Pratham Paris ground station development Hai Nguyen Boris Robert Ingrid Blanchard Sofiane Flih...
-
Upload
miranda-butler -
Category
Documents
-
view
226 -
download
0
description
Transcript of Pratham Paris ground station development Hai Nguyen Boris Robert Ingrid Blanchard Sofiane Flih...
Pratham Paris ground station development
Hai NguyenBoris RobertIngrid BlanchardSofiane FlihBelaid Ait HamoudaNicolas MaringPierdavide CoïssonOlivier Robert
Pratham french team
Prath’art Project
Adrian Riffo
Location of the French team
Hardware
Environmental tests for Paris ground station
Boris RobertIngrid Blanchard
Scheme of our ground station for one plan
Aquisition chain
Test of the equipment
We also test the environment at Saint Maur’s Observatory at both frequencies
145 MHz test
437 MHz tests
LocationWe are currently working at Saint Maur’s
observatoryAt the end, our ground station will be
at the top of Lamarck’s building.
We may have some problem with the environmental noise.
Here is another solution for the acquisition chain:
Another solution : bring our facility to Chambon la forêt
Software supportIssues and strategies
• What ensures scheduler, acquisition and data storage ?– Pratham main application under NI LabVIEW
• How is data managed ?– Filetype specifications give five different files each
acquisition sequence• What happens when power outage occurs ?– We aim to provide updated online system health
monitoring with remote FTP/SSH access
LabVIEW Main Application
parser
Nova eclipse file
# Acquisition date/time
0
1
… …
n
array
while (there are acquisition sequences){if it is time to acquire {
launch acquisition between (i) and (i)}else{
∅}
}
ACQUISITION OFF
4 x ADF7020
4 x AD8302 NI-8302Acquisition box
LabVIEW Main application
FILES PRODUCED
according to filetype specifications
until acquisition end time
ACQUISITION ON
Prath art’ project
Communication part of the project : at every pass of the satellite, virtual connection
between the two campus will be set up through web cam plus typical telecom data control
screen