Building

Post on 07-Jul-2015

171 views 2 download

Tags:

description

contact Amanjit Singh09312221946

Transcript of Building

PROFILE OF THE BUILDING

Building facts

•Prime location NH8

•Green Building

•Fresh air throughout the building thru the ventilation units attached to the AC’s , cross air ventilated building

•Power backup

•Four side open building

• Terrace anti aircraft light

•CCTV Cameras at prime locations

•The flooring carpets are anti static carpets

• Plantation

• Glass Mosaic tiles

• Safety glass all through the building

Ground Floor

GROUND floor

• 3 Cabins

• 2 Training Rooms

• 1 CCTV Room

• 1 Production Hall

• 3 Washrooms

• 1 Cafeteria

Ground floor Total AC Unit Capacity : 70 tons

Reception:5.5 Tons : Voltas

Cafeteria :27 Tons : Carrier and LG

Training Center :9.5 Tons : Carrier

Production Area and Storage Area : 22 Tons : Blue

Star

Individual Units : 6 Tons : Carrier and Samsung

PANELS

• 2 Fire Hydrant stations

1 Notifier Fire control panel

1 Ground Floor Panel 400 Amperes

First floor

• 13 Cabin

• 26 Cubical

• 188 Workstation

• 5 Meeting Room

• 2 Server Room

• 3 Washrooms

First floor

AC Units

•Total AC packaged unit : 68 Tonnes : Voltas

• Individual AC units : 12 Tonnes :Diakin

Panels :

• 2 Fire hydrant station

• 1 First floor panel 200 amperes

Second floor

• 22 Cabins

• 35 Cubicals

• 144 Workstation

• 3 Meeting Room

• 1 Server Room

• 3 Washrooms

Second Floor

AC Units ;

•Total Package Unit : 66 Tons : Voltas

• Individual Units : 24.5 Tons: Carrier /Diakin

Panels

• 2 fire hydrant station

•MDB UPS panel 125 ampere

•Server room control UPS panel 125 ampere

• Research and development panel 100 ampere

THIRD FLOOR

•21 Cabins

• 31 Cubicles

• 60 Workstations

• 1 Meeting Room

• 1 Board Room

• 1 Auditorium

• 1 Server Room

•1 Pantry Directors Area

• 3 Washrooms

• 2 Director Washroom

Third Floor

AC Units :

•Total Package Unit : 68 tons : Voltas

• Individual Units : 23.5 Tons : Diakin /Carrier/Toshiba

Panels :

• 2 Fire hydrant station

•Third floor UPS panel :125 ampere

•Electrical panel : 200 amperes

•Lighting Panel : 125 Amperes

Terrace

Panels :

• 2 Cooling Towers : 165 TR : Case /Asian

• 1 Cooling Tower Pump Room

• 1 Lift room

• 2 Fresh Air Unit

• 2 Exhaust fan unit

Outer AREa ( GF )

Panels :

•HT Meter Room

•HT Panel Rooms

•STP Plant : 50 KLD

•Isolator Panel: 2000 AMPERE

•POLE LIGHTS 39

•RAMP SHUTTERS -2

•PUMP ROOM

•DG SETS

•DIESEL TANK YARD :40000 KLD

Basement •LT PANEL -1 (2000 KVA)

• VENTILATION PANEL -1(250 AMPERE)

• NEW UPS PANEL -1 (100 AMPERE)

• UPS BYPASS CHANGEOVER PANEL -5 (100 AMPERE EACH )

• AC PANE L-1(630 AMPERE)

• ADDITIONAL AC PANEL – 1(250 AMPERE )

• UNIVERSAL TRANSFORMER CONTROL PANEL(RTCC )

• CAPACITOR PANEL -1 (400 AMPERES )

• BLOWER-2(18.5 KW AND 7.5KW)

• FIRE HYDRANT STATION -2

• APC UPS -4 (30 KVA ) WITH 32 BATTERIES EACH OF 65 AH

• APC UPS -3 (40 KVA ) WITH 64 BATTERIES EACH OF 26 AH