ASAS GENERAL CONTRACTING CO. Visit us at .
-
Upload
jacob-anthony-ross -
Category
Documents
-
view
225 -
download
0
Transcript of ASAS GENERAL CONTRACTING CO. Visit us at .
ASAS GENERAL CONTRACTING CO.ASAS GENERAL CONTRACTING CO.
Visit us at www.AsasContractingQ8.com
IndexIndex
1. General Brief1. General Brief
2. Team & Organization Chart2. Team & Organization Chart
3. Current Projects3. Current Projects
4. Company Projects4. Company Projects
General BriefGeneral Brief
• ASAS Was Established in1983 .
• ASAS is primarily involved in civil construction. Being an active participant in the construction market for more than 27 years, the company has obtained a reputation of a stable and reliable partner, having necessary technical knowledge, experience in fulfilling complex and crucial tasks and uniting a team of active and highly qualified employees
• ASAS consists of a team of highly skilled engineers and architects with the innovative and dynamic approach required to develop state-of-the-art projects in the construction field.
• ASAS has a highly qualified crew of Surveyors and Draftsman.
• The company’s economical and technical potential allows it to carry out several contracts in construction of civil objects simultaneously.
General BriefGeneral Brief
Our goals are to:
• Provide the client with a project that fulfills their requirements to the highest standard in a reasonable time frame and within their budget.
• Be a company where employees are proud to work.
• Be an internationally recognized executor of quality construction.
Goal fulfillment will be accomplished by:
• Recruiting highly qualified professionals that are able to perform their required tasks to the best standards.
• Providing our team with continuous training to increase their abilities to understand our clients’ needs.
General BriefGeneral Brief
ASAS Offices are located at:
Ahmed Al Jaber St., Kuwait City Salem Al Mubarak St., Salmyia
ASAS employs more than 100 employees.
General Manager:Engineer Gobran Saba
IndexIndex
2. Team & Organization Chart2. Team & Organization Chart
1. General Brief1. General Brief
3. Current Projects3. Current Projects
4. Company Projects4. Company Projects
Our Technical Team
Gergis AzizCivil Engineer (since 1987)Project Manager
Gobran SabaGeneral Manager
Mohsen AdeebCivil Engineer (since 1995)Project Manager
Mousa Fahmy Mena Architect (since 1986)Senior Site Engineer
Gamal BoshraCivil Engineer (since1989)Project Manager
Zelda Ziegelbaum Interior DesignerHead of Z.Design (Interior Design Dept.)
Gobran SabaGeneral Manager
Hany Helmy GadCivil Engineer (since 2002)
Mustafa Abdul Salam ,PMPCivil Engineer (since 2000)Planner & Quality Control
Our Technical Team
Mahmoud Abdul RahmanCivil Engineer (since 2002)Senior Projects Coordinator
Rasha SamyArchitect (since 1997)Senior Technical Office Engineer
Mahalakshmi Architect (since 1999)Technical Office Engineer
Gobran SabaGeneral Manager
Our Technical Team
Yousef MelkArchitect (since 2003)Site Engineer
Wafiq Melad RezkCivil Engineer (since 2003)
Fady GamilCivil Engineer (since 2008)Junior Site Engineer
Gobran SabaGeneral Manager
Aziz FrejGeneral Foreman
Ra’afat BelalExecutive Secretary
Kamel AttiaGeneral Foreman
Our Technical Team
MoneerGeneral Foreman
Magdy Wasfy MakenSenior Surveyor
Reporting DiagramReporting Diagram
General Manager
BMT Hospital
AdasaniVilla
KIB Bank CopticChurch
Organizational ChartOrganizational ChartGeneral Manager
Eng: Gobran
Interior Design Dept.Architect: Zelda
Junior Site Eng.Eng: Yousef
BMT Hospital PMEng: Girgis
Church PMEng: Mohsen
Adsani Villa PMEng: Mohsen
KIB PMEng: Gamal
Management Depart.Eng: Mustafa
Senior Site Eng.Eng: Mousa
Senior Site Eng.Eng: Wafiq
Site Eng.Eng : Hany
Junior Site Eng.Eng: Fady
Technical Depart.Eng: Rasha
ForemanKamel
ForemanMonir
IndexIndex
1. General Brief1. General Brief
2. Team & Organization Chart2. Team & Organization Chart
4. Company Projects4. Company Projects
3. Current Projects3. Current Projects
Current ProjectsCurrent Projects
ASAS currently has four construction projects with a total value of KD7,500,000 equipped with specialized construction facilities, staffed with highly qualified personnel, capable of building, reconstructing, trimming and equipping new objects independently.
The Current Projects are:
1. Yacoub Behbehani Hospital.2. Kuwait International Bank.3. Adsani Villa.4. Egyptian Church.
IndexIndex
1. General Brief1. General Brief
2. Team & Organization Chart2. Team & Organization Chart
3. Current Projects3. Current Projects
4. Company Projects4. Company Projects
Company Projects Company Projects
Adsani Villa
BMTHospital Coptic
Church
PrivateChalet
KIBBank
CompanyProjects
CompanyProjects West End
Tower
Yacoub Behbehani Bone Marrow Transplantation
BMT is Located at Shuwaikh Medical Area on Al Jahra road (Road 80)
Shuwaikh Medical
Jahra Road (80)
Jamal Abd elnasser (85)
Jahez ST.
Shuwaikh Educational
Yacoub Behbehani Bone Marrow Transplantation
Yacoub Behbehani for BMTYacoub Behbehani for BMT
Owner: Mr. Aqeel Behbehani on behalf of “THIRD OF THE LATE YACOUB YOUSUF BEHBEHANI”
Consultant: Option One International
Owner: Ministry of Public Health
Yacoub Behbehani for BMTYacoub Behbehani for BMTProject Information:
SCHEMATIC DESCRIPTION OF ZONES
Floor Area m2 No. of Floor
Basement Floor 586.31 1
Ground Floor 2655.63 1
First Floor 3570.07 1
Second Floor 3024.07 1
Roof 1076.28 1
Total Area 10913.13
Contract Start Date : 27-10-2009.Contract End Date : 27-06-2011.Contract Period : 610 DaysContract Value : 4,728,419 KD.Variation Order : None
Yacoub Behbehani for BMTYacoub Behbehani for BMT
BMT
Yacoub Behbehani for BMTYacoub Behbehani for BMT
South Perspective North East Perspective
North West Perspective
Yacoub Behbehani for BMTYacoub Behbehani for BMT
Yacoub Behbehani for BMTYacoub Behbehani for BMT
Yacoub Behbehani for BMTYacoub Behbehani for BMT
Yacoub Behbehani for BMTYacoub Behbehani for BMT
Project Facilities:
The Medical Center is a three storey building, covering a gross area of 8000 m2 and comprises the following facilities:-
Outpatient:- Outpatient Department of 6 Clinics.- Medical Records.- Pharmacy.
Inpatient Wards:- One Day Ward (Three Bedded Patient Rooms).- BMT Isolation Ward (9 Single Bed Patient Rooms).- Normal Inpatient Wards (6 single bed rooms for female &
pediatrics patients, 5 single bed rooms for male patients).
Bone Marrow Bank
Egyptian Coptic Orthodox Cathedral
Beirut ST.
Tunisia ST.
The Church is located behind the Hawally fire station
Egyptian Coptic Orthodox Cathedral
Egyptian Coptic Orthodox CathedralEgyptian Coptic Orthodox Cathedral
Owner: Egyptian Coptic Orthodox Cathedral
Architect Design: Wagdy El Meri
Consultant: Fadel Tefony
Egyptian Coptic Orthodox CathedralEgyptian Coptic Orthodox Cathedral
SCHEMATIC DESCRIPTION OF ZONES
Floor Area m2
Basement Floor 6500
Ground Floor 5200
First Floor 4160
Second Floor 174
Third Floor 3328
Roof 6450
Total Area 25812
Project Information:
Contract Start Date : 30-11-2007.Contract End Date : 31-11-2009.Contract Period : 730 DaysContract Value : KD 2,650,000Variation Order : KD 300,000
Egyptian Coptic Orthodox Cathedral Perspective Egyptian Coptic Orthodox Cathedral Perspective
Egyptian Coptic Orthodox CathedralEgyptian Coptic Orthodox Cathedral
Egyptian Coptic Orthodox CathedralEgyptian Coptic Orthodox Cathedral
Egyptian Coptic Orthodox CathedralEgyptian Coptic Orthodox Cathedral
Egyptian Coptic Orthodox CathedralEgyptian Coptic Orthodox Cathedral
Egyptian Coptic Orthodox Cathedral Egyptian Coptic Orthodox Cathedral
The total built-up area of the Project exceeds 25,000 square meters, which includes a 6,500 square meters basement covering the whole plot area.
The complex is a multi-purpose building housing a diversified range of activities among them; a Banquet Hall with all related services. The Project includes a housing building, libraries, computer halls, a gymnasium, a kindergarten, a cafeteria, a central kitchen, administration offices and exterior car parks.The Cathedral is furnished to accommodate around 9,000 worshipers
Kuwait International Bank
KIB is located in Fintas beside The Fintas Co-operative Society
Fintas Co-operative Society
Costal R
oad
KIB
Kuwait International Bank (Funtas)Kuwait International Bank (Funtas)
Owner: Kuwait International Bank
Consultant: Dar Osama Bukhamseen Design
Project Manager: Gulf Consultant
Kuwait International BankKuwait International Bank
Kuwait International BankKuwait International Bank
Kuwait International BankKuwait International Bank
Kuwait International BankKuwait International Bank
Kuwait International Bank (Fintas)Kuwait International Bank (Fintas)
SCHEMATIC DESCRIPTION OF ZONES
Floor Area m2
Basement Floor 300
Ground Floor 300
First Floor 300
Roof 300
Upper Roof 100
Total Area 1300
Project Information:
Contract Start Date : 30-05-2010.Contract End Date : 28-02-2011.Contract Period : 272 DaysContract Value : KD 449,459Variation Order : None
Adsani Villa (Salwa)
Adsani Villa is located at Salwa Sea SideTa’aw
an Road (25)
Adsani Villa
Adsani VillaAdsani Villa
Owner: Marzok Al Adsani
Consultant: OPTION ONE INTERNATIONAL
Adsani VillaAdsani Villa
Adsani VillaAdsani Villa
Adsani VillaAdsani Villa
Adsani VillaAdsani Villa
SCHEMATIC DESCRIPTION OF ZONES
Floor Area m2
Lower Basement 2123
Upper Basement 3372
Ground Floor 1848
First Floor 1511
Second Floor 1368
Total Area 10222
Project Information:
Contract Start Date : 01-09-2009.Contract End Date : 01-07-2011.Contract Period : 660 DaysContract Value : KD 473,000 Variation Order : None
Adsani VillaAdsani Villa
Project Facilities:
• The Villa built up area is about 10,222 m2.
• The villa contains a formal diwan, a daily diwaniyah, reception, dining hall, master bed room and 6 bedroom quarters.
• The basement contains a car parking, a central kitchen and a servant quarters.
West End Tower, Al Nugra Hawally
West End Tower is Located at Al Nugra Hawally
Third
Ring R
oad
Cairo ST..
West End Tower
West End TowerWest End Tower
Owner: Mr. Aqeel Behbehani
Consultant: OPTION ONE INTERNATIONAL
West End TowerWest End Tower
West End TowerWest End Tower
West End TowerWest End Tower
West End TowerWest End Tower
Project Information:
Contract Start Date : 03-05-2007.Contract End Date : 31-06-2009.Contract Period : 789 DaysContract Value : KD 1,288,000Variation Order : KD 70,000
SCHEMATIC DESCRIPTION OF ZONES
Floor Area No. of Floor Total Area(m2)
Basement Floor 798 1 798
Ground Floor 95 1 95
Typical Floor 242X13 13 3146
Level 14 174 1 174
Roof 78 1 78
Total Area 4291
West End TowerWest End Tower
Project Facilities:
• A 14-floor residential tower. Each floor is a single luxurious apartment. The apartment has a fully furnished kitchen, a master bed room and two bedrooms with an en-suite bathroom for each, a large reception and dining area and a living room.
• Each apartment has a main entrance and service entrance to the kitchen
and the maids quarter. The tower entrance is equipped with a counter and a luxurious reception.
• The vast parking areas in the basement and ground floor, secure two parking lots for every apartment. The Tower is furnished with a modern camera surveillance system.
Bnaider ChaletBnaider Chalet
Bnaider ChaletBnaider Chalet
Bnaider ChaletBnaider Chalet
Bnaider ChaletBnaider Chalet
Project Information:
Contract Start Date : 01-10-2004.Contract End Date : 01-04-2006.Contract Period : 547 DaysContract Value : KD 115,000Variation Order : KD 85,000
Bnaider ChaletBnaider Chalet
Project Facilities:
• The chalet consists of a ground floor and a first floor, both with full sea view.
• The chalet has two swimming pools; one on the sea side with waterfalls and the other in the chalet inner court.
• The garden surrounding the chalet was designed and organized under the supervision of a company specialized in landscaping and includes special plants, green areas, walking ways, water falls, a pergola and covered car parks.