Weekly Waste Projects Update – week ending 7th
October 2016
Weekly Waste Projects Update: week ending 7th
October 2016 Source: AcuComm Business Database
01
2nd September 2016
New/Updated Projects Reported (w/e 7th October 2016)
Number
Estimated Value (all projects)
Estimated Value (new projects only)
US$ millions US$ millions
Anaerobic Digestion 3 82 49
Biofuel 3 279 139
Biogas 7 117 44
Gasification - - -
Incineration (with energy recovery) 14 1,766 359
Incineration (without energy recovery) - - -
Integrated/mixed facilities 2 293 222
Landfill 1 19 -
MBT - - -
Other 1 60 60
Recycling 6 250 66
Waste processing 2 62 62
Total 39 2,929 1,000
In the week ended 7th October 2016, AcuComm added 39 new or updated waste projects to
our Business Database, worth an estimated US$2,929 million and waste capacity of just over
7.9 million tonnes.
This takes the cumulative total to 4,445 active projects since 2013,
with a total estimated investment value of US$341.8 billion.
To find out more information about the projects and investments
covered in this update, click here
Integrated/mixed
facilities
34.6%
Biofuel
21.7%
Recycling
10.3%
Waste processing
9.6%
Other
9.3%
Others
14.4%
Est. Value of New Projects by Facility Type (w/e 7th Oct 2016)
Weekly Waste Projects Update – week ending 7th
October 2016
Weekly Waste Projects Update: week ending 7th
October 2016 Source: AcuComm Business Database
02
New/Updated Projects Reported (w/e 7th October 2016)
Number Capacity (tonnes) MW
Anaerobic Digestion 3 175,812 7
Biofuel 3 904,874 74
Biogas 7 410,396 35
Gasification - - -
Incineration (with energy recovery) 14 4,687,568 560
Incineration (without energy recovery) - - -
Integrated/mixed facilities 2 603,501 109
Landfill 1 428,477 -
MBT - - -
Other 1 - 32
Recycling 6 494,929 -
Waste processing 2 245,091 -
Total 39 7,950,647 816
The total estimated waste capacity of projects reported on
in the past week is just over 7.9 million tonnes. WtE
incineration was the largest category, accounting for just
under 4.7 million tonnes.
The total estimated power generation from these projects
was 816 MW. WtE incineration was the largest category,
accounting for 560 MW.
Incineration (with
energy recovery)
59.0%
Biofuel
11.4%
Integrated/mixed
facilities
7.6%
Others
22.1%
Reported Capacity of Projects by Facility Type (w/e
7th Oct 2016)
To find out more information about the projects and investments
covered in this update, click here
Weekly Waste Projects Update – week ending 7th
October 2016
Weekly Waste Projects Update: week ending 7th
October 2016 Source: AcuComm Business Database
03
New Projects Reported by Waste Types (w/e 7th October 2016)
Number Capacity (tonnes) MW
Animal 1 110,000 15
Clinical - - -
Construction/Demolition - - -
e-Waste - - -
Food 2 83,514 5
Gas 2 50,000 32
Glass - - -
Hazardous - - -
Heat 1 136,301 -
Industrial 1 27,375 2
Metals 1 100,000 -
MSW 11 4,339,359 295
Oil - - -
Organic (general/unspecified) 3 698,545 50
Other - - -
Paper - - -
Plant biomass (non-waste) - - -
Plant biomass (waste) 6 1,281,963 124
Plastics 1 30,942 -
Radioactive - - -
Rubber - - -
Sewage/wastewater 4 308,704 7
Wood 6 783,945 286
Total 39 7,950,647 816
MSW was the leading feedstock type reported on in
the past week, accounting for an estimated 4.3
million tonnes, or 54.6% of the total. This was
closely followed by general biomass with just under
1.3 million tonnes or 16.1%.
MSW
54.6%
Plant biomass
(waste)
16.1%
Wood
9.9%
Others
19.4%
Reported Capacity of Projects by Waste Type (w/e
7th Oct 2016)
To find out more information about the projects and investments
covered in this update, click here
Weekly Waste Projects Update – week ending 7th
October 2016
Weekly Waste Projects Update: week ending 7th
October 2016 Source: AcuComm Business Database
04
New/Updated Projects, Country Coverage, (w/e 7th October 2016)
Projects
UK 6
USA 4
Germany 3
China 3
Denmark 3
France 2
Sweden 2
Finland 2
Canada 2
Others 12
Total 39
The leading country in the past week was the UK with
six projects, followed by the USA with four, then
Germany, China and Denmark with three each.
6
4
3 3 3
2 2 2 20 0
12
0
2
4
6
8
10
12
14
UK
US
A
Germ
an
y
Ch
ina
Den
mark
Fra
nc
e
Sw
ed
en
Fin
lan
d
Can
ad
a
Oth
ers
Reported Projects by Country (w/e 7th Oct 2016)
To find out more information about the projects and investments
covered in this update, click here
Weekly Waste Projects Update – week ending 7th
October 2016
Weekly Waste Projects Update: week ending 7th
October 2016 Source: AcuComm Business Database
05
Average Project Values by Facility Type
US$ millions
Anaerobic Digestion 24
Biofuel 119
Biogas 26
Gasification 142
Incineration (with energy recovery) 110
Incineration (without energy recovery) 58
Integrated/mixed facilities 211
Landfill 21
MBT 74
Other 126
Recycling 30
Waste processing 63
All Projects 77
Average Project Values by Feedstock Type
US$ millions
Animal 17
Clinical 30
Construction/Demolition 7
e-Waste 23
Food 20
Gas 58
Glass 13
Hazardous 71
Heat 41
Industrial 120
Metals 49
MSW 91
Oil 44
Organic (general/unspecified) 88
Other 60
Paper 71
Plant biomass (non-waste) 113
Plant biomass (waste) 81
Plastics 21
Radioactive 564
Rubber 34
Sewage/wastewater 48
Wood 88
All Projects 77
The average active waste project is worth US$77 million. There are naturally
wide variations in average project value, due to the size, duration and
complexity of different types of project. The figures on this page represent
our latest estimates, based on data from 2013 to the current week.
To find out more information about the projects and investments
covered in this update, click here
Weekly Waste Projects Update – week ending 7th
October 2016
Weekly Waste Projects Update: week ending 7th
October 2016 Source: AcuComm Business Database
06
Top Five Projects, week ending 7th October 2016, by Estimated Value (US$ millions) Click the flag for more information on each project
1 Sierra Leone 333 Construction of a biomass power plant and biofuel distillery.
2 UK 303 Construction of a 270,000 tpa wood-fuelled biomass plant.
3 Martinique 231 Development of a 40 MW biomass plant.
4 Germany 222 Construction of a waste-to-energy, waste processing and bioenergy project.
5 UK 192 Proposed WtE facility.
Top Five Projects, week ending 7th October 2016, by Reported Waste Capacity (tonnes)
1 China 1,706,375 WtE facility construction - Phase III.
2 China 547,500 Construction of a 1,500 tpd WtE facility.
3 China 292,000 Construction of a 292,000 tpa WtE facility.
4 UK 270,000 Construction of a 270,000 tpa wood-fuelled biomass plant.
5 UK 150,000 Proposed WtE facility.
Top Five Projects, week ending 7th October, by Reported Power Generation (MW)
1 UK 165 Construction of a 270,000 tpa wood-fuelled biomass plant.
2 Germany 88 Construction of a waste-to-energy, waste processing and bioenergy project.
3 UK 44 Upgrade of 44 MW biomass plant.
4 Martinique 40 Development of a 40 MW biomass plant.
5 China 20 Construction of a 1,500 tpd WtE facility.