- 1. GEORGIADOME RENOVATION PHASE 2 August 16, 2007
- 10. General Admission Concourse Lower Level
- 11. Option A Option B Option C Score Board Upgrade
- 14. Seating Bowl Color Study All Red Option
- 15. Seating Bowl Color Study Red & Black Option
- 16. Seating Bowl Color Study
- 17. Seating Bowl Color Study All Red Option
- 18. Seating Bowl Color Study Red & Black Option
- 19. General Admissions Seating Club Seating Suite Seating
- 20. Exterior Painting StudyOption D
- 21. Exterior Painting StudyOption D
- 22. Seating Bowl w/ Window
- 23. $1,376,000 Remove existing metal panels at the drum and add back new curtain wall glazing system with motorized blackout shades. EXTERIOR GLAZING