Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas...

30
Biogas Asia Pacific Forum Kuala Lumpur, April 2015

Transcript of Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas...

Page 1: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

Biogas Asia Pacific Forum Kuala Lumpur, April 2015

Page 2: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com

Gas Purification, Separation & Filtration

Leading designer, manufacturer and

operator of gas purification,

separation and filtration systems for

crude-derived fuels displacement

Biogas

Natural Gas

Associated Gas

Hydrogen

Helium

Global presence, with headquarters in Montreal, Canada

Toronto Stock Exchange (TSXV: XBC)

2

Who we are Markets

Focus Strategy

2

Leverage key technological

advantages into long term

customer relationships to grow

sales and profitability

Page 3: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com

Blainville (QC)

Vancouver (BC)

Shanghai

Singapore

3

Headquarters in Blainville (QC) Manufacturing and Sales

R&D in Blainville (QC)

Customer support Office in Vancouver (BC)

Manufacturing and Sales in Shanghai

Bireme Ltd. in Singapore

Sales & Engineering Office in Houston, Texas

Ability to gain business and service customers worldwide

International Presence

Houston (TX)

Page 4: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com 4

Biogas Upgrading Technology TSA Technology for NGV refueling stations

Rapidly growing market

High recovery, high purity, low energy plants

Key Customers: Sempra, Montauk Energy, Halla, FortisBC, Golden Green, Sirim, SKS,

Growing market

Cost leadership through Chinese manufacturing

Key Customers: Clean Energy, Petrochina, Sinopec, Shell, Angi Energy, Greenfield,

PSA Technology for H2, He, CH4, CO

Business Segments

Growing market segment

Market-leading performance for small & medium capacity purifiers

Syngas purification

Key Customers: HydroChem, Haldor Topsoe Air Liquide, Linde, Iwatani

Membrane Technology – CH4, CO2 H2, He, N2

High recovery, high purity, high selectivity & flux

CH4, H2, He, N2, CO Biogas

Key Customers: Weil Group, Apache

Rapidly evolving market

Page 5: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

Technology and Products

Page 6: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com 6

Pressure Swing Adsorption and Membranes

Pure Innovation™

50 years of dedicated development in adsorption based gas

purification, separation and filtration

Complete proprietary product line with respect to rotary valves, and

fast cycle adsorption processes

Integration of membranes into overall system designs

Strong process capabilities in gas purification, separation & filtration

Ongoing development of next generation purification products,

especially membrane and hybrid systems

Current adsorption technology is applicable to all products segments

and is being augmented with membrane technology

Continued R&D activity with multiple Universities and Research

Institutes, focused on improved recovery and purity, while reducing

costs

Xebec H2X unit installed at ExxonMobil

refinery in 2007

Xebec Technology

Xebec’s membrane module for

BGX biogas upgrading

Page 7: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com 7

Solutions for Landfill and Digester Gas

Complexity reduction

► One-step fast cycle multi-bed kPSA technology separates H2O/CO2/N2/O2 from landfill gas to produce biomethane product

► Superior compared against conventional two-step membrane + PSA

Greatly enhanced product recovery:

► 92% (1-step) vs. 81% (2-step) = 13% more product to sell

Xebec utilizes hollow fiber membranes which are made of high-performance polymers which display excellent durability and longevity.

Designed specifically for carbon dioxide and methane separation and ideally suited for biogas upgrading, where no N2 and O2 is present in the feed gas.

This results in a methane recovery of over 99,5% and a methane slip of less than 0.5%.

Landfill Gas – PSA Solutions Digester gas – Membrane Solutions

Page 8: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com

Products

Biogas Upgrading

(BGX)

Natural Gas Drying

(NGX)

Hydrogen

(H2X)

Associated Gas

(AGX)

8

Rumpke Landfill in Ohio, US MTA, Orange County HydroEdge ,liquid H2 plant, Japan Venoco Off-Shore Oil Platform

Hilarides Dairy, California Trillium, California MKK, Japan PXP Oil Well, California

Page 9: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

Biogas Upgrading

Page 10: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com

Biogas Value Chain

10

Page 11: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com 11

Process Flow Diagram

Xebec’s core M-3200 Purification unit Xebec’s Containerized Small Scale BGX-30

with CNG option

Xebec’s BGX-30 with CNG compression and storage

Page 12: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com

BGX – Small Scale Biogas Upgrading

Standard containerized sizes for 30, 60 125, and 250 SCFM Biogas Flows

Zero emissions with micro-turbine

Plug and Play - Fast Installation

Integrated Control Room

Dry Purification Process, i.e.:

No process water /no water treatment No waste water treatment No chemicals

No bacterial contamination

Integrated drying/dew point < - 40ºC (compliant with CNG specifications SAEJ1616 specification)

No heat requirement

No corrosive gas atmosphere

24/7 Hotline Product Support

BGX-30 integrated control room High pressure CNG storage

Page 13: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com

BGX – A Wide Range Of Options

Optional H2S and / or Siloxane Removal

Optional Zero-Emission system with integrated Mircoturbine – no flare required

Optional integrated CNG compression, storage and dispensing station

Optional Product Flow meter

Optional Flare/Burner

Optional Xebec Leasing and Financing (EDC)

Optional H2S removal

Containerized CNG fuel option Microturbine option for electricity generation

Mobile flare for start-up and maintenance with microturbine option

13

Page 14: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com

BGX Production Capacity

System size

NCMH

BGX 50

BGX 100

BGX 200

BGX 400

Power

usage

HP

25

40

75

145

Optional

turndown

40 – 60%

Methane

recovery*

85 – 99%

Fleet served

Pick-ups Heavy trucks

CNG

Production

GLE/yr

257,000

510,000

1,077,000

2,150,000

20

40

82

164

2

4

8

16

Power

cost

$/yr

10,000

17,000

33,000

66,000

*Methane recovery dependent on recovery option

Displacing diesel fuel with cleaner

renewable natural gas

is the most viable economic solution.

Page 15: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com 15

U.S. DOE estimates 25% of all diesel fuel could be replaced by renewable gas

Impact on GHG Emissions

Source: German Energy Agency

Page 16: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

Selection Considerations

Page 17: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com 17

End-Use Considerations

Heat

Electricity

Upgrading

CNG

Injection into Pipeline

Combination of Power & Upgrading

Choose the Right End-Use Option

Page 18: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com 18

Operational Considerations

Technology

Recovery

Availability

Operational Costs

Local Support & Service

Five important considerations that will

impact your bottom line

Page 19: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com 19

What about Capex?

Less than you think

Do your financial model

Consider the right end-use (highest earnings)

Get the right financing

Include a 10% to 20% contingency.

Be conservative

How important is Capex?

Page 20: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

Case Studies and References

Page 21: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com 21

Location: Trifyl, France

Developer: Verdemobil

Biogas Feed: Landfill Gas

Raw Biogas: 52% CH4

~250 Nm3/h

End-use:

CNG for Refuse Trucks

H2 for municipal vehicles

Start-up date: 2011 to CNG

2013 to Hydrogen

Case Study – LFG to CNG and Hydrogen

First Landfill Gas to Renewable Hydrogen Worldwide

Page 22: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com 22

Location: Southern California, US

Developer: Sempra Utilities

Biogas Feed: Waste Water Plant

Raw Biogas: 58% CH4

~360 Nm3/h

End-use: Test/Pipeline

Pipeline Operator: Southern California Gas

Start-up date: 2011

Case Study – Waste Water Treatment

Page 23: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com 23

Location: Seoul, South Korea

Developer: Halla Environmental

Biogas Feed: Food Waste Digester

Raw Biogas: 60% CH4

~650 Nm3/h

End-use:

CNG for Refuse Trucks

Start-up date: 2011

Case Study – Mixed Waste to CNG

Page 24: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com 24

Location: Inwil, Switzerland

Operator: Swiss Farm Collective

Biogas Feed: Farm Waste Digester / Food

Waste

Raw Biogas: 52% - 56 CH4

~140 scfm / 225 Nm3/h

End-use: Injection into local pipeline,

onsite heat and electricity

Owner: Swiss Farm Collective

Start-up date: 2008

Case Study – Swiss Farm Collective

Page 25: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com

1,400 NCMH

PSA System, 2013

Daegu, South Korea, Municipal Digester

Other Xebec References

25

Page 26: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com 26

10,000-15,000 NCMH

PSA System, 2007

Rumpke Landfill, Cincinnati

Other Xebec References

Page 27: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com

Project Location Biogas Source End-Use

2006 - 2009

Scenic View Dairy MI, US Digester Pipeline

Rumpke Landfill OH, US Landfill Pipeline

Widnau Switzerland Digester Pipeline

Lavigny Farm Switzerland Digester Pipeline

UNH NH, US Landfill Turbine

SKS Austria Digester CNG

Swiss Farmer Switzerland Digester Pipeline

STEP Switzerland Digester Pipeline

Hilarides Dairy CA, US Digester CNG

Daesung Seoul, Korea Landfill CNG/LNG

SKS Austria Digester CNG

2010 - YTD

Sempra Energy CA, US Waste Water Pipeline

Halla Engineering Seoul, Korea Digester CNG

SKS Austria MSW Pipeline

SKS Austria MSW Pipeline

SKS Austria Waste Water CNG

Verdemobil France MSW CNG

Potlach Korea Digester CNG

Loongas China Digester CNG

FortisBC Canada Landfill Pipeline

Golden Green China Landfill CNG

Biogas Upgrading Installations

27

Escondido, California - Waste Water Treatment Plant gas to pipeline

2011

Salmon Arm, British Columbia - landfill gas to pipeline - 2012

Page 28: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com

Reliable and Simple Technologies (PSA and Membrane systems, robust and proven rotary equipment and valves)

Excellent Process Capabilities (CO2, N2, O2, H2S, H2O, VOCs, Siloxanes etc., ability to deal with varying feed gas qualities, while maintaining product gas specifications)

Flexible Designs (Plants designed for your needs, recovery and gas purity rates tailored to your needs, variable CH4 percentages in the exhaust gas for use in engines, boilers, turbines, etc.)

Complete Reference List (for all types of biogas - landfill gas, food digesters gas, organic farm waste gas, POME gas, mixed waste gas, waste waster treatment plant gas)

Full Aftermarket Support (Service and Parts support in the markets we operate in) Experienced Local Support in South East Asia.

Remote monitoring (via internet/satellite)

Financing through EDC (for qualified buyers)

28

Why Chose Xebec for your upgrading Project

Xebec your Technology Provider

Page 29: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com

Natural Gas, CNG and Biogas Filtration

29

Low Pressure XL Series 20 BarG / 290 PSIG

Volume Flow Rate: 70 to 3500 Nm3/h

40 to 2060 scfm

Operating Temp: 0-80 C0 / 32-176 F0

(120 C0 elements are available)

Port size : ¼” to 3” / 6mm to 75mm

Medium Pressure XM Series 50 BarG / 725 PSIG

Volume Flow Rate: 450 to 22,300 Nm3/h

260 to 13,000 scfm

Operating Temp: 0-80 C0 / 32-176 F0

(120 C0 elements are available)

Port size: ½ ” to 3” / 13mm to 75mm

High Pressure XH Series 420 BarG / 6000 PSIG

Volume Flow Rate: 800 to 11,200 m3/h

480 to 6560 scfm

Operating Temp: 0-80 C0 / 32-176 F0

(120 C0 elements are available)

Pipe size: ¼” to 2” / 6mm to 53mm

www.xebecinc.com/products-natural-gas-filtration.php

Page 30: Biogas Asia Pacific Forum - ICESNicesn.com/bgap2015/Slides/Biogas KL Day 2 PDF/09.50 Biogas Asia... · Xebec H2X unit installed at ExxonMobil ... NCMH BGX 50 BGX 100 BGX 200 BGX 400

www.xebecinc.com

Thank you

Kurt Sorschak President & CEO

+1.450.979.8701

[email protected]

Victor Han Business Development Manager

Biogas Upgrading Systems

+65.983.44865

[email protected]