TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early...

28
TWENTIES PROJECT TPWind Energy R&D Event October 4 th 2011

Transcript of TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early...

Page 1: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

TWENTIES PROJECTTPWind Energy R&D Event

October 4th 2011

Page 2: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

EU 2020 Objectives

20% of renewable

energy

2

20% reduction of CO2

emissions20%

improvement in energy efficiency

10% of biofuels

www.twenties-project.eu

Page 3: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

Increase the share of RES to 20%

Will Europe be able to

fulfill them?

3www.twenties-project.eu

fulfill them?

Page 4: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

Barriers: manage highly variable production

30,000

40,000

50,000

60,000

Integración y vertido de renovables en el sistema - Horizonte 2020

Escenario PANER 2011-2020

4www.twenties-project.eu

-20,000

-10,000

-

10,000

20,000

MW

Min R.O. Necesario Hid. Fluyente (medio) RE Cogen. RE Bio-RSU-RSI

RE Mini-hid. RE Solar FV RE Termo-Solar Eolica 1

2020 Eficiente Dem.Efi.+Export.+Bomb. 1 Vertido E1

Page 5: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

Barriers: system variables stressed

Without wind energy (only

conventional power plants)

5www.twenties-project.eu

Wind energy production with 50%

dynamic voltage control capability

implemented

Wind energy production without

dynamic voltage control capability

Page 6: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

Barriers: a need for an offshore grid

6Source: www.trec-uk.org.uk,

Page 7: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

Concept-Idea

The TWENTIES project aims at:“demonstrating by early 2014 through real life, large scale

demonstrations, the benefits and impacts of several critical

technologies required to improve the pan-European transmission

network, thus giving Europe a capability of responding to the increasing

share of renewable in its energy mix by 2020 and beyond while keeping

7

share of renewable in its energy mix by 2020 and beyond while keeping

its present level of reliability performance.”

• pan European electric system from welcoming more renewable generated electricity.

• renewable-generated electricity from contributing more efficiently to the single European electric market.

To this extent it will be focused in removing several barriers which prevent:

Page 8: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

Project objectives

What are the valuable contributions that intermittent

generation and flexible load can bring to system

services?

What should the network operators implement to allow 6 high level

8

What should the network operators implement to allow

for off-shore wind development?

6 high level

demonstration

objectives

2 replication

objectives

How to give more flexibility to the transmission grid?

How scalable and replicable are the results within the

entire pan-European electricity system?

Page 9: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

Twenties orchestra

9www.twenties-project.eu

Page 10: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

Consortium and budget

Denmark (3)DONG ENERGYENERGINETRISO DTU

France (2)RTEEDF

United Kingdom (2)AREVA T&DUNIVERSITY OF STRATHCLYDE

IrelandUCD

The NetherlandsPortugal

NorwaySINTEF

10 European Member States 1 Associated Country

10

Spain (5)RED ELECTRICA DE ESPAÑAIBERDROLA RENOVABLESITT COMILLASGAMESAABB S.A

Belgium (6)ELIA System OperatorEWEACORESOUNIVERSITY LIEGEUNIVERSITY LEUVEN-ELECTAUNIVERSITE LIBRE BRUXELLES

Germany (3)Fraunhofer IWES50 HzSIEMENS Wind Power

ItalyERSE

The NetherlandsTENNETPortugal

INESC-PORTO

Total budget: 56,8 M€EU contribution: 31,8 M€

Page 11: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

DEMO 1 SYSERWIND (Leader: IBR)

• Tests to provide new active and reactive power control services to the system (EMS level), using improved systems, devices and tools, but keeping the current hardware at wind farm level.

Main objective

Approach

480 MW

2 control centers:

CORE & CECRE

11

• Active power regulation: several wind farms aggregated to provide secondary frequency regulation.

• Reactive power regulation: several wind farms aggregated to provide voltage regulation.

• Expected impact:• Preserving stability and security of the energy

transmission system• Higher controllability of the wind energy• Deeper penetration of wind power into the

Transmission Network.

Approach

www.twenties-project.eu

111 MW122 MW

248 MW

Page 12: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

Active Power

Active Power Control – Test Procedure

P available

P max

Reg. Band

Considered

forecast deviation

Offered

Regulation

Band

set points each

4 seconds P requested

12www.twenties-project.eu

Time

P min

Reg. Band

P offered

Band

1 Hour

Page 13: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

Capacitive voltage profile

Base case voltage profile

Inductive voltage profile

Reactive Power Control Wide-Area Test Procedure

13

Inductive voltage profile

Page 14: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

DEMO 2 DERINT (Leader: DONG)

• Improve wind integration based on intelligent energy management of central CHPs, off-shore wind, and local generation and load units in the distribution grid

Main objectivePortfolio optimization

of market positions

across energy and AS

markets

OBJECTIVES

14

• Mobilization of the entire value chain across central and local units

• Focus is on shorter time scale with the goal to balance wind better i.e. for a longer time and more cost efficiently

• Market shaping, regulatory recommendations and scale up rules

• 3 year iterative roll-out, growing in scale and complexity

Approach

www.twenties-project.eu

System

Plants

Processes

THERMALPOWER

WINDTURBINE

CHPPLANT

BOILER SUPER HEATER TUR

BINEM

CONTROL VALVE PUMP FEEDER

SYSTEM

CONTROLLEVEL 1

setpoint

PLANT

CONTROL

setpoint

PROCESS

CONTROL

setpoint

SERVO

CONTROL

actuator signal

POWER PLANTPROCESSES

LEVEL 2

LEVEL 3

LEVEL 4

Integrating the VPP

with central power

control

Page 15: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

Defining the role of a virtual power plant

The virtual power plant is intended to produce services similar to a traditional power plant, but based on DER´s (decentralized energy resources)

In the Danish setting the Production VPP is controlled by the central power control

15

is controlled by the central power control

In the Danish setting the VPP´s services is offered to a market (based on frequent auctions)

The VPP controls the DER´s under full respect for the DER´s primary purpose

Each DER serves multiple purposes in the VPP

Twenties DERINT demo 2 - www.twenties-project.eu

Page 16: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

DEMO 3 DC GRID: Steps to reach the offshore grid

16www.twenties-project.eu

Airtricity sourceKriegers Flak source

8

Page 17: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

DEMO 3 DC GRID (Leader: RTE)

• Assess main drivers for the development of off-shore HVDC networks

Main objective

Approach

Knowledge and

components for

connecting offshore

resources: multi-

terminal DC networks

and interaction with

on-shore AC system

17

• Optimal planning and operation of AC/DC interconnected power systems

• Local control of HVDC networks

• Operation under normal and emergency conditions

• Design and quantify experimental DC networks (N-1, faults)

• Design and test control functions, protection systems…

• Benchmark several network topologies

www.twenties-project.eu

Overall control system

ProtectionDC fault clearing

concept (DC breaker)System architecture

(Bus, meshed, ring…)

Converter stations Interface with existingsystems

Page 18: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

DEMO 4 STORM MANAGEMENT (Leader: ENERGINET)

• Demonstrate shut down of wind farms under stormy conditions without jeopardizing safety of the system

Main objective

Approach

18

• Horns Rev 2 (200MW)

• Flexible turbine control

• Storm front forecasts

• Investigate cost of changed production associated with the planned down regulation

• Coordinate wind farm control with HVDC interconnector control and with hydro power plant operation

Approach

www.twenties-project.eu

Win

d p

ow

er

Wat

er p

ow

er

Page 19: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

Wind power

19

Page 20: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

DEMO 5 NETFLEX (Leader: ELIA)

• Demonstrate at regional level (CWE) how much additional wind generation can be handled thanks to DLR (Dynamic Line Ratings), coordination of controllable devices (PSTs & HVDCs) and usage of WAMS

Main objective

Approach

20

• Dynamic Line Rating (DLR)• Install 10 Ampacimons to monitor the line capacities

• Forecasting Model

• Wide Area Measurement System (WAMS)• 3 Phase Measurement Units (PMUs) to assess good

operating practices

• Smart Power Flow Control (Smart-PFC)• Coordinated use of PSTs and HVDCs on international

basis using smart tools

• Assess available margin for additional wind generation

Approach

www.twenties-project.eu

Page 21: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

Expanding network margin

e an

d

on

sLoss fro

m

GO

Ps

Gain

fro

m P

ST

s

and H

VD

C-lin

ks

C reated Margin

21www.twenties-project.eu

Max

imu

m P

osi

tive

Neg

ativ

e D

evia

tio

Gain

fro

m D

LR

Init

ial

Po

siti

ve

and

N

egat

ive

Dev

iati

on

s

Initial S ituation

Existing Margin

Page 22: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

DEMO 6 FLEXGRID (Leader: REE)

• Demonstrating that current transmission network can meet demands of renewable energy by extending system operational limits, maintaining safety criteria.

Main objective

22

• Real-time thermal rating• Benchmarking of different commercial

devices

• Analysis on wind power generation and correlation with monitored lines

• Innovative FACTS (mobility)• Selection of the location of the FACTS

• Specification, construction and installation of the prototype.

Approach

www.twenties-project.eu

Page 23: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

Calculation each 5 minutes.

Monitorization 4 to 12 FO (optical switch)

Temperature accuracy: Between 1 y 3 ºC.

Location of hot point accuracy: 10 m.

Monitoring System: Optical Phase Conductor

23

Technology maximum 100km

Page 24: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

TWENTIES OLC basic outline Output

Ω

NOPERATION

N/N-1 OPERATION

TRANSIENT OPERATION

PhasePhaseShifter Shifter

Transformer Transformer

24www.twenties-project.eu

Magallón

220 kV SET

X1=2.6 Ohm X2=5.2 Ohm X3=10.3 ohm

CB1

By-pass

CB2

Tudela

220 kV SET

30 km

CB3

ABB research

and execution

CONTROL SYSTEMmeasurements

references

REE research

and execution

Ω

Transformer Transformer (PST)(PST)

OverloadOverload Power Flow Power Flow Controller (OLC) Controller (OLC)

ThyristorThyristor Switched Series Capacitors Switched Series Capacitors (TSSC)(TSSC)

Page 25: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

Replication work packages: barriers and up scaling

WP 15: Economic impacts of the demonstrations, barriers towards scaling up and solutions (Leader: IIT)

• Assess the local economic and/or technological impact of each demo.

• Identify the barriers to scale-up the outcomes at a member-state or regional level, and propose solutions to overcome these barriers.

WP 16: EU wide integrating assessment of demonstration replication potential

25

WP 16: EU wide integrating assessment of demonstration replication potential (Leader: RISOE)

• Assess portability of voltage control, frequency control and VPP model to other countries and regions.

• Evaluate North European 2020 offshore wind power variability, hydro potential and barriers and grid restriction studies.

• Pan European economic impact study.

WP 17: EU Offshore barriers (Leader: TENNET)

• Address the issues of smart licensing of submarine interconnectors with and without wind parks in the North Sea and Baltic Sea.

• Identify common licensing barriers and propose regulatory measures.

www.twenties-project.eu

Page 26: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

Conclusions With TWENTIES: YES, WE CAN

26www.twenties-project.eu

Page 27: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

THANKS FOR YOUR ATTENTION

27www.twenties-project.eu

Page 28: TWENTIES Project TPWIND · Concept-Idea The TWENTIES project aims at: “demonstrating by early 2014 through real life, large scale demonstrations, the benefits and impacts of several

www.twenties-project.eu