    CHAPTER I

    INTRODUCTION

    A dam is a barrier that impounds water or underground streams. Dams

    generally serve the primary purpose of retaining water, while other structures

    such as floodgates or levees (also known as dikes) are used to manage or

    prevent water flow into specific land regions. Hydropower and pumped-storage

    hydroelectricity are often used in conjunction with dams to generate electricity.

    A dam can also be used to collect water or for storage of water which can be

    evenly distributed between locations.

    A. OBJECTIVES

    To know about the whereabouts of Cordero~Pahingahan dam, and its

    purpose to everyone in its radiusof reach.

    To know if a dam has its advantages on its use.

    B. HYPOTHESIS

    A dam can impound and contain water to its fullest capacity.

    C.SCOPE AND LIMITATION

    This topic is limited on the use of the Cordero-Pantabangan dam

    And it also focuses on the advantages and disadvantages of the said dam in

    relation to its uses.

  • 8/10/2019 Pahingahan-cordero Dam Case Study

    2/20

    2

    D.SIGNIFICANCE OF STUDY

    This study will give us the knowledge how the

    Cordera~Pahingahan dam can either give us help and benefits or

    disadvantages, depending on the situation of the dam itself. Dams are

    important because provides people source of water to drink and provide

    water for industry, irrigation, fishing and recreation, households,

    navigation in rivers, and other needs. Dams also served as impounding

    reservoir to prevent floods. Dams also served as lakes for fishing and

    recreation as well as for irrigation.

    DEFINITION OF KEY TERMS

    Floodgates- are adjustable gates used to control water flow in

    flood barriers,reservoir,river,stream,orlevee systems.

    Spillway- is a structure used to provide the controlled release of

    flows from a dam orlevee into a downstream area, typically being

    the river that was dammed.

    Watershed- a region or area bounded peripherally by a divide and

    draining ultimately to a particular watercourse or body of water.

    Delineation- It is the process of determining the boundary

    between wetlands and uplands.

    http://en.wikipedia.org/wiki/Flood_barrierhttp://en.wikipedia.org/wiki/Lakehttp://en.wikipedia.org/wiki/Riverhttp://en.wikipedia.org/wiki/Streamhttp://en.wikipedia.org/wiki/Leveehttp://en.wikipedia.org/wiki/Damhttp://en.wikipedia.org/wiki/Leveehttp://en.wikipedia.org/wiki/Leveehttp://en.wikipedia.org/wiki/Damhttp://en.wikipedia.org/wiki/Leveehttp://en.wikipedia.org/wiki/Streamhttp://en.wikipedia.org/wiki/Riverhttp://en.wikipedia.org/wiki/Lakehttp://en.wikipedia.org/wiki/Flood_barrier
  • 8/10/2019 Pahingahan-cordero Dam Case Study

    3/20

    3

    METHODOLOGY USED IN THE STUDY:

    The descriptive-normative survey has been used in this study in the form

    of questionnaire filled in the premises of the Cordero-Pahingahan dam.

    STATISTICAL MATERIALS USED:

    The frequency method was used in this study; where the mean responses

    were tabulated, calculated and briefly described as follows:

    5Strongly Agree

    4Agree

    3Fairly Agree

    2Disagree

    1Strongly Disagree

  • 8/10/2019 Pahingahan-cordero Dam Case Study

    4/20

    4

    CHAPTER II

    HISTORY BACKGROUND:

    The manmade water impounding facility or also know as the Pahingahan

    dam, was constructed in the area on January 16, 1958 by the 512 army

    engineers to support the water requirement of Fort Magsaysay thru water

    treatment irrigation in the nearly 60s and developed by the Special Forces

    School as a source of potable water for Molave Complex Training Area. It is now

    one of the vital training areas of the Special Forces School and the water from

    the said Dam is utilized for plants/nursery requirements.

    REVIEW OF RELATED LITERATURE:

    A. DAM:DEFINITION

    Dams are structures designed by humans to capture water and

    modify the magnitude and timing of its movement downstream . The

    damming of streams and rivers has been integral to human population

    growth and technological innovation. Among other things , dams have

    reduced flood hazard and allowed humans to settle and farm

    productive alluvial soils on river floodplains; they have harnessed the

    power of moving water for commerce and industry ; and they have

    created reservoirs to augment the supply of water during periods of

    drought. In the 5000 or so years that humans have been building

    dams, millions have been constructed globally , especially in the last

    100 years.

  • 8/10/2019 Pahingahan-cordero Dam Case Study

    5/20

    5

    PAHINGAHAN DAM

    FACILITIES OF THE PAHINGAHAN DAM

  • 8/10/2019 Pahingahan-cordero Dam Case Study

    6/20

    6

    As of today, the Pahingahan dam is just for the use of the camp

    and for a support for water supply for Fort Magsaysay alone, it is not

    being used outside the area unlike other dams that we have here in the

    Philippines. For all we know, the Pahingahan was all alone; But that is

    not the case, you see there is another dam which is not manmade, they

    just constructed a small spillway unto this dam which made it a small

    dam, this dam is called the Cordero dam.

    CORDERO DAM

  • 8/10/2019 Pahingahan-cordero Dam Case Study

    7/20

    7

    The Cordero dam is just up ahead from the Pahingahan dam

    because its elevation is higher. If you look at it properly on to the map,

    youll see that they are just a kilometer away from each other. This dam

    is located at the center of two mountains which served as the dam wall

    for the water. Sometimes these two dams were know as to be connected

    to each other.

    If the Cordero dam is full and about to overflow, there is a spillway

    which could be a passage way for the water to flow downward. These

    waters that came out and over flown from the Cordero dam will be

    directing itself to the Pahingahan dam because as we have said earlier,

    this dam is lower than Cordero dam. So the tendency of the water is to

    flow and be directed to the lower area of the place.

    (The spillway is also used as a small road for the vehicles to pass)

  • 8/10/2019 Pahingahan-cordero Dam Case Study

    8/20

    8

    However, based on the people and armies of today living beside the

    area, they told us that the dam itself is used by the army for mostly of

    agricultural purposes like fisheries, and plant crops.

    Some of the army during the late 80s used the dam for training

    purposes, like for instance, they use the dam for scuba diving training,

    swimming, tactical marine training, and etc. and as of today, they use

    the dam for seminars.

    (SEMINARS FOR THE GUESTS)

  • 8/10/2019 Pahingahan-cordero Dam Case Study

    9/20

    9

    The dam has a device that can convert the water from the dam into

    potable water; they put this device so that if anyone in the camp needs

    water for drinking, they could just simply use the device to clean and

    purify the water.

    They do have army engineers that maintain the dam and its

    facilities.

    (Trivia: President Fidel Ramos used to train in this dam for scuba diving

    lessons)

  • 8/10/2019 Pahingahan-cordero Dam Case Study

    10/20

    10

    ANOTHER EXAMPLE OF A DAM

    B.

    TYPES OF DAMS:

    Arch dams Diversionary dam

    Gravity dams Underground dam

    Arch-gravity dams Tailings dam

    Barrages Steel dams

    Embankment dams Timber dams

    Rock-fill dams Cofferdams

    Concrete-face rock-fill dams Beaver dams

    Earth-fill dams Natural dams

    Saddle dam Check dam

  • 8/10/2019 Pahingahan-cordero Dam Case Study

    11/20

    11

    CONSTRUCTION ELEMENTS:

    SPILLWAYS

    A spillway is a section of a dam designed to pass water from the

    upstream side of a dam to the downstream side. Many spillways have

    floodgates designed to control the flow through the spillway. Types of

    spillway include: A service spillway or primary spillway passes normal

    flow. An auxiliary spillway releases flow in excess of the capacity of the

    service spillway. An emergency spillway is designed for extreme

    conditions, such as a serious malfunction of the service spillway.

    http://en.wikipedia.org/wiki/Floodgatehttp://en.wikipedia.org/wiki/File:Llyn_Brianne_spillway.jpghttp://en.wikipedia.org/wiki/File:Llyn_Brianne_spillway.jpghttp://en.wikipedia.org/wiki/File:Llyn_Brianne_spillway.jpghttp://en.wikipedia.org/wiki/File:Llyn_Brianne_spillway.jpghttp://en.wikipedia.org/wiki/Floodgate
  • 8/10/2019 Pahingahan-cordero Dam Case Study

    12/20

    12

    GEOGRAPHICAL LOCATION AND SIZE:

    In this part of the case study, we will discuss the size and the

    dimensions of the 2 dams that are sisterly connected to each other

    PAHINGAHAN DAM:

    Area = 30.07 meters

    Perimeter = 3246 meters

    Width:

    Width 1 = 274.89 meters

    Width 2 = 90.44 meters

    Width 3 = 257.09 meters

    Width 4 = 137.13 meters

    Length = 966.91 meters

  • 8/10/2019 Pahingahan-cordero Dam Case Study

    13/20

    13

    CORDERO DAM:

    Area = 13.26 meters

    Perimeter = 1909.60 meters

    Width = 222.54 meters

    Length = 391.42 meters

  • 8/10/2019 Pahingahan-cordero Dam Case Study

    14/20

    14

    CHAPTER III

    METHODOLOGY:

    SUMMARY OF FINDINGS

    This chapter reveals that that following findings from different responses,

    based from their personal knowledge about the watershed. These findings were

    Summarized as follows.

    Table 1: Weighted mean and verbal description of location, shape, size, and

    depth

    Revealed the following findings:

    1.

    That the location of the dam and its watershed is conducive and

    accessible to the users gets a mean of 4.31 and got a verbal description

    of agree.

    2.

    That the area of the dam in the watershed in terms of its length, and

    width is enough to impound waters for distribution in the future based

    on the table which get a mean of 4.19 and verbal description of agree.

    3.

    That the depth of the reservoir to which waters maybe impounded is

    enough and it was graded 4.25 and verbally described as agree.

    4.

    That the Reservoir has enough capacity to hold and impound waters

    which receives a grade of 4.31 and verbally described as agree.

    Item no. Questions Frequency of Response VerbalDescription

    5 4 3 2 1 w.m.

    1 The location of the dam and itswatershed is conducive and

    accessible to the users9 3 4 4.31 Agree

    2 The area of the dam in thewatershed in terms of its

    length, and width is enough to

    impound waters fordistribution in the future.

    9 2 4 1 4.19 Agree

    3 The depth of the reservoir towhich waters maybe

    impounded is enough.9 2 5 4.25 Agree

    4 Reservoir has enough capacityto hold and impound waters. 9 3 4 4.31 Agree

    5 The soil foundation isappropriate for the dam in the

    watershed.

    10 1 5 4.31 Agree

    6 The project design is just

    appropriate in the site 10 1 2 4.62

    Strongly

    Agree

  • 8/10/2019 Pahingahan-cordero Dam Case Study

    15/20

    15

    5.

    That soil foundation is appropriate for the dam in the watershed because

    its weighted mean is 4.31 and agreed on the verbal description.

    6.

    That the project design is just appropriate in the site by a weighted mean

    of 4.62 which described as strongly agree description.

    Table 2: Weighted mean and verbal description of operation, Maintenance and

    development.

    Item no. Questions Frequency of Response VerbalDescription

    5 4 3 2 1 w.m.1 The dam is properly

    maintained by group ofengineers and staff.

    5 5 4 1 1 3.75 Agree

    2 There is a set of competentengineers and staff thatoperates the dam in the

    watershed.

    6 5 3 2 3.81 Agree

    3 The engineers and staff are

    knowledgeable to water-resource project

    7 3 5 1 4.00 Agree

    4 Occurrences of the problems inthe operation and maintenance

    of the watershed were givenappropriate actions

    immediately.

    5 7 3 1 4.00 Agree

    5 There is a program fordevelopment for the watershed. 7 4 3 1 1 3.94 Agree

    Revealed the following findings:

    1.

    The dam is properly maintained by group of engineers and staff for it gets

    an agree verbal description by a weighted mean of 3.75.

    2.

    That there is a set of competent engineers and staff that operates the

    dam in the watershed as shown in the table which receives a mean of

    3.81 and verbally said that it is agree.

    3.

    That the engineers and staff are knowledgeable to water-resource project

    by a weighted mean of 4.00 and described as agree.

    4.That occurrences of the problems in the operation and maintenance of

    the watershed were given appropriate actions immediately for it gets a

    weighted mean of 4.00 which its verbal description is agree .

    5.

    That there is a program for development for the watershed which receives

    a weighted mean of 3.94 and its verbal description is agree.

  • 8/10/2019 Pahingahan-cordero Dam Case Study

    16/20

    16

    Table 3: Weighted mean and verbal description of benefits derived from the

    watershed.

    Item no. Questions Frequency of Response Verbal

    Description

    5 4 3 2 1 w.m.

    1 The project considers thepublic interest of the people

    around the area.8 4 3 1 4.13 Agree

    2 People in the area becomeagriculturally motivated 7 7 2 4.31 Agree

    3 People become friendly andcooperative. 7 7 2 4.31 Agree

    4 There is an exchange of ideasfrom among the people

    concerned in the watershed.3 8 4 3.93 Agree

    5 People can communicate with

    other people easily andenthusiastically

    5 6 5 4.00 Agree

    6 In affects the way of life of the

    community people. 7 5 2 1 1 4.00 Agree

    7 There are improvements in thepeoples way of living as in:

    dressing, talking, etc.

    5 6 5 4.00 Agree

    8 The reservoir will become oneof the centers of tourism within

    the community.7 2 3 1 4.15 Agree

    Revealed the following findings:

    1.

    That the project considers the public interest of the people around the

    area for it gets a weighted mean of 4.13 which its verbal description is

    agree.

    2.

    That the People in the area become agriculturally motivated which

    receives a mean of 4.31 and verbally said that it is agree..

    3.

    That the People become friendly and cooperative which receives a mean

    of 4.31 and verbally said that it is agree.

    4.

    That there is an exchange of ideas from among the people concerned inthe watershed for it gets a weighted mean of 3.93 which its verbal

    description is agreed.

    5.

    That the People can communicate with other people easily and

    enthusiastically which receives a mean of 4.00 and verbally said that it is

    agree.

  • 8/10/2019 Pahingahan-cordero Dam Case Study

    17/20

    17

    6.

    That in affects the way of life of the community people which receives a

    mean of 4.00 and verbally said that it is agree.

    7.

    That there are improvements in the peoples way of living as in: dressing,

    talking, etc for it gets a weighted mean of 4.00 which its verbal

    description is agrees.

    8.

    That the reservoir will become one of the centers of tourism within the

    community which receives a mean of 4.15 and verbally said that it is

    agree.

    Table 4: Weighted mean and verbal description of benefits derived from the

    watershed.

    Item no. Questions Frequency of Response VerbalDescription

    5 4 3 2 1 w.m.

    1People became religious 5 6 3 1 1 3.81 Agree

    2People learn to love the nature. 9 3 3 1 4.25 Agree

    3 Community people are

    concerned by the followingrules of environment

    protection.

    8 6 2 4.38 Agree

    4 Farmers experienced anincrease in their harvest. 8 5 2 4.40 Agree

    5 There is an increase in thefamily income of the people in

    the locality.8 6 1 1 4.31 Agree

    6 There is a change in thestandard of living of the people. 6 6 3 1 4.06 Agree

    7 The supply of water by thecordero dam will benefit the

    neighboring provinces3 2 7 1 1 3.36

    FairlyAgree

    Revealed the following findings:

    1.

    That the People became religious which receives a mean of 3.81 and

    verbally said that it is agree.

    2.

    That the People learn to love the nature which receives a mean of 4.25

    and verbally said that it is agree.

    3.

    That the Community people are concerned by the following rules of

    environment protection which receives a mean of 4.38 and verbally said

    that it is agree..

    4.

    That the Farmers experienced an increase in their harvest which receives

    a mean of 4.40 and verbally said that it is agree.

  • 8/10/2019 Pahingahan-cordero Dam Case Study

    18/20

    18

    5.

    That there is an increase in the family income of the people in the locality

    which receives a mean of 4.31 and verbally said that it is agree..

    6.

    That there is a change in the standard of living of the people.

    7.

    That the supply of water by the cordero dam will benefit the neighboring

    provinces which receives a mean of 3.36 and verbally said that it is fairly

    agree.

    Table 5: Weighted mean and verbal description of delineation of watersheds.

    Item no. Questions Frequency of Response VerbalDescription

    5 4 3 2 1 w.m.

    1 Overflow of the dam at times ofheavy rain 5 4 1 3 3 3.31

    FairlyAgree

    2 Lack of water supply duringdry season 2 6 4 3 3.27

    FairlyAgree

    3 Opening of the gate valves attimes the reservoirs overflows,

    thus causing destructive

    floods.

    2 3 2 3 5 2.60 FairlyAgree

    4 Soil erosion brings delineationto reservoir/watersheds 2 4 1 3 6 2.56

    FairlyAgree

    5 Effects of water delineation isexperienced 2 4 1 3 6 2.56

    FairlyAgree

    Revealed the following findings:

    1.

    That overflow of the dam at times of heavy rain receives a mean of 3.31

    and verbally said that it is fairly agree.

    2.

    That there is Lack of water supply during dry season for it gets a fairly

    agree verbal description by a weighted mean of 3.27.

    3.

    That the Opening of the gate valves at times the reservoirs overflows,

    thus causing destructive floods which receives a mean of 2.60 and

    verbally said that it is fairly agree.

    4.

    That soil erosion brings delineation to reservoir/watersheds for it gets a

    fairly agree verbal description by a weighted mean of 2.56.

    5.

    That the Effects of water delineation is experienced which receives a

    mean of 2.56 and verbally said that it is fairly agree.

  • 8/10/2019 Pahingahan-cordero Dam Case Study

    19/20

    19

    CHAPTER IV

    CONCLUSION:

    Based on the finding of the studies, the following conclusion was derived.

    The location, shape, size and depth of the facility are still on its peak of

    durability, although some of its components are old; it is still meeting up

    with the requirements of those officials who are utilizing the said

    facilities.

    The operations, maintenance and development are being supervised by

    the department of engineers on the said dams.

    Based on the responses of the people living near the location, we can say

    that the benefits are still growing due to proper management of the

    officials assigned to the dam.

    Delineation of the watershed is almost negligible.

    RECOMMENDATION:

    As future civil engineers, based on the findings of the conclusion the following

    recommendation were drawn:

    Just continue the ongoing maintenance of the dam by the officials

    If they have the capabilities to enhance and improve the facilities, we

    would recommend the renovation of some of its facilities for presentation

    purposes for the guests that are coming to visit the dam.

    Provide some pre-cautionary measures to prevent delineation of the

    watershed itself.

  • 8/10/2019 Pahingahan-cordero Dam Case Study

    20/20

    20

    CHAPTER V

    BIBLIOGRAPHY:

    THE FORT MAGSAYSAY CAMP FACILITIES

    THE ADJUTANT OFFICE

    WWW.YAHOO.COM

    WWW.GOOGLE.COM

    WWW.WIKIPEDIA.COM

    WWW.ASK.COM

    http://www.yahoo.com/http://www.google.com/http://www.wikipedia.com/http://www.ask.com/http://www.ask.com/http://www.wikipedia.com/http://www.google.com/http://www.yahoo.com/