BIM Through The Project Timeline | Ecobuild 2016

67
BIM through the project timeline Dr Stephen Hamil Director of Design and Innovation

Transcript of BIM Through The Project Timeline | Ecobuild 2016

Page 1: BIM Through The Project Timeline | Ecobuild 2016

BIM through the project timeline

Dr Stephen HamilDirector of Design and Innovation

Page 2: BIM Through The Project Timeline | Ecobuild 2016

Overview

Level-2 BIM

Digital plans of work

Practical tools within this process

Page 3: BIM Through The Project Timeline | Ecobuild 2016

About NBS

Page 4: BIM Through The Project Timeline | Ecobuild 2016

About me

Page 5: BIM Through The Project Timeline | Ecobuild 2016

A digital world

Music

Page 6: BIM Through The Project Timeline | Ecobuild 2016

A digital world

Books

Page 7: BIM Through The Project Timeline | Ecobuild 2016

A digital world

Movies

Page 8: BIM Through The Project Timeline | Ecobuild 2016

A digital world

Construction

Page 9: BIM Through The Project Timeline | Ecobuild 2016

A digital world

Page 10: BIM Through The Project Timeline | Ecobuild 2016

A digital world

Page 11: BIM Through The Project Timeline | Ecobuild 2016
Page 12: BIM Through The Project Timeline | Ecobuild 2016
Page 13: BIM Through The Project Timeline | Ecobuild 2016

Level-2 BIM

Page 14: BIM Through The Project Timeline | Ecobuild 2016

UK Government strategy

"This Government's four year strategy for BIM

implementation will change the dynamics and

behaviours of the construction supply chain,

unlocking new, more efficient and collaborative

ways of working. This whole sector adoption of

BIM will put us at the vanguard of a new digital

construction era and position the UK to become

the world leaders in BIM.“

Francis MaudeMinister for the Cabinet Office

Page 15: BIM Through The Project Timeline | Ecobuild 2016

UK Government strategy

Page 16: BIM Through The Project Timeline | Ecobuild 2016

UK Government strategy - standards

PAS 1192:2:2013 Production of co-ordinated design and construction (CAPEX) information,

PAS 1192:3:2014 Development of operational strategies and the effective transfer of data

into operations (OPEX)

BS 1192:4:2014 COBie - Data definition for information deliveries

BS 1192:5:2015 Data security

BIM Protocol A suite of BIM commercial and contractual advice documents and standard forms

Gov Soft Landings Policy and processes to ensure effective handover and Post Occupation Effectiveness

Classification A structured and standardised information classification system

DPoW An industry standard method of describing geometric, requirements and data deliveries at key stages of the project cycle

Page 17: BIM Through The Project Timeline | Ecobuild 2016

The BIM Toolkit Team

Steering teamCore teamClients

Page 18: BIM Through The Project Timeline | Ecobuild 2016

Digital Plans of Work

Page 19: BIM Through The Project Timeline | Ecobuild 2016
Page 20: BIM Through The Project Timeline | Ecobuild 2016
Page 21: BIM Through The Project Timeline | Ecobuild 2016

Stages of a project

Page 22: BIM Through The Project Timeline | Ecobuild 2016
Page 23: BIM Through The Project Timeline | Ecobuild 2016
Page 24: BIM Through The Project Timeline | Ecobuild 2016
Page 25: BIM Through The Project Timeline | Ecobuild 2016
Page 26: BIM Through The Project Timeline | Ecobuild 2016
Page 27: BIM Through The Project Timeline | Ecobuild 2016

Level of detail (LOD)

Page 28: BIM Through The Project Timeline | Ecobuild 2016

Level of information (LOI)

Page 29: BIM Through The Project Timeline | Ecobuild 2016
Page 30: BIM Through The Project Timeline | Ecobuild 2016
Page 31: BIM Through The Project Timeline | Ecobuild 2016
Page 32: BIM Through The Project Timeline | Ecobuild 2016
Page 33: BIM Through The Project Timeline | Ecobuild 2016
Page 34: BIM Through The Project Timeline | Ecobuild 2016

Classification

Page 35: BIM Through The Project Timeline | Ecobuild 2016

Complexes, entities, spaces,locations and activities

10Preparation and repair

20Administrative, commercial and

protective services

25Cultural,

educational, scientific and information

30Industrial

32Water and

land management

35Medical, health,

welfare and sanitary

40Recreational

42Sport and

activity

45Residential

50Waste

disposal

55Piped supply

60Heating,

cooling and refrigeration

65Ventilation

and air conditioning

70Electrical

power generation

and distribution

75Communications,

security, safety and protection

80Transport

85Operation

and maintenance

90Circulation and storage

Larger scale items – arranged broadly by industry sector and function

Page 36: BIM Through The Project Timeline | Ecobuild 2016

Elements, functionsand systems

15Preparatory

20Structural

25Wall and

barrier

30Roof, floor and

paving

32Damp-

proofing, waterproofing

and plaster finishing

35Stair and ramp

37Tunnel,

shaft, vessel and tower

40Signage, fittings,

furnishings and

equipment

45Flora and

fauna

50Waste

disposal

55Piped supply

60Heating,

cooling and refrigeration

65Ventilation

and air conditioning

70Electrical

power and lighting

75Communications,

security, safety and protection

80Transport

85Process

engineering

90Soft facility

management

Smaller scale items – arranged broadly by fabric and function

Page 37: BIM Through The Project Timeline | Ecobuild 2016
Page 38: BIM Through The Project Timeline | Ecobuild 2016

Classifying the types of space

Page 39: BIM Through The Project Timeline | Ecobuild 2016

Grouping similar spaces together

Page 40: BIM Through The Project Timeline | Ecobuild 2016
Page 41: BIM Through The Project Timeline | Ecobuild 2016
Page 42: BIM Through The Project Timeline | Ecobuild 2016
Page 43: BIM Through The Project Timeline | Ecobuild 2016
Page 44: BIM Through The Project Timeline | Ecobuild 2016

Practical tools within this process

Page 45: BIM Through The Project Timeline | Ecobuild 2016

Practical tools within this processA. Specification

Page 46: BIM Through The Project Timeline | Ecobuild 2016

Building specification templates with associated

guidance

Page 47: BIM Through The Project Timeline | Ecobuild 2016

Develop the information through the project timeline

Page 48: BIM Through The Project Timeline | Ecobuild 2016
Page 49: BIM Through The Project Timeline | Ecobuild 2016

Specify the performance of a system

Page 50: BIM Through The Project Timeline | Ecobuild 2016
Page 51: BIM Through The Project Timeline | Ecobuild 2016

Specify the products that make up a system

Page 52: BIM Through The Project Timeline | Ecobuild 2016

Specify the workmanship and system completion

Page 53: BIM Through The Project Timeline | Ecobuild 2016
Page 54: BIM Through The Project Timeline | Ecobuild 2016
Page 55: BIM Through The Project Timeline | Ecobuild 2016

Specify products from manufacturers

Page 56: BIM Through The Project Timeline | Ecobuild 2016

Not a traditional paper spec –but a well structured data

model

Page 57: BIM Through The Project Timeline | Ecobuild 2016

Practical tools within this processB. Design

Page 58: BIM Through The Project Timeline | Ecobuild 2016

Concept generic objects for early stage design

Page 59: BIM Through The Project Timeline | Ecobuild 2016

Detailed generic objects for developed design

Page 60: BIM Through The Project Timeline | Ecobuild 2016

Manufacturer objects with embedded and linked

information

Page 61: BIM Through The Project Timeline | Ecobuild 2016

Practical tools within this processC. Coordination

Page 62: BIM Through The Project Timeline | Ecobuild 2016

Linked to NBS project specifications

Page 63: BIM Through The Project Timeline | Ecobuild 2016

Report on broken or missing linkages

Page 64: BIM Through The Project Timeline | Ecobuild 2016
Page 65: BIM Through The Project Timeline | Ecobuild 2016

Summary

Page 66: BIM Through The Project Timeline | Ecobuild 2016

Summary

Level-2 BIM will be mandated in 2016

Information is required throughout a BIM project

Consider the practical tools within this process

Page 67: BIM Through The Project Timeline | Ecobuild 2016

www.theNBS.com/BIM

@theNBS

@StephenHamilNBS