    HOSPITAL COMPLEX FOR PAKISTAN KIDNEY & LIVER INSTITUTE AND RESEAR

    Volume - II a

    for 

    Bill of Quantities (ADDENDUM #1)

    Electrical Works

    FINAL DESIGN AND TENDER DOCUMENTS

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    2/147

    arcop Page 1 of 1

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Content

    Lahore, Pakistan.

    S. NO. DESCRIPTION PAGE NO.

    1 GRAND SUMMARY Page 1 of 1

    2 BILL OF QUANTITIES - DIVISION 14 - CONVEYING EQUIPMENTS Page 1 of 2

    3 BILL OF QUANTITIES - DIVISION 25 - INTEGRATED AUTOMATION (BMS) Page 1 of 14

    4 BILL OF QUANTITIES - DIVISION 26 - ELECTRICAL Page 1 of 67

    5 BILL OF QUANTITIES - DIVISION 27 - COMM UNICATION Page 1 of 18

    6 BILL OF QUANTITIES - DIVISION 28 - ELECTRONIC SAFETY & SECURITY Page 1 of 8

    7 BILL OF QUANTITIES - DIVISION - MISCELLANEOUS ITEMS Page 1 of 15

    8 LISTOF APPROVED MANUFACTURER Page 1 of 13

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    3/147

    arcop Page 1 of 1

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore, Pakistan.

    AMOUNT

    Rs.

    AMOUNT

    Rs.

    AMOUNT

    Rs.

    (1) (2) (3) (1+2+3)

    DIVISION 14 CONVEYING EQUIPMENTS

    DIVISION 25 INTEGRATED AUTOMATION (BMS)

    DIVISION 26 ELECTRICAL

    DIVISION 27 COMMUNICATIONS

    DIVISION 28 ELECTRONIC SAFETY & SECURITY

    MISC. ITEMS MISCELLANEOUS ITEMS

    TOTAL OF DIVISION 14 TO MISC.

    Note:

    ● Contractor is advised to confirm the cable running lengths and termination as per site conditions before procurement of cables / commencement of work.

    ● The electrical contractor is to ensure the length limit for IT copper cables which should not exceed from 90 meter. If the length exceeds the limit then the electrical contractor should inform the architect and electrical consultant to

    rectify the issue.

    ● Owner can supply any material of Contractor scope at any stage and its cost will be completely deleted from Contractor scope without any kind of adjustment.

    ● Contractor should mark the selected brands and vendors in approved manufacturers list with submission of Tender Documents. Cost must be as per latest model and advanced technology.

    ● Owner / Consultant have all the r ights to select any brand / vendor from provided approved manufacturer list, Contractor shall not finalize any brand / vendor without written approval from consultant / owner.

    ● Cost of Shifting of material from warehouse or from any where at site must be included in quoted price and no other charges will be claimed.

    ● Preparation of shop drawings is compulsory before execution of work as per requirement of consultant's design and site during project execution with coordination of all other services.

    ● Submission of As-built drawings (2 sets) after work completion of each floor and 3 sets & soft copy of complete electrical works after final commissioning of project. Approval of final bills are subject to approval of As-built drawings.

    ● Cable penetrations through walls should be effectively sealed with FM approved fire-rated sealants of equipment fire-rating as the walls. Cable trenches which cross under the base of such walls should also be similarly sealed.

    ● Insulation Resistance Test , Earthing Resistance Test and Fluke testing reports are mandatory and final bill will not be processed by client / consultant until or unless reports received.

    ● Phase balancing is in the scope of contractor. Proper load balancing, charts to be provided for each Distribution board.

    ● Contractors are reequired to include all applicable Taxes, levies etc. as per prevailing Government rules and requlations, in the given quotation.

    ● All the taxes / levies which are included in the given quotation shall be mentioned clearly.

    ● After Bid opening / Bid disclosure no deviation in the provided data from the contractor shall be accepted.

    PARKING BUILDING

    (P2, P1 & Ground to

    First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor

    & Ground to 10th Floor)

    ELECTRICAL WORKSGRAND SUMMARY (ADDENDUM # 1)

    (Block 10)ENERGY CENTER

    (U.G.Tank, MEP Corridor /

    Sub-Station, Lower Ground,

    Ground & First Floor)

    AMOUNT

    Rs.DIVISION # DIVISIONS

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    4/147

     

    DIVISION – 14CONVEYING EQUIPMENT

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    5/147arcop Page 1 of 2

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 14 : Conveying Equipment

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    14 00 00 CONVEYING EQUIPMENTS

    Supply, installation, testing and commissioning of Electric Passenger /

    Hospital Bed / Service Elevators to carry the specified load serving landing

    complete with gearless electric motor, VVVF drive controller, car and

    landing doors assemblies, automatic push button control system, landing

    controls alarm, telephone and all additional features, interior design

    complete, including complete connectionsand control panel ventilation

    installation, elevator car guides, buffers, suspension system , counterweight

    and safetyspeed governorsystem,c omplete and fitted in to elevator shaft

    all as described in the spec ification as per cod e EN-81.

    14 00 00.13

    VL-01 to VL-03

    13-Persons (1000 Kg), Gearless Motor with VVVF control

    Passenger Elevators, 1.75 m/sec speed

    No. - - - 3 - - -

    14 00 00.16

    SL-01-01 to SL-01-02

    18-Persons (1350 Kg). Gearless Motor with VVVF control

    Passenger Elevators, 1.75 m/sec speed

    No. - - - 2 - - -

    14 00 00.19

    SL-02-01 to SL-02-02 Fire Rated

    21-Persons (1600 Kg), Gearless Motor with VVVF control

    Passenger Elevators, 1.75 m/sec speed

    No. - - - 2 - - -

    14 00 00.23

    BL-01 to BL-02

    1750 Kg, Gearless Motor with VVVF control

    Capsule Elevator, 1.0 m/sec speed

    No. - - - 2 - - -

    14 00 00.26

    SRV-01

    2000 Kg, Gearless Motor with VVVF control

    Capsule Elevator, 1.0 m/sec speed

    No. - - - 1 - - -

    14 00 00.29

    SL-03-02 to SL-03-04

    21-Persons (1600 Kg). Gearless Motor with VVVF control

    Passenger Elevators, 1.75 m/sec speed

    No. - - - 3 - - -

    14 00 00.33

    CL-01 to CL-04

    1600 Kg, Gearless Motor with VVVF control

    Passenger Elevators, 1.75 m/sec speed

    No. - - - 4 - - -

    Note:

    - All the e levators are based on latest versions of EN-81 standard and EN-81-

    58 for SL-02-01 and SL-02-02.

    - All the civil work related with elevators must be carried out by civil

    contractor.

    - Refer specification sheet of individual elevators attached in

    specifica tions.The Bidder shall provide the comp lete Technica l Literature.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    6/147

    arcop Page 2 of 2

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 14 : Conveying Equipment

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    Supply, installation, testing and commissioning of electric moving escalator

    specified size complete with electric motor, VVVF drive controller, pallets,

    balustrades, skirt plate, hand rail guide, PVC hand rail, comb, floor plate,

    exterior Hairline finish cladding for entire pallets drive and control panel,

    safeties as mentioned in schedule, powerand control wiring and cables

    ready to operate. Complete accessories as per selection mentioned in

    specifications a s per EN-115.

    14 00 00.36

    Indoor Type Escalator, 0.5 m/sec speed (9000 Kg) with VVVF c ontrol

    Horizontal Distance 40', 18' Rise, 30 deg Inclina tion.

    Balustrade Height 3'-4" , W-1000 (Compact Type)

    No. - - - 2 - - -

    Note:

    - All the escalato rs are ba sed on latest versions of EN-115 standard.- All the civil work related with escalators must be carried out by civil

    contractor.

    - Refer specification sheet of individual escala tors attac hed in

    specifications.

    Total 14 00 00

    ( CARRIED FORWARD TO SUMMARY)

    TOTAL OF DIVISION - 14

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    7/147

     

    DIVISION – 25INTEGRATED AUTOMATION (BMS) 

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    8/147

    arcop Page 1 of 14

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    25 08 00 COMMISSIONING OF INTEGRATED AUTOMATION

    Supply, installation, testing and commissioning of Integrated Automation

    (BMS), comprising of following equipments based on communication

    protocol Modbus RTU including all accessories required for the completion

    of the system in all respects with manufacturer's instructions, devices and

    equipment as per specifications and drawings to complete the system.

    (For Detail Refer Drawing #BMS-02)

    25 08 00.13

    All Integrated Automation control systemwith automation server, enterprise

    server, networko perator workstation,DDC controllers,network architecture

    and smart structure shall perform all monitoring and controlsas specified in

    the Technical Specifica tions.

     J ob - - - 1 1

    25 08 00.16All required interfacing and interconnection work with high performance

    Ethernet network based on TCP/IP protoc ol. J ob - - - 1 1

    25 08 00.19

    Programming, testing and commissioning of the complete system as per

    client's requirements permissible for the FACP with training sessions of 

    maintenance personnel's.

     J ob - - - 1 1

    25 08 00.23

    Allow for any other item required forcompletionof system not covered in

    BOQ or specifications/ drawingsin accordance with the same standards

    and brands shown and approved by consultant. All such items shall be

    covered in this item but complete description, item rates, quantity required

    and brands shall be mentioned separately and to be attached with the

    BOQ.

     J ob - - - 1 1

    Total 25 08 00

    ( CARRIED FORWARD TO SUMMARY)

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    9/147

    arcop Page 2 of 14

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    25 32 00INTEGRATED AUTOMATION FOR CONVEYING EQUIPMENT

    (VERTICAL TRANSPORTSYSTEM)

    Supply, installation, testing and commissioning of Integrated Vertical

    Transportation System, comprising of following equipments based on

    communication protocol Modbus RTU including all accessories required for

    the completion of the system in all respects with manufacturer'sinstructions,

    devices and equipmentas perspecificationsand drawingsto completethe

    system.

    (For Detail Refer Drawing #BMS-08)

    25 32 00.13 Ethernet Dual-speed HUBwith multiport I/O as per the drawing. No. - - - 12 - - -

    25 32 00.16 24-port Network Switch for device communica tion with main server system. No. - - - 3 - - -

    Control Panel/G ateway for communication of vertical transport system.

    25 32 00.19 Elevators No. - - - 17 - - -

    25 32 00.23 Escalators No. - - - 2 - - -

    25 32 00.26

    Supply and wiring for Vertical Transport System with 4 Pair Shielded

    Communication wire in 25mm dia pvc conduit and other accessories.

    Complete in all respect, as per drawings.

    Rm. - - - 250 - - -

    25 32 00.29

    Supply and wiringforinterconnectingVertical TransportSystem from itsmain

    controller/PC to BMS Server with control cable in 25mm dia pvc conduit

    and o ther acc essories. Co mplete in all respect, as per drawings.

    Rm. - - - 1,050 - - -

    Note:

    * Control Panel/Gateway is only applicable if the provided Vertical

     Transport Panel not workable.

    * BMS Contracto r is advise to verify the cable running leng th and

    termination as per site conditions before commence of work.

    * BMS Contractor is also advise to verify control pane l before bidd ing.

    * BMS Contractor shall provide technical data for all the equipment used.

    Total 25 32 00

    ( CARRIED FORWARD TO SUMMARY)

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    10/147

    arcop Page 3 of 14

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    25 32 13INTEGRATED AUTOMATION FOR CONVEYING EQUIPMENT

    (PARKING MANAGEMENTSYSTEM)

    Supply, installation, testing and commissioning of Integrated Parking

    Management System, comprising of following equipments based on

    communication protocol Modbus RTU including all accessories required for

    the completion of the system in all respects with manufacturer'sinstructions,

    devicesand equipmentas perspecificationsand drawingsto completethe

    system.

    (For Detail Refer Drawing #BMS-07)

    25 32 13.1316-Port Local Area Network Switch for interconnecting main PC in Parking

    management room to BMS Server at First Floor. J ob. 1 - - - - - -

    25 32 13.16 System Manager Module to directly co mmunicate to Public Address System. No. 1 - - - - - -

    25 32 13.19

    Supply and wiring for interconnecting ParkingManagementSystem from its

    main controller to BMS Server with control cable in 25mm dia pvc conduit

    and o ther acc essories. Co mplete in all respect, as per drawings.

    Rm. 625 - - - - - -

    Note:

    * BMS Contractor shall provide technical data for all the equipment used.

    Total 25 32 13

    ( CARRIED FORWARD TO SUMMARY)

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    11/147

    arcop Page 4 of 14

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    25 36 13INTEGRATED AUTOMATION FOR POWER METERS

    (ENERGY MANAGEMENTSYSTEM)

    Supply, installation, testing and commissioning of Integrated Energy

    Management System, comprising of following equipments based on

    communication protocol Modbus RTU including all accessories required for

    the completion of the system in all respects with manufacturer'sinstructions,

    devicesand equipmentas perspecificationsand drawingsto completethe

    system.

    (For Detail Refer Drawing #BMS-03)

    25 36 13.13

    Energy Analyser in Distribution Panels for measuring the required electrical

    parameters including its required rating Current Transducer.

    Class 0.2 (current ac co rding to IEC 61557-12)

    Class 0.2 (voltage acc ording to IEC 61557-12)Class 0.5 (power fac tor ac co rding to IEC 61557-12)

    Class 0.5S (reac tive energy acc ording to IEC 62053-24)

    Class 0.2 (ac tive power acco rding to IEC 61557-12)

    Class 0.2 (ac tive energy ac co rding to ANSI C12.20)

    Class 0.2S (ac tive energy a cc ording to IEC 62053-22)

    Power quality monitoring IEC 62586

    Programmablity (logic and math functions)

    Voltage sag and swell detection

    Waveform capture

    Harmonic distortion

    Up to the 63rd harmonic

    Power quality measurement IEC 61000-4-30 : class S

    Compliance report EN 50160

    Safety Construction C SA C22.2 No 61010-1 : CAT III, 347...600 V ed. 3

    UL 61010-1 : CAT III, 347...600 V ed. 3

    EN 61010-1 : CATIII, 400...690 V ed. 3

    IEC 61010-1 : CA TIII, 400...690 V ed . 3

    IP30 (body) co nforming to IEC 60529IP54 (front) confo rming to IEC 60529

    No. 6 75 15

    25 36 13.16

    Electronic Relay in Distribution Panels for measuring the required electrical

    parameters and controlling the circuit breaker.

    Zelio Timer Relays to master your time in all simplic ity !

    A c omplete range o f Timers combining simplicity, reliability and flexibility

    Zelio Timers Relays isa complete and high performance electronic timers

    offer. It’s designed for hard-wired logic automated system to complement

    industrial programmable lo gic controllers(PLC).

    Industry, infrastructure, building, e tc.

    Standard motor protection

    Line protection

    Motor overload, stalling, loss of phase protection

    No. 1 22 2

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    12/147

    arcop Page 5 of 14

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    25 36 13.19

    Gateway in Distribution Panels for communication and data exchange

    between devices and BMS server.

    MO DBUS RTU OVER TCP/ IP

    Ethernet Mod busTCP/ IP to RS485 or RS232 gateway

    RS485 or RS232 Modbus serial master to Ethernet Mod busTCP/ IP

    10/100Base-Tx Ethernet port

    RS485 / RS232 serial port, op tica lly isolated

    2-wire and 4-wire compatibility

    Support for serial master to ModbusTCP/ IP routing

    P30, DIN rail mounted enclo sure

    Web Interface for configuration, diagnostic and maintenance

    Advanced securitythrough ModbusTCP/IP filtering with configurable access

    levels (read-only or full acc ess)

    Secure user interface includ ing user's name & password log-in.

    User interface in English, French, G erman, and SpanishControl power through PoE (Power over Ethernet) or 24 Vdc power source

    Rated for use in industrial environments (-25 to 70oC)

    No. 1 22 1

    25 36 13.23

    24-Port Local Area Network Switch for gateway communication with BMS

    server.

    10BASE-T: ca vo a 2 copp ie UTP/STP CA T3, CAT4 o

    CA T5 EIA/TIA 568 100 (100 M)

    100BASE-TX: ca vo a 2 coppie UTP/STP CAT5 EIA/TIA 568 100.

    No. 1 1 1

    25 36 13.26

    Supply andwiringforRS-485 orBelden Cable in25mm dia PVC conduitand

    other accessories from individual device to gateway. Comp le te in a ll

    respect, as per draw ings.

    Rm. 300 3,750 500

    25 36 13.29

    Supply and wiring for CAT-6 Cable in 25mm dia pvc conduit and other

    acc essories from individual gateway to network switch. Complete in all

    respect, as per draw ings.

    Rm. 150 1,900 350

    25 36 13.33

    Supply and wiring forinterconnecting Energy Management Systemfrom its

    main controller/PC to BMS Server with contro l cable in 25mm dia pvc

    conduit and other accessories. Complete in all respect, as per drawings.

     J ob. - - - 1 - - -

    25 36 13.36

    Software: Struxuwrae Power Monitoring System 7.2 or latest version SPM

    Complete software with 75device for Energy analyzer, Server, Engineering

    and we b c lient license.

     J ob. - - - 1 - - -

    25 36 13.39Programmable Logic ControllerPLC (40I/Os) witha cc essories for Substation-

    1.No. - - - 1 - - -

    25 36 13.43 Control Panel No. - - - 1 - - -

    Note:

    * BMS Contracto r is advise to verify the cable running leng th and

    termination as per site conditions before commence of work.

    * BMS Contractor shall provide technical data for all the equipment used.

    Total 25 36 13

    ( CARRIED FORWARD TO SUMMARY)

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    13/147

    arcop Page 6 of 14

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    25 36 26INTEGRATED AUTOMATION FOR LIGHTING RELAYS

    (LIGHTING CONTROL SYSTEM)

    Supply, installation, testing and commissioning of Integrated LightingControl

    System, comprising of following equipments based on communication

    protocol Modbus RTU including all accessories required for the completion

    of the system in all respects with manufacturer's instructions, devices and

    equipment as per specifications and drawings to complete the system.

    (For Detail Refer Drawing #BMS-06)

    25 36 26.1316-PortLocal Area NetworkSwitch forintegrationand interconnecting main

    Lighting C ontrol PC/ Touch Screen to BMS Server. J ob. 1 1 1

    25 36 26.16Network Bridge for seperating individual sub-stations/network cloud or

    where applicable.No. 1 1 1

    25 36 26.19

    Supply and wiring for CAT-5e Cable in 25mm dia pvc conduit and other

    acc essoriesfrom relaytorelayand from touch screentorelay. Complete in

    all respect, as per drawings.

    Rm. 550 2,500 175

    25 36 26.23

    Supply and wiring for interconnecting Lighting Control System from its main

    controller/PC to BMS Server with control cable in 25mm dia pvc conduit

    and o ther acc essories. Co mplete in all respect, as per drawings.

    Rm. 440 750 100

    Note:

    * BMS Contractor is advise to verify the cable running length and

    termination as per site conditions before commence of work.

    * BMS Contractor shall provide technical data for all the equipment used.

    * BMS Contractor will submit detail description of all items required to

    complete job.

    Total 25 36 26

    ( CARRIED FORWARD TO SUMMARY)

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    14/147

    arcop Page 7 of 14

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    25 36 29INTEGRATED AUTOMATION FORUPSMONITORS(UNINTERRUPTIBLE POWER

    SUPPLY)

    Supply, installation, testing and commissioning of Integrated UPS System,

    comprising of following equipmentsincluding all acc essoriesrequired forthe

    completion of the system in all respects with manufacturer's instructions,

    devicesand equipmentas perspecificationsand drawingsto completethe

    system.

    (For Detail Refer Drawing #BMS-05)

    25 36 29.1316-PortLocal Area NetworkSwitch forintegrationand interconnecting main

    UPS to BMS Server. J ob. - - - 1 1

    25 36 29.16 System Manager Module to directly communicate to UPS. No. - - - 1 1

    25 36 29.19

    Supply and wiringforinterconnecting UPSSystem to BMSServerwith control

    cable in 25mm dia pvc conduit and other accessories. Complete in all

    respect, as per draw ings.

    Rm. - - - 225 100

    Note:

    * BMS Contractoris advise to verify need of System Manager Module and

    the brand of UPS.

    * BMS Contractor shall provide technical data for all the equipment used.

    * BMS Contractor will submit detail description of all items required to

    complete job.

    Total 25 36 29

    ( CARRIED FORWARD TO SUMMARY)

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    15/147

    arcop Page 8 of 14

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    25 36 33 INTEGRATED AUTOMATION FOR DIESEL GENERATOR SETS(6 No. 2000kVA)

    Supply, installation, testing and commissioning of Integrated Diesel

    Generator Sets, comprising o f fo llowing equipments based on

    communication protocol Modbus RTU including all accessories required for

    the completion of the system in all respects with manufacturer'sinstructions,

    devicesand equipmentas perspecificationsand drawingsto completethe

    system.

    25 36 33.1316-PortLocal Area NetworkSwitch forintegrationand interconnecting main

    Access Control System PC/ Controller to BMS Server at First Floor. J ob. - - - - - - 1

    25 36 33.16

    System Manager Module to directly communicate to Access Control

    System. No. - - - - - - 1

    25 36 33.19Fuel Tank Sensors to directly communicate with Diesel underground and

    day tank pumps including all its controls etc.. J ob. - - - - - - 1

    25 36 33.23

    Supply and wiring for all Control cables required to complete the system

    from its main controller / PC to BMSServer in 25mm dia pvc conduit and

    other accessories. Co mplete in all respect, as per drawings.

     J ob. - - - - - - 1

    Note:

    * BMS Contractoris advise to verify need of System Manager Module and

    the brand of Access Control System.

    * BMS Contractor shall provide technical data for all the equipment used.

    * BMS Contractor will submit detail description of all items required to

    complete job.

    Total 25 36 33

    ( CARRIED FORWARD TO SUMMARY)

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    16/147

    arcop Page 9 of 14

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    25 38 00INTEGRATED AUTOMATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM

    (FIRE ALARM SYSTEM)

    Supply, installation, testing and commissioning of Integrated Fire Alarm

    System, comprising of following equipments based on communication

    protocol ModbusRTU including all accessories required forthe completion

    of the system in all respects with manufacturer's instructions, devices and

    equipment as per specifications and drawings to complete the system.

    (For Detail Refer Drawing #BMS-04)

    25 38 00.1316-Port Local Area Network Switch for interconnecting main Fire Alarm

    PC/ Panel to BMS Server. J ob. - - - 1 1

    25 38 00.16 System Manager Module to directly co mmunicate to Public Address System. No. - - - 1 1

    25 38 00.19

    Supply and wiring for interconnecting Fire Alarm System from its main

    controller/PC to BMS Server with control cable in 25mm dia pvc conduit

    and o ther acc essories. Co mplete in all respect, as per drawings.

    Rm. - - - 225 100

    Note:

    * BMS Contractoris advise to verify need of System Manager Module and

    the brand of Fire Alarm System.

    * BMS Contractor shall provide technical data for all the equipment used.

    * BMS Contractor will submit detail description of all items required to

    complete job.

    Total 25 38 00

    ( CARRIED FORWARD TO SUMMARY)

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    17/147

    arcop Page 10 of 14

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    25 38 13INTEGRATED AUTOMATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM

    (PUBLIC ADDRESSSYSTEM)

    Supply, installation, testing and commissioning of Integrated Public Address

    System, comprising of following equipments based on communication

    protocol Modbus RTU including all accessories required for the completion

    of the system in all respects with manufacturer's instructions, devices and

    equipment as per specifications and drawings to complete the system.

    (For Detail Refer Drawing #BMS-05)

    25 38 13.1316-PortLocal Area NetworkSwitch forintegrationand interconnecting main

    Public A ddress PC/ Amplifierl to BMS Server at First Floor. J ob. - - - 1 - - -

    25 38 13.16 System Manager Module to directly c ommunica te to Fire Alarm System. No. - - - 1 - - -

    25 38 13.19

    Supply and wiring forinterconnecting Public AddressSystem from its main

    controller/PC to BMS Server with control cable in 25mm dia pvc conduit

    and o ther acc essories. Co mplete in all respect, as per drawings.

    Rm. - - - 225 - - -

    Note:

    * BMS Contractoris advise to verify need of System Manager Module and

    the brand of Public Add ress System.

    * BMS Contractor shall provide technical data for all the equipment used.

    * BMS Contractor will submit detail description of all items required to

    complete job.

    Total 25 38 13

    ( CARRIED FORWARD TO SUMMARY)

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    18/147

    arcop Page 11 of 14

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    25 38 16INTEGRATED AUTOMATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM

    (VIDEO SURVEILLANCE)

    Supply, installation, testing and commissioning of Integrated Video

    Survellance, comprising of following equipments based on communication

    protocol Modbus RTU including all accessories required for the completion

    of the system in all respects with manufacturer's instructions, devices and

    equipment as per specifications and drawings to complete the system.

    (For Detail Refer Drawing #BMS-05)

    25 38 16.1316-PortLocal Area NetworkSwitch forintegrationand interconnecting main

    Video Survellanc e PC /NVR to BMS Server. J ob. - - - 1 1

    25 38 16.16 System Manager Module to directly communicate to Video Survellance. No. - - - 1 1

    25 38 16.19

    Supply and wiring for interconnecting Video Survellance from its main

    controller/PC to BMS Server with control cable in 25mm dia pvc conduit

    and o ther acc essories. Co mplete in all respect, as per drawings.

    Rm. - - - 1,125 225

    Note:

    * BMS Contractoris advise to verify need of System Manager Module and

    the brand of Video Survellance.

    * BMS Contractor shall provide technical data for all the equipment used.

    * BMS Contractor will submit detail description of all items required to

    complete job.

    Total 25 38 16

    ( CARRIED FORWARD TO SUMMARY)

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    19/147

    arcop Page 12 of 14

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    25 38 19INTEGRATED AUTOMATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM

    (AC CESSCONTROL SYSTEM)

    Supply, installation, testing and commissioning of Integrated AccessControl

    System, comprising of following equipments based on communication

    protocol Modbus RTU including all accessories required for the completion

    of the system in all respects with manufacturer's instructions, devices and

    equipment as per specifications and drawings to complete the system.

    (For Detail Refer Drawing #BMS-05)

    25 38 19.1316-PortLocal Area NetworkSwitch forintegrationand interconnecting main

    Access Control System PC /C ontroller to BMS Server. J ob. - - - 1 1

    25 38 19.16System Manager Module to directly communicate to Access Control

    System.No. - - - 1 1

    25 38 19.19

    Supply and wiring forinterconnecting Access Control Systemfrom its main

    controller/PC to BMS Server with control cable in 25mm dia pvc conduit

    and o ther acc essories. Co mplete in all respect, as per drawings.

    Rm. - - - 225 225

    Note:

    * BMS Contractoris advise to verify need of System Manager Module and

    the brand of Acc ess Control System.

    * BMS Contractor shall provide technical data for all the equipment used.

    * BMS Contractor will submit detail description of all items required to

    complete job.

    Total 25 38 19

    ( CARRIED FORWARD TO SUMMARY)

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    20/147

    arcop Page 13 of 14

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    LOCAL SUPPLIESAND SERVICESTO C OMPLETE JOB OF INTEGRATED

    AUTOMATION FOR ALL SYSTEMS

    1

    Engineering, Programming, commissioning and Handing over of all above

    systems comprising of following equipments based on communication

    protocol Modbus RTU including all accessories required for the completion

    of the system in all respec ts with manufacturer's instructions.

     J ob. - - - 1 1

    2

    BMSComputer

    HP Prodesk 400 G2

    Mic ro towe r Business PC

    Intel core i5-4590S proc essor atleast 3.7 GHz

    Max turbo frequency (3.0 GHz base frequency) 6 MB cache, 4 cores, 4

    threads intel HDG raphics4600 supportsDDR3 memory upto 1600MT/sdata

    rate.

    Memory 2 GB PC3-10600 Memory (1x2GB)

    Hard Disk 500 GB 7200 RPM SATA-6G

    HP Optic al d rives: HP Supermulti DVD-RW

    Display HP 18.5" LCD Displa y

    Ope rating system windows 7 professional w ith genuine liscense

    No. - - - 1 - - -

    3

    HP ProLiant DL 160 Generation 8

    Processor: (1) Intel Xeon E5-2603 (1.8 GHz / 4 core / 10 MB/ 6.4GT-sQPI /

    80W)Memory: 4 GB Hard disk:HP 500 GB 6G SATA 7.2Krpm LFF (3.5inch)SC

    midline NIC:HP 361iintegrated dual portgigabit. Server adaptorHP Optical

    drives: HP 9.5mm SATA DVD ROM Optical drive storage controllerHP Power

    supplies: 500W Platinum FIO Power Supply with backplane form factor: 1U

    Rack.

    No. - - - 1 - - -

    Note:

    * BMS Contractoris advise to verify need of System Manager Module and

    the brand of Public Add ress System.* BMS Contractor shall provide technical data for all the equipment used.

    * BMS Contractor will submit detail description of all items required to

    complete job.

    Total

    ( CARRIED FORWARD TO SUMMARY)

    TOTAL OF DIVISION - 25

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    21/147

    arcop Page 14 of 14

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Summary of Cost

    Lahore. (ADDENDUM # 1) Division 25 : Integrated Automation (BMS)

    AMOUNTRs.

    AMOUNTRs.

    AMOUNTRs.

    25 08 00 CO MMISSIONING OF INTEGRATED AUTOMATION

    25 32 00INTEGRATED AUTOMATION FOR CO NVEYING EQUIPMENT

    (VERTICAL TRANSPORTSYSTEM)

    25 32 13INTEGRATED AUTOMATION FOR CO NVEYING EQUIPMENT

    (PARKING MANAG EMENTSYSTEM)

    25 36 13INTEGRATED AUTOM ATION FOR POWER METERS

    (ENERGY MANAGEMENTSYSTEM)

    25 36 26INTEGRATED AUTOMATION FO R LIGHTING RELAYS

    (LIGHTING C ONTROL SYSTEM)

    25 36 29 INTEGRATED AUTOM ATION FOR UPS MO NITORS (UPS SYSTEM)

    25 36 33INTEGRATED AUTOM ATION FOR DIESEL GENERATOR SETS

    (6 NO. 2000kVA)

    25 38 00INTEGRATED AUTOM ATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM

    (FIRE ALARM SYSTEM)

    25 38 13INTEGRATED AUTOM ATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM

    (PUBLIC ADDRESS SYSTEM)

    25 38 16INTEGRATED AUTOM ATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM

    (VIDEO SURVEILLANC E)

    25 38 19INTEGRATED AUTOM ATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM

    (AC CESS CONTROL SYSTEM)

    LOC AL SUPPLIES AND SERVICES TO CO MPLETE J OB OF INTEGRATEDAUTOMATION FOR ALL SYSTEMS

    TOTAL OF DIVISION - 25

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)ITEM DESCRIPTION

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    22/147

     

    DIVISION – 26ELECTRICAL 

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    23/147

    arcop Page 1 of 67

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 26 : Electrical

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    26 05 13 MEDIUM VOLTAGE CABLES

    Supply, installation, testing, commissioning and termination of following8.7/15kV,Cu/XLPE/SWA/PVC (MVCables) inalready installed Cable trench /Cable ladder / Cable tray / Duct Bank. Complete in all respects.

    26 05 13.13From Energy Center-1 To Sub Station-1

    3C, 300 Sq.mm 8.7/15kV, C u/XLPE/SWA/PVCRm. - - - 410 - - -

    26 05 13.16From Sub Station-1 To Energy Center-1

    3C, 300 Sq.mm 8.7/15kV, C u/XLPE/SWA/PVCRm. - - - 410 - - -

    26 05 13.19From Grid Station Feeder-1 To Energy Center

    3C, 300 Sq.mm 8.7/15kV, C u/XLPE/SWA/PVCRm. - - - - - - 725

    26 05 13.23From Grid Station Feeder-7 (Backup Feeder) To Energy Center

    3C, 300 Sq.mm 8.7/15kV, C u/XLPE/SWA/PVCRm. - - - - - - 750

    26 05 13.26 3C, 120 Sq.mm 8.7/15kV, Cu/XLPE/SWA/PVC Rm. - - - - - - 10

    26 05 13.29From Step up Transformer to MV Switch. (5 No.)

    3C, 150 Sq.mm 8.7/15kV, C u/XLPE/SWA/PVCRm. - - - - - - 125

    26 05 13.33From MV Switch to Step down Transformer (4 No.)

    3C, 240 Sq.mm 8.7/15kV, C u/XLPE/SWA/PVCRm. - - - 60 - - 60

    15KV CABLE TERMINATION KITS

    Supply, installation, testing and commissioning of 15KV,XLPE-CU,MV Cable

    Termination Kit at both ends with 3M, Raychem or equivalent approvedbrand termination kit etc.

    26 05 13.363C, 300 Sq.mm 15KV, Cable Termination kits including all terminationaccessories like HTtape etc.

     J ob. - - - 6 43

    Note: Contractor is advised to confirm the cable running lengths andtermination as per site conditions before commencement of work.

    Total Rs. Section- 26 05 13

    (CARRIED FORWARD TO SUMMARY)

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    24/147

    arcop Page 2 of 67

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 26 : Electrical

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    26 05 19 LOWVOLTAGE ELECTRICAL POWER CONDUCTORSAND CABLES

    Supply, installation, testing & commissioning of following items including allmaterial, tools, labor& accessories required for completion of worka s perdescription & drawings. Complete in all respects.

    26 05 19.13

    Circuit wiring from DB to switch board including any wiring from switchboard to switch board with 2x2.5 Sq.mm +ECC 1x2.5 Sqmm, 1-core PVCwires in 25mm dia of pvc conduit exposed / concealed as shown ondrawings. Comple te in all respec ts.

     No. 24 483 36

    26 05 19.16

    Wiring forlightpoint from switch board/ Dimmerboard to first lightpointwith

    1.5 Sq.mmcommon neutralof 2.5Sq.mm and common ECC of 2.5 Sq.mm+wires in 25mm dia of exposed / concealed PVC conduit as shown ondrawings.

    No. 116 2,368 187

    26 05 19.19 Same as above item but wiring from light point to point.  No. 58 2,216 136

    26 05 19.23Wiring forGroup Control Light fixtures From DB to first light point with 2x2.5Sq.mm +ECC 1x2.5Sq.mm in 25mmdia PVC conduit exposed / concealedas shown on drawings. Complete in all respects.

     No. 132 152 26

    26 05 19.26 Same as above item but from light point to point. No. 1,120 2,373 311

    26 05 19.29

    Emergency Circuitwiring from DBto switch board including any wiring fromswitch board to switch board with 2x2.5 Sq.mm +ECC 1x2.5 Sqmm, 1-corePVC wires in 25mmdia of pvc conduit exposed / concealed asshownondrawings. Comple te in all respec ts.

     No. - - - 278 - - -

    26 05 19.33

    Emergency Wiring forlightpoint from switch board/ Dimmer board to firstlightpointwith1.5Sq.mm common neutralof 2.5 Sq.mm and common ECCof 2.5 Sq.mm +wiresin 25mm dia of exposed / concealed PVC conduitasshown on draw ings.

    No. - - - 525 - - -

    26 05 19.36 Same as above item b ut wiring from light point to point. No. - - - 606 - - -

    26 05 19.39Wiring forGroupControl Emergency & Exit Lightfixturesfrom DBto first lightpoint with 2x2.5 Sq.mm +ECC 1x2.5 Sq.mm in 25mm dia PVC Conduit asexposed / concealed shown on drawings. Complete in all respects.

    No. 48 79 9

    26 05 19.43 Same as above item but wiring from light point to point. No. 528 507 71

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    25/147

    arcop Page 3 of 67

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 26 : Electrical

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    Wiring of 13A/15A Switch Socket unit (for Normal Power) from DB to firstoutlet with following size of wires in 25mm dia PVC conduit of exposed /concealed as shown on drawings. Complete in all respects.

    26 05 19.46 2x4 Sq.mm Cu/PVC +ECC 1x4 Sq.mm Cu/PVC No. 42 1,268 29

    26 05 19.49 Same as item above but wiring from outlet to outlet. No. 168 5,603 102

    Wiringof 13A FlatPin Switch Socketunit(for UPSPower)from DBto first outletw ith fo llowing size o f w ires in 25mm dia PVC conduit o f exposed /concea led as shown on drawings. Complete in all respects.

    26 05 19.53 2x4 Sq.mm Cu/PVC +ECC 1x4 Sq.mm Cu/PVC No. - - - 711 10

    26 05 19.56 Same as item above but wiring from outlet to outlet. No. - - - 1,264 30

    Wiring of 20A Switch Socketunit(forHand Dryer) from DBto first outlet withfo llowing size o f w ires in 25mm dia size PVC conduit o f exposed /concealed as shown on drawings. Complete in all respects.

    26 05 19.59 2x4 Sq.mm Cu/PVC +ECC 1x4 Sq.mm Cu/PVC No. 1 34 1

    Wiring of 20A DPIsolator Switch from DBto first outlet with following size of wires in 25mmdia size PVC conduit ofexposed / concealed asshownondrawings. Comple te in all respec ts.

    26 05 19.63 2C, 4 Sq.mm Cu/PVC /PVC +ECC 1x4 Sq.mm Cu/PVC No. 36 210 12

    Wiring of 20A 4PIsolator from DBto first outlet with following size of wires in25mm dia size PVC conduit ofexposed / concealed asshownon drawings.Complete in all respects.

    26 05 19.66 4C, 4 Sq.mm Cu/PVC /PVC +ECC 1x4 Sq.mm Cu/PVC No. 16 26 17

    Wiring of 32A 4PIsolator from DBto first outlet with following size of wires in38mm dia size PVC conduit ofexposed / concealed asshownon drawings.Complete in all respects.

    26 05 19.69 4C, 6 Sq.mm Cu/PVC /PVC +ECC 1x6 Sq.mm Cu/PVC No. - - - 8 8

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    26/147

    arcop Page 4 of 67

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 26 : Electrical

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    Wiring of 40A 4PIsolator from DBto first outlet with following size of wires in38mm dia size PVC conduit ofexposed / concealed asshownon drawings.Complete in all respects.

    26 05 19.73 4C, 10 Sq.mm Cu/PVC/PVC +ECC 1x10 Sq.mm Cu/PVC No. - - - 8 4

    Wiring of 63A 4PIsolator from DBto first outlet with following size of wires in38mm dia size PVC conduit ofexposed / concealed asshownon drawings.Complete in all respects..

    26 05 19.76 4C, 16 Sq.mm Cu/PVC/PVC +ECC 1x16 Sq.mm Cu/PVC No. - - - 14 9

    Wiring of 125A 4PIsolator from DBto first outlet with following size of wiresin

    50mm dia size PVC conduit ofexposed / concealed asshownon drawings.Complete in all respects.

    26 05 19.79 4C, 50 Sq.mm Cu/ XLPE/PVC +ECC 1x25 Sq.mm Cu/ PVC No. - - - 4 2

    Wiring of 16A, 3-pin Industrial Socketunitfor UPS from DBto firstoutletwithfo llowing size o f w ires in 25mm dia size PVC conduit o f exposed /concealed as shown on drawings. Complete in all respects.Note: Wires Co lor of UPS circuits should be d ifferent from RAW power circuits.

    26 05 19.83 2x4 Sq.mm Cu/PVC +ECC 1x4 Sq.mm CU/PVC No. - - - 4 4

    Wiring of 32A, 3-pin Industrial SocketunitforUPS/ IDF Racks from DBto firstoutletwith following size of wiresin 25mm dia size PVC conduit of exposed /concealed as shown on drawings. Complete in all respects.

    Note: Wires Co lor of UPS circuits should be d ifferent from RAW power circuits.

    26 05 19.86 2C, 10 Sq.mm Cu/PVC/PVC +ECC 1x10 Sq.mm Cu/PVC No. - - - 29 2

    Wiring of 16A, 5-pinIndustrial Socketunit forIDF Racksfrom DBto firstoutletwith following size of wires in 25mm dia size PVC conduit of exposed /concealed as shown on drawings. Complete in all respects.Note: Wires Co lor of UPS circuits should be d ifferent from RAW power circuits.

    26 05 19.89 2C, 4 Sq.mm Cu/PVC /PVC +ECC 1x4 Sq.mm Cu/PVC No. - - - 1 - - -

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    27/147

    arcop Page 5 of 67

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 26 : Electrical

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    Wiring of 32A, 5-pin Industrial Socket unit forUPS from DBto first outlet withfo llowing size o f w ires in 25mm dia size PVC conduit o f exposed /concealed as shown on drawings. Complete in all respects.Note: Wires Co lor of UPS circuits should be d ifferent from RAW power circuits.

    26 05 19.93 4C, 6 Sq.mm Cu/PVC /PVC +ECC 1x6 Sq.mm Cu/PVC No. - - - 4 2

    Wiring of 63A, 5-pin Industrial Socket unit forUPS from DBto first outlet withfo llowing size o f w ires in 25mm dia size PVC conduit o f exposed /concealed as shown on drawings. Complete in all respects.Note: Wires Co lor of UPS circuits should be d ifferent from RAW power circuits.

    26 05 19.96 4C, 16 Sq.mm Cu/PVC/PVC +ECC 1x16 Sq.mm Cu/PVC No. - - - 2 - - -

    Supply, installation, testing, commissioning and termination of following sizeof  CU/PVC/PVC & CU/XLPE/PVC Cables for Distribution Board in alreadyinstalled PVC conduit / Cable tray,including allac cessories, Complete inallrespect as shown on drawing.

    26 05 19.99From UMDB to UPS & UPS to UMDB2 No. 4C, 240 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC

    Rm. - - - 30 - - -

    26 05 19.103From TAP OFF UNITto SMDB-LGA2 No. 4C, 240 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC

    Rm. - - - 10 - - -

    26 05 19.106From TAP OFF UNITto SMDB-LGB4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.109From TAP OFF UNITto SMDB-GA4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC Rm. - - - 10 - - -

    26 05 19.113From TAP OFF UNITto SMDB-FA4C, 25 Sq.mm Cu/XLPE/PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.116From TAP OFF UNITto SMDB-SA4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.119From TAP OFF UNITto SMDB-SB4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.123From TAP OFF UNITto SMDB-TA4C, 70 Sq.mm Cu/XLPE/PVC +ECC 1C, 35 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    28/147

    arcop Page 6 of 67

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 26 : Electrical

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    26 05 19.126From TAP OFF UNITto SMDB-TB2 No. 4C, 150 Sq.mm Cu/XLPE/PVC +ECC 1C, 70 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.129From TAP OFF UNITto SMDB-44C, 95 Sq.mm Cu/XLPE/PVC +ECC 1C, 50 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.133From TAP OFF UNITto SMDB-54C, 35 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.136From TAP OFF UNITto SMDB-64C, 35 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.139From TAP OFF UNITto SMDB-74C, 35 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.143From TAP OFF UNITto SMDB-84C, 35 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.146From TAP OFF UNITto SMDB-94C, 35 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.149From TAP OFF UNITto SMDB-ROOF-A4C, 95 Sq.mm Cu/XLPE/PVC +ECC 1C, 50 Sq.mm Cu/ PVC

    Rm. - - - 20 - - -

    26 05 19.153From TAP OFF UNITto SMDB-ROOF-B4C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC

    Rm. - - - 20 - - -

    26 05 19.156From TAP OFF UNITto USMDB-LGA4C, 35 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.159From TAP OFF UNITto USMDB-LG-B4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.163From TAP OFF UNITto USMDB-GA4C, 70 Sq.mm Cu/XLPE/PVC +ECC 1C, 35 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.166From TAP OFF UNITto USMDB-GB4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.169From TAP OFF UNITto USMDB-FA4C, 25 Sq.mm Cu/XLPE/PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.173From TAP OFF UNITto USMDB-FB4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.176From TAP OFF UNITto USMDB-SA4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    29/147

    arcop Page 7 of 67

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 26 : Electrical

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    26 05 19.179From TAP OFF UNITto USMDB-SB4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.183From TAP OFF UNITto USMDB-TA4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.186From TAP OFF UNITto USMDB-TB4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.189From TAP OFF UNITto USMDB-44C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.193From TAP OFF UNITto USMDB-54C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.196From TAP OFF UNITto USMDB-64C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.199From TAP OFF UNITto USMDB-74C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.203From TAP OFF UNITto USMDB-84C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.206From TAP OFF UNITto USMDB-94C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.209From TAP OFF UNITto USMDB-OT2 No. 4C, 185 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC

    Rm. - - - 15 - - -

    26 05 19.213From TAP OFF UNITto USMDB-OT-14C, 50 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.216From TAP OFF UNITto USMDB-OT-24C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC

    Rm. - - - 15 - - -

    26 05 19.219From TAP O FF UNITto SMDB-HVAC-LGA4C, 240 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC

    Rm. - - - 15 - - -

    26 05 19.223From TAP O FF UNITto SMDB-HVAC-LGB4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.226From TAP OFF UNITto SMDB-HVAC-G A4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.229From TAP O FF UNITto SMDB-HVAC-GB4C, 70 Sq.mm Cu/XLPE/PVC +ECC 1C, 35 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    30/147

    arcop Page 8 of 67

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 26 : Electrical

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    26 05 19.233From TAP OFF UNITto SMDB-HVAC-FA4C, 25 Sq.mm Cu/XLPE/PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.236From TAP OFF UNITto SMDB-HVAC-FB4C, 35 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.239From TAP OFF UNITto SMDB-HVAC -SB4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.243From TAP OFF UNITto SMDB-HVAC-TA4C, 70 Sq.mm Cu/XLPE/PVC +ECC 1C, 35 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.246From TAP OFF UNITto SMDB-HVAC -TB4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.249From TAP O FF UNITto SMDB-HVAC-44C, 25 Sq.mm Cu/XLPE/PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.253From TAP O FF UNITto SMDB-HVAC-54C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.256From TAP O FF UNITto SMDB-HVAC-64C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.259From TAP O FF UNITto SMDB-HVAC-74C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.263From TAP O FF UNITto SMDB-HVAC-84C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.266From TAP O FF UNITto SMDB-HVAC-94C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.269From TAP OFF UNITto DB-LGA4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.273From TAP OFF UNITto DB-LA4C, 50 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.276From TAP OFF UNITto DB-MB4C, 35 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.279From TAP O FF UNITto DB-CAFE4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.283From TAP OFF UNITto DB-MKL4C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC

    Rm. - - - 15 - - -

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    31/147

    arcop Page 9 of 67

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 26 : Electrical

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    26 05 19.286From TAP OFF UNITto DB-HS4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.289From TAP OFF UNITto DB-LGB4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.293From TAP OFF UNITto DB-SS4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.296From SMDB LGB to DB-ISOLATORS-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 70 - - -

    26 05 19.299From SMDB LGB to DB-ISOLATORS-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 70 - - -

    26 05 19.303From SMDB-LG-B to DB-DK 4C, 240 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC

    Rm. - - - 20 - - -

    26 05 19.306From TAP OFF UNITto DB-LG-RT4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 20 - - -

    26 05 19.309From TAP OFF UNITto UDB-LGA4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.313From TAP OFF UNITto UDB-LA4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.316From TAP OFF UNITto UDB-MB4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.319From TAP OFF UNITto UDB-CA FE4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.323From TAP OFF UNITto UDB-MKL4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.326From TAP OFF UNITto UDB-LGB4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.329From TAP OFF UNITto UDB-SS4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.333From USMDB-LG-B to UDB-DK 4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.336From TAP OFF UNITto UDB-RT4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    32/147

    arcop Page 10 of 67

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 26 : Electrical

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    26 05 19.339From TAP OFF UNITto UDB-CLB4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.343From TAP OFF UNITto UDB-HS4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.346From SMDB-GA to DB-GA-14C, 25 Sq.mm Cu/XLPE/PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.349From TAP O FF UNITto DB-GA-24C, 25 Sq.mm Cu/XLPE/PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.353From TAP O FF UNITto DB-GA-34C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.356From TAP OFF UNITto DB-EXT-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 35 - - -

    26 05 19.359From TAP OFF UNITto DB-EXT-24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 35 - - -

    26 05 19.363From TAP OFF UNITto DB-EXT-34C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 35 - - -

    26 05 19.366From TAP O FF UNITto DB-MMD4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 20 - - -

    26 05 19.369From TAP OFF UNITto DB-SCC4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 20 - - -

    26 05 19.373From TAP OFF UNITto DB-XR4C, 240 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC

    Rm. - - - 25 - - -

    26 05 19.376From TAP OFF UNITto DB-GB-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 5 - - -

    26 05 19.379From TAP OFF UNITto DB-GB-24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 5 - - -

    26 05 19.383From TAP OFF UNITto DB-DIA4C, 50 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.386From TAP OFF UNITto DB-TR14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 5 - - -

    26 05 19.389From TAP OFF UNITto DB-TR24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 5 - - -

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    33/147

    arcop Page 11 of 67

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 26 : Electrical

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    26 05 19.393From TAP OFF UNITto DB-PET-CT4C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC

    Rm. - - - 10 - - -

    26 05 19.396From TAP O FF UNITto DB-CT(4 Nos.)4C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC

    Rm. - - - 40 - - -

    26 05 19.399From TAP OFF UNITto DB-XR1 (5 Nos.)4C, 240 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC

    Rm. - - - 75 - - -

    26 05 19.403From TAP OFF UNITto DB-SPECT(2 Nos.)4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 25 - - -

    26 05 19.406From TAP OFF UNITto DB-MRI (2 Nos.)4C, 70 Sq.mm Cu/XLPE/PVC +ECC 1C, 35 Sq.mm Cu/ PVC

    Rm. - - - 20 - - -

    26 05 19.409From TAP OFF UNITto UDB-GA14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 5 - - -

    26 05 19.413From TAP OFF UNITto UDB-GA24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 5 - - -

    26 05 19.416From TAP OFF UNITto UDB-GA34C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 5 - - -

    26 05 19.419From TAP OFF UNITto UDB-DIA4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 5 - - -

    26 05 19.423From TAP OFF UNITto UDB-SSC4C, 6 Sq.mm Cu/PVC /PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 5 - - -

    26 05 19.426From TAP OFF UNITto UDB-MMD4C, 6 Sq.mm Cu/PVC /PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.429From TAP OFF UNITto DB-FA-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 5 - - -

    26 05 19.433From TAP OFF UNITto DB-FA-24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 5 - - -

    26 05 19.436From TAP OFF UNITto DB-FA-34C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 5 - - -

    26 05 19.439From TAP OFF UNITto DB-END (16 Nos.)4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 80 - - -

    26 05 19.443From TAP OFF UNITto DB-ERCP (4 Nos.)4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 35 - - -

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    34/147

    arcop Page 12 of 67

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 26 : Electrical

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    26 05 19.446From TAP O FF UNITto DB-OT(1 to 6)4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 90 - - -

    26 05 19.449From TAP OFF UNITto UDB-FA-14C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 5 - - -

    26 05 19.453From TAP OFF UNITto UDB-FA-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 5 - - -

    26 05 19.456From TAP OFF UNITto UDB-FA-34C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 5 - - -

    26 05 19.459From TAP OFF UNITto DB-SA-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 5 - - -

    26 05 19.463From TAP OFF UNITto DB-SA-24C, 50 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC

    Rm. - - - 5 - - -

    26 05 19.466From TAP OFF UNITto MDB-24C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC

    Rm. - - - 15 - - -

    26 05 19.469From TAP OFF UNITto LIT-14C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC

    Rm. - - - 10 - - -

    26 05 19.473From TAP OFF UNITto DB-RAD (3 Nos.)4C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC

    Rm. - - - 45 - - -

    26 05 19.476From TAP OFF UNITto DB-SB-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.479From TAP OFF UNITto DB-SB-24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.483From TAP OFF UNITto DB-SICU (58 Nos.)4C, 6 Sq.mm Cu/PVC /PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 290 - - -

    26 05 19.486From TAP OFF UNITto UDB-SA-14C, 6 Sq.mm Cu/PVC /PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.489From TAP OFF UNITto UDB-SA-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.493From TAP OFF UNITto UDB-SA-34C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.496From TAP OFF UNITto UDB-SB-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    35/147

    arcop Page 13 of 67

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 26 : Electrical

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    26 05 19.499From TAP OFF UNITto UDB-SB-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.503From TAP OFF UNITto UDB-OT(18 Nos)4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 270 - - -

    26 05 19.506From TAP OFF UNITto UDB-TO-H4C, 50 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.509From TAP OFF UNITto DB-ME-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.513From TAP OFF UNITto DB-ME-24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.516From TAP OFF UNITto DB-SD4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.519From TAP OFF UNITto DB-CA-TA4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.523From TAP OFF UNITto DB -WASH4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.526From TAP OFF UNITto ISOLATOR -14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 70 - - -

    26 05 19.529From TAP OFF UNITto ISOLATOR -24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 70 - - -

    26 05 19.533From TAP OFF UNITto MDB-14C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC

    Rm. - - - 15 - - -

    26 05 19.536From TAP OFF UNITto MDB-24C, 300 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC

    Rm. - - - 15 - - -

    26 05 19.539From TAP OFF UNITto DB-OFF4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.543From TAP OFF UNITto DB-TB-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 15 - - -

    26 05 19.546From TAP OFF UNITto UDB-WASH4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.549From TAP OFF UNITto UDB-CA-TA4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    36/147

    arcop Page 14 of 67

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 26 : Electrical

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    26 05 19.553From TAP OFF UNITto UDB-SD4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.556From TAP OFF UNITto UDB-ME-14C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.559From TAP OFF UNITto UDB-ME-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.563From MDB-1 to UDB-14C, 240 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC

    Rm. - - - 10 - - -

    26 05 19.566From MDB-2 to UDB-14C, 240 sq.mm Cu/XLPE/PVC +ECC 1C, 70 sq.mm PVC

    Rm. - - - 10 - - -

    26 05 19.569From TAP OFF UNITto UDB-OFF4C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.573From TAP OFF UNITto DB- TB-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.576From TAP OFF UNITto DB-4-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.579From TAP OFF UNITto DB-4-24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.583From TAP OFF UNITto DB- ISO (2 Nos)4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 20 - - -

    26 05 19.586From TAP OFF UNITto UDB-4-14C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.589From TAP OFF UNITto UDB-4-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.593From TAP OFF UNITto UDB- SICU (23 Nos)4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 115 - - -

    26 05 19.596From TAP OFF UNITto DB-5-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.599From TAP OFF UNITto DB-5-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.603From TAP OFF UNITto DB-ISO (10 Nos.)4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 100 - - -

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    37/147

    arcop Page 15 of 67

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 26 : Electrical

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    26 05 19.606From TAP OFF UNITto DB-SB (115 Nos.)4C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 1,725 - - -

    26 05 19.609From TAP OFF UNITto DB- 6-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.613From TAP OFF UNITto DB- 6-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.616From TAP OFF UNITto DB-7-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.619From TAP OFF UNITto DB-7-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.623From TAP OFF UNITto DB-8-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.626From TAP OFF UNITto DB-8-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.629From TAP OFF UNITto DB-9-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.633From TAP OFF UNITto DB 9-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.636From TAP OFF UNITto DB-RB-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.639From TAP OFF UNITto DB-RB-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.643From TAP OFF UNITto ISOLATOR fo r Lifts (10 Nos.)4C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 250 - - -

    26 05 19.646From TAP OFF UNITto UDB-5-14C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.649From TAP OFF UNITto UDB-5-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.653From TAP OFF UNITto UDB-6-14C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.656From TAP OFF UNITto UDB-6-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    38/147

    arcop Page 16 of 67

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 26 : Electrical

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    26 05 19.659From TAP OFF UNITto UDB-7-14C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.663From TAP OFF UNITto UDB-7-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.666From TAP OFF UNITto UDB-8-14C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.669From TAP OFF UNITto UDB-8-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.673From TAP OFF UNITto UDB-9-14C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.676From TAP OFF UNITto UDB-9-24C, 6 Sq.mm Cu/PVC/ PVC +ECC 1C, 6 Sq.mm Cu/ PVC

    Rm. - - - 10 - - -

    26 05 19.679From TAP OFF UNITto DB-MCC-LGA-14C, 25 Sq.mm Cu/XLPE/PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 40 - - -

    26 05 19.683From TAP OFF UNITto DB-MC C-LGB-14C, 25 Sq.mm Cu/XLPE/PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 40 - - -

    26 05 19.686From TAP OFF UNITto DB-MC C-LGB-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 35 - - -

    26 05 19.689From TAP OFF UNITto DB-MC C-LGB-34C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 40 - - -

    26 05 19.693From TAP OFF UNITto DB-MCC-GA-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 40 - - -

    26 05 19.696From TAP OFF UNITto DB-MC C-G B-14C, 50 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC

    Rm. - - - 40 - - -

    26 05 19.699From TAP OFF UNITto DB-MC C-G B-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 30 - - -

    26 05 19.703From TAP OFF UNITto DB-MC C-FA-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 40 - - -

    26 05 19.706From TAP OFF UNITto DB-MC C-FA-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 40 - - -

    26 05 19.709From TAP O FF UNITto DB-MCC-FB-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 40 - - -

  • 8/15/2019 BOQ Package 1A Addendum 1 PKLI Emt080316

    39/147

    arcop Page 17 of 67

    Hospital Complex for Pakistan Kidney & Liver Institute and Research Center Bill of Quantities

    Lahore. (ADDENDUM # 1) Division 26 : Electrical

    QUANTITY RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.QUANTITY 

    RATE

    Rs.

    AMOUNT

    Rs.

    ITEM DESCRIPTION UNIT

    PARKING BUILDING

    (P2, P1 & Ground to First Floor)

    (Block 1 & 2)

    MAIN HOSPITAL BUILDING

    (Lower Ground i/c. MEP Corridor &

    Ground to 10th Floor)

    (Block 10)

    ENERGY CENTER

    (U.G.Tank, MEP Corridor/Sub-Station,

    Lower Ground, Ground & First Floor)

    26 05 19.713From TAP O FF UNITto DB-MCC-FB-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 35 - - -

    26 05 19.716From TAP O FF UNITto DB-MCC-FB-34C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 45 - - -

    26 05 19.719From TAP OFF UNITto DB-MC C-SB-24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 30 - - -

    26 05 19.723From TAP O FF UNITto DB-MCC-TA-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 35 - - -

    26 05 19.726From TAP O FF UNITto DB-MCC-TA-24C, 50 Sq.mm Cu/XLPE/PVC +ECC 1C, 25 Sq.mm Cu/ PVC

    Rm. - - - 35 - - -

    26 05 19.729From TAP OFF UNITto DB-MC C-TB-14C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 35 - - -

    26 05 19.733From TAP OFF UNITto DB-MC C-TB-24C, 10 Sq.mm Cu/PVC /PVC +ECC 1C, 10 Sq.mm Cu/ PVC

    Rm. - - - 35 - - -

    26 05 19.736From TAP OFF UNITto DB-MC C-4-14C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/ PVC

    Rm. - - - 35 - - -

    26 05 19.739From TAP OFF UNITto DB-MC C-4-24C, 16 Sq.mm Cu/PVC /PVC +ECC 1C, 16 Sq.mm Cu/