M-052221 Building #10 5 Plex 5-2 Olive Plaza

144
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2021-Jun-08 07:35:27 Right-Suite® Universal 2019 19.0.20 RSU00897 Page 1 ...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W M - 052221 Job: Load Short Form May 22 2021 Date: Entire House Max Mora By: Building #10 5 Plex 5-2 Plan: Quality Heating Inc. Project Information Roth Properties 2015 IEC For: Building #10 5 Plex 5-2 Olive Plaza Design Information Infiltration Clg Htg Simplified Method 89 -6 Outside db (°F) Semi-tight Construction quality 75 70 Inside db (°F) 0 Fireplaces 14 76 Design TD (°F) H - Daily range 50 50 Inside humidity (%) -31 62 Moisture difference (gr/lb) HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref. n/a Coil n/a AHRI ref. n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling Btuh 0 Heating output Btuh 0 Latent cooling Btuh 0 Temperature rise °F 0 Total cooling Btuh 0 Actual air flow cfm 0 Actual air flow cfm 0 Air flow factor cfm/Btuh 0 Air flow factor cfm/Btuh 0 Static pressure in H2O 0 Static pressure in H2O 0 Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft²) (Btuh) (Btuh) (cfm) (cfm) System 2 d 1401 11266 6967 513 513 Systen1 d 1406 15650 8091 513 513 System 3 d 1406 11276 7027 513 513 System 5 d 1406 15118 7398 513 513 System 4 d 1401 11356 7136 246 513 Entire House d 7021 64667 36619 2298 2565 Other equip loads 0 0 Equip. @ 0.94 RSM 34422 Latent cooling 2106 TOTALS 7021 64667 36528 2298 2565 PDF created with pdfFactory trial version www.pdffactory.com

Transcript of M-052221 Building #10 5 Plex 5-2 Olive Plaza

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 1

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Load Short Form May 22 2021Date:Entire House Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design InformationInfiltrationClgHtg

SimplifiedMethod89-6Outside db (°F)Semi-tightConstruction quality7570Inside db (°F)

0Fireplaces1476Design TD (°F)H-Daily range

5050Inside humidity (%)-3162Moisture difference (gr/lb)

HEATING EQUIPMENT COOLING EQUIPMENTMake n/a Make n/aTrade n/a Trade n/aModel n/a Cond n/aAHRI ref. n/a Coil n/a

AHRI ref. n/aEfficiency n/a Efficiency n/aHeating input Sensible cooling Btuh0Heating output Btuh0 Latent cooling Btuh0Temperature rise °F0 Total cooling Btuh0Actual air flow cfm0 Actual air flow cfm0Air flow factor cfm/Btuh0 Air flow factor cfm/Btuh0Static pressure in H2O0 Static pressure in H2O0Space thermostat n/a Load sensible heat ratio 0

ROOM NAME Area Htg load Clg load Htg AVF Clg AVF(ft²) (Btuh) (Btuh) (cfm) (cfm)

System 2 d 1401 11266 6967 513 513Systen1 d 1406 15650 8091 513 513System 3 d 1406 11276 7027 513 513System 5 d 1406 15118 7398 513 513System 4 d 1401 11356 7136 246 513

Entire House d 7021 64667 36619 2298 2565Other equip loads 0 0Equip. @ 0.94 RSM 34422Latent cooling 2106

TOTALS 7021 64667 36528 2298 2565

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 2

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Load Short Form May 22 2021Date:System 2 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design InformationInfiltrationClgHtg

SimplifiedMethod89-6Outside db (°F)Semi-tightConstruction quality7570Inside db (°F)

0Fireplaces1476Design TD (°F)H-Daily range

5050Inside humidity (%)-3162Moisture difference (gr/lb)

HEATING EQUIPMENT COOLING EQUIPMENTMake Goodman Mfg. Make Goodman Mfg.Trade Trade GOODMANModel ARUF24B14 Cond GSX140191K*AHRI ref Coil A(E,F)W194++TDR

AHRI ref 204783943Efficiency 100 AFUE Efficiency 12.2 EER, 15 SEERHeating input kW4.6 Sensible cooling Btuh10780Heating output Btuh15565 Latent cooling Btuh4620Temperature rise °F33 Total cooling Btuh15400Actual air flow cfm513 Actual air flow cfm513Air flow factor cfm/Btuh0.046 Air flow factor cfm/Btuh0.074Static pressure in H2O0.80 Static pressure in H2O0.80Space thermostat Load sensible heat ratio 0.93

ROOM NAME Area Htg load Clg load Htg AVF Clg AVF(ft²) (Btuh) (Btuh) (cfm) (cfm)

2 Kit-Din-Fam-Ent 472 4060 2708 185 1992-1/2 Bath 25 47 0 2 02-Bedroom 2 182 1620 1160 74 852-Wic 1 25 0 0 0 02-U-Bathroom 60 163 88 7 62-Master Bathroom 60 984 220 45 162-U-Stairs 63 0 0 0 02-Master Bedroom 167 2758 1577 126 1162-Master Wic 66 181 97 8 72-Hallway 121 0 0 0 02-Bedroom 1 161 1454 1117 66 82

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 3

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

System 2 d 1401 11266 6967 513 513Other equip loads 0 0Equip. @ 0.94 RSM 6549Latent cooling 498

TOTALS 1401 11266 7047 513 513

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 4

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Load Short Form May 22 2021Date:System 3 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design InformationInfiltrationClgHtg

SimplifiedMethod89-6Outside db (°F)Semi-tightConstruction quality7570Inside db (°F)

0Fireplaces1476Design TD (°F)H-Daily range

5050Inside humidity (%)-3162Moisture difference (gr/lb)

HEATING EQUIPMENT COOLING EQUIPMENTMake Goodman Mfg. Make Goodman Mfg.Trade Trade GOODMANModel ARUF24B14 Cond GSX140191K*AHRI ref Coil A(E,F)W194++TDR

AHRI ref 204783943Efficiency 100 EFF Efficiency 12.2 EER, 15 SEERHeating input kW3.3 Sensible cooling Btuh10780Heating output Btuh11260 Latent cooling Btuh4620Temperature rise °F24 Total cooling Btuh15400Actual air flow cfm513 Actual air flow cfm513Air flow factor cfm/Btuh0.045 Air flow factor cfm/Btuh0.073Static pressure in H2O0.80 Static pressure in H2O0.80Space thermostat Load sensible heat ratio 0.93

ROOM NAME Area Htg load Clg load Htg AVF Clg AVF(ft²) (Btuh) (Btuh) (cfm) (cfm)

3-Hallway 121 0 0 0 03-M Wic 66 181 97 8 73-Master Bedroom 167 2758 1682 125 1233-Bedroom 2 182 1620 1150 74 843- U Stairs 63 0 0 0 03-Master Wic 60 984 218 45 163-Bathroom 1 60 163 87 7 63-Wic 1 25 0 0 0 03-Bedroom 1 161 1454 1108 66 813-1/2 Bath 25 47 0 2 03-Kit-Din-Fam-Ent 477 4070 2685 185 196

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 5

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

System 3 d 1406 11276 7027 513 513Other equip loads 0 0Equip. @ 0.94 RSM 6605Latent cooling 498

TOTALS 1406 11276 7103 513 513

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 6

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Load Short Form May 22 2021Date:System 4 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design InformationInfiltrationClgHtg

SimplifiedMethod89-6Outside db (°F)Semi-tightConstruction quality7570Inside db (°F)

0Fireplaces1476Design TD (°F)H-Daily range

5050Inside humidity (%)-3162Moisture difference (gr/lb)

HEATING EQUIPMENT COOLING EQUIPMENTMake Goodman Mfg. Make Goodman Mfg.Trade Trade GOODMANModel ARUF24B14 Cond GSX140191K*AHRI ref Coil A(E,F)W194++TDR

AHRI ref 204783943Efficiency 100 EFF Efficiency 12.2 EER, 15 SEERHeating input kW3.3 Sensible cooling Btuh10780Heating output Btuh11356 Latent cooling Btuh4620Temperature rise °F50 Total cooling Btuh15400Actual air flow cfm246 Actual air flow cfm513Air flow factor cfm/Btuh0.022 Air flow factor cfm/Btuh0.072Static pressure in H2O0.80 Static pressure in H2O0.80Space thermostat Load sensible heat ratio 0.93

ROOM NAME Area Htg load Clg load Htg AVF Clg AVF(ft²) (Btuh) (Btuh) (cfm) (cfm)

4-Bedroom 1 182 1620 1161 35 844-Bedroom 2 161 1544 1283 33 924-Wic 1 25 0 0 0 04-U Bathroom 60 163 88 4 64-Master Bath 60 984 220 21 164-U Stairs 63 0 0 0 04-Master Bedroom 167 2758 1578 60 1134-M Wic 66 181 97 4 74-Hallway 121 0 0 0 04-Kit-Din-Fam-Ent 472 4060 2710 88 1954-1/2 Bath 25 47 0 1 0

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 7

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

System 4 d 1401 11356 7136 246 513Other equip loads 0 0Equip. @ 0.94 RSM 6708Latent cooling 498

TOTALS 1401 11356 7206 246 513

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 8

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Load Short Form May 22 2021Date:System 5 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design InformationInfiltrationClgHtg

SimplifiedMethod89-6Outside db (°F)Semi-tightConstruction quality7570Inside db (°F)

0Fireplaces1476Design TD (°F)H-Daily range

5050Inside humidity (%)-3162Moisture difference (gr/lb)

HEATING EQUIPMENT COOLING EQUIPMENTMake Goodman Mfg. Make Goodman Mfg.Trade Trade GOODMANModel ARUF24B14 Cond GSX140191K*AHRI ref Coil A(E,F)W194++TDR

AHRI ref 204783943Efficiency 100 EFF Efficiency 12.2 EER, 15 SEERHeating input kW4.4 Sensible cooling Btuh10780Heating output Btuh15013 Latent cooling Btuh4620Temperature rise °F32 Total cooling Btuh15400Actual air flow cfm513 Actual air flow cfm513Air flow factor cfm/Btuh0.034 Air flow factor cfm/Btuh0.069Static pressure in H2O0.80 Static pressure in H2O0.80Space thermostat Load sensible heat ratio 0.96

ROOM NAME Area Htg load Clg load Htg AVF Clg AVF(ft²) (Btuh) (Btuh) (cfm) (cfm)

5-Bedroom 2 182 2917 1273 99 885-Kit-Din-Fam-Ent 477 5051 2782 171 1935-1/2 Bath 25 47 0 2 05-Hallway 121 0 0 0 05-Bedroom 1 161 1454 1110 49 775-Wic 1 25 0 0 0 05-U Bathroom 60 163 87 6 65-Master Bath 60 984 218 33 155-U Stairs 63 0 0 0 05-Master Bedroom 167 3455 1750 117 1215-M Wic 66 1047 178 36 12

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 9

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

System 5 d 1406 15118 7398 513 513Other equip loads 0 0Equip. @ 0.94 RSM 6954Latent cooling 310

TOTALS 1406 15118 7264 513 513

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 10

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Load Short Form May 22 2021Date:Systen1 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design InformationInfiltrationClgHtg

SimplifiedMethod89-6Outside db (°F)Semi-tightConstruction quality7570Inside db (°F)

0Fireplaces1476Design TD (°F)H-Daily range

5050Inside humidity (%)-3162Moisture difference (gr/lb)

HEATING EQUIPMENT COOLING EQUIPMENTMake Goodman Mfg. Make Goodman Mfg.Trade Trade GOODMANModel ARUF24B14 Cond GSX140191K*AHRI ref Coil A(E,F)W194++TDR

AHRI ref 204783943Efficiency 100 AFUE Efficiency 12.2 EER, 15 SEERHeating input kW4.5 Sensible cooling Btuh10780Heating output Btuh15355 Latent cooling Btuh4620Temperature rise °F32 Total cooling Btuh15400Actual air flow cfm513 Actual air flow cfm513Air flow factor cfm/Btuh0.033 Air flow factor cfm/Btuh0.063Static pressure in H2O0.80 Static pressure in H2O0.80Space thermostat Load sensible heat ratio 0.96

ROOM NAME Area Htg load Clg load Htg AVF Clg AVF(ft²) (Btuh) (Btuh) (cfm) (cfm)

1-Kit-Din-Ent-Fam 477 5923 2871 194 1821-1/2 Bath 25 47 0 2 01-Bedroom 2 182 1620 1155 53 731-Bedroom 1 161 2963 1877 97 1191-Wic 1 25 0 0 0 01-Bathroom 1 60 756 143 25 91-M Bathroom 60 1403 258 46 161-Stairs 63 0 0 0 01-Master Bedroom 167 2758 1690 90 1071-M Wic 66 181 97 6 61-Hallway 121 0 0 0 0

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 11

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

Systen1 d 1406 15650 8091 513 513Other equip loads 0 0Equip. @ 0.94 RSM 7606Latent cooling 302

TOTALS 1406 15650 7907 513 513

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 1

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Load Multizone Summary Report May 22 2021Date:Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Infiltration Summary

Heating Cooling ZONE NAME Volume ACH AVF HTM Volume ACH AVF HTM

ft³ cfm Btuh/ft² ft³ cfm Btuh/ft²

0.3 17 0.08 12609 2.8 32 0.15 12609System 2 0.3 28 0.13 12656 2.8 53 0.25 12656Systen1 0.3 17 0.08 12656 2.8 32 0.15 12656System 3 0.3 27 0.13 12656 2.8 52 0.25 12656System 5 0.3 17 0.08 12609 2.8 32 0.15 12609System 4

Entire House 63187 0.19 200 2.8 63187 0.10 105 0.3

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 2

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

Load and AVF Summary

ROOM NAME Area Htg load Clg load Htg AVF Clg AVF ft² Btuh Btuh cfm cfm

199 185 2708 4060 4722 Kit-Din-Fam-Ent 0 2 0 47 252-1/2 Bath 85 74 1160 1620 1822-Bedroom 2 0 0 0 0 252-Wic 1 6 7 88 163 602-U-Bathroom 16 45 220 984 602-Master Bathroom 0 0 0 0 632-U-Stairs 116 126 1577 2758 1672-Master Bedroom 7 8 97 181 662-Master Wic 0 0 0 0 1212-Hallway 82 66 1117 1454 1612-Bedroom 1

513 513 6967 11266 1401System 2 182 194 2871 5923 4771-Kit-Din-Ent-Fam 0 2 0 47 251-1/2 Bath 73 53 1155 1620 1821-Bedroom 2 119 97 1877 2963 1611-Bedroom 1 0 0 0 0 251-Wic 1 9 25 143 756 601-Bathroom 1 16 46 258 1403 601-M Bathroom 0 0 0 0 631-Stairs 107 90 1690 2758 1671-Master Bedroom 6 6 97 181 661-M Wic 0 0 0 0 1211-Hallway

513 513 8091 15650 1406Systen1 0 0 0 0 1213-Hallway 7 8 97 181 663-M Wic 123 125 1682 2758 1673-Master Bedroom 84 74 1150 1620 1823-Bedroom 2 0 0 0 0 633- U Stairs 16 45 218 984 603-Master Wic 6 7 87 163 603-Bathroom 1 0 0 0 0 253-Wic 1 81 66 1108 1454 1613-Bedroom 1 0 2 0 47 253-1/2 Bath 196 185 2685 4070 4773-Kit-Din-Fam-Ent

513 513 7027 11276 1406System 3 88 99 1273 2917 1825-Bedroom 2 193 171 2782 5051 4775-Kit-Din-Fam-Ent 0 2 0 47 255-1/2 Bath 0 0 0 0 1215-Hallway 77 49 1110 1454 1615-Bedroom 1 0 0 0 0 255-Wic 1 6 6 87 163 605-U Bathroom 15 33 218 984 605-Master Bath 0 0 0 0 635-U Stairs 121 117 1750 3455 1675-Master Bedroom 12 36 178 1047 665-M Wic

513 513 7398 15118 1406System 5 84 35 1161 1620 1824-Bedroom 1 92 33 1283 1544 1614-Bedroom 2 0 0 0 0 254-Wic 1 6 4 88 163 604-U Bathroom 16 21 220 984 604-Master Bath 0 0 0 0 634-U Stairs 113 60 1578 2758 1674-Master Bedroom 7 4 97 181 664-M Wic

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 3

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

0 0 0 0 1214-Hallway 195 88 2710 4060 4724-Kit-Din-Fam-Ent 0 1 0 47 254-1/2 Bath

513 246 7136 11356 1401System 4

Entire House 7021 64667 36619 2298 2565

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 1

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Building Analysis May 22 2021Date:Entire House Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Heating

Walls

Glazing Doors

Ceilings

Floors

Infiltration

% of loadBtuhBtuh/ft²Component31.8205374.9Walls23.41514922.8Glazing4.8309217.8Doors

10.668741.5Ceilings7.749601.91.9Floors

21.7140542.8Infiltration00Ducts00Piping00Humidification00Ventilation

0Adjustments100.064667Total

Cooling

Walls

Glazing

DoorsCeilings

Infiltration

Internal Gains

% of loadBtuhBtuh/ft²Component5.419730.5Walls

49.51813327.3Glazing2.17534.3Doors

10.437990.8Ceilings000Floors

3.713630.3Infiltration00Ducts00Ventilation

28.910600Internal gains00Blower

0Adjustments100.036619Total

Latent Cooling Load = 2106 BtuhOverall U-value = 0.055 Btuh/ft²-°F

Data entries checked.

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 2

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Building Analysis May 22 2021Date:System 2 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Heating

Walls

Glazing Doors

Ceilings

Floors

Infiltration

% of loadBtuhBtuh/ft²Component27.831334.9Walls25.9291622.8Glazing5.561617.9Doors

12.213751.5Ceilings8.89861.91.9Floors

19.922412.8Infiltration00Ducts00Piping00Humidification00Ventilation

0Adjustments100.011266Total

Cooling

Walls

Glazing

DoorsCeilings

Infiltration

Internal Gains

% of loadBtuhBtuh/ft²Component4.33010.5Walls

49.1341926.7Glazing2.21504.4Doors

10.97600.8Ceilings000Floors

3.12170.3Infiltration00Ducts00Ventilation

30.42120Internal gains00Blower

0Adjustments100.06967Total

Latent Cooling Load = 498 BtuhOverall U-value = 0.053 Btuh/ft²-°F

Data entries checked.

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 3

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Building Analysis May 22 2021Date:System 3 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Heating

Walls

Glazing Doors

Ceilings

Floors

Infiltration

% of loadBtuhBtuh/ft²Component27.831334.9Walls25.9291622.8Glazing5.561617.9Doors

12.213751.5Ceilings8.89961.91.9Floors

19.922412.8Infiltration00Ducts00Piping00Humidification00Ventilation

0Adjustments100.011276Total

Cooling

Walls

Glazing

DoorsCeilings

Infiltration

Internal Gains

% of loadBtuhBtuh/ft²Component4.33010.5Walls

49.5347927.2Glazing2.11504.4Doors

10.87600.8Ceilings000Floors

3.12170.3Infiltration00Ducts00Ventilation

30.22120Internal gains00Blower

0Adjustments100.07027Total

Latent Cooling Load = 498 BtuhOverall U-value = 0.053 Btuh/ft²-°F

Data entries checked.

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 4

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Building Analysis May 22 2021Date:System 4 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Heating

Walls

Glazing Doors

Ceilings

Floors

Infiltration

% of loadBtuhBtuh/ft²Component27.431084.9Walls26.7303022.8Glazing5.461617.9Doors

12.113751.5Ceilings8.79861.91.9Floors

19.722412.8Infiltration00Ducts00Piping00Humidification00Ventilation

0Adjustments100.011356Total

Cooling

Walls

Glazing

DoorsCeilings

Infiltration

Internal Gains

% of loadBtuhBtuh/ft²Component4.22990.5Walls

50.3359127.0Glazing2.11504.4Doors

10.67600.8Ceilings000Floors

3.02170.3Infiltration00Ducts00Ventilation

29.72120Internal gains00Blower

0Adjustments100.07136Total

Latent Cooling Load = 498 BtuhOverall U-value = 0.054 Btuh/ft²-°F

Data entries checked.

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 5

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Building Analysis May 22 2021Date:System 5 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Heating

Walls

Glazing DoorsCeilings

Floors

Infiltration

% of loadBtuhBtuh/ft²Component36.955754.9Walls19.3291622.8Glazing4.162217.8Doors9.113751.5Ceilings6.69961.91.9Floors

24.036342.8Infiltration00Ducts00Piping00Humidification00Ventilation

0Adjustments100.015118Total

Cooling

Walls

Glazing

DoorsCeilings

Infiltration

Internal Gains

% of loadBtuhBtuh/ft²Component7.25360.5Walls

47.0347927.2Glazing2.01524.3Doors

10.37600.8Ceilings000Floors

4.83520.3Infiltration00Ducts00Ventilation

28.72120Internal gains00Blower

0Adjustments100.07398Total

Latent Cooling Load = 310 BtuhOverall U-value = 0.056 Btuh/ft²-°F

Data entries checked.

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:27Right-Suite® Universal 2019 19.0.20 RSU00897 Page 6

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Building Analysis May 22 2021Date:Systen1 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Heating

Walls

GlazingDoors

Ceilings

Floors

Infiltration

% of loadBtuhBtuh/ft²Component35.755884.9Walls21.5337222.8Glazing4.062217.8Doors8.813751.5Ceilings6.49961.91.9Floors

23.636972.8Infiltration00Ducts00Piping00Humidification00Ventilation

0Adjustments100.015650Total

Cooling

Walls

Glazing

OtherCeilings

Infiltration

Internal Gains

% of loadBtuhBtuh/ft²Component6.65370.5Walls

51.5416528.2Glazing1.91524.3Doors9.47600.8Ceilings

000Floors4.43580.3Infiltration

00Ducts00Ventilation

26.22120Internal gains00Blower

0Adjustments100.08091Total

Latent Cooling Load = 302 BtuhOverall U-value = 0.057 Btuh/ft²-°F

Data entries checked.

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 1

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:Entire House Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

4780.4749774.9421.00.0651008n3130.4732554.9421.00.065659e8200.4785334.9421.00.0651727s3620.4737724.9421.00.065764w

19730.47205374.9421.00.0654157all

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

286213.3490222.800.300215n78649.136522.800.30016e

1056125.8933522.800.300409s117949.154722.800.30024w

1538823.21514922.800.300664all

Doors11P0: Door, mtl pur core type 5635.36231422.010.50.290105nDftDoor-A: Door, wd sc type 1892.7877811.48.70.15068s

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

37990.8468741.5250.00.0204523

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.0252498 0047471.90

002141.9000.0251130049601.9000.0252611all

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 2

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:System 2 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

960.479954.9421.00.065202n390.474054.9421.00.06582e

1660.4717324.9421.00.065351s3010.4731334.9421.00.065634all

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

57213.398022.800.30043n39349.118222.800.3008e

198325.8175322.800.30077s294923.1291622.800.300128all

Doors11P0: Door, mtl pur core type 1135.3646322.010.50.29021nDftDoor-A: Door, wd sc type 372.7815311.48.70.15013s

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

7600.8413751.5250.00.020905

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.025497 009431.90

00431.9000.02523009861.9000.025519all

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 3

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:Systen1 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

960.479954.9421.00.065202n1570.4716314.9421.00.065330s2840.4729624.9421.00.065600w5370.4755884.9421.00.0651131all

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

57213.398022.800.30043n249925.8220922.800.30097s

39349.118222.800.3008w346423.4337222.800.300148all

Doors11P0: Door, mtl pur core type 1135.3646322.010.50.29021nDftDoor-A: Door, wd sc type 392.7816011.48.70.15014s

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

7600.8413751.5250.00.020905

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.025502 009531.90

00431.9000.02523009961.9000.025524all

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 4

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:System 3 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

960.479954.9421.00.065202n1660.4717324.9421.00.065351s390.474054.9421.00.06582w

3010.4731334.9421.00.065634all

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

57213.398022.800.30043n198325.8175322.800.30077s

39349.118222.800.3008w294923.1291622.800.300128all

Doors11P0: Door, mtl pur core type 1135.3646322.010.50.29021nDftDoor-A: Door, wd sc type 372.7815311.48.70.15013s

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

7600.8413751.5250.00.020905

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.025502 009531.90

00431.9000.02523009961.9000.025524all

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 5

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:System 5 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

960.479954.9421.00.065202n2350.4724454.9421.00.065495e1660.4717304.9421.00.065350s390.474054.9421.00.06582w

5360.4755754.9421.00.0651129all

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

57213.398022.800.30043n198325.8175322.800.30077s

39349.118222.800.3008w294923.1291622.800.300128all

Doors11P0: Door, mtl pur core type 1135.3646322.010.50.29021nDftDoor-A: Door, wd sc type 392.7816011.48.70.15014s

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

7600.8413751.5250.00.020905

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.025502 009531.90

00431.9000.02523009961.9000.025524all

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 6

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:System 4 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

960.479954.9421.00.065202n390.474054.9421.00.06582e

1640.4717084.9421.00.065346s2990.4731084.9421.00.065629all

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

57213.398022.800.30043n39349.118222.800.3008e

211225.8186722.800.30082s307823.2303022.800.300133all

Doors11P0: Door, mtl pur core type 1135.3646322.010.50.29021nDftDoor-A: Door, wd sc type 372.7815311.48.70.15013s

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

7600.8413751.5250.00.020905

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.025497 009431.90

00431.9000.02523009861.9000.025519all

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 7

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:2 Kit-Din-Fam-Ent Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

110.471194.9421.00.06524n810.478414.9421.00.065170s920.479594.9421.00.065194all

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

95125.884122.800.30037s

Doors11P0: Door, mtl pur core type 1135.3646322.010.50.29021nDftDoor-A: Door, wd sc type 372.7815311.48.70.15013s

Ceilings(none)

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.025472 008971.90

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 8

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:2-1/2 Bath Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings(none)

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.02525 00471.90

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 9

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:2-Bedroom 2 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

460.474794.9421.00.06597s

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

51625.845622.800.30020s

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1530.842771.5250.00.020182

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 10

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:2-Wic 1 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

210.84381.5250.00.02025

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 11

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:2-U-Bathroom Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

500.84911.5250.00.02060

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 12

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:2-Master Bathroom Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

390.474054.9421.00.06582n

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

10713.318222.800.3008n

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

500.84911.5250.00.02060

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.02523 00431.90

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 13

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:2-U-Stairs Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

530.84961.5250.00.02063

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 14

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:2-Master Bedroom Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

450.474724.9421.00.06596n390.474054.9421.00.06582e840.478774.9421.00.065178all

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

46613.379822.800.30035n39349.118222.800.3008e85920.098022.800.30043all

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1400.842541.5250.00.020167

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 15

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:2-Master Wic Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

550.841001.5250.00.02066

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 16

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:2-Hallway Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1010.841831.5250.00.020121

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 17

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:1-1/2 Bath Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings(none)

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.02525 00471.90

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 18

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:1-Bedroom 2 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

460.474794.9421.00.06597s

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

51625.845622.800.30020s

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1530.842771.5250.00.020182

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 19

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:1-Bedroom 1 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

300.473144.9421.00.06564s600.476224.9421.00.065126w900.479364.9421.00.065190all

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

103225.891222.800.30040s

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1350.842451.5250.00.020161

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 20

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:1-Wic 1 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

210.472224.9421.00.06545w

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

210.84381.5250.00.02025

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 21

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:1-Bathroom 1 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

260.472674.9421.00.06554w

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

500.84911.5250.00.02060

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 22

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:1-M Bathroom Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

390.474054.9421.00.06582n260.472674.9421.00.06554w650.476724.9421.00.065136all

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

10713.318222.800.3008n

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

500.84911.5250.00.02060

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.02523 00431.90

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 23

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:1-Stairs Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

530.84961.5250.00.02063

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 24

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:1-Master Bedroom Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

450.474724.9421.00.06596n390.474054.9421.00.06582w840.478774.9421.00.065178all

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

46613.379822.800.30035n39349.118222.800.3008w85920.098022.800.30043all

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1400.842541.5250.00.020167

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 25

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:1-M Wic Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

550.841001.5250.00.02066

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 26

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:1-Hallway Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1010.841831.5250.00.020121

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 27

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:1-Kit-Din-Ent-Fam Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

110.471194.9421.00.06524n800.478384.9421.00.065170s

1130.4711784.9421.00.065239w2050.4721354.9421.00.065432all

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

95125.884122.800.30037s

Doors11P0: Door, mtl pur core type 1135.3646322.010.50.29021nDftDoor-A: Door, wd sc type 392.7816011.48.70.15014s

Ceilings(none)

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.025477 009071.90

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 28

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:2-Bedroom 1 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

400.474124.9421.00.06584s

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

51625.845622.800.30020s

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1350.842451.5250.00.020161

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 29

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:3-1/2 Bath Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings(none)

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.02525 00471.90

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 30

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:3-Bedroom 2 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

460.474794.9421.00.06597s

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

51625.845622.800.30020s

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1530.842771.5250.00.020182

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 31

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:3-Bedroom 1 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

400.474124.9421.00.06584s

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

51625.845622.800.30020s

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1350.842451.5250.00.020161

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 32

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:3-Wic 1 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

210.84381.5250.00.02025

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 33

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:3-Bathroom 1 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

500.84911.5250.00.02060

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 34

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:3-Master Wic Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

390.474054.9421.00.06582n

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

10713.318222.800.3008n

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

500.84911.5250.00.02060

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.02523 00431.90

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 35

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:3- U Stairs Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

530.84961.5250.00.02063

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 36

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:3-Master Bedroom Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

450.474724.9421.00.06596n390.474054.9421.00.06582w840.478774.9421.00.065178all

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

46613.379822.800.30035n39349.118222.800.3008w85920.098022.800.30043all

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1400.842541.5250.00.020167

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 37

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:3-M Wic Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

550.841001.5250.00.02066

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 38

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:3-Hallway Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1010.841831.5250.00.020121

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 39

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:3-Kit-Din-Fam-Ent Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

110.471194.9421.00.06524n810.478414.9421.00.065170s920.479594.9421.00.065194all

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

95125.884122.800.30037s

Doors11P0: Door, mtl pur core type 1135.3646322.010.50.29021nDftDoor-A: Door, wd sc type 372.7815311.48.70.15013s

Ceilings(none)

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.025477 009071.90

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 40

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:4-Bedroom 1 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

460.474794.9421.00.06597s

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

51625.845622.800.30020s

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1530.842771.5250.00.020182

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 41

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:4-Bedroom 2 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

370.473884.9421.00.06579s

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

64525.857022.800.30025s

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1350.842451.5250.00.020161

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 42

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:4-Wic 1 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

210.84381.5250.00.02025

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 43

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:4-U Bathroom Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

500.84911.5250.00.02060

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 44

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:4-Master Bath Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

390.474054.9421.00.06582n

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

10713.318222.800.3008n

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

500.84911.5250.00.02060

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.02523 00431.90

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 45

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:4-U Stairs Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

530.84961.5250.00.02063

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 46

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:4-Master Bedroom Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

450.474724.9421.00.06596n390.474054.9421.00.06582e840.478774.9421.00.065178all

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

46613.379822.800.30035n39349.118222.800.3008e85920.098022.800.30043all

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1400.842541.5250.00.020167

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 47

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:4-M Wic Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

550.841001.5250.00.02066

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 48

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:4-Hallway Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1010.841831.5250.00.020121

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 49

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:5-Bedroom 2 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

600.476224.9421.00.065126e460.474794.9421.00.06597s

1060.4711024.9421.00.065223all

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

51625.845622.800.30020s

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1530.842771.5250.00.020182

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 50

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:5-Bedroom 1 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

400.474124.9421.00.06584s

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

51625.845622.800.30020s

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1350.842451.5250.00.020161

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 51

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:5-Wic 1 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

210.84381.5250.00.02025

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 52

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:5-U Bathroom Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

500.84911.5250.00.02060

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 53

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:5-Master Bath Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

390.474054.9421.00.06582n

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

10713.318222.800.3008n

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

500.84911.5250.00.02060

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.02523 00431.90

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 54

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:5-U Stairs Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

300.473114.9421.00.06563e

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

530.84961.5250.00.02063

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 55

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:5-Master Bedroom Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

450.474724.9421.00.06596n430.474454.9421.00.06590e390.474054.9421.00.06582w

1270.4713214.9421.00.065268all

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

46613.379822.800.30035n39349.118222.800.3008w85920.098022.800.30043all

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1400.842541.5250.00.020167

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 56

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:5-M Wic Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

430.474454.9421.00.06590e

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

550.841001.5250.00.02066

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 57

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:4-Kit-Din-Fam-Ent Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

110.471194.9421.00.06524n810.478414.9421.00.065170s920.479594.9421.00.065194all

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

95125.884122.800.30037s

Doors11P0: Door, mtl pur core type 1135.3646322.010.50.29021nDftDoor-A: Door, wd sc type 372.7815311.48.70.15013s

Ceilings(none)

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.025472 008971.90

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 58

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:4-1/2 Bath Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings(none)

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.02525 00471.90

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 59

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:5-Kit-Din-Fam-Ent Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls12F-0sw: Frm wall, vnl ext, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud

110.471194.9421.00.06524n600.476224.9421.00.065126e800.478384.9421.00.065170s

1520.4715794.9421.00.065320all

Partitions(none)

Windowsu factor 300: 2 glazing, clr low-e outr, argon gas, mtl no brk frm mat, clr innr, 1/4" gap, 1/4" thk 0.48 SHGC; 6.67 ft head ht

95125.884122.800.30037s

Doors11P0: Door, mtl pur core type 1135.3646322.010.50.29021nDftDoor-A: Door, wd sc type 392.7816011.48.70.15014s

Ceilings(none)

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.025477 009071.90

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 60

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:5-1/2 Bath Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings(none)

Floors21A-24t: Bg floor, heavy dry or light damp soil, 6' depth 00.02525 00471.90

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:28Right-Suite® Universal 2019 19.0.20 RSU00897 Page 61

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Component Constructions May 22 2021Date:5-Hallway Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

SimplifiedMethod)H(34-Daily range (°F)Semi-tightConstruction quality60-Wet bulb (°F)0Fireplaces7.515.0Wind speed (mph)

Construction descriptions GainLoss Clg HTMHtg HTMInsul RU-valueAreaOrBtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft²

Walls(none)

Partitions(none)

Windows(none)

Doors(none)

Ceilings16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh

1010.841831.5250.00.020121

Floors(none)

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 1...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Project Summary May 22 2021Date:Entire House Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Notes:

Design InformationIdaho Falls, ID, USWeather:

Winter Design Conditions Summer Design ConditionsOutside db °F-6 Outside db °F89Inside db °F70 Inside db °F75Design TD °F76 Design TD °F14

Daily range HRelative humidity %50Moisture difference gr/lb-31

Heating Summary Sensible Cooling Equipment Load SizingStructure Btuh64667 Structure Btuh36619Ducts Btuh0 Ducts Btuh0Central vent (0 cfm) Btuh0 Central vent (0 cfm) Btuh0

Humidification Btuh0 Blower Btuh0Piping Btuh0Equipment load Btuh64667 Use manufacturer's data n

Rate/swing multiplier 0.94Infiltration Equipment sensible load Btuh34422

Method Latent Cooling Equipment Load SizingSimplifiedConstruction quality Semi-tight

0Fireplaces Structure Btuh2106Ducts Btuh0Central vent (0 cfm) Btuh0

CoolingHeating70217021Area (ft²) Equipment latent load Btuh2106

6318763187Volume (ft³)Air changes/hour 0.100.19 Equipment Total Load (Sen+Lat) Btuh36528Equiv. AVF (cfm) 105200 Req. total capacity at 0.70 SHR ton4.1

Heating Equipment Summary Cooling Equipment SummaryMake n/a Make n/aTrade n/a Trade n/aModel n/a Cond n/aAHRI ref n/a Coil n/a

AHRI ref n/aEfficiency n/a Efficiency n/aHeating input Sensible cooling Btuh0Heating output Btuh0 Latent cooling Btuh0Temperature rise °F0 Total cooling Btuh0Actual air flow cfm0 Actual air flow cfm0Air flow factor cfm/Btuh0 Air flow factor cfm/Btuh0Static pressure in H2O0 Static pressure in H2O0Space thermostat n/a Load sensible heat ratio 0

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 2...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Project Summary May 22 2021Date:System 2 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Notes:

Design InformationIdaho Falls, ID, USWeather:

Winter Design Conditions Summer Design ConditionsOutside db °F-6 Outside db °F89Inside db °F70 Inside db °F75Design TD °F76 Design TD °F14

Daily range HRelative humidity %50Moisture difference gr/lb-31

Heating Summary Sensible Cooling Equipment Load SizingStructure Btuh11266 Structure Btuh6967Ducts Btuh0 Ducts Btuh0Central vent (0 cfm) Btuh0 Central vent (0 cfm) Btuh0

(none) (none)Humidification Btuh0 Blower Btuh0Piping Btuh0Equipment load Btuh11266 Use manufacturer's data n

Rate/swing multiplier 0.94Infiltration Equipment sensible load Btuh6549

Method Latent Cooling Equipment Load SizingSimplifiedConstruction quality Semi-tight

0Fireplaces Structure Btuh498Ducts Btuh0Central vent (0 cfm) Btuh0

CoolingHeating (none)14011401Area (ft²) Equipment latent load Btuh498

1260912609Volume (ft³)Air changes/hour 0.080.15 Equipment Total Load (Sen+Lat) Btuh7047Equiv. AVF (cfm) 1732 Req. total capacity at 0.70 SHR ton0.8

Heating Equipment Summary Cooling Equipment SummaryMake Goodman Mfg. Make Goodman Mfg.Trade Trade GOODMANModel ARUF24B14 Cond GSX140191K*AHRI ref Coil A(E,F)W194++TDR

AHRI ref 204783943Efficiency 100 AFUE Efficiency 12.2 EER, 15 SEERHeating input kW4.6 Sensible cooling Btuh10780Heating output Btuh15565 Latent cooling Btuh4620Temperature rise °F33 Total cooling Btuh15400Actual air flow cfm513 Actual air flow cfm513Air flow factor cfm/Btuh0.046 Air flow factor cfm/Btuh0.074Static pressure in H2O0.80 Static pressure in H2O0.80Space thermostat Load sensible heat ratio 0.93

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 3...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Project Summary May 22 2021Date:System 3 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Notes:

Design InformationIdaho Falls, ID, USWeather:

Winter Design Conditions Summer Design ConditionsOutside db °F-6 Outside db °F89Inside db °F70 Inside db °F75Design TD °F76 Design TD °F14

Daily range HRelative humidity %50Moisture difference gr/lb-31

Heating Summary Sensible Cooling Equipment Load SizingStructure Btuh11276 Structure Btuh7027Ducts Btuh0 Ducts Btuh0Central vent (0 cfm) Btuh0 Central vent (0 cfm) Btuh0

(none) (none)Humidification Btuh0 Blower Btuh0Piping Btuh0Equipment load Btuh11276 Use manufacturer's data n

Rate/swing multiplier 0.94Infiltration Equipment sensible load Btuh6605

Method Latent Cooling Equipment Load SizingSimplifiedConstruction quality Semi-tight

0Fireplaces Structure Btuh498Ducts Btuh0Central vent (0 cfm) Btuh0

CoolingHeating (none)14061406Area (ft²) Equipment latent load Btuh498

1265612656Volume (ft³)Air changes/hour 0.080.15 Equipment Total Load (Sen+Lat) Btuh7103Equiv. AVF (cfm) 1732 Req. total capacity at 0.70 SHR ton0.8

Heating Equipment Summary Cooling Equipment SummaryMake Goodman Mfg. Make Goodman Mfg.Trade Trade GOODMANModel ARUF24B14 Cond GSX140191K*AHRI ref Coil A(E,F)W194++TDR

AHRI ref 204783943Efficiency 100 EFF Efficiency 12.2 EER, 15 SEERHeating input kW3.3 Sensible cooling Btuh10780Heating output Btuh11260 Latent cooling Btuh4620Temperature rise °F24 Total cooling Btuh15400Actual air flow cfm513 Actual air flow cfm513Air flow factor cfm/Btuh0.045 Air flow factor cfm/Btuh0.073Static pressure in H2O0.80 Static pressure in H2O0.80Space thermostat Load sensible heat ratio 0.93

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 4...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Project Summary May 22 2021Date:System 4 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Notes:

Design InformationIdaho Falls, ID, USWeather:

Winter Design Conditions Summer Design ConditionsOutside db °F-6 Outside db °F89Inside db °F70 Inside db °F75Design TD °F76 Design TD °F14

Daily range HRelative humidity %50Moisture difference gr/lb-31

Heating Summary Sensible Cooling Equipment Load SizingStructure Btuh11356 Structure Btuh7136Ducts Btuh0 Ducts Btuh0Central vent (0 cfm) Btuh0 Central vent (0 cfm) Btuh0

(none) (none)Humidification Btuh0 Blower Btuh0Piping Btuh0Equipment load Btuh11356 Use manufacturer's data n

Rate/swing multiplier 0.94Infiltration Equipment sensible load Btuh6708

Method Latent Cooling Equipment Load SizingSimplifiedConstruction quality Semi-tight

0Fireplaces Structure Btuh498Ducts Btuh0Central vent (0 cfm) Btuh0

CoolingHeating (none)14011401Area (ft²) Equipment latent load Btuh498

1260912609Volume (ft³)Air changes/hour 0.080.15 Equipment Total Load (Sen+Lat) Btuh7206Equiv. AVF (cfm) 1732 Req. total capacity at 0.70 SHR ton0.8

Heating Equipment Summary Cooling Equipment SummaryMake Goodman Mfg. Make Goodman Mfg.Trade Trade GOODMANModel ARUF24B14 Cond GSX140191K*AHRI ref Coil A(E,F)W194++TDR

AHRI ref 204783943Efficiency 100 EFF Efficiency 12.2 EER, 15 SEERHeating input kW3.3 Sensible cooling Btuh10780Heating output Btuh11356 Latent cooling Btuh4620Temperature rise °F50 Total cooling Btuh15400Actual air flow cfm246 Actual air flow cfm513Air flow factor cfm/Btuh0.022 Air flow factor cfm/Btuh0.072Static pressure in H2O0.80 Static pressure in H2O0.80Space thermostat Load sensible heat ratio 0.93

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 5...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Project Summary May 22 2021Date:System 5 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Notes:

Design InformationIdaho Falls, ID, USWeather:

Winter Design Conditions Summer Design ConditionsOutside db °F-6 Outside db °F89Inside db °F70 Inside db °F75Design TD °F76 Design TD °F14

Daily range HRelative humidity %50Moisture difference gr/lb-31

Heating Summary Sensible Cooling Equipment Load SizingStructure Btuh15118 Structure Btuh7398Ducts Btuh0 Ducts Btuh0Central vent (0 cfm) Btuh0 Central vent (0 cfm) Btuh0

(none) (none)Humidification Btuh0 Blower Btuh0Piping Btuh0Equipment load Btuh15118 Use manufacturer's data n

Rate/swing multiplier 0.94Infiltration Equipment sensible load Btuh6954

Method Latent Cooling Equipment Load SizingSimplifiedConstruction quality Semi-tight

0Fireplaces Structure Btuh310Ducts Btuh0Central vent (0 cfm) Btuh0

CoolingHeating (none)14061406Area (ft²) Equipment latent load Btuh310

1265612656Volume (ft³)Air changes/hour 0.130.25 Equipment Total Load (Sen+Lat) Btuh7264Equiv. AVF (cfm) 2752 Req. total capacity at 0.70 SHR ton0.8

Heating Equipment Summary Cooling Equipment SummaryMake Goodman Mfg. Make Goodman Mfg.Trade Trade GOODMANModel ARUF24B14 Cond GSX140191K*AHRI ref Coil A(E,F)W194++TDR

AHRI ref 204783943Efficiency 100 EFF Efficiency 12.2 EER, 15 SEERHeating input kW4.4 Sensible cooling Btuh10780Heating output Btuh15013 Latent cooling Btuh4620Temperature rise °F32 Total cooling Btuh15400Actual air flow cfm513 Actual air flow cfm513Air flow factor cfm/Btuh0.034 Air flow factor cfm/Btuh0.069Static pressure in H2O0.80 Static pressure in H2O0.80Space thermostat Load sensible heat ratio 0.96

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 6...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Project Summary May 22 2021Date:Systen1 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Notes:

Design InformationIdaho Falls, ID, USWeather:

Winter Design Conditions Summer Design ConditionsOutside db °F-6 Outside db °F89Inside db °F70 Inside db °F75Design TD °F76 Design TD °F14

Daily range HRelative humidity %50Moisture difference gr/lb-31

Heating Summary Sensible Cooling Equipment Load SizingStructure Btuh15650 Structure Btuh8091Ducts Btuh0 Ducts Btuh0Central vent (0 cfm) Btuh0 Central vent (0 cfm) Btuh0

(none) (none)Humidification Btuh0 Blower Btuh0Piping Btuh0Equipment load Btuh15650 Use manufacturer's data n

Rate/swing multiplier 0.94Infiltration Equipment sensible load Btuh7606

Method Latent Cooling Equipment Load SizingSimplifiedConstruction quality Semi-tight

0Fireplaces Structure Btuh302Ducts Btuh0Central vent (0 cfm) Btuh0

CoolingHeating (none)14061406Area (ft²) Equipment latent load Btuh302

1265612656Volume (ft³)Air changes/hour 0.130.25 Equipment Total Load (Sen+Lat) Btuh7907Equiv. AVF (cfm) 2853 Req. total capacity at 0.70 SHR ton0.9

Heating Equipment Summary Cooling Equipment SummaryMake Goodman Mfg. Make Goodman Mfg.Trade Trade GOODMANModel ARUF24B14 Cond GSX140191K*AHRI ref Coil A(E,F)W194++TDR

AHRI ref 204783943Efficiency 100 AFUE Efficiency 12.2 EER, 15 SEERHeating input kW4.5 Sensible cooling Btuh10780Heating output Btuh15355 Latent cooling Btuh4620Temperature rise °F32 Total cooling Btuh15400Actual air flow cfm513 Actual air flow cfm513Air flow factor cfm/Btuh0.033 Air flow factor cfm/Btuh0.063Static pressure in H2O0.80 Static pressure in H2O0.80Space thermostat Load sensible heat ratio 0.96

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:29Right-Suite® Universal 2019 19.0.20 RSU00897 Page 1

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:AED Assessment May 22 2021Date:Entire House Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

)H(34-Daily range (°F)60-Wet bulb (°F)7.515.0Wind speed (mph)

Test for Adequate Exposure DiversityHourly Glazing Load

Hourly Average AED limit

Gla

zing

load

(Btu

h)

Hour of Day

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

8 9 10 11 12 13 14 15 16 17 18 19 20

Maximum hourly glazing load exceeds average by 42.4%.

House does not have adequate exposure diversity (AED), based on AED limit of 30%.

AED excursion: 2745 Btuh (PFG - 1.3*AFG)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:29Right-Suite® Universal 2019 19.0.20 RSU00897 Page 2

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:AED Assessment May 22 2021Date:System 2 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

)H(34-Daily range (°F)60-Wet bulb (°F)7.515.0Wind speed (mph)

Test for Adequate Exposure DiversityHourly Glazing Load

Hourly Average AED limit

Gla

zing

load

(Btu

h)

Hour of Day

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

5,000

5,500

6,000

8 9 10 11 12 13 14 15 16 17 18 19 20

Maximum hourly glazing load exceeds average by 41.1%.

Zone does not have adequate exposure diversity (AED), based on AED limit of 30%.

AED excursion: 471 Btuh (PFG - 1.3*AFG)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:29Right-Suite® Universal 2019 19.0.20 RSU00897 Page 3

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:AED Assessment May 22 2021Date:System 3 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

)H(34-Daily range (°F)60-Wet bulb (°F)7.515.0Wind speed (mph)

Test for Adequate Exposure DiversityHourly Glazing Load

Hourly Average AED limit

Gla

zing

load

(Btu

h)

Hour of Day

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

5,000

5,500

6,000

8 9 10 11 12 13 14 15 16 17 18 19 20

Maximum hourly glazing load exceeds average by 42.6%.

Zone does not have adequate exposure diversity (AED), based on AED limit of 30%.

AED excursion: 530 Btuh (PFG - 1.3*AFG)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:29Right-Suite® Universal 2019 19.0.20 RSU00897 Page 4

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:AED Assessment May 22 2021Date:System 4 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

)H(34-Daily range (°F)60-Wet bulb (°F)7.515.0Wind speed (mph)

Test for Adequate Exposure DiversityHourly Glazing Load

Hourly Average AED limit

Gla

zing

load

(Btu

h)

Hour of Day

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8 9 10 11 12 13 14 15 16 17 18 19 20

Maximum hourly glazing load exceeds average by 41.5%.

Zone does not have adequate exposure diversity (AED), based on AED limit of 30%.

AED excursion: 513 Btuh (PFG - 1.3*AFG)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:29Right-Suite® Universal 2019 19.0.20 RSU00897 Page 5

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:AED Assessment May 22 2021Date:System 5 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

)H(34-Daily range (°F)60-Wet bulb (°F)7.515.0Wind speed (mph)

Test for Adequate Exposure DiversityHourly Glazing Load

Hourly Average AED limit

Gla

zing

load

(Btu

h)

Hour of Day

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

5,000

5,500

6,000

8 9 10 11 12 13 14 15 16 17 18 19 20

Maximum hourly glazing load exceeds average by 42.6%.

Zone does not have adequate exposure diversity (AED), based on AED limit of 30%.

AED excursion: 530 Btuh (PFG - 1.3*AFG)

PDF created with pdfFactory trial version www.pdffactory.com

2021-Jun-08 07:35:29Right-Suite® Universal 2019 19.0.20 RSU00897 Page 6

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:AED Assessment May 22 2021Date:Systen1 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

)H(34-Daily range (°F)60-Wet bulb (°F)7.515.0Wind speed (mph)

Test for Adequate Exposure DiversityHourly Glazing Load

Hourly Average AED limit

Gla

zing

load

(Btu

h)

Hour of Day

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

8 9 10 11 12 13 14 15 16 17 18 19 20

Maximum hourly glazing load exceeds average by 43.9%.

Zone does not have adequate exposure diversity (AED), based on AED limit of 30%.

AED excursion: 700 Btuh (PFG - 1.3*AFG)

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 1...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:Entire House Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name Entire House System 22 Exposed wall 555.0 ft 88.5 ft3 Room height 9.0 dft 9.0 dft4 Room dimensions5 Room area 7020.8 ft² 1401.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 1328 1008 4977 478 266 202 995 96. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 215 0 4902 2862 43 0 980 572. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 105 105 2314 563 21 21 463 113. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 675 659 3255 313 90 82 405 39

11 GG u factor 300u factor 300 0.3000.300 ee 22.8022.80 49.1249.12 16 0 365 786 8 0 182 393WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 2205 1727 8533 820 441 351 1732 166

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 409 0 9335 10561 77 0 1753 1983DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 68 68 778 189 13 13 153 37

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 788 764 3772 362 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 24 0 547 1179 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 4523 4523 6874 3799 905 905 1375 760FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 2498 2498 4747 0 497 497 943 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 113 113 214 0 23 23 43 0

6 c) AED excursion 2745 471

Envelope loss/gain 50613 24657 9025 4630

12 a) Infiltration 14054 1363 2241 217b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 20 4600 4 920Appliances/other 6000 1200

Subtotal (lines 6 to 13) 64667 36619 11266 6967

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 0 0 0 0

14 Subtotal 64667 36619 11266 696715 Duct loads 0% 0% 0 0 0% 0% 0 0

Total room load 64667 36619 11266 6967Air required (cfm)Air required (cfm) 2298 2565 513 513

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 2...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:Entire House Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name Systen1 System 32 Exposed wall 146.0 ft 88.5 ft3 Room height 9.0 dft 9.0 dft4 Room dimensions5 Room area 1406.3 ft² 1406.3 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 266 202 995 96 266 202 995 96. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 43 0 980 572 43 0 980 572. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 21 21 463 113 21 21 463 113. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 441 330 1631 157 441 351 1732 166

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 97 0 2209 2499 77 0 1753 1983DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 14 14 160 39 13 13 153 37

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 608 600 2962 284 90 82 405 39GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 8 0 182 393 8 0 182 393

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 905 905 1375 760 905 905 1375 760FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 502 502 953 0 502 502 953 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 23 23 43 0 23 23 43 0

6 c) AED excursion 700 530

Envelope loss/gain 11953 5613 9035 4689

12 a) Infiltration 3697 358 2241 217b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 4 920 4 920Appliances/other 1200 1200

Subtotal (lines 6 to 13) 15650 8091 11276 7027

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 0 0 0 0

14 Subtotal 15650 8091 11276 702715 Duct loads 0% 0% 0 0 0% 0% 0 0

Total room load 15650 8091 11276 7027Air required (cfm)Air required (cfm) 513 513 513 513

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 3...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:Entire House Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name System 5 System 42 Exposed wall 143.5 ft 88.5 ft3 Room height 9.0 dft 9.0 dft4 Room dimensions5 Room area 1406.3 ft² 1401.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 266 202 995 96 266 202 995 96. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 43 0 980 572 43 0 980 572. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 21 21 463 113 21 21 463 113. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 495 495 2445 235 90 82 405 39

11 GG u factor 300u factor 300 0.3000.300 ee 22.8022.80 49.1249.12 0 0 0 0 8 0 182 393WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 441 350 1730 166 441 346 1708 164

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 77 0 1753 1983 82 0 1867 2112DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 14 14 160 39 13 13 153 37

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 90 82 405 39 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 8 0 182 393 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 905 905 1375 760 905 905 1375 760FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 502 502 953 0 497 497 943 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 23 23 43 0 23 23 43 0

6 c) AED excursion 530 513

Envelope loss/gain 11484 4926 9115 4799

12 a) Infiltration 3634 352 2241 217b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 4 920 4 920Appliances/other 1200 1200

Subtotal (lines 6 to 13) 15118 7398 11356 7136

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 0 0 0 0

14 Subtotal 15118 7398 11356 713615 Duct loads 0% 0% 0 0 0% 0% 0 0

Total room load 15118 7398 11356 7136Air required (cfm)Air required (cfm) 513 513 246 513

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 4...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 2 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name System 2 2 Kit-Din-Fam-Ent2 Exposed wall 88.5 ft 29.5 ft3 Room height 9.0 dft 9.0 heat/coolft4 Room dimensions ft472.0x1.05 Room area 1401.0 ft² 472.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 266 202 995 96 45 24 119 11. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 43 0 980 572 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 21 21 463 113 21 21 463 113. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 90 82 405 39 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 22.8022.80 49.1249.12 8 0 182 393 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 441 351 1732 166 221 170 841 81

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 77 0 1753 1983 37 0 841 951DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 13 13 153 37 13 13 153 37

WW 12F-0sw12F-0sw 0.0650.065 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 905 905 1375 760 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 497 497 943 0 472 472 897 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 23 23 43 0 0 0 0 0

6 c) AED excursion 471 242

Envelope loss/gain 9025 4630 3313 1436

12 a) Infiltration 2241 217 747 72b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 4 920 0 0Appliances/other 1200 1200

Subtotal (lines 6 to 13) 11266 6967 4060 2708

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 0 0 0 0

14 Subtotal 11266 6967 4060 270815 Duct loads 0% 0% 0 0 -0% 0% 0 0

Total room load 11266 6967 4060 2708Air required (cfm)Air required (cfm) 513 513 185 199

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 5...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 2 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 2-1/2 Bath 2-Bedroom 22 Exposed wall 0 ft 13.0 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft7.0x3.5 ft14.0x13.05 Room area 24.5 ft² 182.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 0 0 0 0 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 117 97 479 46

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 20 0 456 516DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 0 0 0 0 182 182 277 153FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 25 25 47 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion 0 141

Envelope loss/gain 47 0 1212 855

12 a) Infiltration 0 0 329 32b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 1 230Appliances/other 0 0

Subtotal (lines 6 to 13) 47 0 1541 1117

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 0 0 79 43

14 Subtotal 47 0 1620 116015 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 47 0 1620 1160Air required (cfm)Air required (cfm) 2 0 74 85

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 6...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 2 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 2-Wic 1 2-U-Bathroom2 Exposed wall 0 ft 0 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft5.0x5.0 ft6.0x10.05 Room area 25.0 ft² 60.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 0 0 0 0 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 25 25 38 21 60 60 91 50FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion -1 -1

Envelope loss/gain 38 20 91 49

12 a) Infiltration 0 0 0 0b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 0 0Appliances/other 0 0

Subtotal (lines 6 to 13) 38 20 91 49

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution -38 -20 71 38

14 Subtotal 0 0 163 8815 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 0 0 163 88Air required (cfm)Air required (cfm) 0 0 7 6

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 7...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 2 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 2-Master Bathroom 2-U-Stairs2 Exposed wall 10.0 ft 0 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft6.0x10.0 ft63.0x1.05 Room area 60.0 ft² 63.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 90 82 405 39 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 8 0 182 107 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 60 60 91 50 63 63 96 53FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 23 23 43 0 0 0 0 0

6 c) AED excursion -6 -1

Envelope loss/gain 721 190 96 52

12 a) Infiltration 253 25 0 0b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 0 0Appliances/other 0 0

Subtotal (lines 6 to 13) 975 215 96 52

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 10 5 -96 -52

14 Subtotal 984 220 0 015 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 984 220 0 0Air required (cfm)Air required (cfm) 45 16 0 0

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 8...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 2 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 2-Master Bedroom 2-Master Wic2 Exposed wall 24.5 ft 0 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft167.0x1.0 ft66.0x1.05 Room area 167.0 ft² 66.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 131 96 472 45 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 35 0 798 466 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 90 82 405 39 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 22.8022.80 49.1249.12 8 0 182 393 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 167 167 254 140 66 66 100 55FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion -41 -1

Envelope loss/gain 2111 1043 100 54

12 a) Infiltration 620 60 0 0b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 2 460 0 0Appliances/other 0 0

Subtotal (lines 6 to 13) 2731 1563 100 54

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 26 14 81 43

14 Subtotal 2758 1577 181 9715 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 2758 1577 181 97Air required (cfm)Air required (cfm) 126 116 8 7

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 9...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 2 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 2-Hallway 2-Bedroom 12 Exposed wall 0 ft 11.5 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft120.5x1.0 ft14.0x11.55 Room area 120.5 ft² 161.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 0 0 0 0 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 104 84 412 40

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 20 0 456 516DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 121 121 183 101 161 161 245 135FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion -3 141

Envelope loss/gain 183 99 1113 832

12 a) Infiltration 0 0 291 28b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 1 230Appliances/other 0 0

Subtotal (lines 6 to 13) 183 99 1404 1090

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution -183 -99 50 27

14 Subtotal 0 0 1454 111715 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 0 0 1454 1117Air required (cfm)Air required (cfm) 0 0 66 82

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 10...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 3 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name System 3 3-Hallway2 Exposed wall 88.5 ft 0 ft3 Room height 9.0 dft 9.0 heat/coolft4 Room dimensions ft120.5x1.05 Room area 1406.3 ft² 120.5 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 266 202 995 96 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 43 0 980 572 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 21 21 463 113 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 441 351 1732 166 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 77 0 1753 1983 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 13 13 153 37 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 90 82 405 39 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 8 0 182 393 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 905 905 1375 760 121 121 183 101FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 502 502 953 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 23 23 43 0 0 0 0 0

6 c) AED excursion 530 -3

Envelope loss/gain 9035 4689 183 98

12 a) Infiltration 2241 217 0 0b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 4 920 0 0Appliances/other 1200 0

Subtotal (lines 6 to 13) 11276 7027 183 98

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 0 0 -183 -98

14 Subtotal 11276 7027 0 015 Duct loads 0% 0% 0 0 -0% 0% 0 0

Total room load 11276 7027 0 0Air required (cfm)Air required (cfm) 513 513 0 0

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 11...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 3 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 3-M Wic 3-Master Bedroom2 Exposed wall 0 ft 24.5 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft66.0x1.0 ft167.0x1.05 Room area 66.0 ft² 167.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 0 0 0 0 131 96 472 45. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 35 0 798 466. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 0 0 0 0 90 82 405 39GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 0 0 0 0 8 0 182 393

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 66 66 100 55 167 167 254 140FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion -2 65

Envelope loss/gain 100 54 2111 1148

12 a) Infiltration 0 0 620 60b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 2 460Appliances/other 0 0

Subtotal (lines 6 to 13) 100 54 2731 1668

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 81 43 26 14

14 Subtotal 181 97 2758 168215 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 181 97 2758 1682Air required (cfm)Air required (cfm) 8 7 125 123

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 12...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 3 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 3-Bedroom 2 3- U Stairs2 Exposed wall 13.0 ft 0 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft14.0x13.0 ft63.0x1.05 Room area 182.0 ft² 63.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 0 0 0 0 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 117 97 479 46 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 20 0 456 516 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 182 182 277 153 63 63 96 53FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion 131 -2

Envelope loss/gain 1212 846 96 51

12 a) Infiltration 329 32 0 0b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 1 230 0 0Appliances/other 0 0

Subtotal (lines 6 to 13) 1541 1108 96 51

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 79 42 -96 -51

14 Subtotal 1620 1150 0 015 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 1620 1150 0 0Air required (cfm)Air required (cfm) 74 84 0 0

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 13...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 3 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 3-Master Wic 3-Bathroom 12 Exposed wall 10.0 ft 0 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft6.0x10.0 ft6.0x10.05 Room area 60.0 ft² 60.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 90 82 405 39 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 8 0 182 107 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 60 60 91 50 60 60 91 50FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 23 23 43 0 0 0 0 0

6 c) AED excursion -7 -2

Envelope loss/gain 721 188 91 49

12 a) Infiltration 253 25 0 0b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 0 0Appliances/other 0 0

Subtotal (lines 6 to 13) 975 213 91 49

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 10 5 71 38

14 Subtotal 984 218 163 8715 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 984 218 163 87Air required (cfm)Air required (cfm) 45 16 7 6

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 14...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 3 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 3-Wic 1 3-Bedroom 12 Exposed wall 0 ft 11.5 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft5.0x5.0 ft14.0x11.55 Room area 25.0 ft² 161.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 0 0 0 0 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 104 84 412 40

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 20 0 456 516DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 25 25 38 21 161 161 245 135FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion -1 132

Envelope loss/gain 38 20 1113 823

12 a) Infiltration 0 0 291 28b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 1 230Appliances/other 0 0

Subtotal (lines 6 to 13) 38 20 1404 1081

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution -38 -20 50 27

14 Subtotal 0 0 1454 110815 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 0 0 1454 1108Air required (cfm)Air required (cfm) 0 0 66 81

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 15...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 3 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 3-1/2 Bath 3-Kit-Din-Fam-Ent2 Exposed wall 0 ft 29.5 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft7.0x3.5 ft477.3x1.05 Room area 24.5 ft² 477.3 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 0 0 0 0 45 24 119 11. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 21 21 463 113. WW 12F-0sw12F-0sw 0.0650.065 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 221 170 841 81

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 37 0 841 951DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 13 13 153 37

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 25 25 47 0 477 477 907 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion 0 219

Envelope loss/gain 47 0 3323 1413

12 a) Infiltration 0 0 747 72b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 0 0Appliances/other 0 1200

Subtotal (lines 6 to 13) 47 0 4070 2685

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 0 0 0 0

14 Subtotal 47 0 4070 268515 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 47 0 4070 2685Air required (cfm)Air required (cfm) 2 0 185 196

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 16...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 4 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name System 4 4-Bedroom 12 Exposed wall 88.5 ft 13.0 ft3 Room height 9.0 dft 9.0 heat/coolft4 Room dimensions ft14.0x13.05 Room area 1401.0 ft² 182.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 266 202 995 96 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 43 0 980 572 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 21 21 463 113 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 90 82 405 39 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 22.8022.80 49.1249.12 8 0 182 393 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 441 346 1708 164 117 97 479 46

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 82 0 1867 2112 20 0 456 516DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 13 13 153 37 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 905 905 1375 760 182 182 277 153FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 497 497 943 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 23 23 43 0 0 0 0 0

6 c) AED excursion 513 141

Envelope loss/gain 9115 4799 1212 856

12 a) Infiltration 2241 217 329 32b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 4 920 1 230Appliances/other 1200 0

Subtotal (lines 6 to 13) 11356 7136 1541 1118

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 0 0 79 43

14 Subtotal 11356 7136 1620 116115 Duct loads 0% 0% 0 0 -0% 0% 0 0

Total room load 11356 7136 1620 1161Air required (cfm)Air required (cfm) 246 513 35 84

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 17...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 4 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 4-Bedroom 2 4-Wic 12 Exposed wall 11.5 ft 0 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft14.0x11.5 ft5.0x5.05 Room area 161.0 ft² 25.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 0 0 0 0 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 104 79 388 37 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 25 0 570 645 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 161 161 245 135 25 25 38 21FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion 180 -1

Envelope loss/gain 1203 998 38 20

12 a) Infiltration 291 28 0 0b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 1 230 0 0Appliances/other 0 0

Subtotal (lines 6 to 13) 1494 1256 38 20

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 50 27 -38 -20

14 Subtotal 1544 1283 0 015 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 1544 1283 0 0Air required (cfm)Air required (cfm) 33 92 0 0

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 18...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 4 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 4-U Bathroom 4-Master Bath2 Exposed wall 0 ft 10.0 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft6.0x10.0 ft6.0x10.05 Room area 60.0 ft² 60.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 0 0 0 0 90 82 405 39. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 8 0 182 107. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 60 60 91 50 60 60 91 50FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 23 23 43 0

6 c) AED excursion -1 -5

Envelope loss/gain 91 49 721 190

12 a) Infiltration 0 0 253 25b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 0 0Appliances/other 0 0

Subtotal (lines 6 to 13) 91 49 975 215

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 71 38 10 5

14 Subtotal 163 88 984 22015 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 163 88 984 220Air required (cfm)Air required (cfm) 4 6 21 16

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 19...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 4 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 4-U Stairs 4-Master Bedroom2 Exposed wall 0 ft 24.5 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft63.0x1.0 ft167.0x1.05 Room area 63.0 ft² 167.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 0 0 0 0 131 96 472 45. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 35 0 798 466. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 0 0 0 0 90 82 405 39

11 GG u factor 300u factor 300 0.3000.300 ee 22.8022.80 49.1249.12 0 0 0 0 8 0 182 393WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 63 63 96 53 167 167 254 140FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion -1 -40

Envelope loss/gain 96 52 2111 1044

12 a) Infiltration 0 0 620 60b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 2 460Appliances/other 0 0

Subtotal (lines 6 to 13) 96 52 2731 1564

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution -96 -52 26 14

14 Subtotal 0 0 2758 157815 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 0 0 2758 1578Air required (cfm)Air required (cfm) 0 0 60 113

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 20...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 4 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 4-M Wic 4-Hallway2 Exposed wall 0 ft 0 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft66.0x1.0 ft120.5x1.05 Room area 66.0 ft² 120.5 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 0 0 0 0 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 66 66 100 55 121 121 183 101FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion -1 -3

Envelope loss/gain 100 54 183 99

12 a) Infiltration 0 0 0 0b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 0 0Appliances/other 0 0

Subtotal (lines 6 to 13) 100 54 183 99

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 81 43 -183 -99

14 Subtotal 181 97 0 015 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 181 97 0 0Air required (cfm)Air required (cfm) 4 7 0 0

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 21...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 4 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 4-Kit-Din-Fam-Ent 4-1/2 Bath2 Exposed wall 29.5 ft 0 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft472.0x1.0 ft7.0x3.55 Room area 472.0 ft² 24.5 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 45 24 119 11 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 21 21 463 113 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 221 170 841 81 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 37 0 841 951 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 13 13 153 37 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 0.000.00 0.000.00 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 472 472 897 0 25 25 47 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion 244 0

Envelope loss/gain 3313 1438 47 0

12 a) Infiltration 747 72 0 0b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 0 0Appliances/other 1200 0

Subtotal (lines 6 to 13) 4060 2710 47 0

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 0 0 0 0

14 Subtotal 4060 2710 47 015 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 4060 2710 47 0Air required (cfm)Air required (cfm) 88 195 1 0

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 22...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 5 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name System 5 5-Bedroom 22 Exposed wall 143.5 ft 27.0 ft3 Room height 9.0 dft 9.0 heat/coolft4 Room dimensions ft14.0x13.05 Room area 1406.3 ft² 182.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 266 202 995 96 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 43 0 980 572 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 21 21 463 113 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 495 495 2445 235 126 126 622 60

11 GG u factor 300u factor 300 0.3000.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 441 350 1730 166 117 97 479 46

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 77 0 1753 1983 20 0 456 516DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 14 14 160 39 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 90 82 405 39 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 8 0 182 393 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 905 905 1375 760 182 182 277 153FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 502 502 953 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 23 23 43 0 0 0 0 0

6 c) AED excursion 530 130

Envelope loss/gain 11484 4926 1834 905

12 a) Infiltration 3634 352 684 66b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 4 920 1 230Appliances/other 1200 0

Subtotal (lines 6 to 13) 15118 7398 2518 1201

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 0 0 399 72

14 Subtotal 15118 7398 2917 127315 Duct loads 0% 0% 0 0 -0% 0% 0 0

Total room load 15118 7398 2917 1273Air required (cfm)Air required (cfm) 513 513 99 88

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 23...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 5 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 5-Kit-Din-Fam-Ent 5-1/2 Bath2 Exposed wall 43.5 ft 0 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft477.3x1.0 ft7.0x3.55 Room area 477.3 ft² 24.5 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 45 24 119 11 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 21 21 463 113 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 126 126 622 60 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 221 170 838 80 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 37 0 841 951 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 14 14 160 39 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 477 477 907 0 25 25 47 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion 221 0

Envelope loss/gain 3949 1475 47 0

12 a) Infiltration 1102 107 0 0b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 0 0Appliances/other 1200 0

Subtotal (lines 6 to 13) 5051 2782 47 0

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 0 0 0 0

14 Subtotal 5051 2782 47 015 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 5051 2782 47 0Air required (cfm)Air required (cfm) 171 193 2 0

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 24...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 5 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 5-Hallway 5-Bedroom 12 Exposed wall 0 ft 11.5 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft120.5x1.0 ft14.0x11.55 Room area 120.5 ft² 161.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 0 0 0 0 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 104 84 412 40

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 20 0 456 516DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 121 121 183 101 161 161 245 135FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion -3 134

Envelope loss/gain 183 98 1113 825

12 a) Infiltration 0 0 291 28b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 1 230Appliances/other 0 0

Subtotal (lines 6 to 13) 183 98 1404 1083

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution -183 -98 50 27

14 Subtotal 0 0 1454 111015 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 0 0 1454 1110Air required (cfm)Air required (cfm) 0 0 49 77

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 25...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 5 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 5-Wic 1 5-U Bathroom2 Exposed wall 0 ft 0 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft5.0x5.0 ft6.0x10.05 Room area 25.0 ft² 60.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 0 0 0 0 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 25 25 38 21 60 60 91 50FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion -1 -2

Envelope loss/gain 38 20 91 49

12 a) Infiltration 0 0 0 0b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 0 0Appliances/other 0 0

Subtotal (lines 6 to 13) 38 20 91 49

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution -38 -20 71 38

14 Subtotal 0 0 163 8715 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 0 0 163 87Air required (cfm)Air required (cfm) 0 0 6 6

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 26...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 5 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 5-Master Bath 5-U Stairs2 Exposed wall 10.0 ft 7.0 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft6.0x10.0 ft63.0x1.05 Room area 60.0 ft² 63.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 90 82 405 39 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 8 0 182 107 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 0 0 0 0 63 63 311 30

11 GG u factor 300u factor 300 0.3000.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 60 60 91 50 63 63 96 53FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 23 23 43 0 0 0 0 0

6 c) AED excursion -7 -3

Envelope loss/gain 721 189 407 80

12 a) Infiltration 253 25 177 17b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 0 0Appliances/other 0 0

Subtotal (lines 6 to 13) 975 213 584 97

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 10 5 -584 -97

14 Subtotal 984 218 0 015 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 984 218 0 0Air required (cfm)Air required (cfm) 33 15 0 0

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 27...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:System 5 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 5-Master Bedroom 5-M Wic2 Exposed wall 34.5 ft 10.0 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft167.0x1.0 ft66.0x1.05 Room area 167.0 ft² 66.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 131 96 472 45 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 35 0 798 466 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 4.944.94 0.470.47 90 90 445 43 90 90 445 43

11 GG u factor 300u factor 300 0.3000.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 90 82 405 39 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 8 0 182 393 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 167 167 254 140 66 66 100 55FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion 65 -4

Envelope loss/gain 2556 1191 545 94

12 a) Infiltration 874 85 253 25b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 2 460 0 0Appliances/other 0 0

Subtotal (lines 6 to 13) 3429 1736 798 119

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 26 14 249 59

14 Subtotal 3455 1750 1047 17815 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 3455 1750 1047 178Air required (cfm)Air required (cfm) 117 121 36 12

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 28...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:Systen1 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name Systen1 1-Kit-Din-Ent-Fam2 Exposed wall 146.0 ft 56.0 ft3 Room height 9.0 dft 9.0 heat/coolft4 Room dimensions ft477.3x1.05 Room area 1406.3 ft² 477.3 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 266 202 995 96 45 24 119 11. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 43 0 980 572 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 21 21 463 113 21 21 463 113. WW 12F-0sw12F-0sw 0.0650.065 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 441 330 1631 157 221 170 838 80

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 97 0 2209 2499 37 0 841 951DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 14 14 160 39 14 14 160 39

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 608 600 2962 284 239 239 1178 113GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 8 0 182 393 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 905 905 1375 760 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 502 502 953 0 477 477 907 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 23 23 43 0 0 0 0 0

6 c) AED excursion 700 226

Envelope loss/gain 11953 5613 4505 1534

12 a) Infiltration 3697 358 1418 137b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 4 920 0 0Appliances/other 1200 1200

Subtotal (lines 6 to 13) 15650 8091 5923 2871

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 0 0 0 0

14 Subtotal 15650 8091 5923 287115 Duct loads 0% 0% 0 0 -0% 0% 0 0

Total room load 15650 8091 5923 2871Air required (cfm)Air required (cfm) 513 513 194 182

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 29...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:Systen1 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 1-1/2 Bath 1-Bedroom 22 Exposed wall 0 ft 13.0 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft7.0x3.5 ft14.0x13.05 Room area 24.5 ft² 182.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 0 0 0 0 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 117 97 479 46

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 20 0 456 516DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 0 0 0 0 182 182 277 153FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 25 25 47 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion 0 136

Envelope loss/gain 47 0 1212 851

12 a) Infiltration 0 0 329 32b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 1 230Appliances/other 0 0

Subtotal (lines 6 to 13) 47 0 1541 1113

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 0 0 79 43

14 Subtotal 47 0 1620 115515 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 47 0 1620 1155Air required (cfm)Air required (cfm) 2 0 53 73

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 30...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:Systen1 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 1-Bedroom 1 1-Wic 12 Exposed wall 25.5 ft 5.0 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft14.0x11.5 ft5.0x5.05 Room area 161.0 ft² 25.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 0 0 0 0 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 104 64 314 30 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 40 0 912 1032 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 126 126 622 60 45 45 222 21GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 161 161 245 135 25 25 38 21FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion 284 -2

Envelope loss/gain 2093 1541 260 41

12 a) Infiltration 646 63 127 12b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 1 230 0 0Appliances/other 0 0

Subtotal (lines 6 to 13) 2739 1834 387 53

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 224 43 -387 -53

14 Subtotal 2963 1877 0 015 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 2963 1877 0 0Air required (cfm)Air required (cfm) 97 119 0 0

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 31...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:Systen1 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 1-Bathroom 1 1-M Bathroom2 Exposed wall 6.0 ft 16.0 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft6.0x10.0 ft6.0x10.05 Room area 60.0 ft² 60.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 0 0 0 0 90 82 405 39. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 8 0 182 107. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 54 54 267 26 54 54 267 26GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 60 60 91 50 60 60 91 50FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 23 23 43 0

6 c) AED excursion -3 -8

Envelope loss/gain 358 73 988 214

12 a) Infiltration 152 15 405 39b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 0 0Appliances/other 0 0

Subtotal (lines 6 to 13) 510 88 1393 253

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 246 55 10 5

14 Subtotal 756 143 1403 25815 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 756 143 1403 258Air required (cfm)Air required (cfm) 25 9 46 16

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 32...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:Systen1 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 1-Stairs 1-Master Bedroom2 Exposed wall 0 ft 24.5 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft63.0x1.0 ft167.0x1.05 Room area 63.0 ft² 167.0 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 0 0 0 0 131 96 472 45. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 35 0 798 466. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 0 0 0 0 90 82 405 39GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 0 0 0 0 8 0 182 393

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 63 63 96 53 167 167 254 140FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion -2 72

Envelope loss/gain 96 51 2111 1156

12 a) Infiltration 0 0 620 60b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 2 460Appliances/other 0 0

Subtotal (lines 6 to 13) 96 51 2731 1676

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution -96 -51 26 14

14 Subtotal 0 0 2758 169015 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 0 0 2758 1690Air required (cfm)Air required (cfm) 0 0 90 107

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.2021-Jun-08 07:35:29

Right-Suite® Universal 2019 19.0.20 RSU00897 Page 33...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Right-J® WorksheetMay 22 2021Date:Systen1 Max MoraBy:Building #10 5 Plex 5-2Plan:Quality Heating Inc.

1 Room name 1-M Wic 1-Hallway2 Exposed wall 0 ft 0 ft3 Room height 9.0 heat/coolft 9.0 heat/coolft4 Room dimensions ft66.0x1.0 ft120.5x1.05 Room area 66.0 ft² 120.5 ft²

Ty Construction U-value Or HTM Area (ft²) Load Area (ft²) Loadnumber (Btuh/ft²-°F)(Btuh/ft²-°F) (Btuh/ft²)(Btuh/ft²) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh)

Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool

6 WW 12F-0sw12F-0sw 0.0650.065 nn 4.944.94 0.470.47 0 0 0 0 0 0 0 0. GG u factor 300u factor 300 0.3000.300 nn 22.8022.80 13.3113.31 0 0 0 0 0 0 0 0. DD 11P011P0 0.2900.290 nn 22.0422.04 5.365.36 0 0 0 0 0 0 0 0. WW 12F-0sw12F-0sw 0.0650.065 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0

11 GG u factor 300u factor 300 0.3000.300 ee 0.000.00 0.000.00 0 0 0 0 0 0 0 0WW 12F-0sw12F-0sw 0.0650.065 ss 4.944.94 0.470.47 0 0 0 0 0 0 0 0

GG u factor 300u factor 300 0.3000.300 ss 22.8022.80 25.7925.79 0 0 0 0 0 0 0 0DD DftDoor-ADftDoor-A 0.1500.150 ss 11.4011.40 2.782.78 0 0 0 0 0 0 0 0

WW 12F-0sw12F-0sw 0.0650.065 ww 4.944.94 0.470.47 0 0 0 0 0 0 0 0GG u factor 300u factor 300 0.3000.300 ww 22.8022.80 49.1249.12 0 0 0 0 0 0 0 0

CC 16B-50ad16B-50ad 0.0200.020 -- 1.521.52 0.840.84 66 66 100 55 121 121 183 101FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0FF 21A-24t21A-24t 0.0250.025 -- 1.901.90 0.000.00 0 0 0 0 0 0 0 0

6 c) AED excursion -2 -3

Envelope loss/gain 100 54 183 98

12 a) Infiltration 0 0 0 0b) Room ventilation 0 0 0 0

13 Internal gains: Occupants @ 230230 0 0 0 0Appliances/other 0 0

Subtotal (lines 6 to 13) 100 54 183 98

Less external loadLess external load 0 0 0 0Less transferLess transfer 0 0 0 0RedistributionRedistribution 81 43 -183 -98

14 Subtotal 181 97 0 015 Duct loads -0% 0% 0 0 -0% 0% 0 0

Total room load 181 97 0 0Air required (cfm)Air required (cfm) 6 6 0 0

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.

2021-Jun-08 07:35:32Right-Suite® Universal 2019 19.0.20 RSU00897 Page 1

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Loads for Multiple Orientations May 22 2021Date:Entire House Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

)H(34-Daily range (°F)60-Wet bulb (°F)7.515.0Wind speed (mph)

Front Door North Northeast East Southeast South Southwest West Northwest

Sensible Load (Btuh) 51428 40315 30338 40388 46989 42165 34422 47162Latent Load (Btuh) 2106 2106 2106 2106 2106 2106 2106 2106Total Load (Btuh) 53534 42421 32444 42494 49095 44271 36528 49268Heating AVF (cfm) 2298 2298 2298 2298 2298 2298 2298 2298Cooling AVF (cfm) 2565 2565 2565 2565 2565 2565 2565 2565

Building Orientation Cooling Load

Tota

l Coo

ling

Load

(Btu

h)

Direction Front Door faces

0

10000

20000

30000

40000

50000

60000

N NE E SE S SW W NW

Front Door faces WestCurrent Orientation:Front Door faces NorthHighest Cooling Load:

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.

2021-Jun-08 07:35:32Right-Suite® Universal 2019 19.0.20 RSU00897 Page 2

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Loads for Multiple Orientations May 22 2021Date:System 2 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

)H(34-Daily range (°F)60-Wet bulb (°F)7.515.0Wind speed (mph)

Front Door North Northeast East Southeast South Southwest West Northwest

Sensible Load (Btuh) 9800 7880 5903 7762 8970 8046 6549 8900Latent Load (Btuh) 498 498 498 498 498 498 498 498Total Load (Btuh) 10298 8378 6401 8260 9468 8544 7047 9398Heating AVF (cfm) 513 513 513 513 513 513 513 513Cooling AVF (cfm) 513 513 513 513 513 513 513 513

Building Orientation Cooling Load

Tota

l Coo

ling

Load

(Btu

h)

Direction Front Door faces

0

5000

10000

15000

N NE E SE S SW W NW

Front Door faces WestCurrent Orientation:Front Door faces NorthHighest Cooling Load:

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.

2021-Jun-08 07:35:32Right-Suite® Universal 2019 19.0.20 RSU00897 Page 3

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Loads for Multiple Orientations May 22 2021Date:Systen1 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

)H(34-Daily range (°F)60-Wet bulb (°F)7.515.0Wind speed (mph)

Front Door North Northeast East Southeast South Southwest West Northwest

Sensible Load (Btuh) 11574 8834 6433 8792 10343 9285 7606 10597Latent Load (Btuh) 302 302 302 302 302 302 302 302Total Load (Btuh) 11876 9136 6735 9094 10645 9587 7907 10899Heating AVF (cfm) 513 513 513 513 513 513 513 513Cooling AVF (cfm) 513 513 513 513 513 513 513 513

Building Orientation Cooling Load

Tota

l Coo

ling

Load

(Btu

h)

Direction Front Door faces

0

5000

10000

15000

N NE E SE S SW W NW

Front Door faces WestCurrent Orientation:Front Door faces NorthHighest Cooling Load:

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.

2021-Jun-08 07:35:32Right-Suite® Universal 2019 19.0.20 RSU00897 Page 4

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Loads for Multiple Orientations May 22 2021Date:System 3 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

)H(34-Daily range (°F)60-Wet bulb (°F)7.515.0Wind speed (mph)

Front Door North Northeast East Southeast South Southwest West Northwest

Sensible Load (Btuh) 9773 7736 5847 7810 9064 8119 6605 9062Latent Load (Btuh) 498 498 498 498 498 498 498 498Total Load (Btuh) 10271 8234 6345 8308 9562 8617 7103 9560Heating AVF (cfm) 513 513 513 513 513 513 513 513Cooling AVF (cfm) 513 513 513 513 513 513 513 513

Building Orientation Cooling Load

Tota

l Coo

ling

Load

(Btu

h)

Direction Front Door faces

0

5000

10000

15000

N NE E SE S SW W NW

Front Door faces WestCurrent Orientation:Front Door faces NorthHighest Cooling Load:

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.

2021-Jun-08 07:35:32Right-Suite® Universal 2019 19.0.20 RSU00897 Page 5

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Loads for Multiple Orientations May 22 2021Date:System 5 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

)H(34-Daily range (°F)60-Wet bulb (°F)7.515.0Wind speed (mph)

Front Door North Northeast East Southeast South Southwest West Northwest

Sensible Load (Btuh) 10122 8085 6196 8159 9413 8468 6954 9411Latent Load (Btuh) 310 310 310 310 310 310 310 310Total Load (Btuh) 10432 8396 6506 8469 9723 8779 7264 9721Heating AVF (cfm) 513 513 513 513 513 513 513 513Cooling AVF (cfm) 513 513 513 513 513 513 513 513

Building Orientation Cooling Load

Tota

l Coo

ling

Load

(Btu

h)

Direction Front Door faces

0

5000

10000

15000

N NE E SE S SW W NW

Front Door faces WestCurrent Orientation:Front Door faces NorthHighest Cooling Load:

PDF created with pdfFactory trial version www.pdffactory.com

Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.

2021-Jun-08 07:35:32Right-Suite® Universal 2019 19.0.20 RSU00897 Page 6

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Loads for Multiple Orientations May 22 2021Date:System 4 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

Design ConditionsLocation: CoolingHeatingIndoor:

7570Indoor temperature (°F)Idaho Falls, ID, US1476Design TD (°F)ft4741Elevation:5050Relative humidity (%)°N44Latitude:

Outdoor: -31.561.5Moisture difference (gr/lb)CoolingHeatingInfiltration:89-6Dry bulb (°F)

)H(34-Daily range (°F)60-Wet bulb (°F)7.515.0Wind speed (mph)

Front Door North Northeast East Southeast South Southwest West Northwest

Sensible Load (Btuh) 10159 8108 5958 7891 9199 8246 6708 9193Latent Load (Btuh) 498 498 498 498 498 498 498 498Total Load (Btuh) 10657 8606 6456 8389 9697 8744 7206 9691Heating AVF (cfm) 246 246 246 246 246 246 246 246Cooling AVF (cfm) 513 513 513 513 513 513 513 513

Building Orientation Cooling Load

Tota

l Coo

ling

Load

(Btu

h)

Direction Front Door faces

0

5000

10000

15000

N NE E SE S SW W NW

Front Door faces WestCurrent Orientation:Front Door faces NorthHighest Cooling Load:

PDF created with pdfFactory trial version www.pdffactory.com

Job #: M - 052221Performed by Max Mora for:

Roth Properties 2015 IECBuilding #10 5 Plex 5-2 Olive Plaza

Quality Heating Inc. Scale: 1 : 220Page 1

Right-Suite® Universal 201919.0.20 RSU00897

2021-Jun-08 07:35:59...10 5 Plex 5-2 Olive Plaza.rup

N

Upper Floor

2-Bedroom 2 2-Bedroom 1

2-Wic 1

2-U-Bathroom

2-Master Bathroom

2-U-Stairs

2-Master Bedroom

2-Master Wic

2-Hallway

1-Bedroom 21-Bedroom 1

1-Wic 1

1-Bathroom 1

1-M Bathroom

1-Stairs

1-Master Bedroom

1-M Wic

1-Hallway

3-Bedroom 23-Bedroom 1

3-Wic 1

3-Bathroom 1

3-Master Wic

3- U Stairs

3-Master Bedroom

3-M Wic

3-Hallway

4-Bedroom 1 4-Bedroom 2

4-Wic 1

4-U Bathroom

4-Master Bath

4-U Stairs

4-Master Bedroom

4-M Wic

4-Hallway

5-Bedroom 25-Bedroom 1

5-Wic 1

5-U Bathroom

5-Master Bath

5-U Stairs

5-Master Bedroom

5-M Wic

5-Hallway

14 x 614 x 6

14 x 6

6 cfm

14 x 6

14 x 6

14 x 6

107 cfm

46 cfm

25 cfm

14 x 6

14 x 6 14 x 6

14 x 6

14 x 6 14 x 6

45 cfm

126 cfm

8 cfm

125 cfm

81 cfm

45 cfm

84 cfm

8 cfm

7 cfm

14 x 614 x 6

14 x 6

113 cfm 121 cfm

7 cfm 36 cfm

84 cfm 92 cfm 99 cfm

33 cfm

6 cfm

14 x 6

14 x 6 14 x 614 x 614 x 6

14 x 6

21 cfm

6 cfm

77 cfm82 cfm85 cfm73 cfm119 cfm

7 cfm

PDF created with pdfFactory trial version www.pdffactory.com

Job #: M - 052221Performed by Max Mora for:

Roth Properties 2015 IECBuilding #10 5 Plex 5-2 Olive Plaza

Quality Heating Inc. Scale: 1 : 220Page 2

Right-Suite® Universal 201919.0.20 RSU00897

2021-Jun-08 07:35:59...10 5 Plex 5-2 Olive Plaza.rup

N

Main Floor

2 Kit-Din-Fam-Ent

2-1/2 Bath2-M Stairs

Garage 2

1-Kit-Din-Ent-Fam

1-1/2 Bath1-M Stairs

Garage 1

3-Kit-Din-Fam-Ent

3-1/2 Bath3-M Stairs

Garage 3

4-Kit-Din-Fam-Ent

4-1/2 Bath4-M Stairs

Garage 4

5-Kit-Din-Fam-Ent

5-1/2 Bath5-M Stairs

Garage 5

65 cfm65 cfm

65 cfm

2 cfm

513 cfm 513 cfm

6 "

6 "6 "

6 "

6 "

6 "

6 "20 x 8

6 "

513 cfm

2 cfm

66 cfm

66 cfm

66 cfm

2 cfm

65 cfm

65 cfm

65 cfm

1 cfm 2 cfm

97 cfm 96 cfm

16 x 8

16 x 8

6 " 6 "

6 "

16 x 8

6 "

6 "

6 "

6 "

6 "

6 "

6 "

6 "

6 "

6 "

6 "

20 x 8

6 "

6 "

6 "

6 "

6 "16 x 8

16 x 8

16 x 8

6 "

6 "

6 "

16 x 8

6 "

6 "

6 "

6 "

6 "

6 "

6 "

16 x 8

6 "

16 x 8

513 cfm

20 x 8

513 cfm

6 "

6 " 97 cfm

6 "

6 "96 cfm

6 "16 x 8

6 "6 "

6 "

6 "6 "6 "6 "6 "

16 x 86 "

20 x 8 20 x 8

PDF created with pdfFactory trial version www.pdffactory.com

Bold/italic values have been manually overridden

2021-Jun-08 07:35:35Right-Suite® Universal 2019 19.0.20 RSU00897 Page 1

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Duct System Summary May 22 2021Date:System 2 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

CoolingHeatingExternal static pressure in H2O0.80in H2O0.80Pressure losses in H2O0.37in H2O0.37Available static pressure in H2O0.43in H2O0.43Supply / return available pressure 0.262 / 0.168 in H2O in H2O0.262 / 0.168Lowest friction rate in/100ft0.092in/100ft0.092Actual air flow cfm513cfm513Total effective length (TEL) ft466

Supply Branch Detail Table

Design Htg Clg Design Diam H x W Duct Actual Ftg.EqvName (Btuh) (cfm) (cfm) FR (in) (in) Matl Ln (ft) Ln (ft) Trunk

st4A245.039.0ShMt0x06.00.0926662903c2 Kit-Din-Fam-Ent

st4B200.019.5ShMt0x06.00.1196662903c2 Kit-Din-Fam-Ent-A

st4160.028.0ShMt0x06.00.1396662903c2 Kit-Din-Fam-Ent-B

st4A180.024.5ShMt0x06.00.1280247h2-1/2 Bath

st4A190.038.0ShMt0x06.00.11582661117c2-Bedroom 1

st4180.026.0ShMt0x06.00.12785741160c2-Bedroom 2

st4A180.026.0ShMt0x06.00.1271645984h2-Master Bathroom

st4170.024.0ShMt0x06.00.1351161262758h2-Master Bedroom

st4190.09.5ShMt0x06.00.13178181h2-Master Wic

st4A200.019.0ShMt0x06.00.12067163h2-U-Bathroom

Supply Trunk Detail Table

Trunk Htg Clg Design Veloc Diam H x W DuctName Type (cfm) (cfm) FR (fpm) (in) (in) Material Trunk

st4B Peak AVF 62 66 0.119 339 6.0 0x0 ShtMetl st4Ast4A Peak AVF 244 238 0.092 274 8.5 16x8 ShtMetl st4st4 Peak AVF 513 513 0.092 577 11.3 16x8 ShtMetl

PDF created with pdfFactory trial version www.pdffactory.com

Bold/italic values have been manually overridden

2021-Jun-08 07:35:35Right-Suite® Universal 2019 19.0.20 RSU00897 Page 2

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

Return Branch Detail Table

Grille Htg Clg TEL Design Veloc Diam H x W Stud/Joist DuctName Size (in) (cfm) (cfm) (ft) FR (fpm) (in) (in) Opening (in) Matl Trunk

rb1 0x 5130 513 182.0 0.092 462 8.0 x8 20 ShMt

PDF created with pdfFactory trial version www.pdffactory.com

Bold/italic values have been manually overridden

2021-Jun-08 07:35:35Right-Suite® Universal 2019 19.0.20 RSU00897 Page 3

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Duct System Summary May 22 2021Date:System 3 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

CoolingHeatingExternal static pressure in H2O0.80in H2O0.80Pressure losses in H2O0.37in H2O0.37Available static pressure in H2O0.43in H2O0.43Supply / return available pressure 0.324 / 0.106 in H2O in H2O0.324 / 0.106Lowest friction rate in/100ft0.114in/100ft0.114Actual air flow cfm513cfm513Total effective length (TEL) ft378

Supply Branch Detail Table

Design Htg Clg Design Diam H x W Duct Actual Ftg.EqvName (Btuh) (cfm) (cfm) FR (in) (in) Matl Ln (ft) Ln (ft) Trunk

st3B255.023.5ShMt0x06.00.1160247h3-1/2 Bath

st3B265.020.0ShMt0x06.00.11467163h3-Bathroom 1

st3A235.038.0ShMt0x06.00.11981661108c3-Bedroom 1

st3160.026.5ShMt0x06.00.17484741150c3-Bedroom 2

st3A245.037.5ShMt0x06.00.1156562895c3-Kit-Din-Fam-Ent

st3B265.020.0ShMt0x06.00.1146562895c3-Kit-Din-Fam-Ent-A

st3170.026.0ShMt0x06.00.1656562895c3-Kit-Din-Fam-Ent-B

st3180.09.0ShMt0x06.00.17278181h3-M Wic

st3160.022.5ShMt0x06.00.1781231252758h3-Master Bedroom

st3B255.025.5ShMt0x06.00.1161645984h3-Master Wic

Supply Trunk Detail Table

Trunk Htg Clg Design Veloc Diam H x W DuctName Type (cfm) (cfm) FR (fpm) (in) (in) Material Trunk

st3 Peak AVF 513 513 0.114 577 9.3 16x8 ShtMetlst3A Peak AVF 244 234 0.114 274 7.1 16x8 ShtMetl st3st3B Peak AVF 116 88 0.114 131 5.4 16x8 ShtMetl st3A

PDF created with pdfFactory trial version www.pdffactory.com

Bold/italic values have been manually overridden

2021-Jun-08 07:35:35Right-Suite® Universal 2019 19.0.20 RSU00897 Page 4

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

Return Branch Detail Table

Grille Htg Clg TEL Design Veloc Diam H x W Stud/Joist DuctName Size (in) (cfm) (cfm) (ft) FR (fpm) (in) (in) Opening (in) Matl Trunk

rb17 0x 5130 513 93.0 0.114 462 10.0 x8 20 ShMt

PDF created with pdfFactory trial version www.pdffactory.com

Bold/italic values have been manually overridden

2021-Jun-08 07:35:35Right-Suite® Universal 2019 19.0.20 RSU00897 Page 5

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Duct System Summary May 22 2021Date:System 4 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

CoolingHeatingExternal static pressure in H2O0.80in H2O0.80Pressure losses in H2O0.37in H2O0.37Available static pressure in H2O0.43in H2O0.43Supply / return available pressure 0.327 / 0.103 in H2O in H2O0.327 / 0.103Lowest friction rate in/100ft0.111in/100ft0.111Actual air flow cfm513cfm246Total effective length (TEL) ft389

Supply Branch Detail Table

Design Htg Clg Design Diam H x W Duct Actual Ftg.EqvName (Btuh) (cfm) (cfm) FR (in) (in) Matl Ln (ft) Ln (ft) Trunk

st1A275.020.0ShMt0x06.00.1110147h4-1/2 Bath

st1170.026.5ShMt0x06.00.16684351161c4-Bedroom 1

st1A245.039.0ShMt0x06.00.11592331283c4-Bedroom 2

st1170.026.5ShMt0x06.00.16697441355c4-Kit-Din-Fam-Ent

st1B200.020.0ShMt0x06.00.14897441355c4-Kit-Din-Fam-Ent-A

st1180.09.5ShMt0x06.00.1727497c4-M Wic

st1A265.024.0ShMt0x06.00.1131621984h4-Master Bath

st1235.023.0ShMt0x06.00.127113601578c4-Master Bedroom

st1A255.020.0ShMt0x06.00.1196488c4-U Bathroom

Supply Trunk Detail Table

Trunk Htg Clg Design Veloc Diam H x W DuctName Type (cfm) (cfm) FR (fpm) (in) (in) Material Trunk

st1A Peak AVF 103 212 0.111 238 6.8 16x8 ShtMetl st1st1B Peak AVF 44 97 0.148 496 6.0 0x0 ShtMetl st1Ast1 Peak AVF 246 513 0.111 578 9.5 16x8 ShtMetl

PDF created with pdfFactory trial version www.pdffactory.com

Bold/italic values have been manually overridden

2021-Jun-08 07:35:35Right-Suite® Universal 2019 19.0.20 RSU00897 Page 6

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

Return Branch Detail Table

Grille Htg Clg TEL Design Veloc Diam H x W Stud/Joist DuctName Size (in) (cfm) (cfm) (ft) FR (fpm) (in) (in) Opening (in) Matl Trunk

rb46 0x 2460 513 93.5 0.111 462 9.5 x8 20 ShMt

PDF created with pdfFactory trial version www.pdffactory.com

Bold/italic values have been manually overridden

2021-Jun-08 07:35:35Right-Suite® Universal 2019 19.0.20 RSU00897 Page 7

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Duct System Summary May 22 2021Date:System 5 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

CoolingHeatingExternal static pressure in H2O0.80in H2O0.80Pressure losses in H2O0.37in H2O0.37Available static pressure in H2O0.43in H2O0.43Supply / return available pressure 0.341 / 0.089 in H2O in H2O0.341 / 0.089Lowest friction rate in/100ft0.095in/100ft0.095Actual air flow cfm513cfm513Total effective length (TEL) ft451

Supply Branch Detail Table

Design Htg Clg Design Diam H x W Duct Actual Ftg.EqvName (Btuh) (cfm) (cfm) FR (in) (in) Matl Ln (ft) Ln (ft) Trunk

st2A310.022.5ShMt0x06.00.1030247h5-1/2 Bath

st2235.038.0ShMt0x06.00.12577491110c5-Bedroom 1

st2170.026.5ShMt0x06.00.17488992917h5-Bedroom 2

st2A320.038.0ShMt0x06.00.09596861391c5-Kit-Din-Fam-Ent

st2B330.020.0ShMt0x06.00.09896861391c5-Kit-Din-Fam-Ent-A

st2180.010.0ShMt0x06.00.18012361047h5-M Wic

st2A310.025.0ShMt0x06.00.1021533984h5-Master Bath

st2170.022.5ShMt0x06.00.1771211171750c5-Master Bedroom

st2235.019.0ShMt0x06.00.1346687c5-U Bathroom

Supply Trunk Detail Table

Trunk Htg Clg Design Veloc Diam H x W DuctName Type (cfm) (cfm) FR (fpm) (in) (in) Material Trunk

st2 Peak AVF 513 513 0.095 577 9.9 16x8 ShtMetlst2A Peak AVF 206 208 0.095 234 7.0 16x8 ShtMetl st2st2B Peak AVF 86 96 0.098 491 6.0 0x0 ShtMetl st2A

PDF created with pdfFactory trial version www.pdffactory.com

Bold/italic values have been manually overridden

2021-Jun-08 07:35:35Right-Suite® Universal 2019 19.0.20 RSU00897 Page 8

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

Return Branch Detail Table

Grille Htg Clg TEL Design Veloc Diam H x W Stud/Joist DuctName Size (in) (cfm) (cfm) (ft) FR (fpm) (in) (in) Opening (in) Matl Trunk

rb37 0x 5130 513 93.0 0.095 462 12.0 x8 20 ShMt

PDF created with pdfFactory trial version www.pdffactory.com

Bold/italic values have been manually overridden

2021-Jun-08 07:35:35Right-Suite® Universal 2019 19.0.20 RSU00897 Page 9

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

M - 052221Job:Duct System Summary May 22 2021Date:Systen1 Max MoraBy:

Building #10 5 Plex 5-2Plan:Quality Heating Inc.

Project InformationRoth Properties 2015 IECFor:Building #10 5 Plex 5-2 Olive Plaza

CoolingHeatingExternal static pressure in H2O0.80in H2O0.80Pressure losses in H2O0.37in H2O0.37Available static pressure in H2O0.43in H2O0.43Supply / return available pressure 0.308 / 0.122 in H2O in H2O0.308 / 0.122Lowest friction rate in/100ft0.134in/100ft0.134Actual air flow cfm513cfm513Total effective length (TEL) ft320

Supply Branch Detail Table

Design Htg Clg Design Diam H x W Duct Actual Ftg.EqvName (Btuh) (cfm) (cfm) FR (in) (in) Matl Ln (ft) Ln (ft) Trunk

st5170.020.5ShMt0x06.00.1620247h1-1/2 Bath

st5A190.019.5ShMt0x06.00.147925756h1-Bathroom 1

st5A170.039.0ShMt0x06.00.147119971877c1-Bedroom 1

st5180.026.0ShMt0x06.00.14973531155c1-Bedroom 2

st5205.024.0ShMt0x06.00.13461651974h1-Kit-Din-Ent-Fam

st5160.037.5ShMt0x06.00.15661651974h1-Kit-Din-Ent-Fam-A

st5B135.019.0ShMt0x06.00.20061651974h1-Kit-Din-Ent-Fam-B

st5A180.025.5ShMt0x06.00.15016461403h1-M Bathroom

st5195.09.5ShMt0x06.00.1506697c1-M Wic

st5190.022.5ShMt0x06.00.145107901690c1-Master Bedroom

Supply Trunk Detail Table

Trunk Htg Clg Design Veloc Diam H x W DuctName Type (cfm) (cfm) FR (fpm) (in) (in) Material Trunk

st5 Peak AVF 513 513 0.134 577 10.1 16x8 ShtMetlst5A Peak AVF 233 205 0.147 262 7.4 16x8 ShtMetl st5st5B Peak AVF 65 61 0.200 330 6.0 0x0 ShtMetl st5A

PDF created with pdfFactory trial version www.pdffactory.com

Bold/italic values have been manually overridden

2021-Jun-08 07:35:35Right-Suite® Universal 2019 19.0.20 RSU00897 Page 10

...221 Building #10 5 Plex 5-2 Olive Plaza.rup Calc = MJ8 Front Door faces: W

Return Branch Detail Table

Grille Htg Clg TEL Design Veloc Diam H x W Stud/Joist DuctName Size (in) (cfm) (cfm) (ft) FR (fpm) (in) (in) Opening (in) Matl Trunk

rb2 0x 5130 513 91.0 0.134 462 10.1 x8 20 ShMt

PDF created with pdfFactory trial version www.pdffactory.com