    1/4

    Id EDT Nombre de tarea %

    completado

    PV (Valor Planificado) EV (Valor Ganado) AC (Costo Real) SV (Variacion del

    cronograma)

    SPI (I.

    Rendimiento del

    Cronograma)

    0 Construccion de Casa 28% S/. 19,733.91 S/. 102,838.82 S/. 18,547.91 S/. 83,104.92 5.21

    1 1 CONSTRUCCION DE CASA 28% S/. 19,733.91 S/. 102,838.82 S/. 18,547.91 S/. 83,104.92 5.21

    2 1.1 GESTION DEL PROYECT 67% S/. 1,000.00 S/. 971.58 S/. 976.00 -S/. 28.42 0.97

    3 1.1.1 INICIO 72% S/. 600.00 S/. 600.00 S/. 600.00 S/. 0.00 1

    4 1.1.1.1 Elaborar Acta de C 100% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    5 1.1.1.2 Elaborar Registro 100% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    6 1.1.1.3 Acondicionar ofici 100% S/. 600.00 S/. 600.00 S/. 600.00 S/. 0.00 1

    7 1.1.1.4 Seguir tareas de in 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    8 1.1.2 INICIO APROBADO 100% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    9 1.1.3 PLANIFICACION 94% S/. 400.00 S/. 371.58 S/. 376.00 -S/. 28.42 0.93

    10 1.1.3.1 Preparar el Plan d 94% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    11 1.1.4 Realizar reuniones d 50% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    28 1.1.5 PLAN DE GESTION A 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    29 1.1.5.18 SEGUIMIENTO 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 030 1.1.5.18.1 Elaborar inform 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    31 1.1.5.18.2 INFOMES APRO 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    32 1.2 PLANOS 100% S/. 4,370.00 S/. 4,370.00 S/. 4,370.00 S/. 0.00 1

    33 1.2.1 Dibujar planos de ar 100% S/. 3,285.00 S/. 3,285.00 S/. 3,285.00 S/. 0.00 1

    34 1.2.2 Dibujar planos sanita 100% S/. 1,085.00 S/. 1,085.00 S/. 1,085.00 S/. 0.00 1

    35 1.2.3 PLANOS APROBADOS 100% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    36 1.3 CIMIENTOS 61% S/. 10,778.91 S/. 6,333.09 S/. 9,616.91 -S/. 4,445.81 0.59

    41 1.4 CASCO 9% S/. 2,960.00 S/. 2,960.00 S/. 2,960.00 S/. 0.00 1

    42 1.4.1 PAREDES 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    43 1.4.1.1 PRIMER PISO 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 044 1.4.1.2 SEGUNDO PISO 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    45 1.4.2 TECHO 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    46 1.4.2.1 PRIMER PISO 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    47 1.4.2.2 SEGUNDO PISO 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    48 1.4.2.3 PAREDES Y TECHO 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    49 1.4.3 INSTALACIONES 10% S/. 2,960.00 S/. 2,960.00 S/. 2,960.00 S/. 0.00 1

    50 1.4.3.1 ELECTRICAS 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    Sesion 10.3 Formatos impresion.mpp

    Pgina 1

  • 7/25/2019 Sesion 10.3 Formatos Impresion

    2/4

    Id EDT Nombre de tarea %

    completado

    PV (Valor Planificado) EV (Valor Ganado) AC (Costo Real) SV (Variacion del

    cronograma)

    SPI (I.

    Rendimiento del

    Cronograma)

    51 1.4.3.1.1 ACOMETIDA 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    52 1.4.3.1.2 PRIMER PISO 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    53 1.4.3.1.3 SEGUNDO PISO 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    54 1.4.3.2 SANITARIAS 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    55 1.4.3.2.1 PRIMER PISO 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    56 1.4.3.2.2 SEGUNDO PISO 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    57 1.4.3.3

    GAS

    0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    58 1.4.3.4 TELEFONO FIJO 100% S/. 2,960.00 S/. 2,960.00 S/. 2,960.00 S/. 0.00 1

    59 1.4.3.4.1 ACOMETIDA 100% S/. 160.00 S/. 160.00 S/. 160.00 S/. 0.00 1

    60 1.4.3.4.2 CABLEADO 100% S/. 2,800.00 S/. 2,800.00 S/. 2,800.00 S/. 0.00 1

    61 1.4.3.5 INTERNET 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    62 1.4.3.5.1 INALAMBRICO 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    63 1.4.3.5.2 CABLEADO 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    64 1.5 ACABADOS 0% S/. 625.00 S/. 0.00 S/. 625.00 -S/. 625.00 0

    65 1.5.1 INTERIOR 0% S/. 625.00 S/. 0.00 S/. 625.00 -S/. 625.00 0

    66 1.5.1.1 Pintar 0% S/. 625.00 S/. 0.00 S/. 625.00 -S/. 625.00 0

    67 1.5.3 EXTERIOR 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    68 1.5.3.1 Colocar cerco elc 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    69 1.6 PISCINA 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    70 1.6.1 EXCAVACIONES 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    71 1.6.2 INSTALACIONES 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    72 1.6.2.1 ELECTRICAS 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    73 1.6.2.2 SANITARIAS 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    74 1.6.2.3 ESTACION DE BO 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 075 1.6.2.3.1 Construir caset 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    76 1.6.2.3.2 Instalar bomba 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    77 1.6.3 ACABADOS 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    78 1.6.3.1 INTERIORES 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    79 1.6.3.2 EXTERIORES 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    80 1.7 PROYECTO FINALIZADO 0% S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0

    Sesion 10.3 Formatos impresion.mpp

    Pgina 2

  • 7/25/2019 Sesion 10.3 Formatos Impresion

    3/4

    VC (Variacion del

    costo)

    CPI (I.

    Rendimiento

    Costo)

    TCPI (I.

    Rendimiento

    Costo

    Programacion)

    BAC (Presupuesto al

    completar)

    EAC (Estimado al

    Completar)

    VAC (Variacion al

    completar)

    CSI

    S/. 84,290.92 5.54 0.72 S/. 319,849.06 S/. 57,687.71 S/. 262,161.36

    S/. 84,290.92 5.54 0.72 S/. 319,849.06 S/. 57,687.71 S/. 262,161.36

    -S/. 4.42 1 1.02 S/. 1,166.00 S/. 1,171.31 -S/. 5.31

    S/. 0.00 1 1 S/. 600.00 S/. 600.00 S/. 0.00

    S/. 0.00 0 0 S/. 0.00 S/. 0.00 S/. 0.00

    S/. 0.00 0 0 S/. 0.00 S/. 0.00 S/. 0.00

    S/. 0.00 1 1 S/. 600.00 S/. 600.00 S/. 0.00

    S/. 0.00 0 0 S/. 0.00 S/. 0.00 S/. 0.00

    S/. 0.00 0 0 S/. 0.00 S/. 0.00 S/. 0.00

    -S/. 4.42 0.99 1.18 S/. 400.00 S/. 404.76 -S/. 4.76

    S/. 0.00 0 0 S/. 0.00 S/. 0.00 S/. 0.00

    S/. 0.00 0 1 S/. 146.00 S/. 146.00 S/. 0.00

    S/. 0.00 0 1 S/. 20.00 S/. 20.00 S/. 0.00

    S/. 0.00 0 1 S/. 20.00 S/. 20.00 S/. 0.00S/. 0.00 0 0 S/. 0.00 S/. 0.00 S/. 0.00

    S/. 0.00 0 1 S/. 20.00 S/. 20.00 S/. 0.00

    S/. 0.00 1 1 S/. 4,370.00 S/. 4,370.00 S/. 0.00

    S/. 0.00 1 1 S/. 3,285.00 S/. 3,285.00 S/. 0.00

    S/. 0.00 1 1 S/. 1,085.00 S/. 1,085.00 S/. 0.00

    S/. 0.00 0 0 S/. 0.00 S/. 0.00 S/. 0.00

    -S/. 3,283.81 0.66 1.53 S/. 15,789.40 S/. 23,976.63 -S/. 8,187.23

    S/. 0.00 1 1 S/. 42,018.66 S/. 42,019.06 -S/. 0.39

    S/. 0.00 0 1 S/. 10,758.00 S/. 10,758.00 S/. 0.00

    S/. 0.00 0 1 S/. 5,013.00 S/. 5,013.00 S/. 0.00S/. 0.00 0 1 S/. 5,745.00 S/. 5,745.00 S/. 0.00

    S/. 0.00 0 1 S/. 12,282.67 S/. 12,282.67 S/. 0.00

    S/. 0.00 0 1 S/. 4,872.67 S/. 4,872.67 S/. 0.00

    S/. 0.00 0 1 S/. 7,410.00 S/. 7,410.00 S/. 0.00

    S/. 0.00 0 0 S/. 0.00 S/. 0.00 S/. 0.00

    S/. 0.00 1 1 S/. 18,978.00 S/. 18,978.16 -S/. 0.16

    S/. 0.00 0 1 S/. 5,998.01 S/. 5,998.01 S/. 0.00

    Sesion 10.3 Formatos impresion.mpp

    Pgina 3

  • 7/25/2019 Sesion 10.3 Formatos Impresion

    4/4

    VC (Variacion del

    costo)

    CPI (I.

    Rendimiento

    Costo)

    TCPI (I.

    Rendimiento

    Costo

    Programacion)

    BAC (Presupuesto al

    completar)

    EAC (Estimado al

    Completar)

    VAC (Variacion al

    completar)

    CSI

    S/. 0.00 0 1 S/. 160.00 S/. 160.00 S/. 0.00

    S/. 0.00 0 1 S/. 3,360.00 S/. 3,360.00 S/. 0.00

    S/. 0.00 0 1 S/. 2,478.01 S/. 2,478.01 S/. 0.00

    S/. 0.00 0 1 S/. 5,178.46 S/. 5,178.46 S/. 0.00

    S/. 0.00 0 1 S/. 2,520.00 S/. 2,520.00 S/. 0.00

    S/. 0.00 0 1 S/. 2,658.46 S/. 2,658.46 S/. 0.00

    S/. 0.00 0 0 S/. 1,033.85 -S/. 1,033.85

    S/. 0.00 1 1 S/. 2,960.00 S/. 2,960.00 S/. 0.00

    S/. 0.00 1 4294967295 S/. 160.00 S/. 160.00 S/. 0.00

    S/. 0.00 1 1 S/. 2,800.00 S/. 2,800.00 S/. 0.00

    S/. 0.00 0 1 S/. 4,841.53 S/. 4,841.53 S/. 0.00

    S/. 0.00 0 1 S/. 529.29 S/. 529.29 S/. 0.00

    S/. 0.00 0 1 S/. 4,312.24 S/. 4,312.24 S/. 0.00

    -S/. 625.00 0 1.31 S/. 2,625.00 S/. 2,625.00 S/. 0.00

    -S/. 625.00 0 2.56 S/. 1,025.00 S/. 1,025.00 S/. 0.00

    -S/. 625.00 0 2.56 S/. 1,025.00 S/. 1,025.00 S/. 0.00

    S/. 0.00 0 1 S/. 1,600.00 S/. 1,600.00 S/. 0.00

    S/. 0.00 0 1 S/. 1,600.00 S/. 1,600.00 S/. 0.00

    S/. 0.00 0 1 S/. 21,880.00 S/. 21,880.00 S/. 0.00

    S/. 0.00 0 1 S/. 14,400.00 S/. 14,400.00 S/. 0.00

    S/. 0.00 0 1 S/. 4,760.00 S/. 4,760.00 S/. 0.00

    S/. 0.00 0 1 S/. 320.00 S/. 320.00 S/. 0.00

    S/. 0.00 0 1 S/. 640.00 S/. 640.00 S/. 0.00

    S/. 0.00 0 1 S/. 3,800.00 S/. 3,800.00 S/. 0.00S/. 0.00 0 0 S/. 0.00 S/. 0.00 S/. 0.00

    S/. 0.00 0 1 S/. 3,800.00 S/. 3,800.00 S/. 0.00

    S/. 0.00 0 1 S/. 2,720.00 S/. 2,720.00 S/. 0.00

    S/. 0.00 0 1 S/. 1,600.00 S/. 1,600.00 S/. 0.00

    S/. 0.00 0 1 S/. 1,120.00 S/. 1,120.00 S/. 0.00

    S/. 0.00 0 0 S/. 0.00 S/. 0.00 S/. 0.00

    Sesion 10.3 Formatos impresion.mpp