1- Introduction
Dubai government has diversified its economy to attract revenues in
the form of expanding commercial activities and construction industry.
This action caused a huge boom in construction & industry sectors since
2002, which leads in importing plenty of new buildings systems and
materials.
At the heart of the buildings construction process is the requirement
to contribute to the objectives of sustainable structure, and to achieve
a more environmental design response. All those involved in importing of
new buildings construction systems should assess how those systems can
pursue the objectives of sustainable social progress, which recognizes the
needs of owners; effective protection of the environment; prudent use of
resources and maintenance of high level of economic growth.
The aim of this booklet is to clarify and simplify the complete
procedure for the approval of new building construction systems from
application submitting up to issuing the final approval certificate,
including all conditions and requirements in order to maintain high
quality, sustainable and durable buildings.
All documents will be evaluated based on DM regulations and in the
light of the following factors:
Durability, quality, environmental impact, urban change, social and
cultural impact, maintenance requirements, weathering condition, design
flexibility to future extensions, refurbishment and renovation and finally
life cycle cost.
4
2- Building Department and its Regulations
(Reference: building department web site)
2.1- introduction
Building Department is the main legislative authority that enact laws
and standards and the requirements and specifications of buildings
construction in the Emirate of Dubai, and adopt an integrated system of
scrutiny and control over all phases of construction, which ensures the
application of all laws and standards so that as the buildings of Dubai
became the world dream. Also, it works on the development of the
construction works in the emirate, according to the highest international
specifications and standards, and to the optimal use of modern
technologies in order to create an outstanding city.
In addition, Building Department is working on the rehabilitation of
all consulting offices and contracting companies in accordance with
standards and plans that ensure the quality of their specialization, which
include: their registration, licensing , classifying, rehabilitation of their
engineers, and assessment annually.
Building Department is considered as a liaison center among the
different concerned bodies, which works on communicating the
information to the concerned parties inside and outside the Municipality,
and coordinating with the local departments, municipality departments,
vocational societies, and arranging the career practice in the required
manner.
5
2.2- Building Department Vision
“Our Buildings ... Dream of the world”
2.3- Building Department Mission
“As a team , we study , organize , control and develop the
construction works in Dubai Emirate as per sustainability standards and
international specifications through the best use of technology and
modern techniques to create Dubai an excellent city”.
2.4- Buildings Department's Duties
1. Preparing and applying the engineering systems and criterions and the
approved specifications for design, construction and execution. In
addition, engineering audit on designs; engineering supervision on
execution; and implementation other departments' regulations relevant to
construction works.
2. Preparing and applying the approved systems and criterions for
evaluating, classifying and registering the engineers, contracting,
maintenance and decoration companies, vocational trades, consultation
offices, opinion advising offices and projects technical management.
3. Carrying the necessary examinations for evaluating the engineering
staff required for registering, classifying, promoting and renewing the
licenses of consultation offices and contracting, demolition, maintenance
or decoration companies and other vocational trades.
4. Monitoring and inspecting the consultation offices; contracting,
demolition, decoration and maintenance companies; and vocational trades
in both their head offices and working sites.
5. Preparing and applying Municipality laws, systems, regulations and
requirements relevant to the issuance of licenses and building permits and
buildings completing certificates.
6
6. Studying and approving the new methods and systems applied for
construction projects, thermal insulation and green buildings.
7. Conducting the engineering supervision for execution works at
construction sites, used materials and construction methods, safety and
security requirements and the arrangement of work sites.
8. Monitoring and inspecting the existing buildings and facilities and
their exploitation for preventing any violation and irregular expansion.
9. Solving and handling complaints and technical disputes and providing
the technical opinion and advice in cooperation with the competent
authorities.
10. Providing all technical and administrative laws, regulations and
criterions applicable in the Department for all clients who benefit of its
services, in addition to spreading awareness and culture of building the
community.
11. Conducting studies and researches relevant to construction works
and spreading and circulating their contents to the concerned authorities.
12. Implementing training programs and courses, symposiums, forums
and educational programs, in cooperation with the concerned units, for
employees, engineers and those benefiting from the Department's services
for the purpose of upgrading the technical and administrative level.
13. Providing comprehensive databases for the buildings, facilities and
their components, and updating them directly on the spot.
14. Enforcing all the approved institutional systems and criterions in
order to manage, develop and improve the work in the Department.
7
2.5- Building Department Sections
Buildings Department is divided into four sections that are working
altogether for providing their services to clients as follows:
1- Building permits Section:
The Building permits Section authorizes the licensing of engineering
drawings submitted by consultants, contractors or proprietors, which
should be identical to the general and special construction conditions
concerning the building intended to be constructed in the emirate
2- Engineering Supervision Section:
The Engineering Supervision Section, affiliated to the Department,
undertakes the task of permanently supervising the building under
construction, following up the matters with contractors and consultants,
following up work progress and compliance with the safety criterions.
3- Buildings Inspection Section:
The Inspection Section works on supervising and monitoring the existing
buildings through a group of the specialized engineers for following up
the buildings conditions and their exploitation in the manner these
buildings are intended for, in addition to verifying the compliance with
the safety and security criterions
4- Qualification & Building Studies Section:
Qualification & Building Studies sec. prepare and implement the
approved regulations and standards for the evaluation, classification and
recording engineers, contractors and consulting offices; as the approval of
new building and thermal insulation systems; as well as studies and
research works related to building construction field.
8
2.6- Building Rules and Regulations
Out of Dubai Municipality keenness for organizing the construction
operation in the emirate, Buildings Department has issued a booklet that
clarify Building Rules and Regulations which aims to achieve the
department Vision and Mission.
9
3- Types of Building Construction Systems
3.1 Introduction
The classification of building systems according to functional
purposes is divided into two main categories: First, Thermal & Electro-
Mechanical Systems which are known as Building Services Systems.
Second, Structural Systems which are divided into two sub-systems:
Complete and Partial building systems . For example, heat insulation
systems, communication lines, energy supply, plumbing: water supply
and drainage works, electrical works, escalators and lifts, fire detection
and protection, water proofing, (HVAC): heating, ventilation and air
condition and security and alarm systems are known as Thermal &
Electro-Mechanical Systems. Low and high rise buildings and precast
structural elements such as wall and roof panels, shells, vaults, folded
plates, pre-stressed slabs, and post-tension slabs are considered as
Structural Systems.
3.2 Definitions of Building Construction Systems
3.2.1 Structural Systems:
3.2.1.1 Complete building system
The complete building system is an architectural, structural and
services composite which consist of several components / materials that
are erected in a specific way to get a complete building that fulfill its
purpose.
The purpose of each building is to be used for one or more of the
following types:
10
(a) Residential buildings
They are divided to two main types:
Villas which consists of one or two floors.
Multi-story buildings which consist of apartments.
(b) Commercial buildings
They are mostly multi-story buildings and usually consist of show
rooms or shops at ground floor and apartments at upper floors that are
used as offices for commercial purposes.
(c) Industrial buildings
They mostly consist of one or two floors which are used for industrial
purposes.
(d) Services buildings
They vary in shape and number of floors according to their use, such as:
Schools
Hospitals
Mosques
Hotels
Sports halls
Parties halls, … etc.
(3.2.1.2) Partial building system
The partial building system is a building component which consists of
materials that are mixed or fixed together in a specific way to get
a component. It is erected in the building to fulfill its purpose, such as:
a) Pre-cast structural elements such as: RCC walls and roof panels.
b) Post-tensioned structural elements such as beams and slabs, … etc.
11
3.2.2 Thermal & Electro-Mechanical Systems (Building Services Systems):
Building services systems can be defined as the elements that are
erected in the building to fulfill their purposes, and all together needed to
allow a building to function, work, and provide for the occupants their
needs. They comprise Mechanical, Electrical and Public Health (MEP)
systems, all of which are further sub-divided into the following:
(a) Mechanical systems:
Escalators and lifts.
Heating, Ventilation and Air Conditioning (HVAC).
Refrigeration.
Mechanical car parking.
(b) Electrical systems:
Energy / electricity supply systems.
Energy / electricity saving systems.
Communication lines, telephones and IT networks (ICT).
Artificial lighting.
Lightning protection.
Security and alarm systems.
(c) Public Health Systems:
Fire detection and protection.
Plumbing : water supply and drainage.
Gas supply systems.
Landscaping / external systems such as: swimming pools,
fountains, irrigation, etc.
Heat insulation components.
Water proofing layers.
12
4.1 Requirements for Structural Systems
4.1.1 General requirements:
1) A copy of a local factory license which has an activity of new
structural elements manufacturing (In case structural elements are pre-
made).
2) A copy of a trade license for an erection contractor.
3) A contract between the original producer in the original country and
the local contractor.
4) A copy of one complete set of drawings for an executed project
included: architectural, structural and services drawings.
5) A brief history of the company (if new established co., submit
whatever is available) including:
List of staff.
List of labors.
List of assets and equipments.
List of all executed projects in the original country using same
system, photos and copies of three completion certificates.
Company category (G+1, G+4, …. Etc.).
Company profile, goals , aspects , etc
4- The Requirements
for the Approval of
New Building
Construction Systems
13
6) After getting the preliminary approval certificate, a trial project mostly
is requires and to be executed providing that:
(a) The project drawings must be submitted through an approved local
consultant in order to get the building permit.
(b) A bank guarantee must be submitted for both performance and
safety.
4.1.2 Technical requirements:
1) All structural calculations including analysis and design.
2) Technical report for each of the following tests:
Compressive strength for concrete, wood and blocks (if used as
structural elements).
Tensile strength for steel, aluminum, or any metal (if used as
structural elements).
Amount of fluoride and chloride salts in R.C.C. structural
elements.
Effects of local temperature variations on structural elements.
Durability tests for structural elements.
3) A list of well trained staff for execution the system to be provided by
the original company.
4) Structure must last for at least 30 years (to be stated in the design
calculation sheet).
5) Guarantee certificate for safety of structure that covers min 10 years
from completion certificate date must be provided by contractor.
6) An approved code must be used in structural analysis and design.
7) Flexibility degree of the system that allow structure to be designed for
all possible architectural shapes.
14
4.2 Requirements for Thermal & Electro-Mechanical Systems
(Building Services Systems):
4.2.1 General Requirements:
1. SYSTEM NAME: Give the generic type and the trade name of the
product, as will be given in the approval certificate.
2. MANUFACTURER: Give the name and the full address of the
manufacturer.
3. LICENSE of the COMPANY: Applicant (Manufacturer or his
authorized agent established in Dubai) must submit a valid license
(commercial, professional, industrial or agricultural) of the
company registered in Dubai.
4. AGENT INFORMATION (if applicable): The Applicant must
provide a written authorization confirming Agent's Authority to act
in this matter and a certified legal agreement between the applicant
and the manufacturer.
5. BRIEF COMPANY PROFILE: Provide a brief description of the
company (the applicant) and the manufacturer (if it is different)
including country and date of establishment, number of staff and
labor, number and type of equipment and any other supporting
information.
6. GUARANTEE CERTIFICATE: The Applicant must provide a
written full guarantee for the manufacturing, installation and
performance of the system for a period that will determined by DM.
7. REFERENCE PROJECTS: List the projects where the system
was used showing the year of installation and full address of the
location of installation.
15
4.2.2 Technical Requirements:
1. SYSTEM DESCRIPTION AND COMPONENTS: Give a brief
description of the system and describe in detail all components of
the system and their physical relationship to each other, providing a
descriptive title, and including model numbers, sizes, and
dimensions where applicable.
2. SYSTEM USAGE, SCOPE OF APPLICATION AND
LIMITATIONS. Describe the uses for which the system is
intended and state types of buildings and locations where the system
can be used. Also, list the known limitations on the uses of the
material, system or building type.
3. APPLICABLE REGULATION: State the applicable
requirements according to the applicable codes and standards of the
current DM legislations (regulations). Also, Identify all provisions
of the current DM legislations (regulations) that inhibit the use of
the proposed material, system, or building design and/or identify the
provisions of the Building Code for which an equivalency is being
sought.
4. NON DM REGULATORY INFORMATION AND
STANDARDS: Include copies of any acceptances, authorizations,
evaluations, or refusals from other local or international bodies of
the proposed material, system or building design. These acceptances
by other bodies should be accompanied with the relevant regulation.
5. TECHNICAL SPECIFICATION: Give all the technical data of
the system. Detail all relevant assumptions, limiting or restricting
factors, drawings and calculations, testing procedures, etc.,
16
including any commissioning, operational and maintenance
requirements. List all Submitted Documents: Tabulate all
documentation and clearly identify the documents, tests, or support
materials to be considered by DM. Information you may consider
submitting for review may include and is not limited to:
System Description
Characteristics
Strength
Durability
Detailed design and installation drawings
Calculations
Certifications
Installation Manuals
Sample of the Product
Site monitoring information
Training Manuals
Quality Control Manuals (factory and onsite)
Identify how each document submitted supports the case that the
proposed material, system or building design provides a level of
performance, at least equivalent to that required by the DM legislations
(regulations). DM may also review or observe testing of the system by
the applicant.
6. HEALTH AND SAFETY: Identify if the system has any health or
safety risks in the handling, installation, usage, decomposition or
others. Provide all the required certificates from the concern
authorities such as civil defense, health and safety, environment or
any other.
17
7. TESTS AND APPROVALS: Provide all test results and approvals
for the system. Also provide certificate of approval for all the
materials used in the system from Dubai Central Lab.
4.3 Civil Defense requirements
An approval certificate from Civil Defense Administration is required.
5- Approval Certificate:
If all the above mentioned requirements are fulfilled, a preliminary
or final approval certificate for the system will be given
(depending on the type and use of the system).
In case a preliminary approval certificate is given, a trial project is
required prior to the final approval.
D.M. staff will supervise the execution of the trial project until
completion certificate is issued. If all works and materials are
matched with DM specification and regulations, a final approval
certificate will be issued.
In case if any defect or technical problem appear in the approved
system within five years from building completion certificate, the
system approval will be terminated.
6- The approval process sequence:
A flow chart is shown next page which illustrates the process
sequence for the approval of a new building system.