CENTENNIAL AWABA
Environmental Monitoring Data
June 2015
Monitoring Data
2
TABLE OF CONTENTS
Introduction ................................................................................................................................................................................ 3
Surface water quality ................................................................................................................................................................. 3
Water volume ............................................................................................................................................................................. 3
Air Quality Monitoring ............................................................................................................................................................... 5
Noise Monitoring ....................................................................................................................................................................... 8
Complaints ................................................................................................................................................................................. 8
Appendix 1 – Plan AW1167 ....................................................................................................................................................... 9
TABLES
Table 1. Colliery Information ..................................................................................................................................................... 3
Table 2. LDP Volume Limits ...................................................................................................................................................... 4
Table 3. Monthly Dust Deposition Gauge Results .................................................................................................................. 5
Table 4. Rolling Annual Average dust deposition ................................................................................................................... 6
FIGURES
Figure 1. Monthly Dust Deposition Gauge Results .................................................................................................. 6
Figure 2. Rolling Annual Average Dust Deposition ................................................................................................. 7
3
INTRODUCTION
This monitoring report is to satisfy the requirements under the Protection of the Environment Legislation Amendment
Act 2011 (POELA Act) to publish or make pollution monitoring data available to members of the public.
This document also satisfies condition 7 schedule 5 of Project Approval 10_0038, this report summarises
environmental monitoring results for Awaba Colliery for the period of June 2015.
Table 1. Colliery Information
Colliery Information
Premises Details Awaba Colliery
Address Wilton Road, Awaba NSW 2280
Licensee Centennial Awaba
EPL no 443
EPL location http://www.environment.nsw.gov.au/prpoeoapp/ViewPOEOLicence.aspx?DOCID=3
0913&SYSUID=1&LICID=443
SURFACE WATER QUALITY
The following parameters pH, Total Suspended Solids (TSS mg/L), Electrical Conductivity (EC µs/cm) and Oil and
Grease (mg/L) are monitored at Licenced Discharge Point 1 – 9 in accordance with the requirements of Environmental
Protection Licence 443.
There were no discharges from Awaba Colliery Licenced Discharge Points during the monitoring period.
WATER VOLUME
Water volume discharged off site is measured through licence discharge points (LDPs). Environment Protection
Licences (EPLs) set limits on the maximum volume of water to be discharged for a given period.
The volume limits for EPL443 Licenced Discharge Points are listed in table 2
4
Table 2. LDP Volume Limits
Point Unit Of Measure Volume / Mass Limit
1 KL/day 200 2 KL/day 200 3 KL/day 2000 4 KL/day 2000 5 KL/day 200 6 KL/day 200 7 KL/day 500 9 ML/year 8
LDP009
Mine water was not discharged from Awaba Colliery Licenced Discharge Points during the monitoring period.
5
AIR QUALITY MONITORING
The air quality monitoring results for the reporting period are summarised below.
Depositional Dust
Depositional dust (g/m2/mth) results (insoluble solids) for June 2015 are shown in Table 3.
Table 3. Monthly Dust Deposition Gauge Results
Data Published: 10/07/2015 Licensee: Awaba Data Sampled: 22/5/15 -23/6/15 Address: Wilton Road, Awaba Data Obtained: 10/07/2015 EPL No. 443 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 DG1 0.3 0.8 0.7 1.5 1.3 1.6 0.6 0.1 0.8 0.5 0.4 0.4DG2 0.6 0.5 0.5 1.1 2.5 3.0 19.8 1.6 1.0 0.6 0.2 0.1DG3 * 3.6 * 2.2 3.1 3.5 1.0 * 2.4 1.1 1.9 *DG4 0.9 1.9 2.3 1.0 1.1 2.3 0.7 0.5 1.2 0.6 1.1 1.9
DG – Dust Gauge
* Results removed due to contamination of the sample. Specific information can be found below.
The following high readings were removed from the tables and graphs due to contamination of the results. The
following provides further information:
July – DG3 recorded a reading of 13.1 g/m2/month. A breakdown of the material shows 50% of the result
was a combination of Vegetation Matter and Polysaccharide slime.
September – DG3 recorded a reading of 7.8 g/m2/month. 50% of the dust was a combination of Vegetation
Matter and Polysaccharide slime.
February – DG3 recorded a reading of 4.4 g/m2/month. 60% of the dust was a combination of Vegetation
Matter and Polysaccharide slime.
June – DG3 recorded a reading of 11.8 g/m2/month. 60% of the dust was a combination of Vegetation Matter
and Polysaccharide slime.
A graphical representation of depositional dust monitoring data is shown in Figure 1.
6
Figure 1. Monthly Dust Deposition Gauge Results
Depositional dust monitoring data indicates that dust deposition results for June range from 0.1 g/m2/month to 11.8
g/m2/month.
Awaba Colliery development consent contains the following limit criteria for dust;
Annual average maximum total deposited dust level of 4 g/m2/month.
Maximum increase in Annual Average deposited dust level, 2 g/m2/month.
The rolling annual average for each of the dust gauges in June 2015 are shown in Table 4 and Figure 2 below.
Table 4. Rolling Annual Average dust deposition
Data Published: 10/07/2015 Licensee: Awaba Data Sampled: 22/5/15 - 23/6/15 Address: Wilton Road, Awaba Data Obtained: 10/07/2015 EPL No. 443 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 DG1 0.7 0.7 0.7 0.7 0.7 0.8 0.8 0.7 0.8 0.8 0.8 0.8 DG2 1.6 1.6 1.6 1.5 1.6 1.6 2.7 2.6 2.6 2.7 2.6 2.6 DG3 2.3 2.5 2.5 2.3 2.4 2.6 2.5 2.6 2.6 2.6 2.6 2.6 DG4 1.2 1.3 1.5 1.5 1.4 1.5 1.5 1.3 1.2 1.2 1.2 1.3
Annual Average Limit (4g/m2/mth) 4 4 4 4 4 4 4 4 4 4 4 4
0.0
5.0
10.0
15.0
20.0
25.0
Jul-1
4
Aug-
14
Sep-
14
Oct
-14
Nov
-14
Dec
-14
Jan-
15
Feb-
15
Mar
-15
Apr-1
5
May
-15
Jun-
15Inso
lubl
e So
lids
(g/m
2/m
th)
Monthly Dust Deposition
DG1 DG2 DG3 DG4
7
Figure 2. Rolling Annual Average Dust Deposition
There were no exceedance of the development consent rolling annual averages limit criteria of 4 g/m2/month for the
reporting period.
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
Jul-1
4
Aug-
14
Sep-
14
Oct
-14
Nov
-14
Dec
-14
Jan-
15
Feb-
15
Mar
-15
Apr-1
5
May
-15
Jun-
15Rol
ling
Ann
ual A
vera
ge (g
/m2/
mth
)
Rolling Annual Average Monthly Dust Deposition
DG1 DG2 DG3 DG4
8
NOISE MONITORING
Attended noise monitoring is undertaken quarterly in accordance with the Awaba Colliery Project Approval. A noise
monitoring survey was conducted between the 9th & 11th of June 2015 at two monitoring locations (Noise Sensitive
Receivers) surrounding the Awaba Colliery operations.
The results of the environmental noise compliance assessment conducted between the 9th & 11th of June 2015
indicated noise levels generated by the Awaba Colliery were compliant with the applicable noise criteria at all rural /
residential monitoring locations during day, evening and night periods.
The next round of noise monitoring is planned to be undertaken in August 2015.
COMPLAINTS
There were no community complaints during the month regarding Awaba Colliery.
9
APPENDIX 1 – PLAN AW1167
Centennial Coal Company Limited
P O Box 1000
Toronto NSW 2283
www.centennialcoal.com.au