Project Controls Best Practicesfor the Energy Sector

Presented by Mark WhiteVice President, EcoSys

Page 3: Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Resource Management - PART 1

Agenda

• Introduction

• What Is Best Practice?

• Organization and Process Enabled

• Systems Enabled

Page 4: Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Resource Management - PART 1

• Founded in 2000 – Enterprise Control Systems

• Enterprise Project Controls Software ExpertsDesigners & Developers of original Primavera P6 and EcoSys EPC

• Implementation of Project Controls Best Practices

• Strong Technology and Implementation Partner Networks

• Global Standard for Leaders in Industry and Public Sector

Our Background

Page 5: Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Resource Management - PART 1

Representative Customers

Page 6: Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Resource Management - PART 1

What Is Best Practice?

• Consistent application of processes proven to achieve optimal results

• Not just one way of doing things – no instruction manual

• Lots of common practice regarding forecasting – no motherhood and apple pie today

• Defeated by inadequate organizational, process and systems infrastructure

Page 7: Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Resource Management - PART 1

Forward

Looking

Backward

Looking

Value

Adding

Commodities

Organization and Process

Page 8: Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Resource Management - PART 1

Organization and Process – Defeating Best Practice

8

Forward

Looking

Backward

Looking

Value

Adding

Commodities

PO coding not aligned with Estimate coding

Budget is summarized estimate, detail not visible

Contingencies are fixed percentages with minimal risk

basis. Leads to early, optimistic utilization

Offline change process not owned by project controls. No real-time visibility into Changes and Trends.

Schedule developed without consideration of cost needs. No

means of data exchange.

Without aligned data, Forecasting becomes a “black hole” of best guesses based on

gut feel.

Finance “allocation” rules not agreed with project controls. Actuals don’t

match budgets.

Progress reporting is non-standard and subjective

Page 9: Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Resource Management - PART 1

Organization and Process – Enabling Best Practice

Forward

Looking

Backward

Looking

Value

Adding

Commodities

CBS structure aligned with Estimate breakdown

Budget merely the final iteration of the estimating process, full traceability.

Contingencies based on objective risk assessment,

utilized appropriately

Integrated change control process (inc workflow and

DOA).

Real-time draw from contingency and impact on

Forecast

Schedule automatically feeding EcoSys to ensure

accurate time-phasing and progress

Full internal integration, ensuring all sub-processes

converge in the Forecasting module.

Forecasting accounts for various contracting and measurement methods.

Automated loading of Commitments and Actuals, enabled

by a compatible, common coding structure across the enterprise

Page 10: Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Resource Management - PART 1

Systems – Defeating Best Practice

SummaryFinancial

Obligations

ERP System

ProjectFinances

DetailedPerformanceObligations

Offline Tools

Manual DataEntry

Excel and Access

SAP, Oracle, etc

ERPAdd-On

Integrated

One-Way View

Visibility

Manual DataExtraction

EcoSysEPC

u w

v

y

x

z

u Due to ERP System inadequacies,

project financials are often managed at a high level

v To support forecasting and revenue

recognition processes, ERP add-ons are often used but are still serving the Finance function, not the Projects function

w Project managers are forced to use

offline tools to meet the performance obligations of their clients. These tools are many, varied, and uncontrolled. The costs of maintaining these tools is significant, albeit hidden.

x Project Managers waste excessive time

manually obtaining commodity data from the ERP, e.g., commitments and actuals

y Even worse, the results of their detailed

analyses must be double-keyed back into the ERP

z Finance and Business managers have no

visibility into the underlying systems and processes and must trust that projects are being managed in accordance with standards. Auditing is time-consuming and costly.

Page 11: Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Resource Management - PART 1

Systems – Defeating Best Practice

SummaryFinancial

Obligations

ERP System

ProjectFinances

DetailedPerformanceObligations

Offline Tools

Manual DataEntry

Excel and Access

SAP, Oracle, etc

ERPAdd-On

Integrated

One-Way View

Visibility

Manual DataExtraction

EcoSysEPC

u w

v

y

x

z

u Due to ERP System inadequacies,

project financials are often managed at a high level

v To support forecasting and revenue

recognition processes, ERP add-ons are often used but are still serving the Finance function, not the Projects function

w Project managers are forced to use

offline tools to meet the performance obligations of their clients. These tools are many, varied, and uncontrolled. The costs of maintaining these tools is significant, albeit hidden.

x Project Managers waste excessive time

manually obtaining commodity data from the ERP, e.g., commitments and actuals

y Even worse, the results of their detailed

analyses must be double-keyed back into the ERP

z Finance and Business managers have no

visibility into the underlying systems and processes and must trust that projects are being managed in accordance with standards. Auditing is time-consuming and costly.

Page 12: Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Resource Management - PART 1

Systems – Enabling Best Practice

SummaryFinancial

Obligations

ERP System

DetailedPerformanceObligations

Project Controls System

Excel and Access

SAP, Oracle, etc

ERP Add-Ons

Integrated

Two-Way View

Visibility

EcoSysEPC

u The ERP System need not accommodate

detailed project management processes, thereby avoiding costly ERP customization.

v No longer is there a need for the ERP Add-On

to support project finance management.

w Project managers manage projects in a

purpose built commercial tool that enforces standards across the entire projects portfolio. The tool is used willingly because it was built for best practice project controls.

x No longer do Project Managers waste time

extracting commodity data from the ERP because it’s updated daily via automated integration.

y Project financials roll up in the Project

Controls System and are automatically fed to the ERP at the required level of detail. No more double keying is needed.

z Finance and Business managers have FULL

visibility into the underlying systems and processes and can easily audit against published standards. This new visibility drives positive behaviors across all projects.

u

v

w

x y

z

Page 13: Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Resource Management - PART 1

Systems – Enabling Best Practice

SummaryFinancial

Obligations

ERP System

DetailedPerformanceObligations

Project Controls System

Excel and Access

SAP, Oracle, etc

ERP Add-Ons

Integrated

Two-Way View

Visibility

EcoSysEPC

u The ERP System need not accommodate

detailed project management processes, thereby avoiding costly ERP customization.

v No longer is there a need for the ERP Add-On

to support project finance management.

w Project managers manage projects in a

purpose built commercial tool that enforces standards across the entire projects portfolio. The tool is used willingly because it was built for best practice project controls.

x No longer do Project Managers waste time

extracting commodity data from the ERP because it’s updated daily via automated integration.

y Project financials roll up in the Project

Controls System and are automatically fed to the ERP at the required level of detail. No more double keying is needed.

z Finance and Business managers have FULL

visibility into the underlying systems and processes and can easily audit against published standards. This new visibility drives positive behaviors across all projects.

u

v

w

x y

z