Alshaya Property Development Co. W.L.L.
BURJ ALSHAYA FOUR SEASONS HOTEL
AL SOOR STREET, KUWAIT
DESIGN DEVELOPMENT (Core & Shell)
BP 3 Structural Works Issued for Tender
DOCUMENT IV
BILLS OF QUANTITIES 17th May2012
BILLS OF QUANTITIES
LIST OF CONTENTS PAGE NO.
GENERAL NOTES GN1 - GN/3
TENDER'S DECLARATION TD1
PREAMBLES P1 - P9
BILL NO. 01: GENERAL REQUIREMENTS 1/1/1 - 1/1/5
BILL NO. 02: PODIUM 2/2/1 - 2/Summ/1
BILL NO. 03 : OFFICE TOWER 3/2/1 - 3/Summ/1
BILL NO. 04 : HOTEL TOWER 4/2/1 - 4/Summ/1
BILL NO. 05 : PROVISIONAL SUMS 5/PS/1 - 5/PS/4
TENDER ADJUSTMENT SCHEDULE TAS/1 - TAS/4
MAIN SUMMARY MS/1
ANALYSIS OF PRICES AP/1
DAYWORK SCHEDULE DW/1 - DW-8
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya IND/1 Index
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
GENERAL NOTES
Total of Bills of Quantities
The Tenderer should note that the total of all the items in the Bills of Quantities including amounts in
respect of Provisional Sums must be equal to the total shown in the Form of Tender against such
Bills of Quantities.
Quantities
The Drawings, Specifications and all other Contract Documents are complementary and if any item
is included in any one of them, it shall be considered as if it is included in all of them.
Notice is drawn to the fact that the quantities provided in the Bills of Quantities are approximate and
the Tenderer should check the same against the information provided in the Drawings,
Specifications and other Tender Documents including checking the Site conditions.
Should the Tenderer feel that adjustments of any quantities or the addition of any further items are
necessary, he shall itemise all such differences or missing items in the Tenderer's Adjustment
Schedule immediately prior to the Summary of the Bills of Quantities giving full details of revised
quantities, descriptions, rates and extensions.
If the Bills of Quantities do not contain items of work that are shown or required in any of the other
Contract Documents, and the Employer wishes to omit or vary such works from the Scope of Work
in accordance with the Conditions of Contract, then such Works shall be valued and the Lump Sum
adjusted accordingly.
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya GN/1 General Notes
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
Units of Measurement
The units of measurement adopted in the Bills of Quantities shall prevail throughout the Contract
notwithstanding any trade, local or general custom and shall be used in the adjustment of all
measured variations or further measurement or remeasurement. All works shall be measured net
as fixed and finished in accordance with the Drawings and no allowance made for waste.
The Units of measurement used herein are :
Volume - Cubic Metre : m3
Area - Square Metre : m2
Length - Linear Metre : m
Number : no
Weight - Kilogrammes/Tonnes : kg/T
Lump sum : item
Lump sum : LS
Group : group
Set : set
Provisional Sum : ps
Pair : pair
In item descriptions, dimensions involving metres are given in metres (Abbreviated m) parts of a
metre are given in centimetres (Abbreviated cm) or millimetres (Abbreviated mm). In certain
descriptions dimensions may be given in British Units viz. inches (Abbreviated in or ".)
Descriptions
General directions and descriptions of work and materials given in the Specification are not
necessarily repeated in these Bills of Quantities. Reference shall be made to the Specifications for
this information.
Where items in the Bills contain the phrase "as specified", the Contractor shall refer to the
Specifications and the Drawings for the full description and the Contractor shall include in his rates
for complying with this clause whether the phrase "as specified" appears in the text or not. Where
the word "allow" occurs the cost of the item shall be at the risk of the Contractor.
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya GN/2 General Notes
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
Rates
The rates to be inserted in the Bills of Quantities are for those works referred to in the Tender
Documents and shall cover the execution, completion and defects maintenance of the Works,
finished complete in every respect and shown and described in the Tender Documents.
These rates shall be the full inclusive value of the work described under the several items including
all costs and expenses which may be required in and for the construction of the work described.
The costs and expenses of all the general risks, liabilities and obligations, set forth or implied in the
conditions of contract shall be deemed to be included in the rates for the work in Divisions 2 to 31 or
alternatively may be priced in Division 1.
Division 1 of the Bills of Quantities provides the tenderer the opportunity for pricing Division 1 -
General Requirements of the Specification and also for pricing Documents I and II, Tendering
Procedures and Conditions of Contract if required. Where any of these items are not priced it shall
be deemed that all costs associated with this section of the tender documents are deemed included
in the rates for the work.
The Contractor shall be deemed to have fully considered all the conditions, obligations and
requirements of the Tender Documents before entering the respective rates against the items
included in the Bills of Quantities.
Rates should be entered against all priceable items included in the Bills of Quantities, whether
quantities are stated or not. Lump sums covering more than one item shall not be given. Items
against which no rate is entered will be considered as covered by the other rates in the Bills.
Builder's work in connection with specialist sub-contractors is deemed to be included in the rates for
those sub-contract works unless specifically mentioned within the Bills. The Contractor must obtain
particulars of the position in which chases, holes, mortises, etc., will be required to avoid any
unnecessary cutting away. No claims will be considered for the extra cost of cutting away work
already built in consequence of any neglect on the part of the Contractor to obtain sufficient
particulars beforehand.
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya GN/3 General Notes
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
BILLS OF QUANTITIES
TENDERER'S DECLARATION
I/We declare that I/we have taken into consideration when pricing the individual unit rates and Tender
Sum that :
The Rates in the Bills of Quantities will be deemed to include for the full cost of the Works as described
in all documents to provide and maintain a complete construction and installation.
I/We declare therefore that all the aforesaid has been considered as declared and that I/we shall not
make any claim of any nature whatsoever on account of the aforesaid.
The total lump sum contract price shall be deemed to include for the full costs and expenses of
whatever nature necessary for any work shown anywhere in the Tender Documents, although such
work may not be specifically mentioned in the Bills of Quantities.
Name :
Signature :
Capacity :
Address :
THE TENDERER LOCAL PARTNER OR AGENT
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya TD/1 Tenderer's Declaration
PREAMBLES TO THE BILLS OF QUANTITIES
A
B
C
i) Labour, supervision and all associated costs.
ii) Materials, goods, consumables and all associated costs.
iii) Fitting and fixing materials and goods in position
iv) Provision of plant, equipment and tools
v) Restriction of working areas and procedures
vi) Temporary works
vii) Establishment, administration and overhead charges and profit
viii) All applicable taxes, duties, charges, government levies, landing charges,
transport and the like.
D
E
The rates for each item must allow for all costs and expenses in complying with all general
risks, liabilities and obligations set forth in the Drawings, Specifications and Conditions of
Contract, including but not limited to the following :
A price or rate is to be entered against each item in the Bills of Quantities and any item left
unpriced will be deemed to be included for elsewhere in the Bills of Quantities and hence the
rate for that item will be taken as Nil.
The prices and rates entered by the Contractor against items in the Bills of Quantities shall
apply throughout the duration of the Contract until the issuance of the Taking Over Certificate
to the execution of these items in any location and, except where otherwise provided for, to any
additional work ordered by the Engineer and/or the Employer.
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
GENERALLY
The Bills of Quantities herein, including all notes and instructions, form an integral part of the
Contract Documents. However, the descriptions contained in the Bills of Quantities for each
item are not necessarily complete.
The rates for each item must be comprehensive and must include for complying with the
Specifications, and all obligations under the Contract including all matters and things necessary
for the proper design, construction, completion and maintenance of the Works. No claims for
additional payment will be allowed for any error or misunderstanding by the Contractor of the
work involved.
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya P/1 Preambles
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
A
B
C
D
E
B.S. means the specification issued by the British Standards Institution.
C.P. means the Code of Practice issued by the B.S.I.
AASHTO means the specification issued by the American Association of the State
Highway and Transportation Officials
ASTM means the specification issued by the American Society for Testing and
Materials.
PD means British Standard Provisional Document
DD means British Standard Draft for Development
Approved/
Approval means approved by or approval of the Engineer in writing
Submit means submitted to or submit to the Engineer in writing
Accepted/
Acceptance means accepted by or acceptance of the Engineer in writing
„As described‟ means as described in the Specifications.
In the Specification and Bills of Quantities the following abbreviations have the meanings
hereby assigned to them :-
Submitted/
The description of each item (which description shall imply references to any heading, sub-
heading, preamble or other clause of item which shall apply) shall be held to include all
materials, workmanship, taxes, duties, charges, Government levies, landing charges, transport,
profit, overheads and all other incidental costs to complete the Works.
The Contractor shall not use these Bills of Quantities as a construction programme or for the
purposes of ordering materials or arranging sub-contracts. The references for these activities
shall be the Drawings, Specifications and Addenda issued by the Engineer.
These preambles are to be read in conjunction with the item descriptions in the Bills of
Quantities.
ABBREVIATIONS
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya P/2 Preambles
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
Inspected/
Inspection means inspected by or inspection of the Engineer
Directed means directed by the Engineer in writing
Authorised/
Authority means authorised by or authority of the Engineer in writing
Required means required by the Engineer in writing
Rejected means rejected by the Engineer in writing
In writing above shall also mean verbally later confirmed in writing
O.O.E.A.A. means or other equal and approved
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya P/3 Preambles
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
A
B
C
D
i) Pricing Preambles and Specifications shall apply reciprocally between sections
of the works unless otherwise described
ii) Materials shall be of the quality specified unless otherwise directed by the
Engineer.
iii) All materials shall be transported, handled, stored and fixed in accordance with
the printed instructions or recommendations of their manufacturers or suppliers.
iv) Protection of completed work, all casings, temporary coverings, making good,
cleaning, polishing and clearing away upon completion.
E
PREAMBLES
Rates for various items throughout the Bills of Quantities shall include, unless otherwise stated
or measured, for cutting of every description and the consequent waste, for work in girths,
widths or heights of less than 300 mm and for all short lengths.
Rates for all work shall include for protection and provision of samples.
All measurements are net and the rates shall include for all laps, waste, working space and
trade or traditional allowances.
The pricing of materials shall take account of the following :
The Contractor should ascertain, before the work is put in hand, the particulars of positions in
which chases, holes, mortices and the like will be required to be formed or left. No claim for the
extra cost of cutting away work already built due to the Contractor‟s failure to ascertain these
particulars will be admitted.
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya P/4 Preambles
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
PRICING
A
B
C
D
E
F
G
VARIATIONS
H
J
The rates inserted in the Schedule of Dayworks if any, shall be deemed to be the rates used by
the Contractor in making up rates for works items in all parts of the Bills of Quantities.
The Tenderer shall submit the analysis of the “Tender Sum” with a full and detailed rate
breakdown of all the BOQ items including spare parts items, together with their tender
submission. The breakdown is to show the actual calculations of the General Items, Labour,
Plant and Materials, Cost for the Works, the build-up of measured rates with on-costs and
overheads and any other allowances used to arrive at the Tender Price. In addition the
Tenderer/Contractor will be required to provide the Engineer within 48 hours with a full and
detailed breakdown/ any other information if requested.
The prices shall be comprehensive and must include for complying in all respects with the
Instructions to Tenderers, Conditions of Contract, Specifications and Drawings and for all
matters and things necessary for the proper construction, completion and maintenance of the
whole of the Works. No claims for additional payment will be allowed for any error or
misunderstanding by the Contractor of the Work involved.
The rates inserted in the Bills of Quantities with the application of the adjustment item will be
used to value any variation to the Works, whether omissions or additions. The Contractor shall
not be entitled to payment for profit and overheads on the value of any Works omitted.
SHOP DRAWINGS
The rates in the appropriate section shall include for design of the elements as specified in the
Contract and for providing working drawings, shop drawings, schedules, specifications,
calculation, etc., and for obtaining the Engineer‟s approval.
Lump sums shall not be given where unit rates are applicable.
Where the word “allow” is used, the cost of the item shall be the responsibility of the Contractor.
The amounts set against any item of overhead shall include for all costs in connection with
letters of credit, bank charges, interest charges and insurance after the materials, come under
the control of the Contractor.
The rates inserted will be used to determine the amount of the Contractor‟s Interim Payments.
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya P/5 Preambles
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
A
i) Use of Contractor's administrative arrangements.
ii) Use of constructional plant.
iii) Use of Contractor's facilities, including messrooms, sanitary accommodation
and welfare facilities.
iv) Use of temporary works.
v) Space for Sub Contractor's or Authority's offices and stores.
vi) Clearing away rubbish.
vii) Scaffolding, including the provision, maintenance and removal of any special
scaffolding required.
viii) Unloading, distributing and placing in position all plant, machinery etc.
ix) Provision of electric power for sub-contractor's on-site work, and for lighting,
including any 3 - phase or heavy supplies which may be required.
x) Provision of water for the works, including requirements for testing and
commissioning
xi) Unloading all plant and materials, placing in suitable storage areas, hoisting or
lowering to respective floor levels and distributing plant and materials to
positions convenient to the nominated sub-contractor for executing his work.
xii) General co-ordination and integration of all sub-contract works into the general
programme.
xiii) Entering into an agreement with the nominated sub-contractor based on the
conditions laid down in the form of contract.
xiv) Ascertaining full details of any work to be executed by other trades in
connection with the sub-contract works and arranging for such work to be
executed at the proper time.
xv) Allowing use of all temporary means of access already fixed or placed in
position on the site for men and materials.
ADJUSTMENT
NOMINATED SUB-CONTRACTORS
General Attendance on Nominated Sub-Contractors
The adjustment item shown on the Summary page, if any, shall apply to all Bills (excluding
Provisional Sums) unless clearly indicated otherwise. In the event that a Contract is awarded
on the basis of this tender, the Adjustment Item, calculated as a percentage of the total
tendered sum or the total for the Bills indicated, shall be applied to all rates and items as
entered in the Bills of Quantities (including any addenda) and the Contract shall be signed
based on the inclusion of the adjusted rates and items. During this Contract, the adjusted rates
and items shall be applied during any remeasured works and in the evaluation of Variation
Orders.
Rates for Assistance by the Contractor in respect of work by Nominated Sub-Contractor or
Government or Public Authority shall include, but not be limited to:
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya P/6 Preambles
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
i) Allowing use of scaffolding and all temporary means of access already fixed or
placed in position on the site for men and materials.
ii) Use of messrooms, sanitary accommodation and welfare facilities.
iii) Providing water for the Works.
iv) Providing power and lighting for the Works.
v) Protecting after installation.
vi) Clearing away rubbish.
i) Unloading, storing, distributing and hoisting.
ii) Arranging for delivery or payment of carriage, where particulars are given.
i) Drilling, cutting or leaving of holes for pipes, ducts and the like though walls,
floors, partitions, roofs, etc. and subsequently making good/waterproofing where
necessary.
ii) Cutting and pinning ends of supports for pipes, equipment, appliances, fittings
and the like to walls, floors, partitions, soffits, etc. and making good. (e.g.. Fixing
of MEP items to the structures where weights of the equipment/Pipes are
detrimental to the structural elements )
Special Attendance on Nominated Sub-Contractors
Any services required by a nominated sub-contractor beyond those referred to in the
proceeding paragraph have been described in detail under "Special Attendance" following the
Facilities for Direct Works
The Contractor shall afford the following facilities free of charge to other contractors appointed
Fixing of Goods or Materials Supplied by Specified Suppliers
Rates for fixing goods and materials supplied by the Specified Merchant or Tradesman shall
include, but not limited to:
Builder's work in connection with Mechanical, Electrical, Plumbing, Drainage, External
The expression “Builder‟s Works” shall mean the ancillary work carried out by the Contractor in
connection with the MEP installations, examples of which are given below.
The drilling, cutting or leaving of holes or apertures through structural floors, walls, beams, etc.
shall be avoided, but where this becomes a necessity, the Contractor must obtain the written
approval of the Engineer before work is put in hand.
The Contractor shall allow for all builders‟ work in connection with the installations as included
in the following list which it should be noted, is not intended to be exhaustive and can be
extended at the discretion of the Engineer.
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya P/7 Preambles
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
iii) Cutting or leaving mortises, sinkings, etc. for holding down bolts, brackets,
supports and the like and grouting in.
iv) Cutting chases for pipes, conduits and the like in walls, floors, partitions, etc.
and subsequent making good.
v) Cutting and filling around, boring holes through and making good of finishings
up to pipes, ducts, fans supports, brackets and the like.
vi) The construction of concrete, block and/or timber ducts.
vii) The formation of ducts within concrete slabs.
viii) The formation of concrete bases, plinths, etc. for plant and equipment including
floating floors, isolation pads, inertia bases for chillers and the like.
ix) The building of timber frames for A/C grilles and ducts penetrations.
x) The waterproofing of penetrations for all external ductwork and pipework to the
Engineer‟s approval.
xi) Making good finishes after second fix installation.
xii) Secondary steel framing necessary for support of plant, pipework, lifts, ductwork
and the like. ( e.g.: Steel supports required for fixings of equipment, pipes etc.
on steel roofs )
xiii) Concrete encasement to drainage pipes and fittings below slab on grade.
xiv) The lifting of all plant and equipment into its place, including the lifting of chillers,
air handling units, water tanks and window cleaning equipment and the like onto
the roof(s) or relevant level (s) from ground floor levels close to the building.
xv) Surveyor‟s assistance for setting out of positions for fixing of pipe sleeves and
cut-outs on floor slabs as required by MEP Subcontractor.
MEP Subcontractor‟s responsibilities in connection with Builders work for Mechanical,
Preparation of accurate shop drawings for all builders work requirement including coordination
with structural beams and walls.
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya P/8 Preambles
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
The building of meter pits, sumps, manholes, handles, access chambers and the like.
Sealing of incoming cable ducts to and from buildings subject to the Engineers approval.
Note: The drilling, cutting or leaving of holes or apertures through structural floors, walls,
beams, etc., shall be avoided, but where this becomes a necessity, the Contractor must obtain
the written approval of the Engineer before work is put in ha
Positioning and fixing of sleeves, frames, mark locations for openings required on slabs and
wall partitions. For the avoidance of doubt, the sleeves shall be supplied by the MEP Sub-
contractor.
Mark accurate opening sizes on ceilings for recessed light fittings, A/C grilles, access panels or
other devices.
Supply and installation of galvanized steel frames and chequered plates for cable trenches /
services trenches, manhole covers as detailed in specification/drawings or B.O.Q
Protective painting for pipe work supports and brackets
Filling of services penetration gaps between pipe sleeves, pipes, cables, ducts, etc. with
specified/approved materials.
Note: Services penetration through fire rated walls, floors shall be filled with fire stop material
as approved by the local authorities / Engineer.
Excavation and backfilling of external pipes or cables service duct trenches.
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya P/9 Preambles
ITEM DESCRIPTION AMOUNT
DIVISION 1 - GENERAL REQUIREMENTS
The pricing of this division should be in respect of the whole contract works.
KD
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
The Contractor is referred to the requirements of Document III - Technical
Specifications (Vol. 1) - together with all other documents that jointly form
the Contract Documents for the Works under this Contract.
BILL NO. 1 - GENERAL REQUIREMENT
Each item is to be priced individually and the Tenderer shall not enter
"included" or enter any lump sums grouping more than one or all items.
CARRIED TO COLLECTION
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 1/1/1Bill No. 1 - General Requirements
Div. 1 - General Requirements
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM QTY. UNIT RATE AMOUNT
DIVISION 1 - GENERAL REQUIREMENTS
SECTION
A 011000 Summary item
B 012100 Contingency Allowances item
C 012200 Unit rates item
D 012600 Contract Modification Procedures item
E 012900 Payment Procedures item
F 013100 Project Management And Coordination
item
G 013200 Construction Progress Documentation item
H 013233 Photographic Documentation item
J 013300 Submittal Procedures item
K 013529 Health, Safety & Emergency Response
Procedures item
L 014000 Quality Requirements item
M 014200 References item
N 015000 Temporary Facilities And Controls item
P 017300 Execution item
KD
DESCRIPTION
Allow for the works as referred in Document III
Specification Division 1, including the following :
Quantified items included below are subject to
remeasurement
CARRIED TO COLLECTION
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 1/1/2Bill No. 1 - General Requirements
Div. 1 - General Requirements
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM QTY. UNIT RATE AMOUNT
DIVISION 1 - GENERAL REQUIREMENTS
A 017700 Closeout Procedures item
B 017839 Project Record Documents item
C
item
D
item
KD
DESCRIPTION
Allow for the works and obligations referred to in
Document I - Tendering Procedures
Allow for the works and obligations referred to in
Document II - Conditions of Contract
CARRIED TO COLLECTION
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 1/1/3Bill No. 1 - General Requirements
Div. 1 - General Requirements
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM QTY. UNIT RATE AMOUNT
DIVISION 1 - GENERAL REQUIREMENTS
A Sub-Clause
4.2
Performance Security
item
B Sub-Clause
14.2
Advance Payment Guarantee
item
C Sub-Clause
18.2
Insurance for Works and Contractor's
Equipment item
D Sub-Clause
18.3
Insurance against Injury to Persons and
Damage to Property item
E Sub-Clause
18.4
Insurance for Contractor's Personnel
item
F Sub-Clause
18.5
Professional Indemnity Insuarance
item
KD
DESCRIPTION
Allow for additional items according to the
requirements of Document II - General and Particular
Conditions of Contract, to be priced as follows:-
CARRIED TO COLLECTION
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 1/1/4Bill No. 1 - General Requirements
Div. 1 - General Requirements
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
DESCRIPTION AMOUNT
DIVISION 1 - GENERAL REQUIREMENTS
COLLECTION
Total of Page 1/1/1
Total of Page 1/1/2
Total of Page 1/1/3
Total of Page 1/1/4
KDCARRIED TO BILL SUMMARY
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 1/1/5Bill No. 1 - General Requirements
Div. 1 - General Requirements
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
BILL NO. 02: PODIUM
DIVISION 02 - EXISTING CONDITIONS
The Contractor is referred to the Specifications
and Drawings for all details related to this
section of the Works and he is to include for
complying with all the requirements contained
therein, whether or not they are specifically
mentioned within the item descriptions
02 3000.13 : SUBSURFACE
INVESTIGATION
Site Investigation
A Allow for site investigation and for locating and
diverting existing utilities interfering with the
Works, sealing existing utilities required to be
maintained and removing redundant utilities/
services, including excavation of trial pits 1 item
CARRIED TO SUMMARY KD
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 2/2/1Bill no. 2 - Podium
Division 2 - Existing Conditions
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
BILL NO. 02: PODIUM
DIVISION 03 - CONCRETE
The Contractor is referred to the Specifications
and Drawings for all details related to this
section of the Works and he is to include for
complying with all the requirements contained
therein, whether or not they are specifically
mentioned within the item descriptions
03 3000 : CAST-IN-PLACE CONCRETE
SUBSTRUCTURE
Plain concrete 17MPa (Cylindrical) using
Ordinary Portland Cement ASTM C150 (Type
I) including formwork and additives
A 75mm Blinding 169 m3
Mass concrete fill 17MPa (Cylindrical) using
Ordinary Portland Cement ASTM C150 (Type
I) including formwork and additives
B Below raft slab 527 m3
Reinforced concrete 45MPa (Cylindrical) using
OPC & PFA & micro silica cement including
formwork, water stops, expansion and
construction joints, joint filler and additives
C Raft foundation including pits and trenches 3,347 m3
D 300mm Retaining wall 140 m3
E 400mm Retaining wall 172 m3
F Columns, attached to retaining walls 138 m3
CARRIED TO COLLECTION KD
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 2/3/1Bill no. 2 - Podium
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
Reinforced concrete 28MPa (Cylindrical) using
Ordinary Portland Cement ASTM C150 (Type
I) including, formwork, expansion and
construction joints, joint filler and additives
A 150mm Suspended slab 25 m3
B 200mm Ditto 21 m3
C 300mm Ditto 2 m3
D Beams 523 m3
E 700mm Deep rib slab, 125mm thick top slab,
900mm centre to centre rib 575mm deep,
350mm top width and bottom width 250mm. 1,657 m2
F 700mm Deep rib slab, 125mm thick top slab,
1800mm centre to centre rib 575mm deep,
350mm top width and bottom width 250mm. 1,304 m2
G 700mm deep Thickening to rib slabs 75 m3
H Stairs 12 m3
J Upstand 1 m3
K Equipment bases 99 m3
Reinforced concrete 45MPa (Cylindrical) using
Ordinary Portland Cement ASTM C150 (Type
I) including formwork, expansion and
construction joints, joint filler and additives
L Columns 220 m3
M 200mm Walls 3 m3
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 2/3/2Bill no. 2 - Podium
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
Reinforcement
A Raft @ 220kg/m3 736,340 kg
B Retaining wall @ 170kg/m3 53,040 kg
C Suspended slabs @ 120kg/m3 5,760 kg
D Rib slabs - 700 deep/900 c/c @ 51kg/m2 84,507 kg
E Rib slabs - 700 deep/1800 c/c @ 28.755kg/m2 37,497 kg
F Thickening to Rib slabs @ 150kg/m3 11,250 kg
G Beams @ 180kg/m3 94,140 kg
H Stairs @ 100kg/m3 1,200 kg
J Columns @ 240kg/m3 85,920 kg
K Walls @ 160kg/m3 480 kg
L Upstands @ 100kg/m3 100 kg
M Equipment bases @ 70kg/m3 6,930 kg
Finishes
N Extra Over Fair face finish, to beams and
slabs m2 Rate only
P Extra Over Fair face finish, to rib slabs
(measured on plan) m2 Rate only
Q Extra Over Fair face finish, to columns and
walls m2 Rate only
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 2/3/3Bill no. 2 - Podium
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
Sundries
A To equipment bases Item
B Expansion joint between retaining wall and
adjacent existing building including filler and
metal flashings Item
SUPERSTRUCTURE
Reinforced concrete 28MPa (Cylindrical) using
Ordinary Portland Cement ASTM C150 (Type
I) including, formwork, expansion and
construction joints, joint filler and additives
C 150mm Suspended slab 10 m3
D 200mm Ditto 10 m3
E 700mm Deep rib slab, 125mm thick top slab,
900mm centre to centre rib 575mm deep,
350mm top width and bottom width 250mm. 712 m2
F 700mm Deep rib slab, 125mm thick top slab,
1800mm centre to centre rib 575mm deep,
300mm top width and bottom width 200mm. 845 m2
G 700mm deep Thickening to rib slabs 74 m3
H 190mm thick slab to metal deck 3,428 m2
J Beams 499 m3
K Stairs 34 m3
L Upstands 1 m3
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 2/3/4Bill no. 2 - Podium
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
Reinforced concrete 45MPa (Cylindrical) using
Ordinary Portland Cement ASTM C150 (Type
I) including, formwork, expansion and
construction joints, joint filler and additives
A Columns 344 m3
Reinforced concrete 45MPa (Cylindrical) using
Ordinary Portland Cement ASTM C150 (Type
I) including additives
B Concrete fill to Hollow steel columns 74 m3
Reinforcement
C Suspended slabs @ 120kg/m3 2,400 kg
D Rib slabs - 700 deep/900 c/c @ 51kg/m2 36,312 kg
E Rib slabs - 700 deep/1800 c/c @ 28.755kg/m2 24,298 kg
F Thickening to Rib slabs @ 150kg/m3 11,100 kg
G Beams @ 180kg/m3 89,820 kg
H Stairs @ 100kg/m3 3,400 kg
J Columns @ 240kg/m3 82,560 kg
K Upstands @ 100kg/m3 100 kg
L Metal deck mesh reinforcement 3,428 m2
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 2/3/5Bill no. 2 - Podium
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
Finishes
A Extra Over Fair face finish, to beams and
slabs m2 Rate only
B Extra Over Fair face finish, to rib slabs
(measured on plan) m2 Rate only
C Extra Over Fair face finish, to columns and
walls m2 Rate only
03 4100 : PRECAST STRUCTURAL
CONCRETE
Precast concrete units including
reinforcement, hardware, anchors, mortar
fixings, fair face finish and painting to exposed
units
D 3800 x 1000 x 300mm Access hatch 14 nr
03 5200 : LIGHTWEIGHT CONCRETE
Lightweight concrete, 700kg/m3 density,
including control joints filled with joint filler
E Filling to make up level 9 m3
F Steps 1 m3
G 150-200mm, to basement roof 168 m2
03 5419 : SAND CEMENT SCREED
H 50mm Thick, to protect horizontal
waterproofing 2,261 m2
J Ditto, to basement roof 168 m2
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 2/3/6Bill no. 2 - Podium
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION AMOUNT
DIVISION 03 - CONCRETE
COLLECTION
Total of page No. 2/3/1
Total of page No. 2/3/2
Total of page No. 2/3/3
Total of page No. 2/3/4
Total of page No. 2/3/5
Total of page No. 2/3/6
CARRIED TO SUMMARY KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 2/3/7Bill no. 2 - Podium
Division 3 - Concrete
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
BILL NO. 02: PODIUM
DIVISION 05 - METALS
The Contractor is referred to the Specifications
and Drawings for all details related to this
section of the Works and he is to include for
complying with all the requirements contained
therein, whether or not they are specifically
mentioned within the item descriptions
05 1200 : STRUCTURAL STEEL
Grade 50, Structural steelwork and framing
including all bolts, nuts, washers, plates, base
plates, stiffening plates, gussets plates,
holding down bolts, angle sections, cleats,
stiffener rods, bracing and the like including
cutting, welding, threading, fixing complete,
fire-proofing and priming / finishing paint as
required, and anchor bolts to concrete
surfaces
A To Podium 454,000 kg
B To Podium (Grade 36) 74,000 kg
C Grand Stair 1 item
D 1875mm high Stair at 2nd Floor 1 item
E Connections 1 item
05 3100 : STEEL DECKING
Galvanized and shop primed steel metal deck
including Z purlins, raised pattern ribs,
interlocking side laps, fire-proofing, painting
and accessories (concrete topping measured
separately)
F To Podium 3,428 m2
CARRIED TO SUMMARY KD
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 2/5/1Bill no. 2 - Podium
Division 5 - Metals
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
BILL NO. 02: PODIUM
DIVISION 07 - THERMAL AND MOISTURE
PROTECTION
The Contractor is referred to the Specifications
and Drawings for all details related to this
section of the Works and he is to include for
complying with all the requirements contained
therein, whether or not they are specifically
mentioned within the item descriptions
07 1354 : THERMOPLASTIC SHEET
WATERPROOFING
Thermoplastic waterproofing system including
2mm thick PVC sheeting, waterstops, injection
hose and resin, welding and fixing
A To raft foundation, horizontal, laid to slopes 2,261 m2
B To raft foundation and retaining walls,
vertically 1,257 m2
C To basement roof, Horizontally 168 m2
Geotextile slip layer
D To raft foundation, horizontal, laid to slopes 2,261 m2
E To raft foundation and retaining walls,
vertically 1,257 m2
F To basement roof, Horizontally 168 m2
Polythene sheet
G To raft foundation, horizontal, laid to slopes 2,261 m2
CARRIED TO COLLECTION KD
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 2/7/1Bill no. 2 - Podium
Division 7 - Thermal and Moisture Protection
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 07 - THERMAL AND MOISTURE
PROTECTION
A To raft foundation and retaining walls,
vertically 402 m2
B To basement roof, Horizontally 168 m2
Protection board
C To raft foundation and retaining walls,
vertically 402 m2
Geotextile protection layer
D To raft foundation and retaining walls,
vertically 855 m2
Shotcrete / Plaster applied to face of secant
piles including welded wire fabric, reinforcing
steel, reinforcement anchors and accessories
E Shotcrete 402 m2 Rate Only
F Plaster 402 m2
07811 : SPRAYED FIRE RESISTIVE
COATING
G To structural steel members indicated on the
drawings or as required by the authorities, 2 hr
fire rated item
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 2/7/2Bill no. 2 - Podium
Division 7 - Thermal and Moisture Protection
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION AMOUNT
DIVISION 07 - THERMAL AND MOISTURE
COLLECTION
Total of page No. 2/7/1
Total of page No. 2/7/2
CARRIED TO SUMMARY KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 2/7/3Bill no. 2 - Podium
Division 7 - Thermal and Moisture Protection
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
BILL NO. 02: PODIUM
DIVISION 31 - EARTHWORK
The Contractor is referred to the Specifications
and Drawings for all details related to this
section of the works and he is to include for
complying with all the requirements contained
therein, whether or not they are specifically
mentioned within the item descriptions
31 2016 : EARTHWORK
Earthwork including excavation in all materials,
backfilling, compaction, eartwork support
system and removal of surplus excavated
materials from site
A Excavation, to final excavation level 4,289 m3
Design, supply and install Localised Earthwork
support system
B Localised Earthwork support system including
adjustment and maintenance until no longer
required item
31 2319 : DEWATERING
C Allow for operation and maintenance of
Dewatering System 15 month
D Allow for demobilizing Dewatering System item
31 3116 : TERMITE CONTROL
E Termite control treatment (area measured on
plan) 2,165 m2
CARRIED TO SUMMARY KD
BURJ AL SHAYABP3 - STRUCTURAL WORKS
KUWAIT
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 2/31/1Bill no. 2 - Podium
Division 31 - Earthwork
ITEM REFERENCE DESCRIPTION PAGE NO. AMOUNT
SUMMARY
DIVISION 2 EXISTING CONDITIONS 2/2/1
DIVISION 3 CONCRETE 2/3/7
DIVISION 05 METALS 2/5/1
DIVISION 7 THERMAL & MOISTURE PROTECTION 2/7/3
DIVISION 31 EARTHWORK 2/31/1
CARRIED TO MAIN SUMMARY KD
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
BILL NO. 02: PODIUM
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 2/Summ/1Bill no. 2 - Podium
Bill Summary
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
BILL NO. 03 : OFFICE TOWER
DIVISION 02 - EXISTING CONDITIONS
The Contractor is referred to the Specifications
and Drawings for all details related to this
section of the Works and he is to include for
complying with all the requirements contained
therein, whether or not they are specifically
mentioned within the item descriptions
02 3000.13 : SUBSURFACE
INVESTIGATION
Site Investigation
A Allow for site investigation and for locating and
diverting existing utilities interfering with the
Works, sealing existing utilities required to be
maintained and removing redundant utilities/
services, including excavation of trial pits 1 item
CARRIED TO BILL SUMMARY KD
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 3/2/1Bill No. 3 - Office Tower
Division 2 - Existing Conditions
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
BILL NO. 03 : OFFICE TOWER
DIVISION 03 - CONCRETE
The Contractor is referred to the Specifications
and Drawings for all details related to this
section of the Works and he is to include for
complying with all the requirements contained
therein, whether or not they are specifically
mentioned within the item descriptions
03 3000 : CAST-IN-PLACE CONCRETE
SUBSTRUCTURE
Plain concrete 17MPa (Cylindrical) using
Ordinary Portland Cement ASTM C150 (Type
I) including formwork and additives
A 75mm Blinding 220 m3
Reinforced concrete 45MPa (Cylindrical) using
OPC & PFA & micro silica cement including
formwork, water stops, expansion and
construction joints, joint filler and additives
B Raft foundation including pits and trenches 3,129 m3
C 300mm Retaining wall 179 m3
D 400mm Retaining wall 181 m3
E 490mm Retaining wall 4 m3
F 200mm Slab-on-grade, to raft 63 m3
CARRIED TO COLLECTION KD
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 3/3/1Bill No. 3 - Office Tower
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
Reinforced concrete 60MPa (Cylindrical) using
OPC & PFA & micro silica cement including
formwork, water stops, expansion and
construction joints, joint filler and additives
A Columns, attached to retaining walls 300 m3
Reinforced concrete 45MPa (Cylindrical) using
Ordinary Portland Cement ASTM C150 (Type
I) including formwork, expansion and
construction joints, joint filler and additives
B 150mm Suspended slab 33 m3
C 200mm Ditto 36 m3
D 220mm Ditto 62 m3
E 300mm Ditto 6 m3
F 350mm Ditto 72 m3
G 700mm Deep rib slab, 125mm thick top slab,
900mm centre to centre rib 575mm deep,
350mm top width and bottom width 250mm. 1,440 m2
H 700mm deep Thickening to rib slabs 55 m3
J Beams 135 m3
K Stairs 32 m3
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 3/3/2Bill No. 3 - Office Tower
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
Reinforced concrete 60MPa (Cylindrical) using
Ordinary Portland Cement ASTM C150 (Type
I) including formwork, expansion and
construction joints, joint filler and additives
A Columns 79 m3
B 800mm Core Walls 438 m3
C 400mm Ditto 210 m3
D 200mm Walls 2 m3
E 250mm Walls 7 m3
F Spandrel beams 79 m3
G Upstands 1 m3
H Corbels supporting stairs 1 m3
Reinforcement
J Raft @ 180kg/m3 563,220 kg
K Retaining wall @ 170kg/m3 61,880 kg
L Suspended slabs @ 130kg/m3 27,170 kg
M Rib slabs - 700 deep/900 c/c @ 51kg/m2 73,440 kg
N Thickening to Rib slabs @ 150kg/m3 8,250 kg
P Beams @ 150kg/m3 20,250 kg
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 3/3/3Bill No. 3 - Office Tower
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
A Stairs @ 100kg/m3 3,200 kg
B Columns @ 250kg/m3 94,750 kg
C Core Walls @ 120kg/m3 77,760 kg
D Spandrel beams @ 150kg/m3 11,850 kg
E Corbels @ 120kg/m3 120 kg
F Walls @ 160kg/m3 1,440 kg
G Upstands @ 100kg/m3 100 kg
H Slab on grade mesh reinforcement 315 m2
Finishes
J Extra Over Fair face finish, to beams and
slabs m2 Rate only
K Extra Over Fair face finish, to rib slabs
(measured on plan) m2 Rate only
L Extra Over Fair face finish, to columns and
walls m2 Rate only
Sundries
M Expansion joint between retaining wall and
adjacent existing building including filler and
metal flashings Item
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 3/3/4Bill No. 3 - Office Tower
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
SUPERSTRUCTURE
Reinforced concrete 45MPa (Cylindrical) using
Ordinary Portland Cement ASTM C150 (Type
I) including, formwork, expansion and
construction joints, joint filler and additives
A 125mm Suspended slab 35 m3
B 150mm Ditto 913 m3
C 180mm Ditto 4 m3
D 200mm Ditto 302 m3
E 220mm Ditto 2,249 m3
F 250mm Ditto 359 m3
G 300mm Ditto 24 m3
H 700mm Deep rib slab, 125mm thick top slab,
900mm centre to centre rib 575mm deep,
350mm top width and bottom width 250mm. 3,224 m2
J 700mm Deep rib slab, 125mm thick top slab,
1800mm centre to centre rib 575mm deep,
300mm top width and bottom width 200mm. 33,301 m2
K 700mm deep Thickening to rib slabs 1,950 m3
L Beams 4,111 m3
M Stairs 34 m3
N Parapet 19 m3
P Water tank upstand 20 m3
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 3/3/5Bill No. 3 - Office Tower
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
Reinforced concrete 60MPa (Cylindrical) using
Ordinary Portland Cement ASTM C150 (Type
I) including, formwork, expansion and
construction joints, joint filler and additives
A Columns 3,366 m3
B Circular columns 90 m3
C Inclined columns 80 m3
D 400mm Core wall 5,201 m3
E 600mm, Ditto 2,788 m3
F 800mm, Ditto 4,728 m3
G 200mm Walls 122 m3
H 250mm Walls 88 m3
J 300mm Walls 14 m3
K Spandrel beams 1,478 m3
L Corbels supporting stairs 11 m3
Reinforcement
M Suspended slabs @ 130kg/m3 505,180 kg
N Rib slabs - 700 deep/900 c/c @ 51kg/m2 164,424 kg
P Rib slabs - 700 deep/1800 c/c @ 28.755kg/m2 957,571 kg
Q Thickening to Rib slabs @ 150kg/m3 292,500 kg
R Beams @ 150kg/m3 616,650 kg
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 3/3/6Bill No. 3 - Office Tower
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
A Stairs @ 100kg/m3 3,400 kg
B Columns @ 250kg/m3 884,000 kg
C Core Walls @ 120kg/m3 1,526,040 kg
D Spandrel beams @ 150kg/m3 221,700 kg
E Corbels @ 120kg/m3 1,320 kg
F Walls @ 160kg/m3 35,840 kg
G Upstands @ 100kg/m3 3,900 kg
Finishes
H Extra Over Fair face finish, to beams and
slabs m2 Rate only
J Extra Over Fair face finish, to rib slabs
(measured on plan) m2 Rate only
K Extra Over Fair face finish, to columns and
walls m2 Rate only
03 4100 : PRECAST STRUCTURAL
CONCRETE
SUBSTRUCTURE
Precast concrete stairs 6210 x 1600mm wide
L 1500mm high 4 no
M 2180mm high 2 no
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 3/3/7Bill No. 3 - Office Tower
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
SUPERSTRUCTURE
Precast concrete stairs 6210 x 1600mm wide
A 1250mm high 8 no
B 1440mm high 2 no
C 1520mm high 4 no
D 1680mm high 4 no
E 1710mm high 2 no
F 2000mm high 2 no
G 2100mm high 68 no
H 2250mm high 2 no
Precast concrete stairs 6675 x 1550mm wide
J 900mm high 2 no
K 1440mm high 2 no
L 1710mm high 2 no
M 2100mm high 74 no
N 2250mm high 2 no
P 3150mm high 2 no
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 3/3/8Bill No. 3 - Office Tower
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
Precast concrete stairs 7165 x 1550mm wide
A 900mm high 2 no
B 1710mm high 2 no
C 2100mm high 36 no
D 2250mm high 2 no
E 3150mm high 2 no
Precast concrete stairs 7500 x 1550mm wide
F 1250mm high 8 no
G 1440mm high 2 no
H 2000mm high 2 no
J 2100mm high 38 no
Precast concrete stairs 7850 x 1550mm wide
K 1250mm high 8 no
L 1520mm high 4 no
M 1680mm high 4 no
N 2000mm high 2 no
Precast concrete access panels & covers
P 2900 x 950 x 150mm thick 6 no
Q 1400 x 700mm pit cover 2 no
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 3/3/9Bill No. 3 - Office Tower
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
03 5200 : LIGHTWEIGHT CONCRETE
Lightweight concrete, 700kg/m3 density,
including control joints filled with joint filler
A Filling to make up level 1 m3
B Steps 1 m3
C Ramp 1 m3
D 150-200mm, to basement roof 168 m2
03 5419 : SAND CEMENT SCREED
E 50mm Thick, to protect horizontal
waterproofing 2,076 m2
F Ditto, to basement roof 168 m2
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 3/3/10Bill No. 3 - Office Tower
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION AMOUNT
DIVISION 03 - CONCRETE
COLLECTION
Total of page No. 3/3/1
Total of page No. 3/3/2
Total of page No. 3/3/3
Total of page No. 3/3/4
Total of page No. 3/3/5
Total of page No. 3/3/6
Total of page No. 3/3/7
Total of page No. 3/3/8
Total of page No. 3/3/9
Total of page No. 3/3/10
CARRIED TO BILL SUMMARY KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 3/3/11Bill No. 3 - Office Tower
Division 3 - Concrete
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
BILL NO. 03 : OFFICE TOWER
DIVISION 07 - THERMAL AND MOISTURE
PROTECTION
The Contractor is referred to the Specifications
and Drawings for all details related to this
section of the Works and he is to include for
complying with all the requirements contained
therein, whether or not they are specifically
mentioned within the item descriptions
07 1354 : THERMOPLASTIC SHEET
WATERPROOFING
Thermoplastic waterproofing system including
2mm thick PVC sheeting, waterstops, injection
hose and resin, welding and fixing
A To raft foundation, horizontal, laid to slopes 2,076 m2
B To raft foundation and retaining walls,
vertically 1,802 m2
C To basement roof, Horizontally 168 m2
Geotextile slip layer
D To raft foundation, horizontal, laid to slopes 2,076 m2
E To raft foundation and retaining walls,
vertically 1,802 m2
F To basement roof, Horizontally 168 m2
CARRIED TO COLLECTION KD
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 3/7/1Bill No. 3 - Office Tower
Division 7 - Thermal and Moisture Protection
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 07 - THERMAL AND MOISTURE
PROTECTION
Polythene sheet
A To raft foundation, horizontal, laid to slopes 2,076 m2
B To basement roof, Horizontally 168 m2
Geotextile protection layer
C To raft foundation and retaining walls,
vertically 1,802 m2
Pile head treatment including 25mm thick
micro concrete grouting and High performance
fluid resin encapsulation,
D 1500mm Diameter 60 no
Shotcrete / Plaster applied to face of secant
piles including welded wire fabric, reinforcing
steel, reinforcement anchors and accessories
E Shotcrete 80 m2
F Plaster 1,265 m2
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 3/7/2Bill No. 3 - Office Tower
Division 7 - Thermal and Moisture Protection
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION AMOUNT
DIVISION 07 - THERMAL AND MOISTURE
COLLECTION
Total of page No. 3/7/1
Total of page No. 3/7/2
CARRIED TO SUMMARY KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 3/7/3Bill No. 3 - Office Tower
Division 7 - Thermal and Moisture Protection
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
BILL NO. 03 : OFFICE TOWER
DIVISION 31 - EARTHWORK
The Contractor is referred to the Specifications
and Drawings for all details related to this
section of the works and he is to include for
complying with all the requirements contained
therein, whether or not they are specifically
mentioned within the item descriptions
31 2016 : EARTHWORK
Earthwork including excavation in all materials,
backfilling, compaction, eartwork support
system and removal of surplus excavated
materials from site
A Excavation, to final excavation level 4,351 m3
Backfilling including compaction
B Sand fill, to slab on grade 607 m3
Design, supply and install Localised Earthwork
support system
C Localised Earthwork support system including
adjustment and maintenance until no longer
required item
31 2319 : DEWATERING
D Allow for operation and maintenance of
Dewatering System 15 month
E Allow for demobilizing Dewatering System item
31 3116 : TERMITE CONTROL
F Termite control treatment (area measured on
plan) 1,785 m2
CARRIED TO BILL SUMMARY KD
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 3/31/1Bill No. 3 - Office Tower
Division 31 - Earthwork
ITEM REFERENCE DESCRIPTION PAGE NO. AMOUNT
SUMMARY
DIVISION 2 EXISTING CONDITIONS 3/2/1
DIVISION 3 CONCRETE 3/3/11
DIVISION 7 THERMAL & MOISTURE PROTECTION 3/7/3
DIVISION 31 EARTHWORK 3/31/1
CARRIED TO MAIN SUMMARY KD
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
BILL NO. 03 : OFFICE TOWER
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 3/Summ/1Bill No. 3 - Office Tower
Bill Summary
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
BILL NO. 04 : HOTEL TOWER
DIVISION 02 - EXISTING CONDITIONS
The Contractor is referred to the Specifications
and Drawings for all details related to this
section of the Works and he is to include for
complying with all the requirements contained
therein, whether or not they are specifically
mentioned within the item descriptions
02 3000.13 : SUBSURFACE
INVESTIGATION
Site Investigation
A Allow for site investigation and for locating and
diverting existing utilities interfering with the
Works, sealing existing utilities required to be
maintained and removing redundant utilities/
services, including excavation of trial pits 1 item
CARRIED TO BILL SUMMARY KD
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 4/2/1Bill No. 4 - Hotel Tower
Division 2 - Existing Conditions
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
BILL NO. 04 : HOTEL TOWER
DIVISION 03 - CONCRETE
The Contractor is referred to the Specifications
and Drawings for all details related to this
section of the Works and he is to include for
complying with all the requirements contained
therein, whether or not they are specifically
mentioned within the item descriptions
03 3000 : CAST-IN-PLACE CONCRETE
SUBSTRUCTURE
Plain concrete 17MPa (Cylindrical) using
Ordinary Portland Cement ASTM C150 (Type
I) including formwork and additives
A 75mm Blinding 220 m3
Reinforced concrete 45MPa (Cylindrical) using
OPC & PFA & micro silica cement including
formwork, water stops, expansion and
construction joints, joint filler and additives
B Raft foundation including pits and trenches 6,656 m3
C 300mm Retaining wall 226 m3
D 400mm Retaining wall 283 m3
Reinforced concrete 60MPa (Cylindrical) using
OPC & PFA & micro silica cement including
formwork, water stops, expansion and
construction joints, joint filler and additives
E Columns, attached to retaining walls 160 m3
CARRIED TO COLLECTION KD
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 4/3/1Bill No. 4 - Hotel Tower
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
Reinforced concrete 45MPa (Cylindrical) using
Ordinary Portland Cement ASTM C150 (Type
I) including formwork, expansion and
construction joints, joint filler and additives
A 150mm Suspended slab 16 m3
B 200mm, Ditto 28 m3
C 250mm, Ditto 108 m3
D 300mm, Ditto 86 m3
E 350mm, Ditto 200 m3
F Beams 305 m3
G 700mm Deep rib slab, 125mm thick top slab,
900mm centre to centre rib 575mm deep,
350mm top width and bottom width 250mm. 2,139 m2
H 700mm deep Thickening to rib slabs 75 m3
J Stairs 10 m3
K Equipment bases 14 m3
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 4/3/2Bill No. 4 - Hotel Tower
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
Reinforced concrete 60MPa (Cylindrical) using
Ordinary Portland Cement ASTM C150 (Type
I) including formwork, expansion and
construction joints, joint filler and additives
A Columns 167 m3
B 400mm Core Walls 253 m3
C 300mm Ditto 48 m3
D 300mm Water tank walls 301 m3
E Spandrel beams 30 m3
F Upstands 2 m3
G Corbels supporting stairs 1 m3
Reinforcement
H Raft @ 180kg/m3 1,198,080 kg
J Retaining wall @ 170kg/m3 86,530 kg
K Suspended slabs @ 130kg/m3 56,940 kg
L Rib slabs - 700 deep/900 c/c @ 51kg/m2 109,089 kg
M Thickening to Rib slabs @ 150kg/m3 11,250 kg
N Beams @ 150kg/m3 45,750 kg
P Stairs @ 100kg/m3 1,000 kg
Q Columns @ 250kg/m3 81,750 kg
R Core Walls @ 120kg/m3 36,120 kg
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 4/3/3Bill No. 4 - Hotel Tower
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
A Spandrel beams @ 150kg/m3 4,500 kg
B Corbels @ 120kg/m3 120 kg
C Walls @ 160kg/m3 48,160 kg
D Upstands @ 100kg/m3 200 kg
E Equipment bases @ 70kg/m3 980 kg
Finishes
F Extra Over Fair face finish, to beams and
slabs m2 Rate only
G Extra Over Fair face finish, to rib slabs
(measured on plan) m2 Rate only
H Extra Over Fair face finish, to columns and
walls m2 Rate only
Sundries
J To equipment bases Item
K Expansion joint between retaining wall and
adjacent existing building including filler and
metal flashings Item
SUPERSTRUCTURE
Reinforced concrete 45MPa (Cylindrical) using
Ordinary Portland Cement ASTM C150 (Type
I) including, formwork, expansion and
construction joints, joint filler and additives
L 150mm Suspended slab 242 m3
M 200mm Ditto 372 m3
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 4/3/4Bill No. 4 - Hotel Tower
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
A 250mm Ditto 244 m3
B 300mm Ditto 25 m3
C 400mm Ditto 40 m3
D 700mm Deep rib slab, 125mm thick top slab,
900mm centre to centre rib 575mm deep,
350mm top width and bottom width 250mm.
9,151 m2
E 650mm Deep rib slab, 125mm thick top slab,
1700mm centre to centre rib 525mm deep,
300mm top width and bottom width 200mm.
20,867 m2
F 650mm deep Thickening to rib slabs 260 m3
G 700mm deep Thickening to rib slabs 115 m3
H Beams 3,754 m3
J Stairs 19 m3
K Equipment bases 47 m3
L Upstands 4 m3
Reinforced concrete 60MPa (Cylindrical) using
Ordinary Portland Cement ASTM C150 (Type
I) including, formwork, expansion and
construction joints, joint filler and additives
M Columns 1,747 m3
N 300mm Core wall 862 m3
P 400mm, Ditto 2,507 m3
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 4/3/5Bill No. 4 - Hotel Tower
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
A 300mm Walls 107 m3
B Spandrel beams 324 m3
Corbels supporting stairs 4 m3
Reinforcement
C Suspended slabs @ 130kg/m3 119,990 kg
D Rib slabs - 700 deep/900 c/c @ 51kg/m2 466,701 kg
E Rib slabs - 650 deep/1700 c/c @ 27.54kg/m2 574,678 kg
F Thickening to Rib slabs @ 150kg/m3 56,250 kg
G Beams @ 150kg/m3 563,100 kg
H Stairs @ 100kg/m3 1,900 kg
J Columns @ 250kg/m3 436,750 kg
K Core Walls @ 120kg/m3 404,280 kg
L Spandrel beams @ 150kg/m3 48,600 kg
M Corbels @ 120kg/m3 600 kg
N Walls @ 160kg/m3 17,120 kg
P Upstands @ 100kg/m3 400 kg
Q Equipment bases @ 70kg/m3 3,290 kg
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 4/3/6Bill No. 4 - Hotel Tower
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
Finishes
A Extra Over Fair face finish, to beams and
slabs m2 Rate only
B Extra Over Fair face finish, to rib slabs
(measured on plan) m2 Rate only
C Extra Over Fair face finish, to columns and
walls m2 Rate only
Styropore fill
D Styropore fill, to make up levels 33 m3
E Styropore fill, to equipment bases 72 m3
03 4100 : PRECAST STRUCTURAL
CONCRETE
SUBSTRUCTURE
Precast concrete stairs 6300 x 1575mm wide
F 1260mm high 8 no
G 1280mm high 8 no
SUPERSTRUCTURE
Precast concrete stairs 6300 x 1575mm wide
H 1250mm high 16 no
J 1410mm high 2 no
K 1500mm high 16 no
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 4/3/7Bill No. 4 - Hotel Tower
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 03 - CONCRETE
A 1530mm high 8 no
B 1690mm high 4 no
C 1900mm high 40 no
D 2000mm high 8 no
E 2060mm high 4 no
F 2100mm high 16 no
G 2140mm high 4 no
Precast concrete access panels & covers
H 4000 x 900 x 150mm thick 4 no
J 1295 x 815mm pit cover 1 no
K 1400 x 700mm pit cover 3 no
03 5200 : LIGHTWEIGHT CONCRETE
Lightweight concrete, 700kg/m3 density,
including control joints filled with joint filler
L Filling to make up level 54 m3
M Lightweight concrete steps 7 m3
N 150-200mm, to basement roof 168 m2
03 5419 : SAND CEMENT SCREED
P 50mm Thick, to protect horizontal
waterproofing 2,922 m2
Q Ditto, to basement roof 168 m2
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 4/3/8Bill No. 4 - Hotel Tower
Division 3 - Concrete
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION AMOUNT
DIVISION 03 - CONCRETE
COLLECTION
Total of page No. 4/3/1
Total of page No. 4/3/2
Total of page No. 4/3/3
Total of page No. 4/3/4
Total of page No. 4/3/5
Total of page No. 4/3/6
Total of page No. 4/3/7
Total of page No. 4/3/8
CARRIED TO BILL SUMMARY KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 4/3/9Bill No. 4 - Hotel Tower
Division 3 - Concrete
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
BILL NO. 04 : HOTEL TOWER
DIVISION 07 - THERMAL AND MOISTURE
PROTECTION
The Contractor is referred to the Specifications
and Drawings for all details related to this
section of the Works and he is to include for
complying with all the requirements contained
therein, whether or not they are specifically
mentioned within the item descriptions
07 1354 : THERMOPLASTIC SHEET
WATERPROOFING
Thermoplastic waterproofing system including
2mm thick PVC sheeting, waterstops, injection
hose and resin, welding and fixing
A To raft foundation, horizontal, laid to slopes 2,922 m2
B To raft foundation and retaining walls,
vertically 1,943 m2
C To basement roof, Horizontally 168 m2
Geotextile slip layer
D To raft foundation, horizontal, laid to slopes 2,922 m2
E To raft foundation and retaining walls,
vertically 1,943 m2
F To basement roof, Horizontally 168 m2
CARRIED TO COLLECTION KD
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 4/7/1Bill No. 4 - Hotel Tower
Division 7 - Thermal and Moisture Protection
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
DIVISION 07 - THERMAL AND MOISTURE
PROTECTION
Polythene sheet
A To raft foundation, horizontal, laid to slopes 2,922 m2
B To raft foundation and retaining walls,
vertically 1,292 m2
C To basement roof, Horizontally 168 m2
Protection board
D To raft foundation and retaining walls,
vertically 1,292 m2
Geotextile protection layer
E To raft foundation and retaining walls,
vertically 651 m2
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 4/7/2Bill No. 4 - Hotel Tower
Division 7 - Thermal and Moisture Protection
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION AMOUNT
DIVISION 07 - THERMAL AND MOISTURE
COLLECTION
Total of page No. 4/7/1
Total of page No. 4/7/2
CARRIED TO SUMMARY KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 4/7/3Bill No. 4 - Hotel Tower
Division 7 - Thermal and Moisture Protection
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
BILL NO. 04 : HOTEL TOWER
DIVISION 31 - EARTHWORK
The Contractor is referred to the Specifications
and Drawings for all details related to this
section of the works and he is to include for
complying with all the requirements contained
therein, whether or not they are specifically
mentioned within the item descriptions
31 2016 : EARTHWORK
Earthwork including excavation in all materials,
backfilling, compaction, eartwork support
system and removal of surplus excavated
materials from site
A Excavation, to final excavation level 5,289 m3
Design, supply and install Localised Earthwork
support system
B Localised Earthwork support system including
adjustment and maintenance until no longer
required item
31 2319 : DEWATERING
C Allow for operation and maintenance of
Dewatering System 15 month
D Allow for demobilizing Dewatering System item
31 3116 : TERMITE CONTROL
E Termite control treatment (area measured on
plan) 2,436 m2
CARRIED TO BILL SUMMARY KD
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 4/31/1Bill No. 4 - Hotel Tower
Division 31 - Earthwork
ITEM REFERENCE DESCRIPTION PAGE NO. AMOUNT
SUMMARY
DIVISION 2 EXISTING CONDITIONS 4/2/1
DIVISION 3 CONCRETE 4/3/9
DIVISION 7 THERMAL & MOISTURE PROTECTION 4/7/3
DIVISION 31 EARTHWORK 4/31/1
CARRIED TO MAIN SUMMARY KD
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
BILL NO. 04 : HOTEL TOWER
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 4/Summ/1Bill No. 4 - Hotel Tower
Bill Summary
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
BILL NO. 05 : PROVISIONAL SUMS
The following Provisional Sums are
designated for the execution of work, supply
of Goods, Materials, Plant or services,
specialist sub-contractors, or for
contingencies, which sums may be used in
whole or in part or not at all, on the
instructions of the Engineer. (Overheads and
profit are paid only when Plant, Materials or
services are purchased from a nominated
Subcontractor)
BP3A - CONVEYING SYSTEMS
A Allow the Provisional Sum of KD Three
Million Fifty Thousand Only (KD 3,050,000)
for Conveying system PS 3,050,000
B Allow for Main Contractor's Overheads and
profit %
C Allow for Attendance by Main Contractor Lump
Sum
BP3B - EXTERIOR ENVELOPE
External envelope including, but not limited to,
glazed curtain wall systems, louvers, glass &
glazing, stone cladding, prefinished metal
cladding systems, structural steel and
galvanized steel support systems, etc.
D Allow the Provisional Sum of KD Nine Million
Nine Hundred Thousand Only (KD 9,900,000)
PS 9,900,000
E Allow for Main Contractor's Overheads and
profit %
F Allow for Attendance by Main Contractor Lump
Sum
CARRIED TO COLLECTION KD
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 5/PS/1 Provisional Sums
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
PROVISIONAL SUMS
BP3C - BUILDING MAINTENANCE SYSTEM
A Allow the Provisional Sum of KD Three
Hundred Eighty Five Thousand Only (KD
385,000) for Building Maintenance PS 385,000
B Allow for Main Contractor's Overheads and
profit %
C Allow for Attendance by Main Contractor Lump
Sum
BP3D - ARCHITECTURAL WORKS
Architectural works in BOH areas including,
but not limited to, Light weight concrete and
concrete block walls, finishes including floor,
wall, ceiling and skirting, waterproofing,
acoustic underlays, screeds, partitioning
walls, toilet fixtures, vanity tops, toilet
accessories, doors including hardware and
finishes, interface doors between BOH and
FOH (finishes on only on BOH side), linen
chute, FFE & cupboards, metal works, kitchen
equipments, roofing, etc.
D Allow the Provisional Sum of KD Eleven
Million Six Hundred Thousand Only (KD
11,600,000) PS 11,600,000
E Allow for Main Contractor's Overheads and
profit %
F Allow for Attendance by Main Contractor Lump
Sum
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 5/PS/2 Provisional Sums
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
PROVISIONAL SUMS
BP3E - MEP WORKS
MEP works including, but not limited to,
complete MEP works for BOH areas, MEP
equipments for FOH and BOH areas, building
management systems, permanent connection
charges for water, electricity, drainage,
telephone, coordination with local authority,
Façade lighting and external landscape
lighting, provision of electrical services for
other trades, etc.(Excluding Distribution
system for FOH area)
A Allow the Provisional Sum of KD Twenty Two
Million Six Hundred Thousand Only (KD
22,600,000) PS 22,600,000
B Allow for Main Contractor's Overheads and
profit %
C Allow for Attendance by Main Contractor Lump
Sum
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 5/PS/3 Provisional Sums
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION AMOUNT
PROVISIONAL SUMS
COLLECTION
Total of page No. 5/PS/1
Total of page No. 5/PS/2
Total of page No. 5/PS/3
KDCARRIED TO SUMMARY
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya 5/PS/4 Provisional Sums
ITEM AMOUNT
TENDERER'S ADJUSTMENT SCHEDULE
A
B
C
D
E
F
CARRIED TO COLLECTION KD
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
Any alterations to the Bills of Quantities will be ignored and the text read as
originally printed.
The Tenderer shall detail in the following pages any items which he requires in
addition to those in the Bills of Quantities, or any of the printed items which he
feels should be omitted from the Bills of Quantities.
Items detailed shall be shown as unit quantities, in the same format as the Bills
of Quantities, each item having a rate duly extended and the whole totalled and
carried to the Summary.
Should further pages be required by the Tenderer he shall include these and
amend the Summaries to suit the revised pages.
This Section shall be deemed to be the whole of the Additions and Omissions
required by the Tenderer.
DESCRIPTION
No alterations shall be made by the Tenderer to the printed text of the foregoing
Bills of Quantities.
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya TAS/1 Tender Adjustment Schedule
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
TENDERER'S ADJUSTMENT SCHEDULE
ADDITIONS
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya TAS/2 Tender Adjustment Schedule
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
TENDERER'S ADJUSTMENT SCHEDULE
OMISSIONS
CARRIED TO COLLECTION KD
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya TAS/3 Tender Adjustment Schedule
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
TENDERER'S ADJUSTMENT SCHEDULE
SUMMARY
ADDITIONS
Total of Page TAS/2
Total Additions KD
OMISSIONS
Total of Page TAS/3
Total Omissions KD
Total of
NET ADDITIONS/OMISSIONS *
FOR TENDERER'S ADJUSTMENT SCHEDULE
* Delete as required
KDTENDERER'S ADJUSTMENT SCHEDULE
CARRIED TO SUMMARY
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya TAS/4 Tender Adjustment Schedule
ITEM REFERENCE DESCRIPTION PAGE NO. AMOUNT
MAIN SUMMARY
BILL NO. 01: GENERAL REQUIREMENTS 1/1/5
BILL NO. 02: PODIUM 2/Summ/1
BILL NO. 03 : OFFICE TOWER 3/Summ/1
BILL NO. 04 : HOTEL TOWER 4/Summ/1
BILL NO. 05 : PROVISIONAL SUMS 5/PS/4
TENDERER'S ADJUSTMENT SCHEDULE TAS/6
* ADDITIONS/OMISSION
Sub-Total KD
TENDERER'S PRICE ADJUSTMENT KD
* ADDITIONS/OMISSIONS
TOTAL CARRIED TO FORM OF KD
TENDER (IN WORDS) KUWAITI DINARS
SIGNATURE OF
TENDERER : STAMP
* Delete as appropriate
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya MS/1 Main Summary
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ANALYSIS OF PRICES
The Tenderer is required to complete the following Schedule in every respect for all rates and
prices in the Bills of Quantities. The sample schedule provided shall be copied as necessary.
The total amount quoted shall equate to the full unit rate or lump sum as inserted against
each respective item in the Bills of Quantities. Tenderers who offer lump sum or percentage
Tenderer's Price Adjustments may be requested to submit Analyses of Prices for rates after
adjustment of Tender Price Adjustment.
Prior to the acceptance of the Tender, the Tenderer may be required to provide further
substantiating details and/or amend any unreasonable rates of analysis.
Where no Subcontractor's OH & P is declared, Contractor's OH & P is deemed to include all
OH & P including any subcontractors or suppliers OH & P.
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya AP/1 Analysis of Prices
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
ANALYSIS OF PRICES
BILL OF UNIT RATE SUBCONTRACTOR'S CONTRACTOR'S
QUANTITIES OR PRICE LABOUR PLANT MATERIAL SUB-TOTAL 1 OH & P SUB-TOTAL 2 OH & P TOTAL
ITEM KD KD KD KD KD % KD KD % KD KD
ITEM
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya AP/2 Analysis of Prices
DESCRIPTION AMOUNT
DAYWORK SCHEDULE
General
Tenderers are to note that the pricing of the following schedule of daywork
rates is not to be carried to the Summary or to the Form of Tender.
The prices inserted against these items will form a basis for assessing the
value of any dayworks which may become necessary during the course and
within the terms of the Contract.
Rates quoted for dayworks will be taken into consideration when Tenders are
examined and they shall bear a reasonable relationship with the unit rates
entered elsewhere in these documents. If any rates are found upon
examination to be excessive or abnormal then the successful Tenderer will be
called upon to revise such rates prior to the signing of the Contract. Failure to
do so may lead to rejection of the Tender.
Time engaged in the actual works will be the time allowed.
The signature of the Engineer on Daywork Records will be for record purposes
only and the Engineer reserves the right to measure and value any works for
which daywork records have been kept.
Subject to the provisions of the preceding clause, the Contractor will be paid for
dayworks carried out during the course of the Contract, while other
operations are in progress at the rates set down by him in this schedule.
Rates quoted for dayworks shall be applicable to any day of the week and to any
time of day or night irrespective of any trade, local or other custom.
Supervision costs including foremen are included in the percentage on cost.
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya DW/1 Dayworks
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
LABOUR HOURLY
RATE
Daywork rates quoted for labour shall be the net amounts payable to the
employee and shall be detailed in the appropriate section below:
Labour on Site
A _____________________________
B _____________________________
C _____________________________
D _____________________________
E _____________________________
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya DW/2 Dayworks
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
Labour On Costs PERCENT
The Tenderer shall append his required percentage addition within the space
provided below for all on-costs on his basic labour cost. This
percentage shall be deemed to include for:
i) Complying with the Labour Law and all of its up to-date amendments, together
with any additional costs for inducements required to attract and retain labour
on the site.
ii) The use of all hand tools, the use of all ordinary non mechanical plant
including staging, scaffolding, etc., where not erected solely for execution
of the daywork item, the use of all electric light and power supplies and access
to and use of all the Contractor's site facilities
iii) All overtime payments including non-productive overtime and travelling time
other than that specifically ordered by the Engineer at the time of
instructing the daywork.
iv) The cost of all supervision of labour employed on the daywork item including
engineers, clerks, store-keepers etc.
v) Overhead and profit including both head office and site overheads.
Percentage addition required to be added to basic labour rates as detailed for
on-costs as described:
%
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya DW/3 Dayworks
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
MATERIALS
Materials used on Daywork items shall be of the same quality as specified for
the whole of the Works.
The rates used will be the NET price of the respective materials
delivered to site and shall include for all costs of loading at source
of supply and transporting to the Site. In the case of materials
specifically imported for use on daywork items at the instruction
of the Engineer the rates used will include, in addition to the requirements
listed above, for freight charges, insurance, custom duties and port landing
charges.
All material rates used on daywork will require to be substantiated by
invoices and in the event of no invoices being forthcoming, the Engineer
may, at his own discretion, replace the rate claimed by the Contractor with the
lowest current market price for that material.
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya DW/4 Dayworks
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
Materials On-Costs PERCENT
The Tenderer shall append his required percentage addition within the space
provided below for all on-costs on his basic material costs and this
percentage shall be deemed to include for:
i) Unloading at site, storage and protection, transporting around the Site and
unloading at the working area, breakages, waste and checking materials.
ii) Overheads and profit include both head office and site overheads.
Percentage addition required to be added to basic material rates as detailed
for on-costs as described:
%
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya DW/5 Dayworks
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
PLANT
The Contractor is to insert in following schedule the hire rates, which will be
applicable for the duration of the contract for all plant he proposed to have on
Site.
Should plant other than that already on site be required for any item of
daywork then the rates included on the daywork returns will be the local hire
rates current at the time of the work.
The rates inserted on the schedule by the Contractor are to include for
drivers, attendants, operators, maintenance of plant in proper working order,
attendance in starting up and shutting down, refueling including all fuel,
power, lubricating oil and grease, regular cleaning, all cleaning materials,
replacement and/or sharpening of tools, ancillary items and consumable
spares. Plant hired from local plant hire companies must have insurance
cover at least equal to that of the Contractor's plant on site and no payment
will be made for mechanics or maintenance time which shall be deemed to
be included in the spread over the rates for the plant concerned.
The hourly rate for plant will apply to the time when the plant is on Site only.
Plant On-Cost PERCENT
The Tenderer shall append his required percentage addition within the space
provided below for all on-cost on his hourly rates for plant and this
percentage shall be deemed to include for:
i) Transporting plant to and from the site
ii) Overheads and profits including both head office and site overheads.
Percentage addition required to be added to the hourly rates of plant as detailed
for on-costs as described
%
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya DW/6 Dayworks
BURJ AL SHAYA
BP3 - STRUCTURAL WORKS
KUWAIT
Schedule of Plant on Site for Use on Daywork Items HOURLY
RATE
DAYWORKS SCHEDULE
Plant List
A _____________________________
B _____________________________
C _____________________________
D _____________________________
E _____________________________
F _____________________________
G _____________________________
H _____________________________
J _____________________________
KEO/07-2345-0011/BP3-Structural Works
Burj Alshaya DW/7 Dayworks