Product Case HistoryPROJECT DESCRIPTION:Ash silo needed to have existingcoating removed and new coatingsystem applied. The spec originallycalled for a Tnemec system. Sprayingwas not an option on this project.We were able to come up with asystem that would provide excellentprotection yet be applied with brushand roller. The owner liked the factthat we could tint the Carboguard 60to the same color as the finish coat.
COATING SELECTIONEXPLANATION:Carbomastic 15, Carboguard 60, andCarbothane 134 HG
www.carboline.com July 2018
Iowa State UniversityPowerhouseLOCATION: Ames, IA, United States
DATE OF APPLICATION: July 2016
MARKET: Power - Conventional
TYPE: Maintenance
OWNER: Iowa State University
PROJECT SIZE: 80 Gallons
Iowa State University Powerhouse
www.carboline.com July 2018
AREA COATED: Ash Silo
SUBSTRATE: Ferrous Metal (Carbon Steel)
EXPOSURE: Exterior Weathering - moderate industrialexposure - chemical environment
SURFACE PREP: SSPC-SP 6 (Commercial Blast)
PRODUCTS: Carbomastic 15, Carboguard 60, Carbothane134 HG