boq-ips
description
Transcript of boq-ips
6. BILL OF QUANTITY AND PROJECT ESTIMATEThe bill of quantity of various items and their estimated cast is presented below in detail. The quantity ofcivil works have been worked out in two categories ; one on the ground and within 1.5m bgl (below groundlevel) and other 1.5 to 1 bgl and hence having on an average ! lifts The rates have for these quantities alsobeen worked out accordingly.The "## of $% grade in construction of liquid retaining heavy structures such as the present sewage sumpwell is generally rich in steel and the & of steel varies from 1.5& to .%&.The rates of all the items have been worked out' either by rate analysis after having market rates of thecomponentsorthroughvendorcorrespondence. Thefinal ratesmentionedinthefollowingestimateareinclusive of transportation( over heads ) the profits of the agency engaged to e*ecute the work and theprevalent ta*es. +urther breakupof the quantityandthe rate analysis wouldbeprovidedif requirednecessarily. Sl.No. Item Descritio!Q"#!tit$ % U!it U!it R#tes&Rr.'Amo"!t&Rs.'1. E#rt( )or* i! E+c#,#tio! (a) +or ,ump -ell .% to 1.5 m below /01.5 to 11.5 m below 11.% m1115. m11%2'15%2'3(3%2'4(51(!%2'(b) 6n foundation 7f #6 raising main 1.% m11%2' 5(5442'(c) 6n foundation of boundary wall 8 m11%2' 1(%!%2'Tot#l - Rs. ./01/0623. PCC4&M50. 6r#7e i.e. 04842 Mi+ '(a) 6n the base slab ) in the screeting of sump floor 9elow !th lift5.1 m15(%%%2' 11(11(5%%2'(b) 6n the bedding of9oundary wall.1 m14(%%%2' !(4%%2'(c) 6n the bedding of #6 rising main 4.!m14(%%%2' 18(%%2'(d) 6n the floor of the pipe :unction #hamber 1.55m14(%%%2' 14(4%2'Tot#l - 9/.9/92:351. R.C.C.4 &M58: 6r#7e ;$ Mi+ Desii!< &@it( Mi+ o> 049 o> co#rse s#!7 or #s er m#!">#ct"rerAs ection of #" +loor 0evel (,ump Top)5.% m 1(5%%2' 18(%%%2'(d) 7n the platform near drain3.% m 1(5%%2' 1%(5%%2'(e) ;iping :unction chamber .% m 1(5%%2' 11(%%%2'Tot#l Rs.- 8/06/6::35!. MS 6r#ti!) -hite wash 2 cement based water proof paint (k) ?pproach "oad (l) +resh -ater ,upply (m);remise and Dnit lighting (n) ;lantation and other decoration 1 no.1 no.3 m8.5 m8 m =os.1 no. 1%% m15% m5% m3 m:ob:ob>ob1%(%%%2'1%(%%%2'(%%2'1(!%2'(%%%2'15(%%%2'1%(%%%2'%%2'1%2'4%2'1%%2'0.,.0.,.0.,.1%(%%%21%(%%%2'15(4%%2'13(1%%2'1!(%%%2'1%(%%%2'1%(%%%2'%(%%%2'1!(%%%2'1%(%%%2'1(%%%2'%(%%%2'4%(%%%2'1%(%%%2'Tot#l- Rs. 8/?:/9::351. CI Pii!ormers4 Thechargestobepaidby0B? forthe installation of transformer touppcl1 no. 1%(%%(%%%2'1%(%%(%%%2'18. Miscell#!eo"s Items4+irst ?id 9o*( ?ir 9lower( wallclock( telephone and anythingrequired ) maintenance of thepumping plants. :ob 0.,. 1%%(%%%2'GRAND TOTAL= Rs. 1,44,29,689(Rupees One crore fourtyfour lc t!enty n"ne t#ousn$ s"% #un$re$ e"ty n"ne only '