Gdańsk Container Terminal Co

Post on 10-Jan-2016

55 views 2 download

Tags:

description

Gdańsk Container Terminal Co. Established in 1998. Our motto. GTK is…. Major advantages:. customer’s approach, professional and comprehensive services including terminal, depot and repair services. high quality standards . good connections to hinterland - PowerPoint PPT Presentation

Transcript of Gdańsk Container Terminal Co

Gdańsk Container Terminal Co

Established in 1998

Our motto

GTK is…

Major advantages: • customer’s approach,• professional and comprehensive services

including terminal, depot and repair services.• high quality standards.• good connections to hinterland • excellent transit connection to Russia, Belarus,

Ukraine, Slovakia and Czech Republic

Location:

Port of Gdańsk

Szczecińskie Quay

Technical facilities:

• quay length 367 m• ship length up to 205 m• max. draft 9.8 m• open stores 67 417 m2

• reefer plugs – 95 units• ships operated in lo-lo systems• full support for railway wagons.

Technical facilities:

• Ship-to-shore gantry crane- 40 / 60 t• Shore cranes- 40 t• Gantry cranes- 32 / 40 t• Straddle carrier- 40 t• Reach-stackers- 10 t• Mobile harbor crane- 100 t• 95 stations for refrigerated containers

Range of services: • loading / unloading,• all kind of container handling services,• stuffing, stripping, sampling, tallying, shifting ect.• depot services (storage, repairs, washing, cleaning),• goods storage on the yard,• goods storage in the warehouse,• consulting services• assistance in contacts with administration Autorities

and institutions (Custom Office, Sanitary Office, Veterinary Border Inspection)

GTK Co. Strengths:

• strong bussines relations with our customers,

• experienced personnel with deep knowledge of the market and the core of business,

• wide range of services (container terminal, containers’ repairs, container depot, containers’ stuffing & stripping services),

• friendly IT software - SOTeK,

• possibility of an automatic access and transfer the system data based on EDIFACT standard,

• good location with increasing potential with road access to the terminal premises after completion the tunnel building under port cannal.

0

Railway Companies providing services to GTK Co.:

• PKP Cargo

• Spedcont

• Prokont

• Polzug

• Cargosped

• PCC Intermodal

PORT OF GDAŃSK

CONTAINER FEEDER SERVICES

UNIFEEDER (calling twice a week ):Gdynia- Gdańsk (GTK)- Rotterdam Gdynia- Gdańsk (GTK)- Szczecin -Bremerhaven- Hamburg CMA - CGM (calling once a week ):Hamburg- Gdańsk (GTK)- Kaliningrad - Tallin- Hamburg

TEAM LINES (calling once a week ): Hamburg-Bremerhaven-Szczecin-Gdansk (GTK) - Bremerhaven

ROTTERDAM

BREMERHAVEN

HAMBURG

Tallin

Kaliningrad

Szczecin

Annual handling turnover from 2002 to 2011 (in TEUs)

18776 19855

41184

6907577473

91127

77889 74809

62309

43057

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

TEU

Major shipping lines handled at GTK:

HanjinEvergreenHapag LloydAPLCMA-CGMCoscoUASCMOLHamburg SÜdZIMCSAVChina Shipping

Yang MingEUCONNYK LineK-LineNORASIAANLHyundaiOOCLDELTADELMASDelphis

Business Activity:

• Ship handling: 24 hours a day, 7 days a week,

• Handling of the container inland transport: from 7.00 a.m. on Monday until 3.00 p.m. on Saturday.

Contact:Gdańsk Container Terminal Co.

Headquarter: Na Zaspę 3, 80-546 Gdańsk, PolandPort Office:– ul. M. Chodackiego; Szczecińskie Quay

NIP: 583-25-55-159KRS: 0000108214; Register Court in GdańskInitial capital: PLN 500.140,00

Tel.: +(48) 58 737 72 73 +(48) 58 737 72 65Fax: +(48) 58 737 72 75E-mail: gtk@portgdansk.plwww.gtk-sa.pl

Office working hours:8.00 a.m. to 4.00 p.m. from Monday to Friday