flats for over head line structures by using Bolts, Nuts, Washer etc as per approved drawing and TS

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Spiral type earthing as per REC construction drawing J-1 including supply of all materials like 8 SWG G.I. wire closely wound having 115 turns, 50mm dia & 450mm long coil (untreated without charcoal & salt) in all type of soil including excavation, refilling with earth, fixing of bolts, nuts, washers for connection with pole support/ metalic part all complete as per TS & direction of Engineer-in charge (individual pole earthing)

Construction of 3 Phase 4 Wire LT Line on 8M, 200 Kg PSC with ACSR Rabbit Conductor in Horizontal configuration

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work as per approved drawing & technical specification.

Erection, testing and commissioning of ACSR Rabbit Conductor including mid point jointing (by providing and using PG clamps, Al Tape) and jumpering , binding of conductor with insulator, binding wire, fixing and fitting of LT PVC phase spacers etc. complete in all respect. (1 CKm= 1 km line length of 4 phase conductor)

Erection of galvanised fabricated steel materials- angle, flats for over head line structures by using Bolts, Nuts, Washer etc as per approved drawing and TS

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Spiral type earthing as per REC construction drawing J-1 including supply of all materials like 8 SWG G.I. wire closely wound having 115 turns, 50mm dia & 450mm long coil (untreated without charcoal & salt) in all type of soil including excavation, refilling with earth, fixing of bolts, nuts, washers for connection with pole support/ metalic part all complete as per TS & direction of Engineer-in charge (individual pole earthing)

Page 72: Erection BOQ - Champaran

BM Guarding of 33 &11 KV line

1 per span 1

Sub Total

BN

1 CKm 1

2

a No 25

3 Set 6

4 Set 6

5

a Ckm 1Sub Total

Special Plan (BRGF) Phase-II PART-CCA

1 CKm 1

Erection, testing and commisiioning of Guarding & Lacing per span by using Fabricated structure, Eye hook, G. I. Wire, Bolts, nuts, washers etc. complete in all respect as per approved drawing/REC standards.

New LT Line on 1 phase ABC [1X16 Sq mm {Phase} + {1x25 Sq mm Messenger cum Neutral wire}] Survey, route alignment & pole spotting, preparation of survey report , Inventory after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for LT line and pole numbering as per scope of work, approved drawings and Technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification.

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Installation, testing and commissioning of Coil Earthing by providing GI wire no.-8SWG for connections with nuts, bolts and washers as per scope of work, technical specifications and approved drawings and REC Specification(untreated).

Erection, testing and Commissioning of LT Line on AB Cables: (average span 40 to 45 m approx.) including all erection accessories required for successful erection of AB Cable Complete in all respect as per approved drawing and Technical Specification etc as required as per scope for work for Branching/termination etc.

1 phase ABC [1 X 16 Sq mm {Phase}+{1x35 Sq mm Messenger cum Neutral wire}]

R&M of existing overhead 11 KV Line by 3 phase ABC 3X120 + 1X 100 Sq.mm

Survey, route alignment & pole spotting, preparation of survey report , Inventory after approval of Engineer-in-charge & redressal of ROW issues.

Page 73: Erection BOQ - Champaran

2

a No 10

3 Set 4

4 Set 10

5

a Ckm 1

6 Ckm 1

Sub Total

CB

1 CKm 1

Excavation of pit, foundation, erection of following Support for 11 KV line and pole numbering as per scope of work, approved drawings and Technical specifications:

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification.

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by providing 0.2 cum cement concrete (1:4:8) and 200x200x6 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Installation, testing and commissioning of Coil Earthing by providing GI wire no.-8SWG for connections with nuts, bolts and washers as per scope of work, technical specifications and approved drawings and REC Specification.

Erection, testing and Commissioning of 11 KV Line on AB Cables including all erection accessories required for successful erection of AB Cable Complete in all respect as per approved drawing and Technical Specification etc as required as per scope for work for Branching/termination etc.

3 phase ABC [3 X 120 Sq mm {Phase}+{1 X 100 Sqmm]

Dismentling of existing defective/damaged pole-support (Rail/joist/tubular),conductor and other dismantled line materials from existing line and devolution of the dismentled pole, structure, conductor and other line materials including storage, handling, insurance, loading, unloading, transportation to designated store of Utility as per the direction of Engineer-in-charge and handing over the all dismentled material to the store of Utility with propoer accounting as per the inventory.

R&M of existing overhead 11 KV Line by 3 phase ABC 3X70 + 1X 70 Sq.mmSurvey, route alignment & pole spotting, preparation of survey report , Inventory after approval of Engineer-in-charge & redressal of ROW issues.

Page 74: Erection BOQ - Champaran

2

a No 10

3 Set 4

4 Set 10

5

a Ckm 1

6 Ckm 1

Sub Total

CC

1 CKm 1

Excavation of pit, foundation, erection of following Support for 11 KV line and pole numbering as per scope of work, approved drawings and Technical specifications:

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification.

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by providing 0.2 cum cement concrete (1:4:8) and 200x200x6 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Installation, testing and commissioning of Coil Earthing by providing GI wire no.-8SWG for connections with nuts, bolts and washers as per scope of work, technical specifications and approved drawings and REC Specification.

Erection, testing and Commissioning of 11 KV Line on AB Cables including all erection accessories required for successful erection of AB Cable Complete in all respect as per approved drawing and Technical Specification etc as required as per scope for work for Branching/termination etc.

3 phase ABC [3 X 70 Sq mm {Phase}+{1 X 70 Sqmm]

Dismentling of existing defective/damaged pole-support (Rail/joist/tubular),conductor and other dismantled line materials from existing line and devolution of the dismentled pole, structure, conductor and other line materials including storage, handling, insurance, loading, unloading, transportation to designated store of Utility as per the direction of Engineer-in-charge and handing over the all dismentled material to the store of Utility with propoer accounting as per the inventory.

R&M of existing overhead 11 KV Line by 3 phase ABC 3X35 + 1X70 Sq.mm

Survey, route alignment & pole spotting, preparation of survey report , Inventory after approval of Engineer-in-charge & redressal of ROW issues.

Page 75: Erection BOQ - Champaran

2

a No 10

3 Set 4

4 Set 10

5

a Ckm 1

6 Ckm 1

Sub Total

CD

Excavation of pit, foundation, erection of following Support for 11 KV line and pole numbering as per scope of work, approved drawings and Technical specifications:

PSC Pole 9 Mtr 400 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm)with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification.

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by providing 0.2 cum cement concrete (1:4:8) and 200x200x6 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Installation, testing and commissioning of Coil Earthing by providing GI wire no.-8SWG for connections with nuts, bolts and washers as per scope of work, technical specifications and approved drawings and REC Specification.

Erection, testing and Commissioning of 11 KV Line on AB Cables including all erection accessories required for successful erection of AB Cable Complete in all respect as per approved drawing and Technical Specification etc as required as per scope for work for Branching/termination etc.

3 phase ABC [3 X 35 Sq mm {Phase}+{1 X 70 Sqmm]

Dismentling of existing defective/damaged pole-support (Rail/joist/tubular),conductor and other dismantled line materials from existing line and devolution of the dismentled pole, structure, conductor and other line materials including storage, handling, insurance, loading, unloading, transportation to designated store of Utility as per the direction of Engineer-in-charge and handing over the all dismentled material to the store of Utility with propoer accounting as per the inventory.

R & M of LT Line on 3 phase ABC [3 X95Sq mm {Phase}+{1x70 Sq mm Messenger cum Neutral wire}]

Page 76: Erection BOQ - Champaran

1 CKm 1

2

a No 10

3 Set 6

4 Set 6

5

a Ckm 1

Survey, route alignment & pole spotting, preparation of survey report , Inventory after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for LT line and pole numbering as per scope of work, approved drawings and Technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification.

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Installation, testing and commissioning of Coil Earthing by providing GI wire no.-8SWG for connections with nuts, bolts and washers as per scope of work, technical specifications and approved drawings and REC Specification(untreated).

Erection, testing and Commissioning of LT Line on AB Cables: (average span 40 to 45 m approx.) including all erection accessories required for successful erection of AB Cable Complete in all respect as per approved drawing and Technical Specification etc as required as per scope for work for Branching/termination etc.

3 phase ABC [3 X95Sq mm {Phase}+{1x70 Sq mm Messenger cum Neutral wire}]

Page 77: Erection BOQ - Champaran

6 Ckm 1

Sub Total

CE

1 CKm 1

2

a No 10

3 Set 6

4 Set 6

Dismentling of existing defective/damaged pole-support (Rail/joist/tubular),conductor and other dismantled line materials from existing line and devolution of the dismentled pole, structure, conductor and other line materials including storage, handling, insurance, loading, unloading, transportation to designated store of Utility as per the direction of Engineer-in-charge and handing over the all dismentled material to the store of Utility with propoer accounting as per the inventory.

R & M of LT Line on 3 phase ABC [3 X70Sq mm {Phase}+{1x50 Sq mm Messenger cum Neutral wire}]

Survey, route alignment & pole spotting, preparation of survey report , Inventory after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for LT line and pole numbering as per scope of work, approved drawings and Technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification.

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Installation, testing and commissioning of Coil Earthing by providing GI wire no.-8SWG for connections with nuts, bolts and washers as per scope of work, technical specifications and approved drawings and REC Specification(untreated).

Page 78: Erection BOQ - Champaran

5

a Ckm 1

6 Ckm 1

Sub Total

CF

1 CKm 1

2

a No 10

Erection, testing and Commissioning of LT Line on AB Cables: (average span 40 to 45 m approx.) including all erection accessories required for successful erection of AB Cable Complete in all respect as per approved drawing and Technical Specification etc as required as per scope for work for Branching/termination etc.

3 phase ABC [3 X70Sq mm {Phase}+{1x50 Sq mm Messenger cum Neutral wire}]

Dismentling of existing defective/damaged pole-support (Rail/joist/tubular),conductor and other dismantled line materials from existing line and devolution of the dismentled pole, structure, conductor and other line materials including storage, handling, insurance, loading, unloading, transportation to designated store of Utility as per the direction of Engineer-in-charge and handing over the all dismentled material to the store of Utility with propoer accounting as per the inventory.

R &M of LT Line on 3 phase ABC [3 X50Sq mm {Phase}+{1x35 Sq mm Messenger cum Neutral wire}]

Survey, route alignment & pole spotting, preparation of survey report , Inventory after approval of Engineer-in-charge & redressal of ROW issues.

Excavation of pit, foundation, erection of following Support for LT line and pole numbering as per scope of work, approved drawings and Technical specifications:

PSC Pole 8 Mtr 200 Kg including fixing of (RCC Base Plate of size 500x500x100 mm./Stone Base Plate of Size 450x450x50mm) with brick blast or boulder refilling (50% depth of pole pit) and ramming foundation with excavated soil with pouring water as required as per scope of work , approved drawing & technical specification.

Page 79: Erection BOQ - Champaran

3 Set 6

4 Set 6

5

a Ckm 1

6 Ckm 1

Sub Total Total Part C

Grand TOTAL

Excavation and erection of galvanised Stay Set with 50x10 mm stay clamp, LT stay guy insulator, nut bolts, turn buckles, 1.8 m long, 16 mm diameter solid GS stay rod & 7/12 SWG dia GI stranded wire by using Stone stay plate 450x450x50 mm Stay plate foundations as per scope of work, specifications and approved drawings.

Installation, testing and commissioning of Coil Earthing by providing GI wire no.-8SWG for connections with nuts, bolts and washers as per scope of work, technical specifications and approved drawings and REC Specification(untreated).

Erection, testing and Commissioning of LT Line on AB Cables: (average span 40 to 45 m approx.) including all erection accessories required for successful erection of AB Cable Complete in all respect as per approved drawing and Technical Specification etc as required as per scope for work for Branching/termination etc.

3 phase ABC [3 X50Sq mm {Phase}+{1x35 Sq mm Messenger cum Neutral wire}]

Dismentling of existing defective/damaged pole-support (Rail/joist/tubular),conductor and other dismantled line materials from existing line and devolution of the dismentled pole, structure, conductor and other line materials including storage, handling, insurance, loading, unloading, transportation to designated store of Utility as per the direction of Engineer-in-charge and handing over the all dismentled material to the store of Utility with propoer accounting as per the inventory.

Page 80: Erection BOQ - Champaran

Schedule 3: Erection Price Component

Districts: East Champaran and West Champaran0

/PR/NBPDCL/2

7=5+6 8 9 10=8+911=7x10

2

2 0 0

4800 0 0

Name of Work: “Strengthening Of Distribution Network in Bihar Under Special Plan (BRGF) Phase-II, Balance Work Of Phase-I for 17 districts and Phase-II-Part-C for all 21 Districts of North Bihar under Special Plan (BRGF) Schemes

Total Quantity

Unit Price for

Erection

Unit Service

tax

Unit Charges includin

g Erection and

Service Tax

Total Price for

Erection

Page 81: Erection BOQ - Champaran

1200 0 0

400 0 0

80 0 0

320 0 0

240 0 0

Page 82: Erection BOQ - Champaran

100 0 0

120 0 0

20 0 0

100 0 0

2 0 0

Page 83: Erection BOQ - Champaran

4 0 0

2 0 0

32 0 0

Page 84: Erection BOQ - Champaran

8 0 0

4 0 0

4 0 0

18 0 0

8 0 0

Page 85: Erection BOQ - Champaran

18 0 0

4 0 0

4 0 0

18 0 0

2 0 0

2 0 0

Page 86: Erection BOQ - Champaran

2 0 0

2 0 0

2 0 0

4 0 0

4 0 0

1 0 0

80 0 0

2 0 0

2 0 0

2 0 0

Page 87: Erection BOQ - Champaran

0

0 0 0

4 0 0

2 0 0

1 0 0

1.8 0 0

0.2 0 0

18 0 0

100 0 0

0

4

4 0 0 0 0

Page 88: Erection BOQ - Champaran

9600 0 0 0 0

2400 0 0 0 0

800 0 0 0 0

160 0 0 0 0

640 0 0 0 0

Page 89: Erection BOQ - Champaran

480 0 0 0 0

200 0 0 0 0

0 0

240 0 0 0 0

40 0 0 0 0

200 0 0 0 0

Page 90: Erection BOQ - Champaran

4 0 0 0 0

8 0 0

4 0 0 0 0

56 0 0 0 0

Page 91: Erection BOQ - Champaran

16 0 0 0 0

0 0

8 0 0 0 0

8 0 0 0 0

36 0 0 0 0

16 0 0 0 0

Page 92: Erection BOQ - Champaran

20 0 0 0 0

8 0 0 0 0

0 0

8 0 0 0 0

20 0 0 0 0

4 0 0 0 0

4 0 0 0 0

Page 93: Erection BOQ - Champaran

4 0 0 0 0

4 0 0 0 0

4 0 0 0 0

0 0

8 0 0 0 0

8 0 0 0 0

2 0 0 0 0

160 0 0 0 0

4 0 0 0 0

4 0 0 0 0

4 0 0 0 0

Page 94: Erection BOQ - Champaran

0 0

8 0 0 0 0

0 0 0 0 0

4 0 0 0 0

0 0

2 0 0 0 0

2.4 0 0 0 0

0.4 0 0 0 0

20 0 0 0 0

200 0 0 0 0

0

1

0

0

0

Page 95: Erection BOQ - Champaran

0

0

0

1

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

Page 96: Erection BOQ - Champaran

0 0

1 0 0 0 0

0 0 0 0 0

0 0 0

0 0 0

0 0 0

Page 97: Erection BOQ - Champaran

0 0 0 0 0

1 0 0 0 0

0 0

1 0 0 0 0

2 0 0 0 0

Page 98: Erection BOQ - Champaran

1 0 0

1 0 0

1 0 0

1 0 0

2 0 0

Page 99: Erection BOQ - Champaran

1 0 0

0

127.31 0

127.31 0 0

2292 0 0

89117 0 0

127 0 0

764 0 0

6493 0 0

Page 100: Erection BOQ - Champaran

127 0 0

2037 0 0

764 0 0

13 0 0 0 0

0

23.65

23.65 0 0 0 0

118 0 0

Page 101: Erection BOQ - Champaran

47.3 0 0 0 0

24 0 0

7095 0 0 0 0

23.65 0 0 0 0

142 0 0 0 0

710 0 0 0 0

24 0 0 0 0

Page 102: Erection BOQ - Champaran

189 0 0 0 0

142 0 0 0 0

23.65 0 0

0

3

7.5 0 0 0 0

3 0 0 0 0

Page 103: Erection BOQ - Champaran

3 0 0 0 0

6 0 0 0 0

3 0 0 0 0

3 0 0 0 0

3 0 0

18 0 0 0 0

Page 104: Erection BOQ - Champaran

15 0 0 0 0

0

1

115 0 0

04

4 0 0

0

29.13

29.13 0 0

Page 105: Erection BOQ - Champaran

466 0 0 0 0

12380 0 0 0 0

29.13 0 0

174.78 0 0

1310.85 0 0

29 0 0 0 0

408 0 0 0 0

175 0 0 0 0

3 0 0

0

29.13

Page 106: Erection BOQ - Champaran

29.13 0 0 0 0

583 0 0 0 0

32043 0 0 0 0

58.26 0 0 0 0

350 0 0 0 0

3321 0 0 0 0

29 0 0 0 0

524 0 0 0 0

233 0 0 0 0

Page 107: Erection BOQ - Champaran

0

203.91

203.91 0 0 0 0

4078 0 0 0 0

74427 0 0 0 0

203.91 0 0 0 0

1223 0 0 0 0

11623 0 0 0 0

0 0 0 0 0

204 0 0 0 0

Page 108: Erection BOQ - Champaran

3670 0 0 0 0

1223 0 0 0 0

20 0 0 0 0

0

354.79

354.79 0 0 0 0

6386 0 0 0 0

129498 0 0 0 0

354.79 0 0

Page 109: Erection BOQ - Champaran

2128.74 0 0 0 0

18094 0 0 0 0

0 0

355 0 0 0 0

5677 0 0 0 0

2129 0 0 0 0

35 0 0 0 0

0

532.19

532.19 0 0 0 0

9579 0 0

Page 110: Erection BOQ - Champaran

194249 0 0 0 0

532.19 0 0 0 0

3193.14 0 0 0 0

27142 0 0 0 0

532 0 0 0 0

8515 0 0 0 0

3193 0 0 0 0

53 0 0 0 0

0

0

0 0 0 0 0

Page 111: Erection BOQ - Champaran

0 0 0 0 0

0 0 0 0 0

0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

Page 112: Erection BOQ - Champaran

0 0 0 0 0

0

36.4

36.4 0 0

36 0 0 0 0

73 0 0 0 0

1820 0 0 0 0

36.4 0 0 0 0

109 0 0 0 0

Page 113: Erection BOQ - Champaran

546 0 0 0 0

36 0 0 0 0

109 0 0 0 0

73 0 0 0 0

36.4 0 0

0

54.6

54.6 0 0 0 0

164 0 0 0 0

Page 114: Erection BOQ - Champaran

2730 0 0 0 0

54.6 0 0 0 0

164 0 0 0 0

983 0 0 0 0

55 0 0 0 0

164 0 0 0 0

109 0 0 0 0

54.6 0 0 0 0

0

0

Page 115: Erection BOQ - Champaran

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

Page 116: Erection BOQ - Champaran

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

011

11 0 0

01

0.115 0 0

06

Page 117: Erection BOQ - Champaran

15 0 0 0 0

6 0 0

12 0 0 0 0

6 0 0 0 0

6 0 0 0 0

6 0 0 0 0

Page 118: Erection BOQ - Champaran

6 0 0

36 0 0 0 0

30 0 0 0 0

06

6 0 0

6 0 0

0

49

Page 119: Erection BOQ - Champaran

49 0 0

49 0 0

98 0 0 0 0

13720 0 0 0 0

147 0 0 0 0

49 0 0

49 0 0

49 0 0

Page 120: Erection BOQ - Champaran

49 0 0

49 0 0

98 0 0 0 0

0

114

114 0 0 0 0

114 0 0 0 0

228 0 0 0 0

Page 121: Erection BOQ - Champaran

30210 0 0 0 0

342 0 0 0 0

114 0 0 0 0

114 0 0 0 0

114 0 0 0 0

114 0 0 0 0

114 0 0 0 0

228 0 0 0 0

0

Page 122: Erection BOQ - Champaran

127

127 0 0

127 0 0 0 0

0 0

254 0 0 0 0

31750 0 0 0 0

381 0 0 0 0

127 0 0 0 0

127 0 0 0 0

Page 123: Erection BOQ - Champaran

127 0 0

127 0 0 0 0

127 0 0

254 0 0 0 0

0

127

127 0 0 0 0

127 0 0 0 0

Page 124: Erection BOQ - Champaran

254 0 0 0 0

31750 0 0 0 0

381 0 0 0 0

127 0 0 0 0

127 0 0 0 0

127 0 0 0 0

127 0 0 0 0

Page 125: Erection BOQ - Champaran

127 0 0 0 0

254 0 0 0 0

0

213

213 0 0

213 0 0 0 0

426 0 0 0 0

53250 0 0 0 0

639 0 0 0 0

Page 126: Erection BOQ - Champaran

213 0 0 0 0

213 0 0 0 0

213 0 0 0 0

213 0 0 0 0

213 0 0 0 0

426 0 0 0 0

0

89

89 0 0 0 0

Page 127: Erection BOQ - Champaran

89 0 0

0

154

154 0 0 0 0

154 0 0

0

76

76 0 0

76 0 0 0 0

0313

Page 128: Erection BOQ - Champaran

16 0 0 0 0

16 0 0 0 0

313 0 0 0 0

9390 0 0 0 0

235 0 0 0 0

157 0 0 0 0

Page 129: Erection BOQ - Champaran

313 0 0 0 0

313 0 0

313 0 0 0 0

313 0 0

0

245.13

245.13 0 0

4903 0 0 0 0

245.13 0 0

12256.5 0 0 0 0

Page 130: Erection BOQ - Champaran

1226 0 0

2451 0 0 0 0

0

571.97

571.97 0 0 0 0

11439.4 0 0 0 0

571.97 0 0 0 0

114394 0 0 0 0

3431.82 0 0 0 0

Page 131: Erection BOQ - Champaran

5719.7 0 0 0 0

0

0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0

0

0 0 0

Page 132: Erection BOQ - Champaran

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0

0

0

0 0 0 0 0

Page 133: Erection BOQ - Champaran

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0

275.3

275.3 0 0 0 0

Page 134: Erection BOQ - Champaran

551 0 0 0 0

275.3 0 0 0 0

55060 0 0 0 0

551 0 0 0 0

1376 0 0 0 0

275.3 0 0 0 0

0

14.93

14.93 0 0 0 0

Page 135: Erection BOQ - Champaran

373 0 0 0 0

90 0 0 0 0

90 0 0 0 0

14.93 0 0

0

27.88

Page 136: Erection BOQ - Champaran

27.88 0 0 0 0

697 0 0 0 0

167 0 0 0 0

167 0 0 0 0

27.88 0 0

0

Page 137: Erection BOQ - Champaran

104.57

104.57 0 0 0 0

2614 0 0 0 0

627 0 0 0 0

627 0 0 0 0

Page 138: Erection BOQ - Champaran

104.57 0 0

0

2

2 0 0 0 0

50 0 0 0 0

12 0 0 0 0

12 0 0 0 0

Page 139: Erection BOQ - Champaran

2 0 0

00

BALANCE PART OF PHASE-I

119

119 0 0 0 0

119 0 0 0 0

0

67

67 0 0 0 0

Page 140: Erection BOQ - Champaran

67 0 0 0 0

0

0

0 0 0 0 0

0 0 0 0 0

0 0

0 0 0 0 0

0 0 0 0 0

0 0

0 0 0 0 0

Page 141: Erection BOQ - Champaran

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0

30

30 0 0

Page 142: Erection BOQ - Champaran

30 0 0 0 0

60 0 0 0 0

7500 0 0 0 0

90 0 0 0 0

30 0 0 0 0

30 0 0 0 0

30 0 0 0 0

Page 143: Erection BOQ - Champaran

30 0 0 0 0

30 0 0 0 0

60 0 0 0 0

0

30

30 0 0 0 0

30 0 0 0 0

0 0

60 0 0 0 0

Page 144: Erection BOQ - Champaran

7500 0 0 0 0

0 0

90 0 0 0 0

30 0 0 0 0

30 0 0 0 0

30 0 0 0 0

30 0 0 0 0

30 0 0 0 0

60 0 0 0 0

01650

Page 145: Erection BOQ - Champaran

83 0 0 0 0

83 0 0 0 0

825 0 0 0 0

49500 0 0 0 0

1238 0 0 0 0

825 0 0 0 0

Page 146: Erection BOQ - Champaran

1650 0 0 0 0

1650 0 0 0 0

1650 0 0 0 0

1650 0 0 0 0

0

11.66

11.66 0 0 0 0

292 0 0 0 0

70 0 0 0 0

Page 147: Erection BOQ - Champaran

70 0 0 0 0

11.66 0 0 0 0

0

21.32

21.32 0 0 0 0

533 0 0 0 0

128 0 0 0 0

128 0 0 0 0

Page 148: Erection BOQ - Champaran

21.32 0 0 0 0

0

81.64

81.64 0 0 0 0

2041 0 0 0 0

490 0 0 0 0

490 0 0 0 0

81.64 0 0 0 0

0

Page 149: Erection BOQ - Champaran

36.74

36.74 0 0 0 0

735 0 0 0 0

36.74 0 0 0 0

1837 0 0 0 0

184 0 0 0 0

367 0 0 0 0

0

85.73

85.73 0 0 0 0

1715 0 0 0 0

85.73 0 0 0 0

Page 150: Erection BOQ - Champaran

17146 0 0 0 0

514 0 0 0 0

857 0 0 0 0

0

52.48

52.48 0 0 0 0

1050 0 0 0 0

52.48 0 0 0 0

10496 0 0 0 0

262 0 0 0 0

525 0 0 0 0

0

Page 151: Erection BOQ - Champaran

200

200 0 0

0

2

2 0 0 0 0

0 0

50 0 0 0 0

12 0 0 0 0

12 0 0 0 0

0 0

2 0 0 0 0

00

Special Plan (BRGF) Phase-II PART-C25

25 0 0 0 0

Page 152: Erection BOQ - Champaran

250 0 0 0 0

100 0 0 0 0

250 0 0 0 0

25 0 0

25 0 0 0 0

0

25

25 0 0 0 0

Page 153: Erection BOQ - Champaran

250 0 0 0 0

100 0 0 0 0

250 0 0 0 0

25 0 0

25 0 0 0 0

0

75

75 0 0 0 0

Page 154: Erection BOQ - Champaran

750 0 0 0 0

300 0 0 0 0

750 0 0 0 0

75 0 0

75 0 0 0 0

0

116

Page 155: Erection BOQ - Champaran

116 0 0 0 0

1160 0 0 0 0

696 0 0 0 0

696 0 0 0 0

116 0 0 0 0

Page 156: Erection BOQ - Champaran

116 0 0 0 0

0

290

290 0 0 0 0

2900 0 0 0 0

1740 0 0 0 0

1740 0 0 0 0

Page 157: Erection BOQ - Champaran

290 0 0 0 0

290 0 0 0 0

0

174

174 0 0 0 0

1740 0 0 0 0

Page 158: Erection BOQ - Champaran

1044 0 0 0 0

1044 0 0 0 0

174 0 0 0 0

174 0 0 0 0

00

0