Optimization of Pumping Systems in HVAC

download Optimization of Pumping Systems in HVAC

of 30

Transcript of Optimization of Pumping Systems in HVAC

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    1/30

    B. Srinivasa RajkumarSales Manager (HVAC)

    Commercial Building ServicesGrundfos India

    Optimization of Pumping System in HVAC

    ACREX 2012

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    2/30

    All system operated as variable flow systemPrimary variable pumping

    Use of thermal storageCombination of active and passive systemsUse of tertiary pumps (zone dividing)

    Challenges in condenser water pumpingRemote monitoring of pumping systems

    HVAC pumping schemes

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    3/30

    All system operated as variable flow system

    Constant flow system:Constant flow systems will use three way val-

    ves and will give a variable flow in distribution

    net and variable flow in the load.

    Variable flow system:Variable flow systems will use two way valvesand give a variable flow in both the load and inthe distribution net.

    By using Tertiary pumps the flow in load canbe held constant but with a variabletemperature.

    MAB A

    B

    Variable flowConstant temperature

    Constant flowVariable temperature Load

    M

    Constnt flowVariable temperature

    Variable flowConstant temperature Load

    M

    Constnt flowVariable temperature

    Variable flowConstant temperature Load

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    4/30

    The way to - Primary variable flow

    Improvedperformance

    Chiller

    Chiller

    Chiller

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Constant flowThree way valvesConstant speed pumps

    Chiller

    Chiller

    Chiller

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Commonpipe

    Constant flow (primary)

    Variable flow (secondary)Two way valvesConstant/variable speed pumps

    Chiller

    Chiller

    Chiller

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    LoadBuffer tank

    Constant flow (primary)Variable flow (secondary)Two way valvesConstant/variable speed pumps

    Chiller

    Chiller

    Chiller

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Variable flowTwo way valvesVariable speed pumps

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    5/30

    Primary variable flow

    Also the using primary variable flow has been discussion inleading technical magazines like The ASHRAE Journal.The conclusion often end up in favour of:Primary variable flow

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    6/30

    Primary variable flow

    Advantages:Lower first costLess space required (less pumps)Reduced pump power designLower energy consumption

    Between a flow at50% to 80% we havethe highest numberof operation hours,and here the saving

    is significant.

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    7/30

    Primary variable flow

    Primary/tertiary dedicated pumps:

    If there is a demand for standby pumps

    there has to be installed one standby per

    chiller. The pump controller has to be

    able

    take out the pump of control sequence

    when the chiller is switches off.Primary/tertiary common pumps:

    There is a demand for control valves on

    each chiller to be able to control the flow

    in the chiller, and there is only demand

    for one standby pump for all the chillers.

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Chiller

    Chiller

    Chiller

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Chiller

    Chiller

    Chiller

    For both system types there is a demand for controlled bypass tosecure the minimum flow.

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    8/30

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    9/30

    Use of thermal storage tanks

    Chillerplant

    Charge mode flow Discharge mode flow

    Stage storage tank

    Distribution net

    Basis thermal storage tank principal

    Reduced refrigeration equipment investmentLess expensive than chiller capacity in large systemsLess inefficient part-load operation of plantCapacity for emergencies and growth

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    10/30

    Capacityhandle bychillers

    Capacityhandle by

    chillers andstorage

    Load

    24 hours

    Use of thermal storage tanks

    Use of thermal storage provide a good opportunities tocover the peak load instead of installing more capacity, alsoin situation where the system is expanded.

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    11/30

    Combination of active and passive systems

    To reduce the size of the air part (ducts and AHUs) passive systems areoften used it could be cooling ceilings or cooling floors. The passivesystem also has an advantage in operating with a higher flowtemperature (15-17oC) which fit with alternative cooling sources andmake it possible to operate with a higher system Dt.The big challenge is to avoid condensation on floors and ceilings.

    M

    M

    M

    15oC

    18oCCooling Ceiling/floors as apart of the building

    construction

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    12/30

    Typical buildings where passive system can be use arebuildings with large public areas like:

    Air portsHotel receptions

    MuseumsOpera housesetc.

    Passive systems always has to combined with chilled airsystem to provide fresh air.

    Combination of active and passive systems

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    13/30

    Use of tertiary pumps

    Chiller

    Chiller

    Chiller

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Chiller

    Chiller

    Chiller

    De-coupling

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    De-couplingChiller

    Chiller

    Chiller

    No matter if the system design is a Primary variable flow or Primarysecondary flow tertiary can be used larger systems. The mainpurpose is to increase the hydraulic balancing and to lower the headof the Primary/Secondary pumps and there by reduce the operationcost.The system will be much more flexible easier to make changes.

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Chiller

    Chiller

    Chiller

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    14/30

    Indirect connection

    with flowtemperature control,

    and and heatexchanger

    Indirect connection

    with flowtemperature control,and by-pass control

    Indirect connectionwith flow

    temperature control

    Connection with

    booster pumpand high pressure

    bypass

    Connection withbooster pump

    Connection withcontrol valve

    Direct connection

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    Load

    The tertiary system/pumps can be connected to thedistribution net in different ways depending on the individualconditions.

    Use of tertiary pumps

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    15/30

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    16/30

    Potential Challenges in Condensers Circuit

    Condensers circuit are Primarily a much easier to manage. However,troubles still persist occasionally in some system. Lets have a brief look

    at

    some of the potential challenges:

    1. Pump Cavitations due to insufficient inlet pressure

    2. Air entering pumps due to the formation of vortex at collection basinor incorrect setting of bypass

    3. Over sizing of pump due to over estimation of frictional losses in thecircuit

    4. Fouling of pipes and condenser tube

    5. Changes in operating condition for circuit with bypass line

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    17/30

    Closed Loop and Open Loop system

    In a large chilled water system consists two difference kind of circuit

    Closed loop system- Distribution circuit

    Closed systems are characterized as systems with pumps that onlyhave to overcome the sum of friction losses, which are generated by

    all the components Open loop system- Heat rejection circuit

    Open systems are systems, where the pump is used to transportliquid from one point to another

    Thing to note between these two type of circuit while sizing the pump is

    Static head consideration.

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    18/30

    System Curve for Closed/ Open Loop system

    Closed Loop system Open Loop system

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    19/30

    Typical Heat Rejection Circuit

    Chiller

    Condenser Pump

    Cooling Tower

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    20/30

    Points to note to avoid cavitations on Condenserpump

    Condenser side is an open loop system, the only positive pressure to the

    pump suction are the elevation of cooling tower and atmospheric

    pressure, therefore, here are a few notes;-

    Always locate the condenser pumps as close as possible to the tower

    Design the pumps below As much as possible below the collection basinwater level

    Locate the condenser pumps before Condenser to avoid large pressuredrop of this component

    Ensure sufficient NPSHA.

    Avoid using high pressure drop strainer, check Valve and balancing Valveat pump suction line

    (If strainer has to be installed, try to use large mesh opening up to 3/16 atthe suction, propose is just to protect the pump and install a fine meshstrainer at the pump discharge to protect all other equipments)

    Avoid Overhead suction piping

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    21/30

    Vortex at Collection basin Exit

    Vortex at Collection basin iscreated when, there is insufficientwater level above the collectionbasin exit for the velocity that thewater is exiting.

    Facts contributing to the vortexing:-1. Sudden decrease in exit pipe

    size (Suction line) causes thewater velocities above themaximum allowable limit,vortex created

    2. Over sizing of pumps due toover estimation of frictionallosses

    3. In correct setting of bypassline (If any)

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    22/30

    Points to note to avoid formation of Vortex

    Cooling Tower exit pipe follows collection basin exit at least for thelength of 10x the diameter before reducing it to the pump suctionsize

    Throttle valve to control flow (energy consideration)

    Modifying impeller diameter

    Speed control

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    23/30

    Remote monitoring of pumping systems

    Why to own when you can rent theservices ?

    World is moving towards cloudcomputing. So does the buildingservices

    No hassles of maintaining a localnetwork

    All devices talk to each other and to acentral network

    Nominal charges for web servicemaintenance to the use

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    24/30

    Remote monitoring of pumpingsystems

    Easy-to-install, low-cost monitoring andmanagement of pumping systems.

    Web access to reports and trend data for all relevantemployees.

    Automatic event log and service log for all pumpsin the system.

    Plug n

    Play integration with Controls

    monitoring of all pumps and sensors.

    Centrally hosted database andapplication server.Users only need an Internet PC.

    Alarms on SMS and Email distributed according tobuilt-in week schedule.

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    25/30

    Cloud Overview

    Pump LogicControllers

    Data logger

    Internet

    GSM

    Central Web Server

    Users

    Users

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    26/30

    Online monitoring of pumpingsystem efficiency

    Close monitoring of specificenergy consumption

    Immediate course correction inevent of any performancedegradation

    Get access to data andperform basic functions suchas acknowledge alarms,start/stop pumps, reset

    controllers from your mobilephone / PDA

    Business model could coverAMC or 24/7 operation supportto benefit users

    Remote monitoring of pumping systems Userbenefits

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    27/30

    Focus on energy saving (Carbon footprint)

    Energy saving:To reduce operation costTo reduce CO2 emissionUtilizing energy sources better

    The use of Life Cycle Cost more and more common

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    28/30

    How to evaluate the most efficient pump solution

    The best way to evaluate theefficiency of a pump system is touse:Life Cycle Cost Analysis (LCC)LCC shows the total life time cost of

    a pump system.The lifetime of a quality pumpsystem will be no less than 20years.When used as a comparison toolbetween possible design oroverhaul alternatives, the LCCprocess will show the most cost-effective solution within the limits ofavailable data.

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    29/30

    The LCC equation

    Normally only 3 elements in theequation will add value whencalculating HVAC systems inCommercial Buildings :

    Initial costMaintenance costEnergy cost

  • 8/2/2019 Optimization of Pumping Systems in HVAC

    30/30

    B. Srinivasa Rajkumar

    Manager Sales (HVAC)

    Commercial Building Services

    Grundfos Pumps India

    Direct: (+91) 44 4596 6891Mobile: (+91) 99406 79196

    Mail: [email protected]