Gdańsk Container Terminal Co Established in 1998.

download Gdańsk Container Terminal Co Established in 1998.

of 32

  • date post

    26-Mar-2015
  • Category

    Documents

  • view

    220
  • download

    0

Embed Size (px)

Transcript of Gdańsk Container Terminal Co Established in 1998.

  • Slide 1

Gdask Container Terminal Co Established in 1998 Slide 2 Slide 3 Our motto GTK is Slide 4 Slide 5 Major advantages: customers approach, professional and comprehensive services including terminal, depot and repair services. high quality standards. good connections to hinterland excellent transit connection to Russia, Belarus, Ukraine, Slovakia and Czech Republic Slide 6 Slide 7 Location : Port of Gdask Slide 8 Slide 9 Szczeciskie Quay Slide 10 Slide 11 Technical facilities: quay length 367 m ship length up to 205 m max. draft 9.8 m open stores 67 417 m 2 reefer plugs 95 units ships operated in lo-lo systems full support for railway wagons. Slide 12 Slide 13 Technical facilities: Ship-to-shore gantry crane- 40 / 60 t Shore cranes- 40 t Gantry cranes- 32 / 40 t Straddle carrier- 40 t Reach-stackers- 10 t Mobile harbor crane- 100 t 95 stations for refrigerated containers Slide 14 Slide 15 Range of services: loading / unloading, all kind of container handling services, stuffing, stripping, sampling, tallying, shifting ect. depot services (storage, repairs, washing, cleaning), goods storage on the yard, goods storage in the warehouse, consulting services assistance in contacts with administration Autorities and institutions (Custom Office, Sanitary Office, Veterinary Border Inspection) Slide 16 Specjalizacja: Nietypowe formowanie i rozformowywanie kontenerw adunki sypkie Sztuki cikie Drobnica Slide 17 adunki sypkie: Slide 18 Sztuki cikie: Slide 19 Drobnica: Slide 20 Slide 21 GTK Co. Strengths: strong bussines relations with our customers, experienced personnel with deep knowledge of the market and the core of business, wide range of services (container terminal, containers repairs, container depot, containers stuffing & stripping services), friendly IT software - SOTeK, possibility of an automatic access and transfer the system data based on EDIFACT standard, good location with increasing potential with road access to the terminal premises after completion the tunnel building under port cannal. 0 Slide 22 Slide 23 Railway Companies providing services to GTK Co.: PKP Cargo Spedcont Prokont Polzug Cargosped PCC Intermodal Slide 24 Slide 25 PORT OF GDASK CONTAINER FEEDER SERVICES UNIFEEDER (calling twice a week ): Gdynia- Gdask (GTK)- Rotterdam Gdynia- Gdask (GTK)- Szczecin - Bremerhaven- Hamburg CMA - CGM (calling once a week ): Hamburg- Gdask (GTK)- Kaliningrad - Tallin- Hamburg ROTTERDAM BREMERHAVEN HAMBURG Tallin Kaliningrad Szczecin Slide 26 Slide 27 Slide 28 Major shipping lines handled at GTK: Hanjin Evergreen Hapag Lloyd APL CMA-CGM Cosco UASC MOL Hamburg S d ZIM CSAV China Shipping Yang Ming EUCON NYK Line K-Line NORASIA ANL Hyundai OOCL DELTA DELMAS Delphis Slide 29 Slide 30 Business Activity: Ship handling: 24 hours a day, 7 days a week, Handling of the container inland transport: from 7.00 a.m. on Monday until 3.00 p.m. on Saturday. Slide 31 Slide 32 Contact: Gdask Container Terminal Co. Headquarter: Na Zasp 3, 80-546 Gdask, Poland Port Office: ul. M. Chodackiego; Szczeciskie Quay NIP: 583-25-55-159 KRS: 0000108214; Register Court in Gdask Initial capital: PLN 500.140,00 Tel.: +(48) 58 737 72 69 +(48) 58 737 72 71 +(48) 58 737 72 74 +(48) 58 737 70 60 Fax: +(48) 58 737 72 75 E-mail: gtk@portgdansk.pl www.gtk-sa.pl Office working hours: 8.00 a.m. to 4.00 p.m. from Monday to Friday