Ⅲ Construction Progress of Samcheok Plant
2Introduction of KOSPOⅠ
Transmission & Distribution
Generation
Korean GovernmentKorean Government
(100%) (100%) (100%) (100%) (100%) (100%)
(51%)
Thermal & Renewable
KOSEP
Thermal & Renewable
KOMIPO
Thermal & Renewable
WP
PrimaryShareholder
Thermal & Renewable
EWP
Nuclear & Hydro
KHNP
Thermal & Renewable
KOSPO
Ownership StructureOwnership Structure
5Introduction of KOSPOⅠ
Committed Future CapacityCommitted Future Capacity
• 1,000MW x 2 CFBC Boiler- World-largest Capacity- Low-calorific Coal
Location of the Samcheok PlantLocation of the Samcheok Plant
Introduction of SamcheokⅠ
Before construction
Area2.6million m2 (Land1.6million m2 + Sea1million m2)
6
Under construction
Supercritical 2Boiler 1TBN Combined
Introduction of SamcheokⅠ
1,000MW Steam Turbine 1,000MW Steam Turbine
CFBC500MW
CFBC500MW
CFBC500MWCFBC500MW
Capacity 2,000MW (1000MWⅩ2)
World’s First 2BLR + 1TBN
Steam Condition 255.5bar /603℃
1,000MW Turbine Toshiba
Once Through CFBC Foster Wheeler
Samcheok Green Power PlantSamcheok Green Power Plant
7
Introduction of SamcheokⅠ8
Unit 1A BoilerUnit 1B BoilerUnit 2A BoilerUnit 2B Boiler
Unit 1TurbineUnit 2 Turbine Electric Building
2 Boiler : 1 Turbine Configuration2 Boiler : 1 Turbine Configuration
Unit1 BoilerUnit1 BoilerCoal ShedCoal Shed
Unit1 TurbineUnit1 Turbine
Control Room with StackControl Room with Stack
Coal Unloading DockCoal Unloading Dock
(Unit 3, 4)(Unit 3, 4)
Small Hydro Power Equip.Small Hydro Power Equip.
Unit2 BoilerUnit2 Boiler
Unit2 TurbineUnit2 Turbine
Aerial view of the Samcheok Green Power
Introduction of SamcheokⅠ9
Elevation Drawing3D Model
10
Samcheok CFBC BoilerSamcheok CFBC Boiler
Furnace
Primary Air Fan Secondary Air FanBottom Ash Handling
Intrex RHIntrex SH
Cross Over Duct
SeparatorSeparator
Eco.
SH
Start-up Burner
Platen SH
RH
RAPH
RH
SCR
USC, Once-Through CFBC Boiler Benson type, Vertical Tube Furnace4 coal silo, 8 Cyclone, 8 Intrex(4 SH, 4 RH)
Design ConceptⅡ
11
Boiler Water-Steam SystemBoiler Water-Steam System
: Economizer System
: Evaporator System
: SuperHeater System
: ReHeater System
Design ConceptⅡ
Tandem Compound, Reheat Condensing Type
HP 1xDouble Flow+8, IP 9x2 Flow, LP 6x4F, Turbine Efficiency 48.72%
Guaranteed Rating : 1,100MW (Nominal Rating : 1,022MW)
LSB 48”
Ti-6Al-4V
(1219.2㎜)
12
Samcheok Turbine GeneratorSamcheok Turbine Generator
HPIP
LP-ALP-B
1,000MW Steam Turbine
Design ConceptⅡ
Samcheok Plant Unique DesignSamcheok Plant Unique Design
13
365m
Water supply
Water pondUnderground Channel
Plant
Reclamation
Cement
No Ash Pond Non Visible Coal Yard
New water Supply System Multi–use Complex
Sea
Desalination
Facility
Storage Tank Plant
desalination
Mine Backfill
Design ConceptⅡ
Unique & Eco-Friendly DesignⅡ
Typical Coal Power Plant
Ash is 10~15% Coal ByproductEnvironmentally Unfriendly
Disposal of Ash Waste
No Ash PondNo Ash Pond
14
TypicalSamcheok
New water Supply SystemNew water Supply System
Expensive, Impact on environment
New Dam Construction
Unique & Eco-Friendly DesignⅡ17
Reclamation of retention basin discharge
Water supply
Water pondUnderground Channel
Plant
Seawater desalination
Sea
Desalination Facility
Storage Tank
Plant
Unique & Eco-Friendly DesignⅡ
Viewing Deck
New Concept Green Building
Cafeteria OfficeControl Room
Multi-use Complex Multi-use Complex
18
Constant Pressure Operation
Throttling Loss , Thermal Stress , Startup Time , Efficiency
⇒ Modified Sliding Pressure Operation
Operation ConceptOperation Concept
35000
0
Variable Pressure Program Of Supercritical Boilers
20 40 60 80 100
Main
Turb
ine T
hro
ttle
Pre
ssure
PSIG
3000
2000
1000
1 2 3 4
① Constant Pressure ②③ Modified Sliding Pressure④ Sliding Pressure
Samcheok Green Power
14Design ConceptⅡ
2nd Boiler
1st Boiler Serviced( 2nd Boiler Bypass)
1st & 2nd Boiler Tie-in (connecting)
1st & 2nd Boiler Parallel Operation
Startup Operation ConceptStartup Operation Concept
15Design ConceptⅡ
Construction MilestonesConstruction Milestones
Samcheok Construction ProgressⅢ
Notable Dates12.06.01
13.02.15
13.11.06
14.06.28
15.02.15
15.12.15
Start of Excavation
Start of Steel Structure Erection
Pressure Parts Installation
Power Receiving
Hydro Test
1st Firing
100
98
96
94
92
90
88
86
84
82Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
2015 2016
Total Progress
Actual Progress ('15.10)
94.25% Actual Progress ('15.10)
94.25%
17
18
Samcheok Site Aerial View(`15.10 Current State)Samcheok Site Aerial View(`15.10 Current State)
#1,2 Boiler
#1 EP
Control Room with Stack
Coal Shed
Desalination Plant
Coal Dock
Switchyard
EL.(+)10.0m
EL.(+)40.0m
EL.(+)70.0m
Samcheok Construction ProgressⅢ
Boiler Construction StatusBoiler Construction Status
19Samcheok Construction ProgressⅣ
Actual / Planned % Complete
Design 2.49 / 2.50 99.64%
Procurement 74.17 / 74.17 100.00%
Construction 15.23 / 20.28 75.08%
Total 91.89 / 96.94 94.79%
Boiler Progress Stage (Oct. 2015)
2011 2012 2013 2014 2015 2016 2017
06.29 08.03 02.15 09.15 04.18 12.15 01.01 06.30 10.30
BLRAward
Start of 1st BLR
Excavation
Start Steel
Structure
BLR Tube Installation
1st BLRHydro Test
Initial FiringSteam
BlowingUnit 1 COD Unit 2 COD
Boiler Construction Milestones
20Samcheok Construction ProgressⅣ
Boiler Front View(Oct. 2015)Boiler Front View(Oct. 2015)
Unit 1 Progress : 84.54% Unit 2 Progress : 69.96%
Unit 1 #A,B Boiler Unit 2 #A,B Boiler
Boiler Construction StatusBoiler Construction Status
Pendent SH
Convection SH RH Coil
Furnace Lower Part
Main Steam Pipe
21Samcheok Construction ProgressⅢ
Turbine Construction StatusTurbine Construction Status
22
#1 Steam Turbine Area #2 Steam Turbine Area
#1 Lube Oil Cooler Permanent PipingRestoration Work
#2 HP Turbine Bolt Remove for Tops-off Work
Samcheok Construction ProgressⅢ
BOP Construction StatusBOP Construction Status
CSU
Coal Shed Coal Handling Equipment
Stacking Tripper
23Samcheok Construction ProgressⅢ
BOP Construction StatusBOP Construction Status
Limestone Silo
Ash SiloLimestone CSU
EP
24Samcheok Construction ProgressⅢ
25
Commissioning ScheduleCommissioning Schedule
BLR AcidCleaning
Material System
DraftSystem
SteamSystem
Coal HandlingSystem
Duct, Damper TestFan No Load Test
11/15
10/26 11/15 11/25
Fan Load Test Air Balance TestDraft Sys. Tuning
Simulation Test(Purge I/T, Burner)
BLR Alkali CleaningInstall Piping(for Acid Cleaning) BLR Flushing
Coal Unloading & Coal Storage System Test Coal Feeder Test
Ash, Limestone, Bed Material Handling System TestDe-NOx Test
10/26 11/25
Critical Path
Initial Firing
Install Piping(for Steam Blowing)
12/3 12/9 12/15
BCP TestSteam Blowing
RefractoryDry-out
FludizingTest
12/30 1/24 1/29
Catalyst
2/13
TBN Bypass OperationSVP Test
2/20Steamto TBN
6/30CommercialOperation
Samcheok Construction ProgressⅢ