4/30/2009 Scope of Work Remark 1 Wherever Areas Available 2 STG Building Work in Progress 3 GTG Building Work in Progress 4 Electrical Building No Work Requires Drawing 5 Control Room Building No Work Requires Drawing 6 BFP Building 7 GT Foundation pilecap in progress 8 STG Foundation 9 No Work Requires Drawing 10 HRSG Foundation Completed completed 11 No Work Requires Drawing 12 No Work Requires Drawing 13 No Work Requires Drawing 14 No Work Requires Drawing 15 No Work Requires Drawing 16 No Work Requires Drawing 17 No Work Requires Drawing 18 Bus Duct Foundations No Work Requires Drawing 19 Oil Water Seperator Pit No Work Requires Drawing for Main Power Block for 1 X 350 MW for CCPP at Hazira, GSEGL, construction Drawings & status of the work Sr. No. Availabi lity of Drawing Status of the work as on 25.03.09 Site Levelling and Grading Availabl e Availabl e Piling Work Completed. Pilecap work in progress Availabl e Piling Work Completed. Pilecap in Progress Not Availabl e Not Availabl e Availabl e piling work completed, pilecap work in progress Piling finished on 24'Apr, Pilecap work in progress start date: 27/04/09 Availabl e Piling work completed Availabl e piling work in progress only piling layout dwg available BFP Foundation (Equipment) Not Availabl e Availabl e Air Washer Building System Civil Works Not Availabl e Compressor Building Including Compressor Foundations Not Availabl e AC, Ventilation System Civil Works Not Availabl e Foundations DG and other Misc. Equipment Not Availabl e Chlorination Plant System Civil Works Not Availabl e Generator Transformer Foundation Not Availabl e Unit Auxiliary Transformer Foundation Not Availabl e Not Availabl e Not Availabl e

Transcript of [XLS] · Web viewBasic_Tower_A Basic5fini Basic5str Basic6fini Basic6str BasicC basicfin...

Page 1: [XLS] · Web viewBasic_Tower_A Basic5fini Basic5str Basic6fini Basic6str BasicC basicfin Basicoverall basistr bcd BidClass BidClass_Text BillingFreq BillingTiming BLK2 BLK3 BOQ bp

4/30/2009

Scope of Work Remark

1 Site Levelling and Grading Available Wherever Areas Available

2 STG Building Available Work in Progress

3 GTG Building Available Work in Progress

4 Electrical Building No Work Requires Drawing

5 Control Room Building No Work Requires Drawing

6 BFP Building Available

7 GT Foundation Available pilecap in progress

8 STG Foundation Available

9 BFP Foundation (Equipment) No Work Requires Drawing

10 HRSG Foundation Available Completed completed

11 No Work Requires Drawing

12 No Work Requires Drawing

13 No Work Requires Drawing

14 No Work Requires Drawing

15 No Work Requires Drawing

16 No Work Requires Drawing

17 No Work Requires Drawing

18 Bus Duct Foundations No Work Requires Drawing

19 Oil Water Seperator Pit No Work Requires Drawing

20 No Work Requires Drawing

21 Miscellaneous Sumps & Pits No Work Requires Drawing

Civil, Structural & Architectural work for Main Power Block for 1 X 350 MW for

CCPP at Hazira, GSEGL, Dist. SuratDetails of the scope of work, availability of

construction Drawings & status of the work

Sr.No.

Availability of

Drawing

Status of the work as on

25.03.09

Piling Work Completed. Pilecap work in progressPiling Work Completed. Pilecap in Progress

Not Available

Not Available

piling work completed,

pilecap work in progress

Piling finished on 24'Apr, Pilecap work in progress

start date: 27/04/09

Piling work completed

piling work in progress

only piling layout dwg available

Not Available

Air Washer Building System Civil Works

Not Available

Compressor Building Including Compressor Foundations

Not Available

AC, Ventilation System Civil Works

Not Available

Foundations DG and other Misc. Equipment

Not Available

Chlorination Plant System Civil Works

Not Available

Generator Transformer Foundation

Not Available

Unit Auxiliary Transformer Foundation

Not Available

Not Available

Not Available

Miscellaneous Civil Works in Transformer Yard like Fir Barrier Wall, Fencing around Transformer etc.

Not Available

Not Available

Page 2: [XLS] · Web viewBasic_Tower_A Basic5fini Basic5str Basic6fini Basic6str BasicC basicfin Basicoverall basistr bcd BidClass BidClass_Text BillingFreq BillingTiming BLK2 BLK3 BOQ bp

22 No Work Requires Drawing

23 Roads No Work Requires Drawing

24 Drains & Culverts No Work Requires Drawing

25 No Work Requires Drawing

26 Pipe Support Pedestals No Work Requires Drawing

27 Stack Foundation Available Completed completed

28 HRSG to Stack Area Paving No Work Requires Drawing

29 DG Building No Work Requires Drawing

30 CW Chlorinatio Building No Work Requires Drawing

31 CW Pipeline Civil Works No Work Requires Drawing

32 No Work Requires Drawing

33 No Work Requires Drawing

34 available No Work

35 RW Pipeline Civil Work No Work Requires Drawing

36 No Work Requires Drawing

37 Stores Building No Work Requires Drawing

38 No Work Requires Drawing

39 Fuel Pipe Support Pedestals No Work Requires Drawing

40 No Work Requires Drawing

41 Effluent Holding Tank No Work Requires Drawing

42 Overhead Water Tank Available Work in Progress

43 No Work Requires Drawing

Misc. Outdoor Equipment Foundations & Trenches

Not Available

Not Available

Not Available

Pipe Rack/Cable Tray Supporting Structures and their Foundations

Not Available

Not Available

Not Available

Not Available

Not Available

Not Available

CW Pump House including forebay and CW/CT switchgear room

Not Available

Civil Works for CW Duct from Cooling Tower to CWPH

Not Available

Raw Water Reservoir & Pump House

released on 18/04 & kept on hold since 23/04/09

after completion of 6000 cum excavation & 88 cum

PCC

Not Available

Clarified Water Reservoir & Pump House

Not Available

Not Available

Miscellaneous Tank Foundations like Fuel tank Foundation, DM Tank Foundation, Condenstae Storage Tank Foundation etc.

Not Available

Not Available

Fuel Gas Metering & Receiving Station Civil Works

Not Available

Not Available

Civil Works related to Potable and Service Water Systems

Not Available

Page 3: [XLS] · Web viewBasic_Tower_A Basic5fini Basic5str Basic6fini Basic6str BasicC basicfin Basicoverall basistr bcd BidClass BidClass_Text BillingFreq BillingTiming BLK2 BLK3 BOQ bp

44 No Work Requires Drawing

45 No Work Requires Drawing

46 Available Completed

Any building/ Structure required from system point of view but not included above

Not Available

Civil Works for sewerage system including Septic tanks, soak pits & Manholes

Not Available

Arrangement for Drawing Construction Water from Existing Reversoir

Page 4: [XLS] · Web viewBasic_Tower_A Basic5fini Basic5str Basic6fini Basic6str BasicC basicfin Basicoverall basistr bcd BidClass BidClass_Text BillingFreq BillingTiming BLK2 BLK3 BOQ bp

ERA INFRA ENGG LTD371-371/2, SAHI HOSPITAL ROAD, JUNGPURA, BHOGAL, NEW DELHI-110014

PROGRAMME AS PER LOA FOR THE CONSTRUCTION OF 1X350 MW CCPP EXTN AT GSEG HAZIRAPROGRESS COMPARATIVE STATEMENT L2 VS ACTUAL (ACCORDING RECEIPT OF DRAWINGS) AS ON 30/04/09

DATE OF LOA: 07/08/2008ACTUAL DATE OF START:25/10/2008 (DATE OF ISSSUED OF RFC DRAWING OF HRSG AREA PILING)

S NO AREA ACTIVITY

1 MAIN BLOCK A GT-GTG & STG BUILDING FOUNDATION 7 MONTHS 12/17/2008

GTG BLDG PILING LAYOUT

PILECAP EXCAVATION

PCC

RCC

PEDASTAL

STG BLDG PILING LAYOUT

PILECAP EXCAVATION

PCC

RCC

PEDASTAL

PILING LAYOUT

PILECAP EXCAVATIONPCC RCCOPEDASTAL

B BLDG STRUCTURES- FABRICATION 9 MONTHS 2/1/2009BLDG STRUCTURES- ERECTION 10 MONTHS 4/1/2009

C 15 MONTHS 7/1/2009

D GT-GTG FOUNDATION 5 MONTHS

PILING LAYOUTPILECAP EXCVNPCC RCCOPEDASTAL

E STG EQPT STG FOUNDATION 6 MONTHS

DURATION FROM ACTUAL START DATE

AS PER LOIPLANNED DATE OF

START

AUX COLUMN

BLDG SUPERSTRUCRURE CIVIL INCLUDING INTERNAL FLOORING

AFTER RECIPT OF DWG

AFTER RECIPT OF DWG

Page 5: [XLS] · Web viewBasic_Tower_A Basic5fini Basic5str Basic6fini Basic6str BasicC basicfin Basicoverall basistr bcd BidClass BidClass_Text BillingFreq BillingTiming BLK2 BLK3 BOQ bp

PILE LAYOUT

PILECAP EXCVNPCC RCCOPEDASTAL

F STG DECK SLAB 9 MONTHS

G 6 MONTHS 10/25/2008

HRSG HRSG PILE LAYOUTPILECAP INCLUDING PEDASTAL

STACK STACK PILING LAYOUTSTACK PILECAPSTACK PEDASTAL

H OTHER MAJOR EQUIPMENT FOUNDATIONS 12 MONTHS 6/1/2009

I 18 MONTHS NOV'2009

J ALL AUXILIARY/FACILITY BUILDINGS 18 MONTHS AUG'2009

BFP BUILDING PILING LAYOUTPILECAP 4/26/2009PEDASTALBOILER FEED PUMP (EQPT-BPF)PILING LAYOUTPILECAP

PILING LAYOUT

PILECAPSUPERSTRUCTURE

K TRANSFORMAR YARD, FENCING, OWS ETC 16 MONTHS OCT'20092 WATER SYSTEMS

A 18 MONTHS MAY'2009

3 PIPE/CABLE RACKSA FOUNDATION 11 MONTHS JUNE'2009B STRUCTURE FABRICATION/ERECTION 15 MONTHS AUG'2009

4 21 MONTHS JAN'2010

AFTER RECIPT OF FDN DWG

HRSG FOUNDATION & STEEL STACK FOUNDATION

EXTERNAL PAINTING & OTHER MISCELLANEOUS WORKS INCLUDING ARCHITECTURAL WORK OF GTG & STG BUILDINGS

BFP BUILDING

OH WATER TANK

RW & CW PUMP HOUSE, FORBAY, CHLORINATION BLDG, CW DUCT, DM TANK, DMPRF PH, POTABLE WATER PH ETC

PLANT, ROADS, DRAINS, FENCING, PAVING & OTHER MISCELLANEOUS WORKS

Page 6: [XLS] · Web viewBasic_Tower_A Basic5fini Basic5str Basic6fini Basic6str BasicC basicfin Basicoverall basistr bcd BidClass BidClass_Text BillingFreq BillingTiming BLK2 BLK3 BOQ bp

PLANNING ENGINEER

Page 7: [XLS] · Web viewBasic_Tower_A Basic5fini Basic5str Basic6fini Basic6str BasicC basicfin Basicoverall basistr bcd BidClass BidClass_Text BillingFreq BillingTiming BLK2 BLK3 BOQ bp

ERA INFRA ENGG LTD371-371/2, SAHI HOSPITAL ROAD, JUNGPURA, BHOGAL, NEW DELHI-110014

PROGRAMME AS PER LOA FOR THE CONSTRUCTION OF 1X350 MW CCPP EXTN AT GSEG HAZIRAPROGRESS COMPARATIVE STATEMENT L2 VS ACTUAL (ACCORDING RECEIPT OF DRAWINGS) AS ON 30/04/09

DATE OF LOA: 07/08/2008ACTUAL DATE OF START:25/10/2008 (DATE OF ISSSUED OF RFC DRAWING OF HRSG AREA PILING)

SCHEDULED FINISH DATE CURRENT STATUS

5/24/2009 5.5 MONTHS

12/16/200812/31/2008 FINISHED 2/13/2009

3/10/20093/20/2009 50% completed

3/21/2009 3/23/2009 50% completed

3/22/2009 45% completed

in progress

12/17/2009 COMPLETED 3/21/2009

3/9/2009 3/12/2009

3/10/2009

3/11/2009

UNDER PROGRESS

3/30/2009 3/31/2009 UNDER PROGRESS4/21/2009 UNDER PROGRESS

7/24/2009 6 MONTHS 4/16/2009 4/14/2009 UNDERPROGRESS8/24/2009 5 MONTHS UNDER PROGRESS

1/24/2010 7 MONTHS

3/24/2009UNDER PROGRESS

2/9/2009 2/15/2009 FINISHED 3/28/20094/18/2009 UNDER PROGRESS

4/24/2009

SCHEDULED DURATION OF

ACTIVITY

DATE OF RECEIPT OF DRAWINGS

(RFC)

DATE OF START

DATE OF FINISH

17/12/08 & 7/03/09

50% COMPLETED UNDER PRORESS

50% COMPLETED UNDER PRORESS

50% COMPLETED UNDER PRORESS

Page 8: [XLS] · Web viewBasic_Tower_A Basic5fini Basic5str Basic6fini Basic6str BasicC basicfin Basicoverall basistr bcd BidClass BidClass_Text BillingFreq BillingTiming BLK2 BLK3 BOQ bp

4/21/2009

7/24/2009

4/24/2009 6 MONTHS

11/5/2008 10/20/2008 COMPLETED 12/27/200812/9/2009 12/20/2008 COMPLETED 4/22/2009

12/16/2008 12/15/2008 COMPLETED 2/12/20091/30/2009 2/11/2009 COMPLETED 3/31/2009

COMPLETED

10/24/2009 4 MONTHS

4/24/2010 6 MONTHS

4/24/2010 9 MONTHS

3/14/2009 3/17/2009 COMPLETED 4/19/2009

5/31/2009 4/3/2009 Work in Progress

1/30/2009 2/12/2009 COMPLETED 2/20/2009

1/30/2009 4/16/2009 UNDERPROGRESS

2/24/2010 7 MONTHS

APRIL' 2010 12 MONTHS 4/18/2009 4/18/2009 Hold (23/04/2009)

9/24/2009 4 MONTHS 24/01/2010 6 MONTHS 7/24/2010 7 MONTHS

Hold (22/04/2009) , Released on 29/04/2009

Under progress

Page 9: [XLS] · Web viewBasic_Tower_A Basic5fini Basic5str Basic6fini Basic6str BasicC basicfin Basicoverall basistr bcd BidClass BidClass_Text BillingFreq BillingTiming BLK2 BLK3 BOQ bp

PROJECT IN CHARGE

Page 10: [XLS] · Web viewBasic_Tower_A Basic5fini Basic5str Basic6fini Basic6str BasicC basicfin Basicoverall basistr bcd BidClass BidClass_Text BillingFreq BillingTiming BLK2 BLK3 BOQ bp

ERA INFRA ENGG LTD371-371/2, SAHI HOSPITAL ROAD, JUNGPURA, BHOGAL, NEW DELHI-110014

PROGRAMME AS PER LOA FOR THE CONSTRUCTION OF 1X350 MW CCPP EXTN AT GSEG HAZIRAPROGRESS COMPARATIVE STATEMENT L2 VS ACTUAL (ACCORDING RECEIPT OF DRAWINGS) AS ON 30/04/09

DATE OF LOA: 07/08/2008ACTUAL DATE OF START:25/10/2008 (DATE OF ISSSUED OF RFC DRAWING OF HRSG AREA PILING)

REMARKS

COMPLETED EXCEPT 19 HOLD PILES PARTLY RELEASED

TRUSS FAB WORK ONLY

AFTER STRUCTURE ERECTION

WORK IN PROGRESS

balance after gt eqpt fdn & aux column piling

balance after gt eqpt fdn & aux column piling

balance after gt eqpt fdn & aux column piling

balance after gt eqpt fdn & aux column piling

balance after gt eqpt fdn & aux column piling

balance after gt eqpt fdn & aux column piling

balance after gt eqpt fdn & aux column piling

balance after gt eqpt fdn & aux column piling

balance after gt eqpt fdn & aux column piling

Page 11: [XLS] · Web viewBasic_Tower_A Basic5fini Basic5str Basic6fini Basic6str BasicC basicfin Basicoverall basistr bcd BidClass BidClass_Text BillingFreq BillingTiming BLK2 BLK3 BOQ bp

COMP ON: 30/04/09

DWG AWAITED

Drawing not received

Hold since 23/04/2009 change in design' not released so far, Excavation

6000 cum & PCC 88Cum completed before hold.