MCP– MISSIONCRITICALPROJECTS
2
þ DatacenterCampusintegratedconsultancyandprojectþ ”RFP”anddecisionsupportDatacenterconsultancyþ UpTimeInstitutestandardsandrequirementsprojectcomplianceþ ManagementoftheDatacentercertificationprocessþ PSIM– PhysicalSecurityInfrastructureManagementprojectsþ “SmartCities”projectsþ ConsultingandAdvisoryoncriticalinfrastructuresprojectsþ Criticalinfrastructuresauditingand“GapAnalysis”reportsþ ISO27001– Consulting,auditingandimplementationþ ISO22301– Consulting,auditingandimplementationþ ISO20000 – Consulting,auditingandimplementation
Version1.5November2016
3
The MCP - Mission Critical Projects is a consortium of experts focused on thedevelopment and implementation of projects with high demands for criticality,security and business continuity requirements.
Datacenter(s) Campus, integrated physical security perimeters and “smart cities” areexamples of the areas of activities of the technical team and the proven experienceof the MCP consortium.
With several members of the team certified internationally on standards andaccreditation bodies such as the UpTime Institute and the PECB - ProfessionalEvaluation And Certification Board, the MCP team is able to meet the challenges ofintegrated infrastructure for business continuity and security models based on bestpractices supported by ISO standards, among others.
MCP– MISSIONCRITICALPROJECTS
Version1.5November2016
DATACENTERINTEGRATEDPROJECTS
WHATISADATACENTERCAMPUS?
4
TheUptimeInstitutemethodology,fromdesigntocertification
Version1.5November2016
5
GESTÃODOCAMPUS
CLIMATIZAÇÃO
COMUNICAÇÕESINTERNAS
STAGING
ENERGYPRODUCTION
COOLINGPRODUCTION
TELECOMPROVIDERS
USERSWORKAREAFORBUSINESSCONTINUITY
ExternalTechnicalParkBusiness ContinuityWorkspace
DATACENTERPROJECTS
CAMPUSMANAGEMENT
COOLINGROOM(S)
NETWORKING
STAGING
ENERGYROOM(S)
ITROOM(S)
Datacenterinternalperimeter
Version1.5November2016
6
PHASESOFDESIGN
• IdentificationofbusinessneedsforDatacenterservices• DefinitionofRTO– RecoveryTimeObjectivesandRPO– RecoveryPoint
ObjectivesandotherSLAfortheDatacenterservices• IdentificationoftheapplicableTierLevelaccordingtoUpTimeInstitute
requirements• DecisionsupportfortheDatacenterlocationandlayout• Preliminarydefinitionofinstalledpower,bothforenergyandcold• Preliminarydefinitionofneedsforspecialties:
• Firesecurity• PerimeterPhysicalSecurity• CablingandCommunicationsSystems• ITinfrastructureforCampustechnicalmanagement• Automation,Monitoringandremotecontrolodtheinfrastructure• Creationofthedocument“DatacenterProgramDefinition"
DATACENTERPROJECTS
Version1.5November2016
7
PHASESOFDESIGN
• Datacenterspacelayout(AutoCad2D)• EnergyGrid(production,distributionandconsumption)• CoolingGrid(production,distributionandconsumption)• FireSecurity(detectionandextinguishing)topology• PerimeterPhysicalSecurity(CCTV,IDS,AccessControl)topology• StructuredCablingandCommunicationssystemstopology• Automation,MonitoringandRemoteControltopology• DescriptionDocuments(Word/Excel/Visio/PDF)• DesignDocuments(AutoCad2D)• AutoCad3Dviews,ondemand
• Ifthecertificationoftheprojectisrequired,identifiedas"DD-DesignDocuments",thefollowingtasksmustbeadded:ü SubmissionofDDdocumentation(inEnglish)totheUpTimeInstituteü InteractionwiththeUpTimeInstituteforclarificationsandeventualchangesü Supportthedesignersfortheintegrationofimprovementactions
DATACENTERPROJECTS
Version1.5November2016
8
PHASESOFDESIGN
• Detaileddrawingsfortheimplementationofallspecialties(AutoCad2D)• Descriptiondocumentsforall specialties(Word/Excel/PDF)• SpaceManagement– 2DvisionoftheuseofaerialspaceoncriticalspotsoftheDatacenterCampus,
AutoCad3Dvisionsavailableondemand.• BOM– Project“BillofMaterial”• DocumentalsupportfortheRFP– “RequestforPrices”todefinetheproposalscopefortheselected
proponents
• Ifthecertificationoftheprojectisrequired,identifiedas"DD-DesignDocuments",thefollowingtasksmustbeadded:ü Datacenterimplementationriskanalysisü Revisionand(re)submissionofthe“ProgramDefinition”ü DocumentsUploadfortheUpTimeInstituteprojectmanagerforthe“DesignDocuments”
certificationü InteractionwiththeUpTimeInstituteforclarificationsandeventualchangesü Supportthedesignersfortheintegrationofimprovementactionsü Certificationprocessmanagementonbehalfoftheclient
DATACENTERPROJECTS
Version1.5November2016
9
PHASESOFDESIGN
• Monitoring of work in progress and conducting of compliance audits of theimplementation
• Support the completion and documentation of quality tests by specialties• Support on the compliance of the documents from global tests of the Datacenter
Campus for certification purposes• Commissioning reports by specialty and for the entire project• Compliance report regarding the readiness of the infrastructure to "GO LIVE“• Monitoring the "GO LIVE" for a period of time deemed necessary
• Ifthecertificationoftheprojectisrequired,identifiedas“CF– ConstructedFacilities”,thefollowingtasksmustbeadded:ü Creationofcomplianceauditreportsü CreationofthedossierofevidenceofcompliancetestsfortheDatacenterü CreationoftheGOLIVEreportü Certificationauditfollow-up
DATACENTERPROJECTS
Version1.5November2016
10
PHASESOFDESIGN
• If the certification of the project is required, identified as " ConstructedFacilities ", the following tasks must be added:
o Preparation of the dossier for “Constructed Facilities” certificationo Submission of documentation (in English) for the UpTime Instituteo Monitoring on-site audits of the UpTime Instituteo Interaction with the UpTime Institute for clarifications and eventual
changeso Support the designers for the integration of improvement actionso Support for the completion of the “Constructed Facilities” certification
process
DATACENTERPROJECTS
Version1.5November2016
11
PHASESALIGNMENTDATACENTERPROJECTS
PHASE GeneralDescription Remarks
ProgramDefinition Projectdefinitions DefinitionofglobalcommitmentsCampusDCforallspecialties
Conceptual Design– DesignDocuments
Drawinganddescriptionoftopologies
SupportingthefirstpartoftheCertification"DesignDocuments"
DesignDetails– DesignDocumentscertification
Drawinganddescriptionofspecialtiesforimplementation
SupportingthesecondpartoftheCertification"DesignDocuments"
Tenderforimplementationcandidates
Tenderandcontractcommitments TobedetermineddependingontheProgramDefinition
DATACENTERCampusimplementation
Executionofapprovedprojects TobedetermineddependingontheProgramDefinition
Commissioning Complianceauditofprojectdesignsandcommissioning oftheinfrastructure
SupportsthefirstpartofCertification"ConstructedFacilities"
ConstructedFacilitiescertification TechnicalsupportforauditsoftheUpTimeInstitute
SupportsthesecondpartofCertification"ConstructedFacilities"
Version1.5November2016
14
MCP- MISSIONCRITICALPROJECTS
TierIVMultidatacenterBusinessContinuityCampus – GuimarãesTierIVMultidatacenterBusinessContinuityCampus – AlvercaTierIIIMultidatacenterCampus – MatosinhosTierIIMultidatacenterCampus – PortoBCPDatacenterTagusPark – OeirasBancodePortugalDatacenter – Lisbon
TierIIIDatacenter – BMALuandaTierIIDatacenter – CAIXATOTTALuanda
DatacenterdesignandinstallationfortheGovernmentofCapeVerde(NOSI)– Praia