2013 AEP Ohio Business Incentives Program
![Page 2: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/2.jpg)
2012 Program Results
• AEP Ohio received 3,153 applications
• Annual energy savings achieved = 223 GWh
• Paid $15.6 Million in incentives
![Page 3: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/3.jpg)
2012 Participation
Industrial/Manufacturing 42%
School 10%
Miscellaneous 9%
Large Office 7%
Government/Municipal 6%
Conditioned Warehouse 6%
Large Retail/Service 6%
Medical- Hospital 5% Small Retail/Service
5% College/University
4%
![Page 4: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/4.jpg)
Variable Speed Drives • Incentive $60 per hp
– Pump or fan motor
– Supply return fan
– Hot water pump
– Cooling tower fan
– HVAC motor
• $100 per hp, VSD air compressor
• Typical energy savings: 5 to 25 percent
![Page 5: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/5.jpg)
New High Efficiency Transformers • Better reliability • For single- or three-phase
transformers meeting or exceeding NEMA Premium™
• Efficiency requirements at 35 percent load are eligible
• Base Incentive $60-$1,000, plus efficiency bonus $0.75-$30.25
• Utility owned transformers NOT eligible
• Typical segment, large commercial, schools, industrial
![Page 6: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/6.jpg)
More Ways to Save: Compressed Air, Motors, VFDs
• Variable frequency drives
• NEMA Premium motors
• Added compressor storage
• No-loss condensate drains
• Refrigerated cycling thermal mass air dryer
• Air compressor replacement
• Dryer
• Compressed air engineered nozzle
• Compressed air leak repair
Potential customer segments
• Manufacturing
• Hospitals
• Large office
• Universities/Schools
• Restaurants
• Water/Wastewater Treatment
![Page 7: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/7.jpg)
Custom Program • Electricity saving measures not
found on prescriptive list, may qualify for custom incentives – $0.08 per first year kWh saved
• AEP Business team will conduct technical site assessment to help identify energy efficiency opportunity
• Payback must pass utility cost effectiveness test – typically a one- to seven-year payback
![Page 8: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/8.jpg)
Some Common Custom Projects • Process improvements • VFDs on pumps and fans over 200 HP • VFDs on compressors over 100 HP • New technology applications • EMS over 50,000 sq ft. • Large Air Compressors • Compressed Air System Optimization • Injection Molding Machines • Cooling tower optimization • Building Envelope Measures • ‘Free’ cooling – water-side economizers
![Page 9: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/9.jpg)
Custom Worksheet
![Page 10: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/10.jpg)
Compressed Air
12%
EMS 7%
HVAC 20%
Lighting 6%
Motors 5%
Other 28% Process VSD
16%
Refrigeration 5%
Virtualization 1%
Custom Project By Measure Type
2012 Custom Projects
![Page 11: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/11.jpg)
2013 Custom Projects Submitted
• Less lighting
• Less HVAC
• More EMS
• More compressed air
• More motors
![Page 12: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/12.jpg)
Savings ideas for Compressed Air
• Replace constant speed air compressor with VFD air compressor
• Retrofit VFD on a constant speed compressor • Install intelligent controllers on a group of air
compressors • Replace compressed air operated knifes and
bars with low-powered energy efficient blowers
• Replace non-cycling air dryer with cycling thermal mass dryer
![Page 13: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/13.jpg)
New Construction/Major Renovation: Three Paths
Whole Building
Design team applies during design phase,
energy simulation model required.
Typically incentives deeper, incentives
available to owner and design team
Custom Need to establish baseline energy
consumption, requires some engineering
calculations
Captures savings for non-standard
equipment e.g. compressors, process
equipment
Prescriptive Uses prescriptive
worksheets, Lighting Power density, HVAC,
VFD’s
Easiest approach, less time required when no energy model is done
![Page 14: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/14.jpg)
New Construction/Major Renovation: Whole Building
• Design team incentives
– $0.02 to $0.04/kWh
– Based on 10 percent efficiency over ASHRAE 90.1-2007
• Owner incentives
– $0.08 to $0.12/kWh
– Based on 10 percent efficiency over ASHRAE 90.1-2007 standard
Fully executable model required starting July 1,
2013
![Page 15: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/15.jpg)
New Construction: Prescriptive Lighting Power Density (LPD)
![Page 16: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/16.jpg)
Retroactive Projects • Known as Self Direct Program • Available to largest energy users
– 700,000 kWh+ annually – Part of National Account or with
multiple locations
• For installations completed after January 1, 2010
• Requires both AEP Ohio and PUCO approval – every application is auto-approved after 60 days with the PUCO
• Incentives paid at 75 percent (compared to programs for future energy efficiency measures)
![Page 17: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/17.jpg)
The Fine Print
• Incentive funds are limited, funds are reserved based on availability
• Measures must be installed for five years or the life of the measure, whichever is less
• Prescriptive, custom incentives may not exceed 50 percent of the total project cost
• Program year begins December 17, 2012 and ends November 15, 2013
• Project completion dates greater than six months may qualify for Self Direct
![Page 18: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/18.jpg)
www.AEPOhio.com/Incentives
![Page 19: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/19.jpg)
How Do I Pre-Apply?
Fill out customer information page and prescriptive or
custom worksheet
Gather scope of project, spec sheets on proposed
measures
Have customer sign the customer information page
and send the gathered information to aepohio
[email protected] or use the online application
![Page 20: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/20.jpg)
Benefits of Pre-Application • Ensures proposed equipment qualifies for incentives
• Ensures incentive estimates are accurate and maximized
• Final applications are generally paid quicker
• Measures requiring pre-app – T12 lamp removal in retrofitted fixtures
– New T5/T8 fluorescent fixtures, LED, HID retrofits, etc
– Lighting Controls
– Custom Projects
– Any project requiring pre-metering
Recommended for All Projects
![Page 21: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/21.jpg)
Tools Available
![Page 22: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/22.jpg)
Marketing & Education Materials
• Segment technology sheets - Now available!
• Customer case studies by segment available
• Technology-specific fact sheets available – Variable Frequency
Drives
– Compressed Air
– Parking Garage/Lot Lighting
![Page 23: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/23.jpg)
NEW Online Application for Multiple Programs
![Page 24: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/24.jpg)
The Evolution of Continuous Improvement
1970 1980 Today
Safety
Quality Lean Energy “CEI” Environmental
Six Sigma
• CEI applies the business management principles of continuous improvement and employee engagement to plant-wide energy efficiency focusing on low/no-cost energy saving opportunities.
• CEI Integrates with and enhances existing continuous improvement programs.
1990
24
![Page 25: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/25.jpg)
CEI Program Participants
• Cohorts of industrial sites within AEP Ohio service territory
• 7 to 14 industrial sites per cohort
• Site annual electrical usage > 10 GWh
• Cohort locations /
– Columbus / Q1 – Underway (Jan 2013)
– Lima-Findlay / Q2 – Underway (May 2013)
– Canton / Q3 – Recruiting (Sept 2013)
25
![Page 26: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/26.jpg)
CEI Program Benefits 1. Infrastructure
• Executive sponsor, energy champion, energy team, energy policy
2. Metrics • Baseline energy model, goal, tracking method
3. Improvement Process •Tools, techniques and practices
4. Technical and Implementation Support
• Electrical energy expertise, how-to expertise, resources
5. Moral Support •Encouragement and Accountability
Incentives ($0.02/kWh) for three years
26
![Page 27: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/27.jpg)
CEI Program Commitments
• Requires no financial commitment
• Requires signing CEI Enrollment Agreement
– Defines incentive payment and program time frame
– Participant agrees to provide “energy driver” data, e.g., production
– Participant agrees to attend and participate in the workshops
– No penalty for early withdrawal or non-participation other than not receiving incentives
• Requires investment in time
27
![Page 28: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/28.jpg)
Initiatives & Upcoming Events
• AEP Ohio Water/Waste water users group
– Next meeting June 27 in Zanesville
• Polymer Users Group
• AEP Ohio Small Foods Segment Seminar
– July 8 (Columbus) and July 9 (Lima)
• Advanced Lighting Controls Initiative
![Page 29: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/29.jpg)
We’re Here to Help!
• Angie Rybalt, Outreach manager, 614-359-6276, [email protected]
• Barry Gritton, Athens District Outreach, 614-420-0103, [email protected]
• Scot Thrapp, Outreach Newark district, 614-563-9203, [email protected]
• George Munis, Outreach Lima district, 614-446-5374, [email protected]
• Ron Rowe, Outreach Canton district, 330-323-7328 [email protected]
![Page 30: Overview of the AEP Business Incentive Programs](https://reader034.fdocuments.us/reader034/viewer/2022052600/55756549d8b42a2e248b47a4/html5/thumbnails/30.jpg)
Questions