Corps of EngineersBUILDING STRONG®
TABLE ROCK DAM SLIDE – CASE STUDYDave Paul, P.E.Lead Civil EngineerU.S. Army Corps of EngineersRisk Management Center [email protected]
Dam Safety WorkshopBrasília, Brazil20-24 May 2013
![Page 2: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/2.jpg)
Purpose
Provide real-life application for reporting distress
Review project conditions and distress reporting
timeline
Stress Dam Safety training and communication
Emphasize the importance of partnering with
regional experts
![Page 3: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/3.jpg)
Event Background
![Page 4: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/4.jpg)
![Page 5: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/5.jpg)
Rainfall Comparison
Average Rainfall Rainfall RainfallDAM April Rain 22-28 April April 2011 April
2008Beaver 4.5 in 11.57 in 15.1 in 9.16 inTable Rock 4.1 10.43 13.6 7.90Bull Shoals 3.9 12.06 15.3 7.90Norfork 4.1 13.23 16.8 8.15Greers Ferry 4.9 7.4 10.6 9.21Clearwater 4.5 11.31 14.01 9.16
![Page 6: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/6.jpg)
Rainfall Comparison
Average Rainfall Rainfall RainfallDAM April Rain 22-28 April April 2011 April
2008Beaver 4.5 in 11.57 in 15.1 in 9.16 inTable Rock 4.1 10.43 13.6 7.90Bull Shoals 3.9 12.06 15.3 7.90Norfork 4.1 13.23 16.8 8.15Greers Ferry 4.9 7.4 10.6 9.21Clearwater 4.5 11.31 14.01 9.16
![Page 7: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/7.jpg)
CHALLENGESDams
![Page 8: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/8.jpg)
CHALLENGESLevees
![Page 9: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/9.jpg)
CHALLENGESNavigation System
![Page 10: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/10.jpg)
Table Rock Lake Dam
![Page 11: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/11.jpg)
Records at Table Rock DamRECORD RAINFALL RECORD INFLOW
RECORD RELEASE RECORD POOL
![Page 12: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/12.jpg)
Distress Reporting Timeline
Discovery OPM Calls DSO
DSO Engages
Tech Team
Media Outlets
Contacted
Tech Team Makes
Stability / Repair
Decisions
Emergency Contract
In-Place and Repairs
Completed
Normal Operation and
Follow-up Inspection
Tech Team Dispatched to Site/Evaluation
DSO/DSPM Upward Reports
![Page 13: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/13.jpg)
Distress Reporting Timeline
Discovery OPM Calls DSO
DSO Engages
Tech Team
Media Outlets
Contacted
Tech Team Makes
Stability / Repair
Decisions
Emergency Contract
In-Place and Repairs
Completed
Normal Operation and
Follow-up Inspection
Tech Team Dispatched to Site/Evaluation
DSO/DSPM Upward Reports
![Page 14: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/14.jpg)
Table Rock Slide
![Page 15: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/15.jpg)
Table Rock Slide
![Page 16: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/16.jpg)
Distress Reporting Timeline
Discovery OPM Calls DSO
DSO Engages
Tech Team
Media Outlets
Contacted
Tech Team Makes
Stability / Repair
Decisions
Emergency Contract
In-Place and Repairs
Completed
Normal Operation and
Follow-up Inspection
Tech Team Dispatched to Site/Evaluation
DSO/DSPM Upward Reports
![Page 17: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/17.jpg)
Tulsa Tech Team
Little Rock Tech Team
![Page 18: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/18.jpg)
24-Hour Observation
![Page 19: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/19.jpg)
Distress Reporting Timeline
Discovery OPM Calls DSO
DSO Engages
Tech Team
Media Outlets
Contacted
Tech Team Makes
Stability / Repair
Decisions
Emergency Contract
In-Place and Repairs
Completed
Normal Operation and
Follow-up Inspection
Tech Team Dispatched to Site/Evaluation
DSO/DSPM Upward Reports
![Page 20: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/20.jpg)
Table Rock Event
![Page 21: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/21.jpg)
DSPMT Reporting
![Page 22: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/22.jpg)
Distress Reporting Timeline
Discovery OPM Calls DSO
DSO Engages
Tech Team
Media Outlets
Contacted
Tech Team Makes
Stability / Repair
Decisions
Emergency Contract
In-Place and Repairs
Completed
Normal Operation and
Follow-up Inspection
Tech Team Dispatched to Site/Evaluation
DSO/DSPM Upward Reports
![Page 23: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/23.jpg)
Emergency Repair
![Page 24: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/24.jpg)
Distress Reporting Timeline
Discovery OPM Calls DSO
DSO Engages
Tech Team
Media Outlets
Contacted
Tech Team Makes
Stability / Repair
Decisions
Emergency Contract
In-Place and Repairs
Completed
Normal Operation and
Follow-up Inspection
Tech Team Dispatched to Site/Evaluation
DSO/DSPM Upward Reports
![Page 25: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/25.jpg)
Repair
![Page 26: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/26.jpg)
Distress Reporting Timeline
Discovery OPM Calls DSO
DSO Engages
Tech Team
Media Outlets
Contacted
Tech Team Makes
Stability / Repair
Decisions
Emergency Contract
In-Place and Repairs
Completed
Normal Operation and
Follow-up Inspection
Tech Team Dispatched to Site/Evaluation
DSO/DSPM Upward Reports
![Page 27: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/27.jpg)
Lesson’s Learned District and technical team reacted well
Anticipate the unexpected Project challenges Performance may change Resources will be thin Plan for backup DSO
Dam safety training is critical It works – project personnel noted the distress
![Page 28: TABLE ROCK DAM SLIDE – CASE STUDY](https://reader036.fdocuments.us/reader036/viewer/2022062222/56816623550346895dd97aac/html5/thumbnails/28.jpg)
Lesson’s Learned Communication
Project Personnel to DSO DSO to Engineers/DSPM Engineers on Site to DSO/DSPM DSO/DSPM to MSC and HQ OPM/Lake Manager and PAO to Public and Media
Constantly educate the public Purpose and Value of Projects Consequences without Projects