    Royal Kaytumadi hotelDate -20-Feb-2009

    Power supply system

    MEPE power 11KV/0.4KV,50Hz, 315KVA Transformer = 1no.11KV/0.4KV,50Hz, 300KVA Transformer = 1no.

    Transformer 300KVA and 315KVA HT Post and Protection devices

    Generator set power

    25KVA , 3phase,4wire Gen set = 1no.150KVA, 3phase,4wire Gen set = 1no.275KVA, 3phase,4wire Gen set = 1no.

    Generator Sets

  • 7/31/2019 Royal Kay Tu Madi

    2/9

    There were used 3 gen set in this hotel for the alternative energy.All of generators were not connecting by auto synchronizing system.These were operated by depended on power requirement.If it needed low power demand, It would be operated smallest 25KVA gen set.It was used at Receptions, Control room main entrance lightings, public area lighting, passagelighting, water pumps, compressors, water treatment system, common area lighting.etc.If it needed more demand, it would be operated by 150KVA gen set when Deluxe rooms and allelectrical power appliances.Biggest Gen Set 275KVA was used for peak season of power requirement.There were two type of rooms. These were Deluxe rooms and Executive rooms.Deluxe rooms were 48 units.Executive rooms were 12 units.

    Deluxe room In Deluxe room

    In Deluxe room In Deluxe room

  • 7/31/2019 Royal Kay Tu Madi

    3/9

    Deluxe room Landscaping Lamp

    Fence Lighting ( Using energy saving lamps) External Distribution Board

    Power consumption of one unit Deluxe room (35m)

    Lighting = 410 watt estimated period 8hr/day = 3.28KWHAir Con; = 1100 watt estimated period 4hr/day = 4.40KWHWater heater 50Litre/4unit = 750 watt estimated period 1hr/day = 0.75KWHMini bar = 120 watt estimated period 4hr/day = 0.48KWHTelevision = 100 watt estimated period 2hr/day = 0.20KWH

    Total = 9.11KWH

    Lighting Load = 11.7 Watt /m Air Con: Load = 188.7BTU/m

  • 7/31/2019 Royal Kay Tu Madi

    4/9

    Power consumption of one unit Executive room (90m)

    Lighting = 425 watt estimated period 8hr/day = 3.40 KWHAir Con; = 2200 watt estimated period 4hr/day = 8.80 KWH

    Water heater 50Litre/2unit = 1500 watt estimated period 1hr/day = 1.50 KWHMini bar = 120 watt estimated period 4hr/day = 0.48 KWHTelevision = 300 watt estimated period 2hr/day = 0.60 KWH

    Hair Dryer = 150 watt estimated period 0.5hr/day = 0.08 KWH

    Total = 14.86 KWH

    Lighting Load = watt4.7/mAir Con: Load = 219BTU/m

    All of lightings and power unit were controlled by electronic access card.There is no guest in the room, all of electrical power will be off position.Fences and outside lightings of buildings were also used 11 watt energy saving lamps.It is one of the way of energy saving purpose.Energy Efficiency of Deluxe & Execute building = 70KWH/m/Yr

    Power consumption of Others Buildings

    Kitchen power consumption = 31.10 KWDining room power consumption = 32.60 KWBeauty Saloon power consumption = 11.86 KWGymnasium room power consumption = 13.65 KWSwimming pool power consumption = 4.80 KW

    Main Entrance Reception building

  • 7/31/2019 Royal Kay Tu Madi

    5/9

    Restaurant Swimming Pool( night view)

    Buddhas Temple Lake side view

    Night View Utility building

    Elevated Water tank Deluxe buildings

  • 7/31/2019 Royal Kay Tu Madi

    6/9

    Air conditioning System

    Ceiling conceal corner flow type Split Air Con: unit are used at Deluxe rooms and Executive rooms.Natural air flow are used at Reception building.( It was not used any air con: system)Single split air con: system are used at dining room, beauty saloon, Gymnasium room.

    Split Type Outdoor Unit Specification of Outdoor unit

    Outdoor Units Installation Ceiling Conceal Type Air Con: ( Corner flow)

  • 7/31/2019 Royal Kay Tu Madi

    7/9

    Water Supply System

    Underground water was extracted by tube well. There were two kind of tube wells.There were air compressor and submersible pump by electric power.Under ground raw water were stored at 7,000 gallons capacity of under ground water tank.

    2000 GPH water treatment system was used for utility water.Treated water were sent to 4000 gallon capacity and 12meter height of over head water tank

    by the using of 2HP transfer pumps included with level sensors and auto fill system.

    40ft, Height Elevated Water Tank Secondary elevated water tank

    Auto pressure pump

  • 7/31/2019 Royal Kay Tu Madi

    8/9

    Treated water Delivery system

    It was used by gravity flow water delivery system. It is mean, no need to use electric energy.

    Minimum water pressure was at least 1bar that could be used any water tap of buildings.Gardening water was used by raw water.

    Water Treatment System H2O2 and PAC Dosing

    Pump Control Panel

  • 7/31/2019 Royal Kay Tu Madi

    9/9

    Sewage and waste water deposition system

    Deluxe room 48 unit were used by one conventional septic tank.

    Executive room 12 unit were used by one conventional septic tank.

    These septic tanks were cleaned six month per one time.

    Kitchen waste water were used by grease trap.

    All of waste water from buildings were sent to site drainage channel.

    Waste of foods were added by acid that substance such as manure or a mixture of nitrates used to

    make soil more fertile landscaping plants.

    Thank You