T NOR COSTO T. NOR T MIN COSTO T. MINIMO T FIN COSTO COSTO COSTO ACT SIGUE (SEM) $1,000 (SEM) $1,000 ∆S ∕∆T RED SEM REDUCCION TOTAL SEM
1 5.6 5 $1,500,000 5 $1,500,000 - 5 $1,500,000 $300,0002 10 15 $7,200,000 10 $8,000,000 160000 4 11 $640,000 $7,840,000 $712,7273 13 30 $8,400,000 18 $9,000,000 50000 12 18 $600,000 $9,000,000 $500,0004 14 20 $2,100,000 14 $2,700,000 100000 2 18 $200,000 $2,300,000 $127,7785 7.12 12 $1,400,000 8 $1,560,000 40000 4 8 $160,000 $1,560,000 $195,0006 8,9,10 6 $800,000 4 $1,200,000 200000 6 $800,000 $133,3337 11 24 $6,800,000 20 $7,800,000 250000 4 20 $1,000,000 $7,800,000 $390,0008 11 8 $1,000,000 5 $1,240,000 80000 8 $1,000,000 $125,0009 12 4 $600,000 3 $900,000 300000 4 $600,000 $150,000
10 12,13,14 10 $3,000,000 7 $3,450,000 150000 3 7 $450,000 $3,450,000 $492,85711 17 11 $2,500,000 8 $3,580,000 360000 3 8 $1,080,000 $3,580,000 $447,50012 15 9 $1,800,000 6 $2,700,000 300000 9 $1,800,000 $200,00013 15.16 14 $2,600,000 10 $3,320,000 180000 14 $2,600,000 $185,71414 16.17 21 $8,400,000 15 $10,800,000 400000 3 18 $1,200,000 $9,600,000 $533,33315 17 10 $1,900,000 6 $2,140,000 60000 1 9 $60,000 $1,960,000 $217,77816 18 12 $1,300,000 10 $1,400,000 50000 2 10 $100,000 $1,400,000 $140,00017 18 7 $700,000 5 $840,000 70000 2 5 $140,000 $840,000 $168,00018 3 $500,000 3 $500,000 - 3 $500,000 $166,667
$52,500,000 $62,630,000 $5,630,000 $58,130,000
ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.
92 12992 129
37
DIAGRAMA DE RUTA CRITICA 35
92 12992 129
37
36
92 12992 129
92 12937
92 129
37 37
92 12992 129
30 7537
30 75
45 3830 117
290 110 110 117
30 117 90 110 110 117 92 129
87 20 792 129
30 9037
009-D.03 EXCAVACIONES :30 90
5 460 39
392 12992 129
37
52 6040
52 60
892 98
1492 98
6
52 6522
52 60
1392 98
1592 98
6
52 7523
52 75
230 0 92 98
1792 98
6INICIO 0 30 0 30
0 30 22 52 52 92 75 9224
30 3052 92 52 75 75 92
4052 75
17
TERRACERÍAS 1 23
SUBRASANTE 1692 98
1892 98
692 98
52 75 92 9825
52 756
23
OBRAS DE DRENAJE92 98
1992 98
6
52 7526
52 75
2392 98
2092 98
6
LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO
PACHUCA, HGO A 19 DE MAYO DEL 2011
CONSTRUCCION DE BASE HIDRAULICA
MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO-PAPATLATA (CALNALI), TRAMO: DEL KM. 0+000 AL KM. 39+000, SUBTRAMO A MODERNIZAR: DEL KM. 12+000 AL KM. 14+000
90 DIAS
45
60
60
6
52 7527
52 75
2392 98
2192 98
6
52 9228
52 92
4030 3130 31
792 98
192 98
6
652 9252 92
2930 75
4030 75 30 52
30 9245
30 5211
92 9830 92
2292 98
62 8 6
952 92
TERRAPLENES52 92
3040
30 5230 52
1292 98
2292 98
6
1052 9252 92
3140
1392 98 92 9892 98 92 98
6 6
32
92 9892 98
6
33
92 9892 98
6
34
ACARREOS PARA OBRAS DE DRENAJE Y ESTRUCTURA
70
60
129 188129 188
129 18859
129 188
59 45190 205
41190 205
129 18815
190 205129 188 190 205
129 18859
RAYA CENTRAL15
129 188
59 46 71129 188129 188
4259
129 188129 188
RIEGO DE IMPREGNACIÓN59
190 205
47190 205
129 18815
129 188
59129 188
72129 188
43 59160 190 190 205
48160 190 190 205 190 205
30190 205
15129 188
15129 188 129 188
63 7359
129 188
RAYA LATERAL59
44160 190 190 205
49160 190 190 205
30 15
129 16064 74
129 160129 160
31129 160 160 190 190 205
31 56160 190 190 205
30 15
50129 160
65 75129 160
129 16031
129 160 160 190 190 205
31 57160 190 190 205
160 19030 15
51160 190
129 16030 66 76
129 160129 160
31CUNETAS129 160 160 190 190 205
31 58160 190 190 205 190 205
30 15190 205
129 16052 15
129 160 129 16067 77
31129 160
FIN31
160 190 190 205
59160 190 190 205
30 15129 160 190 205129 160 129 160
68190 205
7831
129 16015
31
53160 190
SEÑALAMIENTO VERTICAL190 205
60160 190 190 205
30 15129 160129 160 129 160
69 7931
129 160
31
54160 190 190 205
61160 190 190 205
30 15129 160129 160 129 160
70 8031
129 160
31
55190 205
62190 205
15
81
190 205190 205
15
82
CARPETA DE CONCRETO ASFALTICO
SEÑAL
SEÑAL
SEÑAL
DEFENZAS
SEÑAL
SEÑAL
SEÑAL
SEÑAL
ZAMPEADO
CONCRETO
ACERO BORDILLOS
60
60
30
15
31
15
CONCRETO
ACERO BORDILLOS
ACERO BORDILLOS
ACERO BORDILLOS
ACERO BORDILLOS
15
CONCRETO
CONCRETO
CONCRETO
CONCRETO
ATENTAMENTE
ING.ENRIQUE AZPEITIA MEDINA
REPRESENTANTE COMUN
ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.
15
Edith Blancas Bautista
M es Enero FebreroSem 1 2 3 4 5 6 7 8Dia m m j v l m m j v l m m j v l m m j v l m m j v m m j v l m m j v l m m j v l m
Fecha 2 3 4 5 8 9 10 11 12 15 16 17 18 19 22 23 24 25 26 29 30 31 1 2 6 7 8 9 12 13 14 15 16 19 20 21 22 23 26 27Act1 23456789
101112131415161718
$300,000.00 $300,000.00 $300,000.00 $300,000.00 $300,000.00 $133,333.00 $133,333.00 $133,333.00$712,727.00 $712,727.00 $712,727.00 $712,727.00 $712,727.00 $712,727.00 $712,727.00 $712,727.00$500,000.00 $500,000.00 $500,000.00 $500,000.00 $500,000.00 $500,000.00 $500,000.00 $500,000.00$127,778.00 $127,778.00 $127,778.00 $127,778.00 $127,778.00 $127,778.00 $127,778.00 $127,778.00
$195,000.00 $195,000.00 $195,000.00
$1,640,505.00 $1,640,505.00 $1,640,505.00 $1,640,505.00 $1,640,505.00 $1,668,838.00 $1,668,838.00 $1,668,838.001 2 3 4 5 6 7 8
Edith Blancas Bautista
$1,640,506.00 $1,640,507.00 $1,640,508.00 $1,640,509.00 $1,640,510.00 $1,668,844.00 $1,668,845.00 $1,668,846.00
Edith Blancas Bautista
Marzo AbrilA 9 10 11 12 13 14 15 16 17c m j v l m m j v l m m j v l m j v l m m j v l m m l m m j v l m m j v l m m j v l m j v mt 28 1 2 5 6 7 8 9 12 13 14 15 16 19 20 22 23 26 27 28 29 30 2 3 4 9 10 11 12 13 16 17 18 19 20 23 24 25 26 27 30 2 3 4 8
123456789
101112131415161718
$133,333.00 $133,333.00 $133,333.00 $125,000.00 $150,000.00 $150,000.00 $150,000.00 $492,857.00 $492,857.00$712,727.00 $712,727.00 $712,727.00 $150,000.00 $492,857.00 $492,857.00 $492,857.00 $125,000.00 $125,000.00$500,000.00 $500,000.00 $500,000.00 $500,000.00 $500,000.00 $500,000.00 $500,000.00 $500,000.00 $500,000.00$127,778.00 $127,778.00 $127,778.00 $127,778.00 $127,778.00 $127,778.00 $127,778.00 $127,778.00 $127,778.00$195,000.00 $195,000.00 $195,000.00 $195,000.00 $195,000.00 $390,000.00 $390,000.00 $390,000.00 $390,000.00
$492,857.00 $125,000.00 $125,000.00 $125,000.00
$1,668,838.00 $1,668,838.00 $1,668,838.00 $1,590,635.00 $1,590,635.00 $1,785,635.00 $1,785,635.00 $1,635,635.00 $1,635,635.00
Edith Blancas Bautista
Mayo JunioA 18 19 20 21 22 23 24 25c m j v l m m j v l m m j v l m m j v l m m j v l m m j v l m m j v l m m j v l mt 9 10 11 14 15 16 17 18 21 22 23 24 25 28 29 30 31 1 4 5 6 7 8 11 12 13 14 15 18 19 20 21 22 25 26 27 28 29 2 3
123456789
101112131415161718
$492,857.00 $390,000.00 $390,000.00 $390,000.00 $390,000.00 $390,000.00 $390,000.00 $390,000.00$125,000.00 $533,333.00 $533,333.00 $533,333.00 $533,333.00 $533,333.00 $533,333.00 $533,333.00$500,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00$127,778.00 $185,714.00 $185,714.00 $185,714.00 $185,714.00 $185,714.00 $185,714.00 $185,714.00$390,000.00 $125,000.00
$1,635,635.00 $1,434,047.00 $1,309,047.00 $1,309,047.00 $1,309,047.00 $1,309,047.00 $1,309,047.00 $1,309,047.00
Edith Blancas Bautista
Julio AgostoA 26 27 28 29 30 31 32 33 34c m jj v l m m j v l m m j v l m m j v l m m j v l m m j v l m m j v l m m j v l m m j v l mt 4 4 6 9 10 11 12 13 16 17 18 19 20 23 24 25 26 27 30 31 1 2 3 6 7 8 9 10 13 14 15 16 17 20 21 22 23 24 27 28 29 30 31 3 4
123456789
101112131415161718
$390,000.00 $390,000.00 $390,000.00 $390,000.00 $390,000.00 $390,000.00 $390,000.00 $390,000.00 $447,500.00$533,333.00 $533,333.00 $533,333.00 $533,333.00 $533,333.00 $533,333.00 $533,333.00 $533,333.00 $533,333.00$200,000.00 $200,000.00 $185,714.00 $185,714.00 $185,714.00 $185,714.00 $185,714.00 $217,778.00 $217,778.00$185,714.00 $185,714.00
$1,309,047.00 $1,309,047.00 $1,109,047.00 $1,109,047.00 $1,109,047.00 $1,109,047.00 $1,109,047.00 $1,141,111.00 $1,198,611.00
Edith Blancas Bautista
Septiembre OctubreA 35 36 37 38 39 40 41 42c m j v l m m j v m m j v l m m j v l m m j v l m m j v l m m v v l m m j v l m mt 5 6 7 10 11 12 13 14 18 19 20 21 24 25 26 27 28 1 2 3 4 5 8 9 10 11 12 15 16 17 18 19 22 23 24 25 26 29 39 31
123456789
101112131415161718
$447,500.00 $447,500.00 $447,500.00 $447,500.00 $447,500.00 $447,500.00 $447,500.00 $168,000.00$533,333.00 $533,333.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00$217,778.00 $217,778.00 $217,778.00 $217,778.00 $217,778.00 $217,778.00 $217,778.00
$1,198,611.00 $1,198,611.00 $805,278.00 $805,278.00 $805,278.00 $805,278.00 $805,278.00 $308,000.00
Edith Blancas Bautista
Noviembre DiciembreA 43 44 45 46 47 48 49c j l m m j v m m m j v l m j v l m m j v l m m j v l m m j v l m m j vt 1 5 6 7 8 9 12 13 14 15 16 19 21 22 23 26 27 28 29 30 3 4 5 6 7 10 11 12 13 14 17 18 19 20 21
123456789
101112131415161718
$168,000.00 $168,000.00 $168,000.00 $168,000.00 $166,667.00 $166,667.00 $166,667.00$140,000.00 $140,000.00 $140,000.00 $140,000.00
$308,000.00 $308,000.00 $308,000.00 $308,000.00 $166,667.00 $166,667.00 $166,667.00
ATENTAMENTE
ING. ENRIQUE AZPEITIA MEDINAREPRESENTANTE COMUN
ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.
DIAGRAMA DE RUTA CRITICA
No. DE ACTIVIDAD CLAVE CONCEPTO UNIDAD CANTIDAD FECHA DE INICIO DURACION
TERRACERÍAS
1 I0002 HA 3.00 25-may-2011 30.00
009-D.03 EXCAVACIONES :
A) EN CORTE Y ADICIONALES ABAJO DE LA SUBRASANTE:
2 I0008 2) EN MATERIAL "B" M3 8,794.56 20-jun-2011 45.003 I0009 2) EN MATERIAL "C" M3 35,178.23 5-jul-2011 60.00
4 I0044 M3 3,200.00 30-jun-2011 80.00
5 I0115 M3 10,993.20 20-jun-2011 90.00
TERRAPLENES
6 I0025 M3 3,000.00 1-jul-2011 30.00
009-E.03 EXCAVACIONES DE PRESTAMOS:
7 I0037 B) DE BANCO: 2) EN MATERIAL "B" M3 6,149.56 15-jul-2011 40.008 I0038 B) DE BANCO: 3) EN MATERIAL "C" M3 1,537.39 15-jun-2011 45.00
9 I0119 M3 7,686.95 1-jul-2011 50.00
10 I0120 M3-KM 76,869.50 1-jul-2011 50.00
11 I0088 009-F.08 AGUA EMPLEADA PARA COMPACTACION M3 1,921.74 15-jul-2011 40.00
12 I0121 M3-KM 24,982.59 15-jul-2011 40.00
13 I0054 M3 7,686.95 15-jul-2011 40.00
SUBRASANTE
14 I0025 M3 3,600.00 10-jul-2011 30.00
15 I0037 B) DE BANCO: 2) EN MATERIAL "B" M3 4,151.89 10-jul-2011 35.0016 I0038 B) DE BANCO: 3) EN MATERIAL "C" M3 1,037.97 25-jul-2011 30.00
17 I0119 M3 5,189.86 10-jul-2011 45.00
18 I0120 M3 - KM 51,898.60 10-jul-2011 45.00
LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO
PACHUCA, HGO A 19 DE MAYO DEL 2011
009-.C.01 DESMONTE PARA DENSIDAD 100% DE VEGETACIÓN CON TIPO: B) SELVA O BOSQUE
009-F.02 COMPACTACIONES: B) DE LA CAMA DE LOS CORTES EN QUE NO SE HAYA ORDENADO EXCAVACIÓN ADICIONAL: 2) PARA 90%.
009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 1) PARA EL PRIMER KM
009-E.02 DESPALME EN MATERIAL A, DESPERDICIANDO EL MATERIAL AL BORDE DEL PRESTAMO.
009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 1) PARA EL PRIMER KM
009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 2) PARA LOS KM SUB-SECUENTES
009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. E) PARA CUALQUIER DISTANCIA, DEL AGUA UTILIZADA EN LA COMPACTACION DE LAS TERRACERIAS
009-F.04 FORMACION Y COMPACTACION: A) DE TERRAPLENES ADICIONADOS CON SUS CUÑAS DE SOBREANCHO: 2) PARA 90%
009-.E.02 DESPALME EN MATERIAL "A" DESPERDICIANDO EL MATERIAL AL BORDE DEL PRESTAMO
009-E.03 EXCAVACIONES DE PRESTAMOS:
009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 1) PARA EL PRIMER KM
009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 2) PARA LOS KM SUB-SECUENTES
ATENTAMENTE
ING. ENRIQUE AZPEITIA MEDINAREPRESENTANTE COMUN
ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.
DIAGRAMA DE RUTA CRITICA
No. DE ACTIVIDAD CLAVE CONCEPTO UNIDAD CANTIDAD FECHA DE INICIO DURACION
LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO
PACHUCA, HGO A 19 DE MAYO DEL 2011
19 I0088 009-F.08 AGUA EMPLEADA PARA COMPACTACION M3 1,297.47 10-jul-2011 45.00
20 I0121 M3-KM 16,867.05 10-jul-2011 45.00
A) DE LA ELEVACION DE SUBRASANTE EN CORTES Y/O TERRAPLENES EXISTENTES:
21 I0080 2) PARA EL 95% M3 5,189.86 10-jul-2011 45.00OBRAS DE DRENAJE
22 I0123 M3 2.92 1-jul-2011 60.00
23 I0124 M3 26.28 1-jul-2011 60.00
24 I0126 M3 26.28 1-jul-2011 60.00
25 I0127 M3 236.52 1-jul-2011 60.00
26 I0172 M3 40.00 1-jul-2011 60.00
27 I0183 M3 57.97 1-jul-2011 60.00
28 I0194 M2 42.18 1-jul-2011 60.00
29 I0319 ML 60.00 1-jul-2011 60.00
ACARREOS PARA OBRAS DE DRENAJE Y ESTRUCTURA
30 I0369 M3 235.36 1-jul-2011 60.00
31 I0370 2) KILOMETROS SUBSECUENTES M3/KM 23,840.00 1-jul-2011 60.00A) SOBRE BRECHAHASTA 10 KM.
32 I0367 2) KILOMETROS SUBSECUENTES M3/KM 191.61 1-jul-2011 60.0033 I0371 047-Z.03 SOBREACARREO DEL AGUA:
A) SOBRE BRECHA M3/KM 30.05 1-jul-2011 60.00
34 I0380 M-K 60.00 1-jul-2011 60.00
PAVIMENTO
CONSTRUCCION DE BASE HIDRAULICA
35 I0423-B M3 3,940.30 1-ago-2011 60.00
36 I0431 M3 3,031.00 1-ago-2011 60.00
37 I0549 M3 3,940.30 1-ago-2011 60.00
38 I0550 2) KMS SUBSECUENTES M3/KM 685,612.20 1-ago-2011 60.0039 I0453 086-E.04 AGUA UTILIZADA EN COMPACTACION M3 985.08 1-ago-2011 60.0040 I0551 086-P.03 ACARREOS DEL AGUA PARA COMPACTACION M3-KM 12,805.98 1-ago-2011 60.00
RIEGO DE IMPREGNACIÓN
41 I0534 086-I.02 BARRIDO DE LA SUPERFICIE POR TRATAR HA 1.50 30-sep-2011 60.00
42 I0519 LT 22,500.00 30-sep-2011 60.00
43 I0521 LT 22,500.00 30-sep-2011 60.00
44 I0523 LT 22,500.00 30-sep-2011 60.00
45 I0525 086-G.02 RIEGO: A) RIEGO DE IMPREGNACION: 1) EMULSION RM-2K LT 22,500.00 30-sep-2011 60.00
009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. E) PARA CUALQUIER DISTANCIA, DEL AGUA UTILIZADA EN LA COMPACTACION DE LAS TERRACERIAS
009-F.07 MEZCLADO, TENDIDO Y COMPACTACION DE LA CAPA SUBRASANTE FORMADA CON MATERIAL SELECCIONADO:
047-C.02 EXCAVACIÓN PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACIÓN, A CUALQUIER PROFUNDIDAD: A) EXCAVANDO A MANO, EN SECO: 2) EN MATERIAL "B"
047-C.02 EXCAVACIÓN PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACIÓN, A CUALQUIER PROFUNDIDAD: A) EXCAVANDO A MANO, EN SECO: 3) EN MATERIAL "C"
047-C.02 EXCAVACIÓN PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACIÓN, A CUALQUIER PROFUNDIDAD: B) EXCAVADO A MAQUINA, EN SECO: 2) EN MATERIAL "B"
047-C.02 EXCAVACIÓN PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACIÓN, A CUALQUIER PROFUNDIDAD: B) EXCAVADO A MAQUINA, EN SECO: 3) EN MATERIAL "C"
047-D.02 RELLENOS: A) DE EXCAVACION PARA ESTRUCTURAS, 2) CON MATERIAL "B"047-E.03 MAMPOSTERIA DE TERCERA CLASE A CUALQUIER ALTURA: A) PARA PIEDRA OBTENIDA DE BANCOS: 1) CON MORTERO DE CEMENTO047-E.07 PLANTILLA SOBRE LA SUPERFICIE DE DESPLANTE: A) CON MORTERO DE CEMENTO047-L.02 TUBERIA DE CONCRETO : A) REFORZADO, DE F'C=280 KG/CM2, TIPO MACHO Y HEMBRA, FABRICADO EN OBRA: 4) DE 90 CM. DE DIAMETRO
047-Z.02 SOBREACARREOS PARA LA PIEDRA, LA ARENA, EL MATERIAL DE FILTRO Y LOS AGREGADOS FINO Y GRUESO: B) SOBRE CAMINO TERMINADO O PAVIMENTADO, CON BUENA SUPERFICIE DE RODAMIENTO, HASTA 20 KM.: 1) PRIMER KILOMETRO b) CARGA CON MAQUINA
047-Z.04 SOBREACARREO DE LOS TUBOS DE CONCRETO PARA ALCANTARILLAS: D) DE 90 CM. DE DIAMETRO
S/C SUMINISTRO DE MATERIAL PÉTREO 1 1/2" A FINOS PARA BASE
086-E.02 OPERACION DE MEZCLADO, TENDIDO Y COMPACTACION, EN LA CONSTRUCCION DE SUB-BASES O BASES: B) DE BASES: 1) CUANDO SE EMPLEE UN MATERIAL PETREO: b) COMPACTADO AL 100%
086-P.02 ACARREO DE LOS MATERIALES SELECCIONADOS NATURALES O DE LOS QUE HAYAN TENIDO UN TRATAMIENTO DE LAS MEZCLAS Y DE LOS CONCRETOS ASFALTICOS: A) MEDIDO EN EL CAMELLON, EN LOS ALMACENAMIENTOS O EN LOS VEHICULOS DE TRANSPORTE: 1) PRIMER KM
086-G.02 SUMINISTRO DE MATERIALES ASFALTICOS A) EMULSIONES ASFALTICAS: 2) EMULSION RM-2K086-G.02 ALMACENAMIENTO DE LOS MATERIALES ASFALTICOS: A) EN TANQUES O FOSAS DEL CONTRATISTA: 1) EMULSIONES ASFALTICAS086-G.02 CALENTAMIENTO Y BOMBEO DE MATERIALES ASFALTICOS: A) EMULSIONES ASFALTICAS
ATENTAMENTE
ING. ENRIQUE AZPEITIA MEDINAREPRESENTANTE COMUN
ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.
DIAGRAMA DE RUTA CRITICA
No. DE ACTIVIDAD CLAVE CONCEPTO UNIDAD CANTIDAD FECHA DE INICIO DURACION
LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO
PACHUCA, HGO A 19 DE MAYO DEL 2011
46 I0554 M3 22.50 30-sep-2011 60.00
47 I0555 M3/KM 5,625.00 30-sep-2011 60.00
48 I0556 M3 22.50 30-sep-2011 60.00
49 I0557 M3/KM 225.00 30-sep-2011 60.00
CARPETA DE CONCRETO ASFALTICO
50 I0535 086-J.02 BARRIDO DE LA BASE IMPREGNADA HA 1.50 1-sep-2011 60.00
51 I0518-B SUMINISTRO DE MEZCLA ASFALTICA EN CALIENTE AGREGADO DE 3/4" A FINOS. TON 1,556.08 1-sep-2011 60.00
52 I0549 M3 943.08 1-sep-2011 60.00
53 I0550 M3/KM 164,096.04 1-sep-2011 60.00
54 I0519 LT 12,000.00 1-sep-2011 60.00
55 I0521 LT 12,000.00 1-sep-2011 60.00
56 I0523 LT 12,000.00 1-sep-2011 60.00
57 I0527 086-G.02 RIEGO: B) RIEGO DE LIGA: 1) EMULSION RR-2K LT 12,000.00 1-sep-2011 60.00
58 I0554 M3 12.00 1-sep-2011 60.00
59 I0555 M3/KM 3,000.00 1-sep-2011 60.00
60 I0556 M3 12.00 1-sep-2011 60.00
61 I0557 M3/KM 120.00 1-sep-2011 60.00
62 I0545 M3 264.04 1-sep-2011 60.00
OBRAS COMPLEMENTARIAS
CUNETAS
63 I0123 2) EN MATERIAL B. M3 7.45 1-nov-2011 30.0064 I0124 3) EN MATERIAL C M3 29.80 1-nov-2011 30.00
65 I0207 M3 208.60 1-nov-2011 30.00
66 I0219 M3 5.30 1-nov-2011 30.00
086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: A) DEL CENTRO PRODUCTOR AL ALMACENAMIENTO MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: a) PRIMER KM
086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: A) DEL CENTRO PRODUCTOR AL ALMACENAMIENTO MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: b) KMS. SUBSECUENTES
086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: C) DEL ALMACENAMIENTO AL LUGAR DE UTILIZACION MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: a) PRIMER KM
086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: C) DEL ALMACENAMIENTO AL LUGAR DE UTILIZACION MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: b) KMS SUB-SECUENTES
086-P.02 ACARREO DE LOS MATERIALES SELECCIONADOS NATURALES O DE LOS QUE HAYAN TENIDO UN TRATAMIENTO DE LAS MEZCLAS Y DE LOS CONCRETOS ASFALTICOS: A) MEDIDO EN EL CAMELLON, EN LOS ALMACENAMIENTOS O EN LOS VEHICULOS DE TRANSPORTE: 1) PRIMER KM
086-P.02 ACARREO DE LOS MATERIALES SELECCIONADOS NATURALES O DE LOS QUE HAYAN TENIDO UN TRATAMIENTO DE LAS MEZCLAS Y DE LOS CONCRETOS ASFALTICOS: A) MEDIDO EN EL CAMELLON, EN LOS ALMACENAMIENTOS O EN LOS VEHICULOS DE TRANSPORTE: 2) KMS SUBSECUENTES
086-G.02 SUMINISTRO DE MATERIALES ASFALTICOS A) EMULSIONES ASFALTICAS: 1) EMULSION RR-2K086-G.02 ALMACENAMIENTO DE LOS MATERIALES ASFALTICOS: A) EN TANQUES O FOSAS DEL CONTRATISTA: 1) EMULSIONES ASFALTICAS086-G.02 523 CALENTAMIENTO Y BOMBEO DE MATERIALES ASFALTICOS: A) EMULSIONES ASFALTICAS
086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: A) DEL CENTRO PRODUCTOR AL ALMACENAMIENTO MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: a) PRIMER KM
086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: A) DEL CENTRO PRODUCTOR AL ALMACENAMIENTO MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: b) KMS. SUBSECUENTES
086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: C) DEL ALMACENAMIENTO AL LUGAR DE UTILIZACION MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: a) PRIMER KM
086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: C) DEL ALMACENAMIENTO AL LUGAR DE UTILIZACION MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: b) KMS SUB-SECUENTES
086-L.02 OPERACIÓN DE CONSTRUCCION DE LAS CARPETAS DE CONCRETOS ASFALTICO: (SOLO TENDIDO Y COMPACTADO SIN INCLUIR MEZCLADO): A) COMPACTADAS AL 95%
047-C.02 EXCAVACION PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACION, A CUALQUIER PROFUNDIDAD: A) EXCAVADO A MANO EN SECO:
047-F.04 ZAMPEADO DE CONCRETO HIDRAULICO, A CUALQUIER ALTURA: A) SIMPLE, DE F'c= 100 Kg/Cm² EN CUNETAS
047-G.02 CONCRETO HIDRAULICO, SIN INCLUIR CIMBRA, COLADO EN SECO: C) SIMPLE, GRUPO III, EN ZAPATAS; PILOTES TABLESTACAS Y POSTES PRECOLADOS, APOYOS PRECOLADOS, TAPONES SUPERIORES DE CILINDROS, LOSETAS PRECOLADAS, DOVELAS PRECOLADAS, DENTELLENES Y GUARNICIONES: 2) DE F´C= 150 KG/CM2
ATENTAMENTE
ING. ENRIQUE AZPEITIA MEDINAREPRESENTANTE COMUN
ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.
DIAGRAMA DE RUTA CRITICA
No. DE ACTIVIDAD CLAVE CONCEPTO UNIDAD CANTIDAD FECHA DE INICIO DURACION
LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO
PACHUCA, HGO A 19 DE MAYO DEL 2011
67 I0271 KG 118.08 1-nov-2011 30.00
68 I0369 M3 328.95 1-nov-2011 30.00
69 I0370 2) KILOMETROS SUBSECUENTES M3/KM 6,579.00 1-nov-2011 30.0070 I0371 047-Z.03 SOBREACARREO DEL AGUA A) SOBRE BRECHA (5 KM) M3/KM 65.79 1-nov-2011 30.00
SEÑALAMIENTO
RAYA CENTRAL
71 I0558 ML 2,000.00 1-dic-2011 15.00
RAYA LATERAL
72 I0559 ML 4,000.00 1-dic-2011 15.00
73 EXT-87 PZA 134.00 1-dic-2011 15.00
74 EXT-87 PZA 268.00 1-dic-2011 15.00
SEÑALAMIENTO VERTICAL
75 EXT-69 PZA 1.00 15-nov-2011 31.00
76 EXT-70 PZA 1.00 15-nov-2011 31.00
77 EXT-78 PZA 21.00 15-nov-2011 31.00
78 EXT-83 PZA 50.00 15-nov-2011 31.00
79 EXT-79 PZA 4.00 15-nov-2011 31.00
80 EXT-80 PZA 4.00 15-nov-2011 31.00
81 EXT-65 PZA 1.00 15-nov-2011 31.00
82 EXT-91 ML 500.00 15-nov-2011 31.00
047-H.02 ACERO DE REFUERZO: A) VARILLAS. ACERO DE 3/8 EN ANCLAJES DE 15 CM DE LONGITUD A CADA METRO, EN BORDILLOS.
047-Z.02 SOBREACARREOS PARA LA PIEDRA, LA ARENA, EL MATERIAL DE FILTROS Y LOS AGREGADOS FINOS Y GRUESOS: B) SOBRE CAMINO TERMINADO A PAVIMENTADO, CON BUENA SUPERFICIE DE RODAMIENTO, HASTA 20 KM.: 1) PRIMER KILOMETRO: b) CARGA CON MAQUINA
S/C SUMINISTRO Y APLICACIÓN DE PINTURA AMARILLA Y MICROESFERA EN RAYA CENTRAL, INCLUYE: MATERIAL, MANO DE OBRA, ACARREO Y TODO LO NECESARIO PARA SU CORRECTA APLICACIÓN
S/C SUMINISTRO Y APLICACIÓN DE PINTURA BLANCA Y MICROESFERA EN RAYAS LATERAL, INCLUYE: MATERIAL,MANO DE OBRA, ACARREO Y TODO LO NECESARIO PARA SU CORRECTA APLICACIÓN
VIALETAS REFLEJANTES (AMARILLO) AMBOS LADOS 10 X 10 CMS, INCLUYE SUMINISTRO, ACARREO Y COLOCACION VIALETAS REFLEJANTES (BLANCO) AMBOS LADOS 10 X 10 CMS, INCLUYE SUMINISTRO, ACARREO Y COLOCACION
SEÑAL INFORMATIVA (SIG-7) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 40 x178 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (UN TABLERO) SUJETA A POSTE DE 3 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION
SEÑAL INFORMATIVA (SID-9) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 40 x178 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (UN TABLERO) SUJETA A POSTE DE 3 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION
SEÑAL PREVENTIVA (SP-6, SP-8, SP-20, SP-29, SP-33, SP-34) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 71x71 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (VUELTA DERECHA, VUELTA IZQUIERDA, CURVA INVERSA, ESTRECHAMIENTPOO SIMETRICO, PENDIENTE PELIGROSA, PEATONES) SUJETA A POSTE DE 3 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION
SEÑAL PREVENTIIVA (OD-12) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 45X60 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (INDICADOR DE CURVA PELIGROSA) SUJETA A POSTE DE 3 m DE ANGULO DE 2"X2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8"X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION
SEÑAL RESTRICTIVA (SR-9, SR-18) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 71x71 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (VELOCIDAD, PROHIBIDO REBASAR) SUJETA A POSTE DE 3 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION
SEÑAL INFORMATIVAS DE RECOMENDACION , IDENTIFICACION E INFORMACION GENERAL (SII-15) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 30x76 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (KILOMETRAJE SIN RUTA ) SUJETA A POSTE DE 1.5 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION
SEÑAL INFORMATIVA RESTRICTIVA (S.I.R.) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 71 x178 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE SUJETA A POSTE DE 1.5 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION
OD- 4 DEFENSA METALICA GALVANIZADA (NORMA AASTHO-M180.- DE 2 CRESTAS CALIBRE 12 DE 4.10 MTS. DE LARGO. INCLUYE POSTE IPR GALVANIZADO DE 1.50 MTS., SEPARADOR PARA DEFENSA ANGULO REFLEJANTE EN COLOR AMBAR ALTA INTENSIDAD, TERMINAL (COLOA DE PATO) Y TORNILLOS.
ATENTAMENTE
ING. ENRIQUE AZPEITIA MEDINAREPRESENTANTE COMUN
ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.
DIAGRAMA DE RUTA CRITICA
No. DE ACTIVIDAD CLAVE CONCEPTO
TERRACERÍAS
1 I0002
009-D.03 EXCAVACIONES :
A) EN CORTE Y ADICIONALES ABAJO DE LA SUBRASANTE:
2 I0008 2) EN MATERIAL "B"
3 I0009 2) EN MATERIAL "C"
4 I0044
5 I0115
TERRAPLENES
6 I0025
009-E.03 EXCAVACIONES DE PRESTAMOS:
7 I0037 B) DE BANCO: 2) EN MATERIAL "B"
8 I0038 B) DE BANCO: 3) EN MATERIAL "C"
9 I0119
10 I0120
11 I0088 009-F.08 AGUA EMPLEADA PARA COMPACTACION
12 I0121
13 I0054
SUBRASANTE
14 I0025
15 I0037 B) DE BANCO: 2) EN MATERIAL "B"
16 I0038 B) DE BANCO: 3) EN MATERIAL "C"
17 I0119
18 I0120
LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO
PACHUCA, HGO A 19 DE MAYO DEL 2011
009-.C.01 DESMONTE PARA DENSIDAD 100% DE VEGETACIÓN CON TIPO: B) SELVA O BOSQUE
009-F.02 COMPACTACIONES: B) DE LA CAMA DE LOS CORTES EN QUE NO SE HAYA ORDENADO EXCAVACIÓN ADICIONAL: 2) PARA 90%.
009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 1) PARA EL PRIMER KM
009-E.02 DESPALME EN MATERIAL A, DESPERDICIANDO EL MATERIAL AL BORDE DEL PRESTAMO.
009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 1) PARA EL PRIMER KM
009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 2) PARA LOS KM SUB-SECUENTES
009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. E) PARA CUALQUIER DISTANCIA, DEL AGUA UTILIZADA EN LA COMPACTACION DE LAS TERRACERIAS
009-F.04 FORMACION Y COMPACTACION: A) DE TERRAPLENES ADICIONADOS CON SUS CUÑAS DE SOBREANCHO: 2) PARA 90%
009-.E.02 DESPALME EN MATERIAL "A" DESPERDICIANDO EL MATERIAL AL BORDE DEL PRESTAMO
009-E.03 EXCAVACIONES DE PRESTAMOS:
009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 1) PARA EL PRIMER KM
009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 2) PARA LOS KM SUB-SECUENTES
DIAGRAMA DE RUTA CRITICA
FECHA DE TERMINO
23-jun-2011
3-ago-20112-sep-2011
17-sep-2011
17-sep-2011
30-jul-2011
23-ago-201129-jul-2011
19-ago-2011
19-ago-2011
23-ago-2011
23-ago-2011
23-ago-2011
8-ago-2011
13-ago-201123-ago-2011
23-ago-2011
23-ago-2011
LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO
PACHUCA, HGO A 19 DE MAYO DEL 2011
ATENTAMENTE
ING. ENRIQUE AZPEITIA MEDINAREPRESENTANTE COMUN
ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.
DIAGRAMA DE RUTA CRITICA
No. DE ACTIVIDAD CLAVE CONCEPTO
LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO
PACHUCA, HGO A 19 DE MAYO DEL 2011
19 I0088 009-F.08 AGUA EMPLEADA PARA COMPACTACION
20 I0121
A) DE LA ELEVACION DE SUBRASANTE EN CORTES Y/O TERRAPLENES EXISTENTES:
21 I0080 2) PARA EL 95%
OBRAS DE DRENAJE
22 I0123
23 I0124
24 I0126
25 I0127
26 I0172
27 I0183
28 I0194
29 I0319
ACARREOS PARA OBRAS DE DRENAJE Y ESTRUCTURA
30 I0369
31 I0370 2) KILOMETROS SUBSECUENTES
A) SOBRE BRECHAHASTA 10 KM.
32 I0367 2) KILOMETROS SUBSECUENTES
33 I0371 047-Z.03 SOBREACARREO DEL AGUA:
A) SOBRE BRECHA
34 I0380
PAVIMENTO
CONSTRUCCION DE BASE HIDRAULICA
35 I0423-B
36 I0431
37 I0549
38 I0550 2) KMS SUBSECUENTES
39 I0453 086-E.04 AGUA UTILIZADA EN COMPACTACION
40 I0551 086-P.03 ACARREOS DEL AGUA PARA COMPACTACION
RIEGO DE IMPREGNACIÓN
41 I0534 086-I.02 BARRIDO DE LA SUPERFICIE POR TRATAR
42 I0519
43 I0521
44 I0523
45 I0525 086-G.02 RIEGO: A) RIEGO DE IMPREGNACION: 1) EMULSION RM-2K
009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. E) PARA CUALQUIER DISTANCIA, DEL AGUA UTILIZADA EN LA COMPACTACION DE LAS TERRACERIAS
009-F.07 MEZCLADO, TENDIDO Y COMPACTACION DE LA CAPA SUBRASANTE FORMADA CON MATERIAL SELECCIONADO:
047-C.02 EXCAVACIÓN PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACIÓN, A CUALQUIER PROFUNDIDAD: A) EXCAVANDO A MANO, EN SECO: 2) EN MATERIAL "B"
047-C.02 EXCAVACIÓN PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACIÓN, A CUALQUIER PROFUNDIDAD: A) EXCAVANDO A MANO, EN SECO: 3) EN MATERIAL "C"
047-C.02 EXCAVACIÓN PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACIÓN, A CUALQUIER PROFUNDIDAD: B) EXCAVADO A MAQUINA, EN SECO: 2) EN MATERIAL "B"
047-C.02 EXCAVACIÓN PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACIÓN, A CUALQUIER PROFUNDIDAD: B) EXCAVADO A MAQUINA, EN SECO: 3) EN MATERIAL "C"
047-D.02 RELLENOS: A) DE EXCAVACION PARA ESTRUCTURAS, 2) CON MATERIAL "B"047-E.03 MAMPOSTERIA DE TERCERA CLASE A CUALQUIER ALTURA: A) PARA PIEDRA OBTENIDA DE BANCOS: 1) CON MORTERO DE CEMENTO047-E.07 PLANTILLA SOBRE LA SUPERFICIE DE DESPLANTE: A) CON MORTERO DE CEMENTO047-L.02 TUBERIA DE CONCRETO : A) REFORZADO, DE F'C=280 KG/CM2, TIPO MACHO Y HEMBRA, FABRICADO EN OBRA: 4) DE 90 CM. DE DIAMETRO
047-Z.02 SOBREACARREOS PARA LA PIEDRA, LA ARENA, EL MATERIAL DE FILTRO Y LOS AGREGADOS FINO Y GRUESO: B) SOBRE CAMINO TERMINADO O PAVIMENTADO, CON BUENA SUPERFICIE DE RODAMIENTO, HASTA 20 KM.: 1) PRIMER KILOMETRO b) CARGA CON MAQUINA
047-Z.04 SOBREACARREO DE LOS TUBOS DE CONCRETO PARA ALCANTARILLAS: D) DE 90 CM. DE DIAMETRO
S/C SUMINISTRO DE MATERIAL PÉTREO 1 1/2" A FINOS PARA BASE
086-E.02 OPERACION DE MEZCLADO, TENDIDO Y COMPACTACION, EN LA CONSTRUCCION DE SUB-BASES O BASES: B) DE BASES: 1) CUANDO SE EMPLEE UN MATERIAL PETREO: b) COMPACTADO AL 100%
086-P.02 ACARREO DE LOS MATERIALES SELECCIONADOS NATURALES O DE LOS QUE HAYAN TENIDO UN TRATAMIENTO DE LAS MEZCLAS Y DE LOS CONCRETOS ASFALTICOS: A) MEDIDO EN EL CAMELLON, EN LOS ALMACENAMIENTOS O EN LOS VEHICULOS DE TRANSPORTE: 1) PRIMER KM
086-G.02 SUMINISTRO DE MATERIALES ASFALTICOS A) EMULSIONES ASFALTICAS: 2) EMULSION RM-2K086-G.02 ALMACENAMIENTO DE LOS MATERIALES ASFALTICOS: A) EN TANQUES O FOSAS DEL CONTRATISTA: 1) EMULSIONES ASFALTICAS086-G.02 CALENTAMIENTO Y BOMBEO DE MATERIALES ASFALTICOS: A) EMULSIONES ASFALTICAS
DIAGRAMA DE RUTA CRITICA
FECHA DE TERMINO
LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO
PACHUCA, HGO A 19 DE MAYO DEL 2011
23-ago-2011
23-ago-2011
23-ago-2011
29-ago-2011
29-ago-2011
29-ago-2011
29-ago-2011
29-ago-2011
29-ago-2011
29-ago-2011
29-ago-2011
29-ago-2011
29-ago-2011
29-ago-2011
29-ago-2011
29-ago-2011
29-sep-2011
29-sep-2011
29-sep-2011
29-sep-201129-sep-201129-sep-2011
28-nov-2011
28-nov-2011
28-nov-2011
28-nov-2011
28-nov-2011
ATENTAMENTE
ING. ENRIQUE AZPEITIA MEDINAREPRESENTANTE COMUN
ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.
DIAGRAMA DE RUTA CRITICA
No. DE ACTIVIDAD CLAVE CONCEPTO
LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO
PACHUCA, HGO A 19 DE MAYO DEL 2011
46 I0554
47 I0555
48 I0556
49 I0557
CARPETA DE CONCRETO ASFALTICO
50 I0535 086-J.02 BARRIDO DE LA BASE IMPREGNADA
51 I0518-B SUMINISTRO DE MEZCLA ASFALTICA EN CALIENTE AGREGADO DE 3/4" A FINOS.
52 I0549
53 I0550
54 I0519
55 I0521
56 I0523
57 I0527 086-G.02 RIEGO: B) RIEGO DE LIGA: 1) EMULSION RR-2K
58 I0554
59 I0555
60 I0556
61 I0557
62 I0545
OBRAS COMPLEMENTARIAS
CUNETAS
63 I0123 2) EN MATERIAL B.
64 I0124 3) EN MATERIAL C
65 I0207
66 I0219
086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: A) DEL CENTRO PRODUCTOR AL ALMACENAMIENTO MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: a) PRIMER KM
086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: A) DEL CENTRO PRODUCTOR AL ALMACENAMIENTO MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: b) KMS. SUBSECUENTES
086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: C) DEL ALMACENAMIENTO AL LUGAR DE UTILIZACION MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: a) PRIMER KM
086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: C) DEL ALMACENAMIENTO AL LUGAR DE UTILIZACION MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: b) KMS SUB-SECUENTES
086-P.02 ACARREO DE LOS MATERIALES SELECCIONADOS NATURALES O DE LOS QUE HAYAN TENIDO UN TRATAMIENTO DE LAS MEZCLAS Y DE LOS CONCRETOS ASFALTICOS: A) MEDIDO EN EL CAMELLON, EN LOS ALMACENAMIENTOS O EN LOS VEHICULOS DE TRANSPORTE: 1) PRIMER KM
086-P.02 ACARREO DE LOS MATERIALES SELECCIONADOS NATURALES O DE LOS QUE HAYAN TENIDO UN TRATAMIENTO DE LAS MEZCLAS Y DE LOS CONCRETOS ASFALTICOS: A) MEDIDO EN EL CAMELLON, EN LOS ALMACENAMIENTOS O EN LOS VEHICULOS DE TRANSPORTE: 2) KMS SUBSECUENTES
086-G.02 SUMINISTRO DE MATERIALES ASFALTICOS A) EMULSIONES ASFALTICAS: 1) EMULSION RR-2K086-G.02 ALMACENAMIENTO DE LOS MATERIALES ASFALTICOS: A) EN TANQUES O FOSAS DEL CONTRATISTA: 1) EMULSIONES ASFALTICAS086-G.02 523 CALENTAMIENTO Y BOMBEO DE MATERIALES ASFALTICOS: A) EMULSIONES ASFALTICAS
086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: A) DEL CENTRO PRODUCTOR AL ALMACENAMIENTO MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: a) PRIMER KM
086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: A) DEL CENTRO PRODUCTOR AL ALMACENAMIENTO MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: b) KMS. SUBSECUENTES
086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: C) DEL ALMACENAMIENTO AL LUGAR DE UTILIZACION MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: a) PRIMER KM
086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: C) DEL ALMACENAMIENTO AL LUGAR DE UTILIZACION MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: b) KMS SUB-SECUENTES
086-L.02 OPERACIÓN DE CONSTRUCCION DE LAS CARPETAS DE CONCRETOS ASFALTICO: (SOLO TENDIDO Y COMPACTADO SIN INCLUIR MEZCLADO): A) COMPACTADAS AL 95%
047-C.02 EXCAVACION PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACION, A CUALQUIER PROFUNDIDAD: A) EXCAVADO A MANO EN SECO:
047-F.04 ZAMPEADO DE CONCRETO HIDRAULICO, A CUALQUIER ALTURA: A) SIMPLE, DE F'c= 100 Kg/Cm² EN CUNETAS
047-G.02 CONCRETO HIDRAULICO, SIN INCLUIR CIMBRA, COLADO EN SECO: C) SIMPLE, GRUPO III, EN ZAPATAS; PILOTES TABLESTACAS Y POSTES PRECOLADOS, APOYOS PRECOLADOS, TAPONES SUPERIORES DE CILINDROS, LOSETAS PRECOLADAS, DOVELAS PRECOLADAS, DENTELLENES Y GUARNICIONES: 2) DE F´C= 150 KG/CM2
DIAGRAMA DE RUTA CRITICA
FECHA DE TERMINO
LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO
PACHUCA, HGO A 19 DE MAYO DEL 2011
28-nov-2011
28-nov-2011
28-nov-2011
28-nov-2011
30-oct-2011
30-oct-2011
30-oct-2011
30-oct-2011
30-oct-2011
30-oct-2011
30-oct-2011
30-oct-2011
30-oct-2011
30-oct-2011
30-oct-2011
30-oct-2011
30-oct-2011
30-nov-201130-nov-2011
30-nov-2011
30-nov-2011
ATENTAMENTE
ING. ENRIQUE AZPEITIA MEDINAREPRESENTANTE COMUN
ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.
DIAGRAMA DE RUTA CRITICA
No. DE ACTIVIDAD CLAVE CONCEPTO
LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO
PACHUCA, HGO A 19 DE MAYO DEL 2011
67 I0271
68 I0369
69 I0370 2) KILOMETROS SUBSECUENTES
70 I0371 047-Z.03 SOBREACARREO DEL AGUA A) SOBRE BRECHA (5 KM)
SEÑALAMIENTO
RAYA CENTRAL
71 I0558
RAYA LATERAL
72 I0559
73 EXT-87
74 EXT-87
SEÑALAMIENTO VERTICAL
75 EXT-69
76 EXT-70
77 EXT-78
78 EXT-83
79 EXT-79
80 EXT-80
81 EXT-65
82 EXT-91
047-H.02 ACERO DE REFUERZO: A) VARILLAS. ACERO DE 3/8 EN ANCLAJES DE 15 CM DE LONGITUD A CADA METRO, EN BORDILLOS.
047-Z.02 SOBREACARREOS PARA LA PIEDRA, LA ARENA, EL MATERIAL DE FILTROS Y LOS AGREGADOS FINOS Y GRUESOS: B) SOBRE CAMINO TERMINADO A PAVIMENTADO, CON BUENA SUPERFICIE DE RODAMIENTO, HASTA 20 KM.: 1) PRIMER KILOMETRO: b) CARGA CON MAQUINA
S/C SUMINISTRO Y APLICACIÓN DE PINTURA AMARILLA Y MICROESFERA EN RAYA CENTRAL, INCLUYE: MATERIAL, MANO DE OBRA, ACARREO Y TODO LO NECESARIO PARA SU CORRECTA APLICACIÓN
S/C SUMINISTRO Y APLICACIÓN DE PINTURA BLANCA Y MICROESFERA EN RAYAS LATERAL, INCLUYE: MATERIAL,MANO DE OBRA, ACARREO Y TODO LO NECESARIO PARA SU CORRECTA APLICACIÓN
VIALETAS REFLEJANTES (AMARILLO) AMBOS LADOS 10 X 10 CMS, INCLUYE SUMINISTRO, ACARREO Y COLOCACION VIALETAS REFLEJANTES (BLANCO) AMBOS LADOS 10 X 10 CMS, INCLUYE SUMINISTRO, ACARREO Y COLOCACION
SEÑAL INFORMATIVA (SIG-7) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 40 x178 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (UN TABLERO) SUJETA A POSTE DE 3 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION
SEÑAL INFORMATIVA (SID-9) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 40 x178 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (UN TABLERO) SUJETA A POSTE DE 3 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION
SEÑAL PREVENTIVA (SP-6, SP-8, SP-20, SP-29, SP-33, SP-34) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 71x71 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (VUELTA DERECHA, VUELTA IZQUIERDA, CURVA INVERSA, ESTRECHAMIENTPOO SIMETRICO, PENDIENTE PELIGROSA, PEATONES) SUJETA A POSTE DE 3 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION
SEÑAL PREVENTIIVA (OD-12) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 45X60 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (INDICADOR DE CURVA PELIGROSA) SUJETA A POSTE DE 3 m DE ANGULO DE 2"X2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8"X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION
SEÑAL RESTRICTIVA (SR-9, SR-18) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 71x71 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (VELOCIDAD, PROHIBIDO REBASAR) SUJETA A POSTE DE 3 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION
SEÑAL INFORMATIVAS DE RECOMENDACION , IDENTIFICACION E INFORMACION GENERAL (SII-15) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 30x76 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (KILOMETRAJE SIN RUTA ) SUJETA A POSTE DE 1.5 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION
SEÑAL INFORMATIVA RESTRICTIVA (S.I.R.) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 71 x178 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE SUJETA A POSTE DE 1.5 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION
OD- 4 DEFENSA METALICA GALVANIZADA (NORMA AASTHO-M180.- DE 2 CRESTAS CALIBRE 12 DE 4.10 MTS. DE LARGO. INCLUYE POSTE IPR GALVANIZADO DE 1.50 MTS., SEPARADOR PARA DEFENSA ANGULO REFLEJANTE EN COLOR AMBAR ALTA INTENSIDAD, TERMINAL (COLOA DE PATO) Y TORNILLOS.
DIAGRAMA DE RUTA CRITICA
FECHA DE TERMINO
LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO
PACHUCA, HGO A 19 DE MAYO DEL 2011
30-nov-2011
30-nov-2011
30-nov-201130-nov-2011
15-dic-2011
15-dic-2011
15-dic-2011
15-dic-2011
15-dic-2011
15-dic-2011
15-dic-2011
15-dic-2011
15-dic-2011
15-dic-2011
15-dic-2011
15-dic-2011