TG3a Project Timeline
-
Upload
donna-tran -
Category
Documents
-
view
16 -
download
0
description
Transcript of TG3a Project Timeline
January 2003
Robert F. Heile, AppairentSlide 1
doc.: IEEE 802.15-03/056r0
Submission
TG3a Project Timeline
• Jan03 Session #22– Complete TRD, Selection Criteria Doc, and Downselect Procedure Doc
• Mar03 Session #23– Proposals should be heard, criteria doc amended as needed
• May03 Session #24– Second round of proposals heard – We should spend part of this session discussing proposals presented, answering technical
questions/concerns (i.e. put the diehard engineers in a room and let them verbally duke it out).
– Spend time on conference calls discussing proposals to let everyone get comfortable (before and after this session).
– Criteria doc amended as needed
• Jul03 Session #25– Final round of presentations. Voting must occur here --start drafting process.
• Sep03 Session #26– proposals for draft improvements should be entertained at this time (i.e. now that we know
the realm of the game, let the games begin)
• Nov03 Session #27– complete drafting process…seek approval to go to WG Letter Ballot
January 2003
Robert F. Heile, AppairentSlide 2
doc.: IEEE 802.15-03/056r0
Submission
TG3a Timeline
2003
J J A S O N D J F M A M J J DJ F M A M A S O N
Downselect
2002
CFA
D
PAR
DraftProject Definition