  1. 1. GEORGIADOME RENOVATION PHASE 2 August 16, 2007
  2. 10. General Admission Concourse Lower Level
  3. 11. Option A Option B Option C Score Board Upgrade
  4. 14. Seating Bowl Color Study All Red Option
  5. 15. Seating Bowl Color Study Red & Black Option
  6. 16. Seating Bowl Color Study
  7. 17. Seating Bowl Color Study All Red Option
  8. 18. Seating Bowl Color Study Red & Black Option
  9. 19. General Admissions Seating Club Seating Suite Seating
  10. 20. Exterior Painting StudyOption D
  11. 21. Exterior Painting StudyOption D
  12. 22. Seating Bowl w/ Window
  13. 23. $1,376,000 Remove existing metal panels at the drum and add back new curtain wall glazing system with motorized blackout shades. EXTERIOR GLAZING